Browse Arkansas Code titles and sections
33 U.S.C. § 2282e — Post-authorization change reports
Federal law — U.S. Code and appendices · legal_authorities
Page 775
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2282g
§ 2282e. Post-authorization change reports
(a) In general
The completion of a post-authorization change
report prepared by the Corps of Engineers for a
water resources development project—
(1) may not be delayed as a result of consid-
eration being given to changes in policy or pri-
ority with respect to project consideration;
and
(2) shall be submitted, upon completion, to—
(A) the Committee on Environment and
Public Works of the Senate; and
(B) the Committee on Transportation and
Infrastructure of the House of Representa-
tives.
(b) Completion review
With respect to a post-authorization change
report subject to review by the Secretary, the
Secretary shall, not later than 120 days after the
date of completion of such report—
(1) review the report; and
(2) provide to Congress any recommenda-
tions of the Secretary regarding modification
of the applicable water resources development
project.
(c) Prior reports
Not later than 120 days after December 16,
2016, with respect to any post-authorization
change report that was completed prior to De-
cember 16, 2016, and is subject to a review by the
Secretary that has yet to be completed, the Sec-
retary shall complete review of, and provide rec-
ommendations to Congress with respect to, the
report.
(d) Post-authorization change report inclusions
In this section, the term ‘‘post-authorization
change report’’ includes—
(1) a general reevaluation report;
(2) a limited reevaluation report; and
(3) any other report that recommends the
modification of an authorized water resources
development project.
(Pub. L. 114–322, title I, § 1132, Dec. 16, 2016, 130
Stat. 1653.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resourc
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2282e
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: f611810bbcb92db38b5f0c716e6c059f704a168d83551a07514803ba5af40463. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-250a5262e6814dbac445fadc
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2282e-post-authorization-change-reports--b649383071.md
Pages: Not recorded – Not recorded
Passage SHA-256: fd76033fb24f66f09a1ccc736b1097594af16ba1b6844e0ef19c96bd03c2e505
Source location: USCODE-2024-title33-chap36-subchapV-sec2282e.pdf
Stored source content
Page 775
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2282g
§ 2282e. Post-authorization change reports
(a) In general
The completion of a post-authorization change
report prepared by the Corps of Engineers for a
water resources development project—
(1) may not be delayed as a result of consid-
eration being given to changes in policy or pri-
ority with respect to project consideration;
and
(2) shall be submitted, upon completion, to—
(A) the Committee on Environment and
Public Works of the Senate; and
(B) the Committee on Transportation and
Infrastructure of the House of Representa-
tives.
(b) Completion review
With respect to a post-authorization change
report subject to review by the Secretary, the
Secretary shall, not later than 120 days after the
date of completion of such report—
(1) review the report; and
(2) provide to Congress any recommenda-
tions of the Secretary regarding modification
of the applicable water resources development
project.
(c) Prior reports
Not later than 120 days after December 16,
2016, with respect to any post-authorization
change report that was completed prior to De-
cember 16, 2016, and is subject to a review by the
Secretary that has yet to be completed, the Sec-
retary shall complete review of, and provide rec-
ommendations to Congress with respect to, the
report.
(d) Post-authorization change report inclusions
In this section, the term ‘‘post-authorization
change report’’ includes—
(1) a general reevaluation report;
(2) a limited reevaluation report; and
(3) any other report that recommends the
modification of an authorized water resources
development project.
(Pub. L. 114–322, title I, § 1132, Dec. 16, 2016, 130
Stat. 1653.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2016, and also as part of the Water
Infrastructure Improvements for the Nation Act, also
known as the WIIN Act, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 1002 of Pub. L. 114–322, set out as a note under sec-
tion 2201 of this title.
§ 2282f. Review of resiliency assessments
(a) Resiliency assessment
(1) In general
Not later than 180 days after December 27,
2020, and in conjunction with the development
of procedures under section 1962–4 of title 42,
the Secretary is directed to review, and where
appropriate, revise the existing planning guid-
ance documents and regulations of the Corps
of Engineers on the assessment of the effects
of sea level rise or inland flooding on future
water resources development projects to en-
sure that such guidance documents and regu-
lations are based on the best available, peer-
reviewed science and data on the current and
future effects of sea level rise or inland flood-
ing on relevant communities.
(2) Coordination
In carrying out this subsection, the Sec-
retary shall—
(A) coordinate the review with the Engi-
neer Research and Development Center,
other Federal and State agencies, and other
relevant entities; and
(B) to the maximum extent practicable
and where appropriate, utilize data provided
to the Secretary by such agencies.
(b) Assessment of benefits from addressing sea
level rise and inland flooding resiliency in
feasibility reports
(1) In general
Upon the request of a non-Federal interest,
in carrying out a feasibility study for a
project for flood risk mitigation, hurricane
and storm damage risk reduction, or eco-
system restoration under section 2282 of this
title, the Secretary shall consider whether the
need for the project is predicated upon or ex-
acerbated by conditions related to sea level
rise or inland flooding.
(2) Addressing sea level rise and inland flood-
ing resiliency benefits
To the maximum extent practicable, in car-
rying out a study pursuant to paragraph (1),
the Secretary shall document the potential ef-
fects of sea level rise or inland flooding on the
project, and the expected benefits of the
project relating to sea level rise or inland
flooding, during the 50-year period after the
date of completion of the project.
(Pub. L. 116–260, div. AA, title I, § 113, Dec. 27,
2020, 134 Stat. 2626.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of div. AA of Pub. L. 116–260, set out as a note
under section 2201 of this title.
§ 2282g. Scope of feasibility studies
(a) Flood risk management or hurricane and
storm damage risk reduction
In carrying out a feasibility study for a
project for flood risk management or hurricane
and storm damage risk reduction, the Secretary,
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** To the extent practicable, a feasibility study initiated by the Secretary, after June 10, 2014, under [section 2282(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2282/a&num=0&edition=prelim) shall—
(1) result in the completion of a final feasibility report not later than 4 years after the date on which the Secretary determines the Federal interest for purposes of the report pursuant to [section 2282(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2282/b&num=0&edition=prelim);
(2) have a maximum total cost of $5,000,000; and
(3) ensure that personnel from the district, division, and headquarters levels of the Corps of Engineers concurrently conduct the review required under that section.
**(b) Extension** If the Secretary determines that a feasibility study described in subsection (a) will not be conducted in accordance with subsection (a), the Secretary, not later than 30 days after the date of making the determination, shall—
(1) prepare an updated feasibility study schedule and cost estimate;
(2) notify the non-Federal feasibility cost-sharing partner that the feasibility study has been delayed; and
(3) provide written notice to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives as to the reasons the requirements of subsection (a) are not attainable.
**(c) Exception**
(1) **In general** — The Secretary may extend the timeline of a study by a period not to exceed 3 years, if the Secretary determines that the feasibility study is too complex to comply with the requirements of subsection (a).
(2) **Factors** — In making a determination that a study is too
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2282e
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.