33 U.S.C. § 2280 — Maximum cost of projects

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2280 — Maximum cost of projects

Page 757 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2280 ‘‘(F) regularly monitor and audit each eligible project being constructed by an Indian Tribe under this section to ensure that the construction activi- ties are carried out in compliance with the plans approved by the Secretary and that the construc- tion costs are reasonable. ‘‘(2) DETAILED PROJECT SCHEDULE.—Not later than 180 days after entering into an agreement under para- graph (1)(D), each Indian Tribe, to the maximum ex- tent practicable, shall submit to the Secretary a de- tailed project schedule, based on estimated funding levels, that lists all deadlines for each milestone in the construction of the eligible project. ‘‘(3) TECHNICAL ASSISTANCE.—On the request of an Indian Tribe, the Secretary may provide technical as- sistance to the Indian Tribe, if the Indian Tribe con- tracts with and compensates the Secretary for the technical assistance relating to— ‘‘(A) any study, engineering activity, and design activity for construction carried out by the Indian Tribe under this section; and ‘‘(B) expeditiously obtaining any permits nec- essary for the eligible project. ‘‘(e) COST SHARE.—Nothing in this section affects the cost-sharing requirement applicable on the day before the date of enactment of this Act to an eligible project carried out under this section. ‘‘(f) IMPLEMENTATION GUIDANCE.— ‘‘(1) IN GENERAL.—Not later than 120 days after the date of enactment of this Act, the Secretary shall issue guidance for the implementation of the pilot program under this section that, to the extent prac- ticable, identifies— ‘‘(A) the metrics for measuring the success of the pilot program; ‘‘(B) a process for identifying future eligible projects to participate in the pilot program; ‘‘(C) measur

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2280

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: c98ed6c745383ed5502de8e82888bd70347b35deeb222c987073065c4e695a07. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-b387c98d3b8fc3bfdae55d25
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2280-maximum-cost-of-projects--0ce3de524b.md
Pages: Not recorded – Not recorded
Passage SHA-256: 1bda1bb1f1ae60e78f927750510c0486928350beae3b59bbef9caca727e249ab

