33 U.S.C. § 2282e — Post-authorization change reports

Page 775 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2282g § 2282e. Post-authorization change reports (a) In general The completion of a post-authorization change report prepared by the Corps of Engineers for a water resources development project— (1) may not be delayed as a result of consid- eration being given to changes in policy or pri- ority with respect to project consideration; and (2) shall be submitted, upon completion, to— (A) the Committee on Environment and Public Works of the Senate; and (B) the Committee on Transportation and Infrastructure of the House of Representa- tives. (b) Completion review With respect to a post-authorization change report subject to review by the Secretary, the Secretary shall, not later than 120 days after the date of completion of such report— (1) review the report; and (2) provide to Congress any recommenda- tions of the Secretary regarding modification of the applicable water resources development project. (c) Prior reports Not later than 120 days after December 16, 2016, with respect to any post-authorization change report that was completed prior to De- cember 16, 2016, and is subject to a review by the Secretary that has yet to be completed, the Sec- retary shall complete review of, and provide rec- ommendations to Congress with respect to, the report. (d) Post-authorization change report inclusions In this section, the term ‘‘post-authorization change report’’ includes— (1) a general reevaluation report; (2) a limited reevaluation report; and (3) any other report that recommends the modification of an authorized water resources development project. (Pub. L. 114–322, title I, § 1132, Dec. 16, 2016, 130 Stat. 1653.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resourc

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2282e

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: f611810bbcb92db38b5f0c716e6c059f704a168d83551a07514803ba5af40463. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-250a5262e6814dbac445fadc
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2282e-post-authorization-change-reports--b649383071.md
Pages: Not recorded – Not recorded
Passage SHA-256: fd76033fb24f66f09a1ccc736b1097594af16ba1b6844e0ef19c96bd03c2e505

Source location: USCODE-2024-title33-chap36-subchapV-sec2282e.pdf

Stored source content

Page 775 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2282g § 2282e. Post-authorization change reports (a) In general The completion of a post-authorization change report prepared by the Corps of Engineers for a water resources development project— (1) may not be delayed as a result of consid- eration being given to changes in policy or pri- ority with respect to project consideration; and (2) shall be submitted, upon completion, to— (A) the Committee on Environment and Public Works of the Senate; and (B) the Committee on Transportation and Infrastructure of the House of Representa- tives. (b) Completion review With respect to a post-authorization change report subject to review by the Secretary, the Secretary shall, not later than 120 days after the date of completion of such report— (1) review the report; and (2) provide to Congress any recommenda- tions of the Secretary regarding modification of the applicable water resources development project. (c) Prior reports Not later than 120 days after December 16, 2016, with respect to any post-authorization change report that was completed prior to De- cember 16, 2016, and is subject to a review by the Secretary that has yet to be completed, the Sec- retary shall complete review of, and provide rec- ommendations to Congress with respect to, the report. (d) Post-authorization change report inclusions In this section, the term ‘‘post-authorization change report’’ includes— (1) a general reevaluation report; (2) a limited reevaluation report; and (3) any other report that recommends the modification of an authorized water resources development project. (Pub. L. 114–322, title I, § 1132, Dec. 16, 2016, 130 Stat. 1653.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resources Development Act of 2016, and also as part of the Water Infrastructure Improvements for the Nation Act, also known as the WIIN Act, and not as part of the Water Resources Development Act of 1986 which comprises this chapter. Statutory Notes and Related Subsidiaries ‘‘SECRETARY’’ DEFINED Secretary means the Secretary of the Army, see sec- tion 1002 of Pub. L. 114–322, set out as a note under sec- tion 2201 of this title. § 2282f. Review of resiliency assessments (a) Resiliency assessment (1) In general Not later than 180 days after December 27, 2020, and in conjunction with the development of procedures under section 1962–4 of title 42, the Secretary is directed to review, and where appropriate, revise the existing planning guid- ance documents and regulations of the Corps of Engineers on the assessment of the effects of sea level rise or inland flooding on future water resources development projects to en- sure that such guidance documents and regu- lations are based on the best available, peer- reviewed science and data on the current and future effects of sea level rise or inland flood- ing on relevant communities. (2) Coordination In carrying out this subsection, the Sec- retary shall— (A) coordinate the review with the Engi- neer Research and Development Center, other Federal and State agencies, and other relevant entities; and (B) to the maximum extent practicable and where appropriate, utilize data provided to the Secretary by such agencies. (b) Assessment of benefits from addressing sea level rise and inland flooding resiliency in feasibility reports (1) In general Upon the request of a non-Federal interest, in carrying out a feasibility study for a project for flood risk mitigation, hurricane and storm damage risk reduction, or eco- system restoration under section 2282 of this title, the Secretary shall consider whether the need for the project is predicated upon or ex- acerbated by conditions related to sea level rise or inland flooding. (2) Addressing sea level rise and inland flood- ing resiliency benefits To the maximum extent practicable, in car- rying out a study pursuant to paragraph (1), the Secretary shall document the potential ef- fects of sea level rise or inland flooding on the project, and the expected benefits of the project relating to sea level rise or inland flooding, during the 50-year period after the date of completion of the project. (Pub. L. 116–260, div. AA, title I, § 113, Dec. 27, 2020, 134 Stat. 2626.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resources Development Act of 2020, and not as part of the Water Resources Development Act of 1986 which comprises this chapter. Statutory Notes and Related Subsidiaries ‘‘SECRETARY’’ DEFINED Secretary means the Secretary of the Army, see sec- tion 2 of div. AA of Pub. L. 116–260, set out as a note under section 2201 of this title. § 2282g. Scope of feasibility studies (a) Flood risk management or hurricane and storm damage risk reduction In carrying out a feasibility study for a project for flood risk management or hurricane and storm damage risk reduction, the Secretary,

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2282e — Vertical integration and acceleration of studies

**(a) In general** To the extent practicable, a feasibility study initiated by the Secretary, after June 10, 2014, under [section 2282(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2282/a&num=0&edition=prelim) shall— (1) result in the completion of a final feasibility report not later than 4 years after the date on which the Secretary determines the Federal interest for purposes of the report pursuant to [section 2282(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2282/b&num=0&edition=prelim); (2) have a maximum total cost of $5,000,000; and (3) ensure that personnel from the district, division, and headquarters levels of the Corps of Engineers concurrently conduct the review required under that section. **(b) Extension** If the Secretary determines that a feasibility study described in subsection (a) will not be conducted in accordance with subsection (a), the Secretary, not later than 30 days after the date of making the determination, shall— (1) prepare an updated feasibility study schedule and cost estimate; (2) notify the non-Federal feasibility cost-sharing partner that the feasibility study has been delayed; and (3) provide written notice to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives as to the reasons the requirements of subsection (a) are not attainable. **(c) Exception** (1) **In general** — The Secretary may extend the timeline of a study by a period not to exceed 3 years, if the Secretary determines that the feasibility study is too complex to comply with the requirements of subsection (a). (2) **Factors** — In making a determination that a study is too