Browse Arkansas Code titles and sections
43 U.S.C. § 1523 — Power requirements of Central Arizona
Federal law — U.S. Code and appendices · legal_authorities
Page 402
TITLE 43—PUBLIC LANDS
§ 1523
maintenance of Orme Dam and Reservoir, or al-
ternative. The Secretary shall offer to pay the
fair market value of the lands and interests des-
ignated, inclusive of improvements. In addition,
the Secretary shall offer to pay toward the cost
of relocating or replacing such improvements
not to exceed $500,000 in the aggregate, and the
amount offered for the actual relocation or re-
placement of a residence shall not exceed the
difference between the fair market value of the
residence and $8,000. Each community and each
affected allottee shall have six months in which
to accept or reject the Secretary’s offer. If the
Secretary’s offer is rejected, the United States
may proceed to acquire the property interests
involved through eminent domain proceedings
in the United States District Court for the Dis-
trict of Arizona under sections 3113 and 3114(a)
to (d) of title 40. Upon acceptance in writing of
the Secretary’s offer, or upon the filing of a dec-
laration of taking in eminent domain pro-
ceedings, title to the lands or interests involved,
and the right to possession thereof, shall vest in
the United States. Upon a determination by the
Secretary that all or any part of such lands or
interests are no longer necessary for the purpose
for which acquired, title to such lands or inter-
ests shall be restored to the appropriate commu-
nity upon repayment to the Federal Govern-
ment of the amounts paid by it for such lands.
(b) Rights of former owners to use or lease land
Title to any land or easement acquired pursu-
ant to this section shall be subject to the right
of the former owner to use or lease the land for
purposes not inconsistent with the construction,
operation, and maintenance of the project, as
determ
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1523
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 64199b4e102a4bae8599d11978991d92c5fa0c0f8d95952579b3644567b3b794. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-b14e3abce695e20f8af5a172
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-1523-power-requirements-of-central-arizona--13c57d9855.md
Pages: Not recorded – Not recorded
Passage SHA-256: 071026b768ec8e66febd7d9dae2a824a574ca73495cee6593084da3e4fd3cf0f
Source location: USCODE-2024-title43-chap32-subchapIII-sec1523.pdf
Stored source content
Page 402
TITLE 43—PUBLIC LANDS
§ 1523
maintenance of Orme Dam and Reservoir, or al-
ternative. The Secretary shall offer to pay the
fair market value of the lands and interests des-
ignated, inclusive of improvements. In addition,
the Secretary shall offer to pay toward the cost
of relocating or replacing such improvements
not to exceed $500,000 in the aggregate, and the
amount offered for the actual relocation or re-
placement of a residence shall not exceed the
difference between the fair market value of the
residence and $8,000. Each community and each
affected allottee shall have six months in which
to accept or reject the Secretary’s offer. If the
Secretary’s offer is rejected, the United States
may proceed to acquire the property interests
involved through eminent domain proceedings
in the United States District Court for the Dis-
trict of Arizona under sections 3113 and 3114(a)
to (d) of title 40. Upon acceptance in writing of
the Secretary’s offer, or upon the filing of a dec-
laration of taking in eminent domain pro-
ceedings, title to the lands or interests involved,
and the right to possession thereof, shall vest in
the United States. Upon a determination by the
Secretary that all or any part of such lands or
interests are no longer necessary for the purpose
for which acquired, title to such lands or inter-
ests shall be restored to the appropriate commu-
nity upon repayment to the Federal Govern-
ment of the amounts paid by it for such lands.
(b) Rights of former owners to use or lease land
Title to any land or easement acquired pursu-
ant to this section shall be subject to the right
of the former owner to use or lease the land for
purposes not inconsistent with the construction,
operation, and maintenance of the project, as
determined by, and under terms and conditions
prescribed by, the Secretary. Such right shall
include the right to extract and dispose of min-
erals. The determination of fair market value
under subsection (a) shall reflect the right to ex-
tract and dispose of minerals and all other uses
permitted by this section.
(c) Addition of land to Fort McDowell Indian
Reservation
In view of the fact that a substantial portion
of the lands of the Fort McDowell Mohave-
Apache Indian Community will be required for
Orme Dam and Reservoir, or alternative, the
Secretary shall, in addition to the compensation
provided for in subsection (a) of this section,
designate and add to the Fort McDowell Indian
Reservation twenty-five hundred acres of suit-
able lands in the vicinity of the reservation that
are under the jurisdiction of the Department of
the Interior in township 4 north, range 7 east;
township 5 north, range 7 east; and township 3
north, range 7 east, Gila and Salt River base me-
ridian, Arizona. Title to lands so added to the
reservation shall be held by the United States in
trust for the Fort McDowell Mohave-Apache In-
dian Community.