Source location: USCODE-2024-title33-chap36-subchapV-sec2280.pdf

Stored source content

Page 757 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2280 ‘‘(F) regularly monitor and audit each eligible project being constructed by an Indian Tribe under this section to ensure that the construction activi- ties are carried out in compliance with the plans approved by the Secretary and that the construc- tion costs are reasonable. ‘‘(2) DETAILED PROJECT SCHEDULE.—Not later than 180 days after entering into an agreement under para- graph (1)(D), each Indian Tribe, to the maximum ex- tent practicable, shall submit to the Secretary a de- tailed project schedule, based on estimated funding levels, that lists all deadlines for each milestone in the construction of the eligible project. ‘‘(3) TECHNICAL ASSISTANCE.—On the request of an Indian Tribe, the Secretary may provide technical as- sistance to the Indian Tribe, if the Indian Tribe con- tracts with and compensates the Secretary for the technical assistance relating to— ‘‘(A) any study, engineering activity, and design activity for construction carried out by the Indian Tribe under this section; and ‘‘(B) expeditiously obtaining any permits nec- essary for the eligible project. ‘‘(e) COST SHARE.—Nothing in this section affects the cost-sharing requirement applicable on the day before the date of enactment of this Act to an eligible project carried out under this section. ‘‘(f) IMPLEMENTATION GUIDANCE.— ‘‘(1) IN GENERAL.—Not later than 120 days after the date of enactment of this Act, the Secretary shall issue guidance for the implementation of the pilot program under this section that, to the extent prac- ticable, identifies— ‘‘(A) the metrics for measuring the success of the pilot program; ‘‘(B) a process for identifying future eligible projects to participate in the pilot program; ‘‘(C) measures to address the risks of an Indian Tribe constructing eligible projects under the pilot program, including which entity bears the risk for eligible projects that fail to meet Corps of Engi- neers standards for design or quality; ‘‘(D) the laws and regulations that an Indian Tribe must follow in carrying out an eligible project under the pilot program; and ‘‘(E) which entity bears the risk in the event that an eligible project carried out under the pilot pro- gram fails to be carried out in accordance with the project authorization or this section. ‘‘(2) NEW PROJECT PARTNERSHIP AGREEMENTS.—The Secretary may not enter into a project partnership agreement under this section until the date on which the Secretary issues the guidance under paragraph (1). ‘‘(g) REPORT.— ‘‘(1) IN GENERAL.—Not later than 3 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transpor- tation and Infrastructure of the House of Representa- tives and make publicly available a report detailing the results of the pilot program under this section, including— ‘‘(A) a description of the progress of Indian Tribes in meeting milestones in detailed project schedules developed pursuant to subsection (d)(2); and ‘‘(B) any recommendations of the Secretary con- cerning whether the pilot program or any compo- nent of the pilot program should be implemented on a national basis. ‘‘(2) UPDATE.—Not later than 5 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives an update to the report under paragraph (1). ‘‘(3) FAILURE TO MEET DEADLINE.—If the Secretary fails to submit a report by the required deadline under this subsection, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a de- tailed explanation of why the deadline was missed and a projected date for submission of the report. ‘‘(h) ADMINISTRATION.—All laws and regulations that would apply to the Secretary if the Secretary were car- rying out the eligible project shall apply to an Indian Tribe carrying out an eligible project under this sec- tion. ‘‘(i) TERMINATION OF AUTHORITY.—The authority to commence an eligible project under this section termi- nates on December 31, 2029. ‘‘(j) AUTHORIZATION OF APPROPRIATIONS.—In addition to any amounts appropriated for a specific eligible project, there is authorized to be appropriated to the Secretary to carry out this section, including the costs of administration of the Secretary, $15,000,000 for each of fiscal years 2024 through 2029.’’ ‘‘SECRETARY’’ DEFINED Secretary means the Secretary of the Army, see sec- tion 2 of Pub. L. 106–541, set out as a note under section 2201 of this title. § 2270. Subsurface drain systems research and development Subject to the availability of appropriations, the Secretary, acting through the Director of the Engineer Research and Development Center and, where appropriate, in consultation with other Federal agencies, shall carry out research and development activities relating to the use of subsurface drain systems as— (1) a flood risk-reduction measure; or (2) a coastal storm risk-reduction measure. (Pub. L. 116–260, div. AA, title II, § 227, Dec. 27, 2020, 134 Stat. 2698.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resources Development Act of 2020, and not as part of the Water Resources Development Act of 1986 which comprises this chapter. Statutory Notes and Related Subsidiaries ‘‘SECRETARY’’ DEFINED Secretary means the Secretary of the Army, see sec- tion 2 of div. AA of Pub. L. 116–260, set out as a note under section 2201 of this title. SUBCHAPTER V—GENERAL PROVISIONS § 2280. Maximum cost of projects (a) In general In order to insure against cost overruns, each total cost set forth with respect to a project for water resources development and conservation and related purposes authorized to be carried out by the Secretary in this Act or in a law en- acted after the date of the enactment of this Act, including the Water Resources Develop- ment Act of 1988, or in an amendment made by this Act or any later law with respect to such a project shall be the maximum cost of that project, except that such maximum amount— (1) may be increased by the Secretary for modifications which do not materially alter the scope or functions of the project as author- ized, but not by more than 20 percent of the total cost stated for the project in