Arkansas Legal Resource Navigator

42 U.S.C. § 2236 — Revocation of licenses

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 2236 — Revocation of licenses

Page 5529 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 2236 Commission shall ensure that the prescribed in- spections, tests, and analyses are performed and, prior to operation of the facility, shall find that the prescribed acceptance criteria are met. Any finding made under this subsection shall not re- quire a hearing except as provided in section 2239(a)(1)(B) of this title. (c) APPLICATION REVIEWS FOR PRODUCTION AND UTILIZATION FACILITIES OF AN EXISTING SITE.—In reviewing an application for an early site per- mit, construction permit, operating license, or combined construction permit and operating li- cense for a production facility or utilization fa- cility located at the site of a production facility or utilization facility licensed by the Commis- sion, the Commission shall, to the extent prac- ticable, use information that was part of the li- censing basis of the licensed production facility or utilization facility. (Aug. 1, 1946, ch. 724, title I, § 185, as added Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 955; renumbered title I and amended Pub. L. 102–486, title IX, § 902(a)(8), title XXVIII, § 2801, Oct. 24, 1992, 106 Stat. 2944, 3120; Pub. L. 118–67, div. B, title V, § 505(c), July 9, 2024, 138 Stat. 1478.) Editorial Notes REFERENCES IN TEXT This chapter, referred to in subsecs. (a) and (b), was in the original ‘‘this Act’’, meaning act Aug. 1, 1946, ch. 724, as added by act Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 919, known as the Atomic Energy Act of 1954, which is classified principally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section 2011 of this title and Tables. AMENDMENTS 2024—Subsec. (c). Pub. L. 118–67 added subsec. (c). 1992—Pub. L. 102–486, § 2801, inserted ‘‘and op

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 2236

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: dfedc62b012b573583f67ec7031c4b7215e5e6a61c497a046c2ba5c04069ddb7. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-ae7502a79be60449298483c5
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-2236-revocation-of-licenses--17bb7bcd4b.md
Pages: Not recorded – Not recorded
Passage SHA-256: e06bf29c1c3c08740e0a6053d25bf9610c8e4259c1c72fd2d8eb55bbd4d5f190