(d) Recreational facilities developed and oper-
ated by Indian communities along Orme Res-
ervoir shoreline
Each community shall have a right, in accord-
ance with plans approved by the Secretary, to
develop and operate recreational facilities along
the part of the shoreline of the Orme Reservoir
located on or adjacent to its reservation, includ-
ing land added to the Fort McDowell Reserva-
tion as provided in subsection (b) of this section,
subject to rules and regulations prescribed by
the Secretary governing the recreation develop-
ment of the reservoir. Recreation development
of the entire reservoir and federally owned lands
under the jurisdiction of the Secretary adjacent
thereto shall be in accordance with a master
recreation plan approved by the Secretary. The
members of each community shall have non-
exclusive personal rights to hunt and fish on or
in the reservoir without charge to the same ex-
tent they are now authorized to hunt and fish,
but no community shall have the right to ex-
clude others from the reservoir except by con-
trol of access through its reservation or any
right to require payment by members of the
public except for the use of community lands or
facilities.
(e) Exemption of funds from State and Federal
income taxes
All funds paid pursuant to this section, and
any per capita distribution thereof, shall be ex-
empt from all forms of State and Federal in-
come taxes.
(Pub. L. 90–537, title III, § 302, Sept. 30, 1968, 82
Stat. 888.)
Editorial Notes
CODIFICATION
In subsec. (a), ‘‘sections 3113 and 3114(a) to (d) of title
40’’ substituted for ‘‘40 U.S.C., sections 257 and 258a’’ on
authority of Pub. L. 107–217, § 5(c), Aug. 21, 2002, 116
Stat. 1303, the first section of which enacted Title 40,
Public Buildings, Property, and Works.
Statutory Notes and Related Subsidiaries
INAPPLICABILITY OF SUBSECTION (a) TO FORT
MCDOWELL INDIAN COMMUNITY
Pub. L. 101–628, title IV, § 411(e), Nov. 28, 1990, 104
Stat. 4491, provided that: ‘‘As of the date the authoriza-
tions contained in section 409(b) of this Act become ef-
fective [see section 412 of Pub. L. 101–628, 104 Stat. 4491],
section 302(a) of the Colorado River Basin Project Act
(43 U.S.C. 1522(a)) shall no longer apply to the Commu-
nity [Fort McDowell Indian Community].’’
INAPPLICABILITY TO SALT RIVER PIMA-MARICOPA
INDIAN COMMUNITY
Pub. L. 100–512, § 11(c), Oct. 20, 1988, 102 Stat. 2558, pro-
vided that: ‘‘Upon the effective date of this Act as set
forth in section 12 [102 Stat. 2559], section 302 of the
Colorado River Basin Project Act (43 U.S.C. 1522) shall
no longer apply to the Community [Salt River Pima-
Maricopa Indian Community].’’
§ 1523. Power requirements of Central Arizona
Project and augmentation of Lower Colorado
River Basin Development Fund
(a) Engineering and economic studies
The Secretary is authorized and directed to
continue to a conclusion appropriate engineer-
ing and economic studies and to recommend the
most feasible plan for the construction and oper-
ation of hydroelectric generating and trans-
mission facilities, the purchase of electrical en-
ergy, the purchase of entitlement to electrical
plant capacity, or any combination thereof, in-
Page 403
TITLE 43—PUBLIC LANDS
§ 1524
cluding participation, operation, or construction
by non-Federal entities, for the purpose of sup-
plying the power requirements of the Central
Arizona Project and augmenting the Lower Col-
orado River Basin Development Fund: Provided,
That nothing in this section or in this chapter
contained shall be construed to authorize the
study or construction of any dams on the main
stream of the Colorado River between Hoover
Dam and Glen Canyon Dam.