this Act, in Page 758 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2280 any later law, or in an amendment made by this Act or any later law; and (2) shall be automatically increased for— (A) changes in construction costs applied to unconstructed features (including real property acquisitions, preconstruction stud- ies, planning, engineering, and design) from the date of enactment of this Act or any later law (unless otherwise specified) as indi- cated by engineering and other appropriate cost indexes; and (B) additional studies, modifications, and actions (including mitigation and other en- vironmental actions) authorized by this Act or any later law or required by changes in Federal law. (b) Contributions by non-Federal interests Notwithstanding subsection (a), in accordance with section 701h of this title, the Secretary may accept funds from a non-Federal interest for any authorized water resources development project that has exceeded its maximum cost under subsection (a), and use such funds to carry out such project, if the use of such funds does not increase the Federal share of the cost of such project. (Pub. L. 99–662, title IX, § 902, Nov. 17, 1986, 100 Stat. 4183; Pub. L. 100–676, § 3(b), Nov. 17, 1988, 102 Stat. 4014; Pub. L. 113–121, title I, § 1023, June 10, 2014, 128 Stat. 1228.) Editorial Notes REFERENCES IN TEXT This Act, referred to in subsec. (a), is Pub. L. 99–662, Nov. 17, 1986, 100 Stat. 4082, known as the Water Re- sources Development Act of 1986. For complete classi- fication of this Act to the Code, see Short Title note set out under section 2201 of this title and Tables. The date of enactment of this Act, referred to in sub- sec. (a), is the date of enactment of Pub. L. 99–662, which was approved Nov. 17, 1986. The Water Resources Development Act of 1988, re- ferred to in subsec. (a), is Pub. L. 100–676, Nov. 17, 1988, 102 Stat. 4012. For complete classification of this Act to the Code, see Short Title of 1988 Amendment note set out under section 2201 of this title and Tables. AMENDMENTS 2014—Pub. L. 113–121 designated existing provisions as subsec. (a), inserted heading, and added subsec. (b). 1988—Pub. L. 100–676, § 3(b)(1), substituted ‘‘with re- spect to a project for water resources development and conservation and related purposes authorized to be car- ried out by the Secretary in this Act or in a law en- acted after the date of the enactment of this Act, in- cluding the Water Resources Development Act of 1988, or in an amendment made by this Act or any later law with respect to such a project’’ for ‘‘in this Act, or an amendment made by this Act, for a project’’. Par. (1). Pub. L. 100–676, § 3(b)(2), inserted ‘‘, in any later law,’’ after ‘‘in this Act’’, and ‘‘or any later law’’ after ‘‘by this Act’’. Par. (2). Pub. L. 100–676, § 3(b)(3), (4), inserted ‘‘or any later law’’ after ‘‘of this Act’’ in subpars. (A) and (B). Statutory Notes and Related Subsidiaries CONTINUATION OF CONSTRUCTION Pub. L. 117–263, div. H, title LXXXI, § 8155, Dec. 23, 2022, 136 Stat. 3736, provided that: ‘‘(a) CONTINUATION OF CONSTRUCTION.— ‘‘(1) IN GENERAL.—Upon the transmittal of an initial notification pursuant to subsection (b)(1) with re- spect to a water resources development project, the Secretary [of the Army] shall not, solely on the basis of the maximum cost requirements under section 902 of the Water Resources Development Act of 1986 (33 U.S.C. 2280)— ‘‘(A) defer the initiation or continuation of con- struction of the water resources development project during the covered period; or ‘‘(B) terminate during or after the covered period, a contract for design or construction of the water resources development project that was entered into prior to or during the covered period. ‘‘(2) RESUMPTION OF CONSTRUCTION.—The Secretary shall, upon the transmittal of an initial notification pursuant to subsection (b)(1) with respect to a water resources development project for which construction was deferred, during the period beginning on October 1, 2021, and ending on the date of enactment of this Act [Dec. 23, 2022], because the cost of such project exceeded the maximum cost permitted under section 902 of the Water Resources Development Act of 1986 (33 U.S.C. 2280), resume construction of the project. ‘‘(b) NOTIFICATION.— ‘‘(1) INITIAL NOTIFICATION.—Not later than 30 days after the Chief of Engineers makes a determination that a water resources development project exceeds, or is expected to exceed, the maximum cost of the project permitted under section 902 of the Water Re- sources Development Act of 1986 (33 U.S.C. 2280), the Chief of Engineers shall transmit a written notifica- tion concurrently to the Secretary and to the Com- mittee on Environment and Public Works of the Sen- ate and the Committee on Transportation and Infra- structure of the House of Representatives for each such determination. ‘‘(2) SUPPLEMENTAL NOTIFICATION.—Not later than 60 days after the Chief of Engineers transmits an ini- tial notification required under paragraph (1), the Chief shall transmit concurrently to the Secretary and to the Committee on Environment and Public Works of the Senate and the Committee on Transpor- tation and Infrastructure of the House of Representa- tives a supplemental notification that includes, based on information available to the Corps of Engineers on the date of the supplemental notification— ‘‘(A) an estimate of the expected increase in the cost of the project that is in excess of the author- ized maximum cost for the project; ‘‘(B) a description of the reason for the increased cost of the project; and ‘‘(C) the expected timeline for submission of a post-authorization change report for the project in accordance with section 1132 of the Water Re- sources Development Act of 2016 (33 U.S.C. 2282e). ‘‘(3) TRANSMITTAL.—The notifications described in paragraphs (1) and (2) may not be delayed as a result of consideration being given to changes in policy or priority with respect to project consideration. ‘‘(c) DEFERRAL OF CONSTRUCTION.