(b) Construction of thermal generating power-
plants; agreements for acquisition by United
States of portions of plant capacity
If included as a part of the recommended plan,
the Secretary may enter into agreements with
non-Federal interests proposing to construct
thermal generating powerplants whereby the
United States shall acquire the right to such
portions of their capacity, including delivery of
power and energy over appurtenant trans-
mission facilities to mutually agreed upon deliv-
ery points, as he determines is required in con-
nection with the operation of the Central Ari-
zona Project. When not required for the Central
Arizona Project, the power and energy acquired
by such agreements may be disposed of inter-
mittently by the Secretary for other purposes at
such prices as he may determine, including its
marketing in conjunction with the sale of power
and energy from Federal powerplants in the Col-
orado River system so as to produce the greatest
practicable amount of power and energy that
can be sold at firm power and energy rates. The
agreements shall provide among other things,
that—
(1) the United States shall pay not more
than that portion of the total construction
cost, exclusive of interest during construction,
of the powerplants, and of any switchyards
and transmission facilities serving the United
States, as is represented by the ratios of the
respective capacities to be provided for the
United States therein to the total capacities
of such facilities. The Secretary shall make
the Federal portion of such costs available to
the non-Federal interests during the construc-
tion period, including the period of prepara-
tion of designs and specifications, in such in-
stallments as will facilitate a timely construc-
tion schedule, but no funds other than for
preconstruction activities shall be made avail-
able by the Secretary until he determines that
adequate contractual arrangements have been
entered into between all the affected parties
covering land, water, fuel supplies, power (its
availability and use), rights-of-way, trans-
mission facilities and all other necessary mat-
ters for the thermal generating powerplants;
(2) annual operation and maintenance costs
shall be apportioned between the United
States and the non-Federal interests on an eq-
uitable basis taking into account the ratios
determined in accordance with the foregoing
clause (1): Provided, however, That the United
States shall share on the foregoing basis in the
depreciation component of such costs only to
the extent of provision for depreciation on re-
placements financed by the non-Federal inter-
ests;
(3) the United States shall be given appro-
priate credit for any interests in Federal lands
administered by the Department of the Inte-
rior that are made available for the power
plants and appurtenances;
(4) costs to be borne by the United States
under clauses (1) and (2) shall not include (a)
interest and interest during construction, (b)
financing charges, (c) franchise fees, and (d)
such other costs as shall be specified in the
agreement.
(c) Recommended plan; submission to Congress
No later than one year from September 30,
1968, the Secretary shall submit his rec-
ommended plan to the Congress. Except as au-
thorized by subsection (b) of this section, such
plan shall not become effective until approved
by the Congress.
(d) Apportionment of water for Arizona plants
diverted above Lee Ferry
If any thermal generating plant referred to in
subsection (b) of this section is located in Ari-
zona, and if it is served by water diverted from
the drainage area of the Colorado River system
above Lee Ferry, other provisions of existing
law to the contrary notwithstanding, such con-
sumptive use of water shall be a part of the fifty
thousand acre-feet per annum apportioned to
the State of Arizona by article III(a) of the
Upper Colorado River Basin Compact (63 Stat.
31).
(Pub. L. 90–537, title III, § 303, Sept. 30, 1968, 82
Stat. 889.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in subsec. (a), was in the
original ‘‘this Act’’, meaning Pub. L. 90–537, Sept. 30,
1968, 82 Stat. 885, known as the Colorado River Basin
Project Act, which enacted this chapter and sections
616aa–1, 620a–1, 620a–2, 620c–1, and 620d–1 of this title,
amended sections 616hh, 620, and 620a of this title, and
enacted provisions set out as notes under sections 620,
620k, and 1501 of this title. For complete classification
of this Act to the Code, see Short Title note set out
under section 1501 of this title and Tables.
§ 1524. Water furnished from Central Arizona
Project
(a) Restriction on use of water for irrigation
Unless and until otherwise provided by Con-
gress, water from the Central Arizona Project
shall not be made available directly or indi-
rectly for the irrigation of lands not having a re-
cent irrigation history as determined by the
Secretary, except in the case of Indian lands, na-
tional wildlife refuges, and, with the approval of
the Secretary, State-administered wildlife man-
agement areas.