—After expiration of the covered period, the Secretary shall not enter into any new contract, or exercise any option in a contract, for construction of a water resources development project if the project exceeds the maximum cost of the project permitted under section 902 of the Water Re- sources Development Act of 1986 (33 U.S.C. 2280), until the date on which Congress authorizes an increase in the cost of the project. ‘‘(d) STATUTORY CONSTRUCTION.—Nothing in this sec- tion waives the obligation of the Secretary to submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a post- authorization change report recommending an increase in the authorized cost of a project if the project other- wise would exceed the maximum cost of the project permitted under section 902 of the Water Resources De- velopment Act of 1986 (33 U.S.C. 2280). ‘‘(e) DEFINITION OF COVERED PERIOD.—In this section, the term ‘covered period’ means the period beginning on the date of enactment of this Act [Dec. 23, 2022] and ending on December 31, 2024.’’ Page 759 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2281a § 2281. Matters to be addressed in planning (a) In general Enhancing national economic development (including benefits to particular regions of the Nation not involving the transfer of economic activity to such regions from other regions), the quality of the total environment (including preservation and enhancement of the environ- ment), the well-being of the people of the United States, the prevention of loss of life, and the preservation of cultural and historical values shall be addressed in the formulation and eval- uation of water resources projects to be carried out by the Secretary, and the associated bene- fits and costs, both quantifiable and unquantifiable, and information regarding po- tential loss of human life that may be associ- ated with flooding and coastal storm events, shall be displayed in the benefits and costs of such projects. (b) Assessments For all feasibility reports for water resources projects completed after December 31, 2007, the Secretary shall assess whether— (1) the water resources project and each sep- arable element is cost-effective; and (2) the water resources project complies with Federal, State, and local laws (including regu- lations) and public policies. (Pub. L. 99–662, title IX, § 904, Nov. 17, 1986, 100 Stat. 4185; Pub. L. 101–640, title III, § 315, Nov. 28, 1990, 104 Stat. 4641; Pub. L. 104–303, title II, § 231, Oct. 12, 1996, 110 Stat. 3704; Pub. L. 110–114, title II, § 2033(a), Nov. 8, 2007, 121 Stat. 1084.) Editorial Notes AMENDMENTS 2007—Pub. L. 110–114 designated existing provisions as subsec. (a), inserted heading, and added subsec. (b). 1996—Pub. L. 104–303 inserted ‘‘and information re- garding potential loss of human life that may be associ- ated with flooding and coastal storm events,’’ after ‘‘unquantifiable,’’. 1990—Pub. L. 101–640 inserted ‘‘(including preserva- tion and enhancement of the environment)’’ after ‘‘en- vironment’’. Statutory Notes and Related Subsidiaries RURAL PROJECT EVALUATION AND SELECTION CRITERIA Pub. L. 102–580, title II, § 214, Oct. 31, 1992, 106 Stat. 4831, directed Comptroller General, not later than 18 months after Oct. 31, 1992, to report to Congress with specific legislative and other recommendations on im- proving the equitable distribution of water resources development projects in rural areas, prior to repeal by Pub. L. 104–316, title I, § 117, Oct. 19, 1996, 110 Stat. 3835. § 2281a. Tribal Liaison (a) In general Beginning not later than 1 year after Decem- ber 23, 2022, the District Commander for each Corps of Engineers district that contains a Trib- al community shall have on staff a Tribal Liai- son. (b) Duties Each Tribal Liaison shall make recommenda- tions to the applicable District Commander re- garding, and be responsible for— (1) removing barriers to access to, and par- ticipation in, Corps of Engineers programs for Tribal communities, including by improving implementation of section 2213(m) of this title; (2) improving outreach to, and engagement with, Tribal communities about relevant Corps of Engineers programs and services; (3) identifying and engaging with Tribal communities suffering from water resources challenges; (4) improving, expanding, and facilitating government-to-government consultation be- tween Tribal communities and the Corps of Engineers; (5) coordinating and implementing all rel- evant Tribal consultation policies and associ- ated guidelines, including the requirements of section 2356 of title; (6) training and tools to facilitate the ability of Corps of Engineers staff to effectively en- gage with Tribal communities in a culturally competent manner, especially in regards to lands of ancestral, historic, or cultural signifi- cance to a Tribal community, including burial sites; and (7) such other issues identified by the Sec- retary. (c) Uniformity Not later than 120 days after December 23, 2022, the Secretary shall finalize guidelines for— (1) a position description for Tribal Liaisons; and (2) required qualifications for Tribal Liai- sons, including experience and expertise relat- ing to Tribal communities and water resource issues. (d) Funding Funding for the position of Tribal Liaison shall be allocated from the budget line item pro- vided for the expenses necessary for the super- vision and general administration of the civil works program, and filling the position shall not be dependent on any increase in this budget line item. (e) Definitions In this section: (1) Tribal community The term ‘‘Tribal community’’ means a com- munity of people who are recognized and de- fined under Federal law as indigenous people of the United States. (2) Tribal Liaison The term ‘‘Tribal Liaison’’ means a perma- nent employee of a Corps of Engineers district whose primary responsibilities are to— (A) serve as a direct line of communication between the District Commander and the Tribal communities within the boundaries of the Corps of Engineers district; and (B) ensure consistency in government-to- government relations. (Pub. L. 117–263, div. H, title LXXXI, § 8112, Dec. 23, 2022, 136 Stat. 3704.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resources Development Act of 2022, and also as part of the James

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2280 — Marine technology review

**(a) Dredging needs** The Secretary is authorized to conduct such studies as are necessary to provide a report to Congress on the dredging needs of the national ports and harbors of the United States. The report shall include existing and projected future project depths, types and sizes of ships in use, and world trade patterns, an assessment of the future national waterside infrastructure needs, and a comparison of drafts of United States and selected world ports. **(b) Authorization of appropriations** There is authorized to be appropriated $2,500,000 to carry out this section for fiscal years beginning after September 30, 1992. Such sums shall remain available until expended.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2280

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2282e — Vertical integration and acceleration of studies

**(a) In general** To the extent practicable, a feasibility study initiated by the Secretary, after June 10, 2014, under [section 2282(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2282/a&num=0&edition=prelim) shall— (1) result in the completion of a final feasibility report not later than 4 years after the date on which the Secretary determines the Federal interest for purposes of the report pursuant to [section 2282(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2282/b&num=0&edition=prelim); (2) have a maximum total cost of $5,000,000; and (3) ensure that personnel from the district, division, and headquarters levels of the Corps of Engineers concurrently conduct the review required under that section. **(b) Extension** If the Secretary determines that a feasibility study described in subsection (a) will not be conducted in accordance with subsection (a), the Secretary, not later than 30 days after the date of making the determination, shall— (1) prepare an updated feasibility study schedule and cost estimate; (2) notify the non-Federal feasibility cost-sharing partner that the feasibility study has been delayed; and (3) provide written notice to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives as to the reasons the requirements of subsection (a) are not attainable. **(c) Exception** (1) **In general** — The Secretary may extend the timeline of a study by a period not to exceed 3 years, if the Secretary determines that the feasibility study is too complex to comply with the requirements of subsection (a). (2) **Factors** — In making a determination that a study is too

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2282e

Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2282e. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2282e — Post-authorization change reports

Page 775 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2282g § 2282e. Post-authorization change reports (a) In general The completion of a post-authorization change report prepared by the Corps of Engineers for a water resources development project— (1) may not be delayed as a result of consid- eration being given to changes in policy or pri- ority with respect to project consideration; and (2) shall be submitted, upon completion, to— (A) the Committee on Environment and Public Works of the Senate; and (B) the Committee on Transportation and Infrastructure of the House of Representa- tives. (b) Completion review With respect to a post-authorization change report subject to review by the Secretary, the Secretary shall, not later than 120 days after the date of completion of such report— (1) review the report; and (2) provide to Congress any recommenda- tions of the Secretary regarding modification of the applicable water resources development project. (c) Prior reports Not later than 120 days after December 16, 2016, with respect to any post-authorization change report that was completed prior to De- cember 16, 2016, and is subject to a review by the Secretary that has yet to be completed, the Sec- retary shall complete review of, and provide rec- ommendations to Congress with respect to, the report. (d) Post-authorization change report inclusions In this section, the term ‘‘post-authorization change report’’ includes— (1) a general reevaluation report; (2) a limited reevaluation report; and (3) any other report that recommends the modification of an authorized water resources development project. (Pub. L. 114–322, title I, § 1132, Dec. 16, 2016, 130 Stat. 1653.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resourc

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2282e

Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 2282e. This identifies an authority to review, not proof of applicability.