(b) Contracts with municipal and industrial
users
(1) Irrigation and municipal and industrial
water supply under the Central Arizona Project
within the State of Arizona may, in the event
the Secretary determines that it is necessary to
effect repayment, be pursuant to master con-
tracts with organizations which have power to
levy assessments against all taxable real prop-
erty within their boundaries. The terms and
conditions of contracts or other arrangements
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Acquisition of lands of Salt River Pima-Maricopa Indian Community and Fort McDowell-Apache Indian Community; relocation; eminent domain** The Secretary shall designate the lands of the Salt River Pima-Maricopa Indian Community, Arizona, and the Fort McDowell-Apache Indian Community, Arizona, or interests therein, and any allotted lands or interests therein within said communities which he determines are necessary for use and occupancy by the United States for the construction, operation, and maintenance of Orme Dam and Reservoir, or alternative. The Secretary shall offer to pay the fair market value of the lands and interests designated, inclusive of improvements. In addition, the Secretary shall offer to pay toward the cost of relocating or replacing such improvements not to exceed $500,000 in the aggregate, and the amount offered for the actual relocation or replacement of a residence shall not exceed the difference between the fair market value of the residence and $8,000. Each community and each affected allottee shall have six months in which to accept or reject the Secretary’s offer. If the Secretary’s offer is rejected, the United States may proceed to acquire the property interests involved through eminent domain proceedings in the United States District Court for the District of Arizona under sections 3113 and 3114(a) to (d) of title 40. Upon acceptance in writing of the Secretary’s offer, or upon the filing of a declaration of taking in eminent domain proceedings, title to the lands or interests involved, and the right to possession thereof, shall vest in the United States. Upon a determination by the Secretary that all or any part of such lands or interests are no longer necessary for the purpose for which acquired, title to such lands or interests shal
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1522
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 1522. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 401
TITLE 43—PUBLIC LANDS
§ 1522
or suitable alternative, which system may have
a capacity of 3,000 cubic feet per second or what-
ever lesser capacity is found to be feasible: Pro-
vided, That any capacity in the Hayden-Rhodes
Aqueduct in excess of 2,500 cubic feet per second
shall be utilized for the conveyance of Colorado
River water only when Lake Powell is full or re-
leases of water are made from Lake Powell to
prevent the reservoir from exceeding elevation
3,700 feet above mean sea level or when releases
are made pursuant to the proviso in section
1552(a)(3) of this title: Provided further, That the
costs of providing any capacity in excess of 2,500
cubic feet per second shall be repaid by those
funds available to Arizona pursuant to the pro-
vision of section 1543(f) of this title, or by funds
from sources other than the development fund;
(2) Orme Dam and Reservoir and power pumping
plant or suitable alternative; (3) Buttes Dam
and Reservoir, which shall be so operated as not
to prejudice the rights of any user in and to the
waters of the Gila River as those rights are set
forth in the decree entered by the United States
District Court for the District of Arizona on
June 29, 1935, in United States against Gila Val-
ley Irrigation District and others (Globe Equity
Numbered 59); (4) Hooker Dam and Reservoir or
suitable alternative, which shall be constructed
in such a manner as to give effect to the provi-
sions of subsection (f) of section 1524 of this
title; (5) Charleston Dam and Reservoir; (6) Tuc-
son aqueducts and pumping plants; (7) Fannin-
McFarland Aqueduct; (8) related canals, regu-
lating facilities, hydroelectric powerplants, and
electric transmission facilities required for the
operation of said principal works; (9) rela
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1522
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 1522. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Engineering and economic studies** The Secretary is authorized and directed to continue to a conclusion appropriate engineering and economic studies and to recommend the most feasible plan for the construction and operation of hydroelectric generating and transmission facilities, the purchase of electrical energy, the purchase of entitlement to electrical plant capacity, or any combination thereof, including participation, operation, or construction by non-Federal entities, for the purpose of supplying the power requirements of the Central Arizona Project and augmenting the Lower Colorado River Basin Development Fund: Provided, That nothing in this section or in this chapter contained shall be construed to authorize the study or construction of any dams on the main stream of the Colorado River between Hoover Dam and Glen Canyon Dam.
**(b) Construction of thermal generating powerplants; agreements for acquisition by United States of portions of plant capacity** If included as a part of the recommended plan, the Secretary may enter into agreements with non-Federal interests proposing to construct thermal generating powerplants whereby the United States shall acquire the right to such portions of their capacity, including delivery of power and energy over appurtenant transmission facilities to mutually agreed upon delivery points, as he determines is required in connection with the operation of the Central Arizona Project. When not required for the Central Arizona Project, the power and energy acquired by such agreements may be disposed of intermittently by the Secretary for other purposes at such prices as he may determine, including its marketing in conjunction with the sale of power and energy from Federal powerplants in the Colorado River system so as to produce
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1523
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.