Source location: USCODE-2024-title42-chap23-divsnA-subchapXV-sec2236.pdf

Stored source content

Page 5529 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 2236 Commission shall ensure that the prescribed in- spections, tests, and analyses are performed and, prior to operation of the facility, shall find that the prescribed acceptance criteria are met. Any finding made under this subsection shall not re- quire a hearing except as provided in section 2239(a)(1)(B) of this title. (c) APPLICATION REVIEWS FOR PRODUCTION AND UTILIZATION FACILITIES OF AN EXISTING SITE.—In reviewing an application for an early site per- mit, construction permit, operating license, or combined construction permit and operating li- cense for a production facility or utilization fa- cility located at the site of a production facility or utilization facility licensed by the Commis- sion, the Commission shall, to the extent prac- ticable, use information that was part of the li- censing basis of the licensed production facility or utilization facility. (Aug. 1, 1946, ch. 724, title I, § 185, as added Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 955; renumbered title I and amended Pub. L. 102–486, title IX, § 902(a)(8), title XXVIII, § 2801, Oct. 24, 1992, 106 Stat. 2944, 3120; Pub. L. 118–67, div. B, title V, § 505(c), July 9, 2024, 138 Stat. 1478.) Editorial Notes REFERENCES IN TEXT This chapter, referred to in subsecs. (a) and (b), was in the original ‘‘this Act’’, meaning act Aug. 1, 1946, ch. 724, as added by act Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 919, known as the Atomic Energy Act of 1954, which is classified principally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section 2011 of this title and Tables. AMENDMENTS 2024—Subsec. (c). Pub. L. 118–67 added subsec. (c). 1992—Pub. L. 102–486, § 2801, inserted ‘‘and operating licenses’’ after ‘‘permits’’ in section catchline, des- ignated existing text as subsec. (a), and added subsec. (b). Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 1992 AMENDMENT Pub. L. 102–486, title XXVIII, § 2806, Oct, 24, 1992, 106 Stat. 3121, provided that: ‘‘Sections 185 b. and 189 a. (1)(B) of the Atomic Energy Act of 1954 [subsec. (b) of this section and section 2239(a)(1)(B) of this title], as added by sections 2801 and 2802 of this Act, shall apply to all proceedings involving a combined license for which an application was filed after May 8, 1991, under such sections.’’ COMBINED LICENSE REVIEW PROCEDURE Pub. L. 118–67, div. B, title II, § 207, July 9, 2024, 138 Stat. 1463, provided that: ‘‘(a) IN GENERAL.—In accordance with this section, the [Nuclear Regulatory] Commission shall establish and carry out an expedited procedure for issuing a com- bined license pursuant to section 185 b. of the Atomic Energy Act of 1954 (42 U.S.C. 2235(b)). ‘‘(b) QUALIFICATIONS.—To qualify for the expedited procedure under subsection (a), an applicant— ‘‘(1) shall submit a combined license application for a new nuclear reactor that— ‘‘(A) references a design for which the Commis- sion has issued a design certification (as defined in section 52.1 of title 10, Code of Federal Regulations (or any successor regulation)); or ‘‘(B) has a design that is substantially similar to a design of a nuclear reactor for which the Commis- sion has issued a combined license, an operating li- cense, or a manufacturing license under the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.); ‘‘(2) shall propose to construct the new nuclear re- actor on a site— ‘‘(A) on which a licensed commercial nuclear re- actor operates or previously operated; or ‘‘(B) that is directly adjacent to a site on which a licensed commercial nuclear reactor operates or previously operated and has site characteristics that are substantially similar to that site; and ‘‘(3) may not be subject to an order of the Commis- sion to suspend or revoke a license under section 2.202 of title 10, Code of Federal Regulations (or any suc- cessor regulation). ‘‘(c) EXPEDITED PROCEDURE.—With respect to a com- bined license for which the applicant has satisfied the requirements described in subsection (b), the Commis- sion shall, to the maximum extent practicable— ‘‘(1) not later than 18 months after the date on which the application is accepted for docketing— ‘‘(A) complete the technical review process and issue a safety evaluation report; and ‘‘(B) issue a final environmental impact state- ment or environmental assessment, unless the Commission finds that the proposed agency action is excluded pursuant to a categorical exclusion in accordance with the National Environmental Pol- icy Act of 1969 (42 U.S.C. 4321 et seq.); ‘‘(2) not later than 2 years after the date on which the application is accepted for docketing, complete any necessary public licensing hearings and related processes; and ‘‘(3) not later than 25 months after the date on which the application is accepted for docketing, make a final decision on whether to issue the com- bined license. ‘‘(d) PERFORMANCE AND REPORTING.— ‘‘(1) DELAYS IN ISSUANCE.—Not later than 30 days after the applicable deadline, the Executive Director for Operations of the Commission shall inform the Commission of any failure to meet a deadline under subsection (c). ‘‘(2) DELAYS IN ISSUANCE EXCEEDING 90 DAYS.—If any deadline under subsection (c) is not met by the date that is 90 days after the applicable date required under that subsection, the Commission shall submit to the appropriate committees of Congress [Com- mittee on Energy and Commerce of the House of Rep- resentatives and Committee on Environment and Public Works of the Senate] a report describing the delay, including— ‘‘(A) a detailed explanation accounting for the delay; and ‘‘(B) a plan for completion of the applicable ac- tion.’’ Executive Documents EXECUTIVE ORDER NO. 12129 Ex. Ord. No. 12129, Apr. 5, 1979, 44 F.R. 21001, which es- tablished a Critical Energy Facility Program, was re- voked by Ex. Ord. No. 12553, Feb. 25, 1986, 51 F.R. 7237. § 2236. Revocation of licenses (a) False applications; failure of performance Any license may be revoked for any material false statement in the application or any state- ment of fact required under section 2232 of this title, or because of conditions revealed by such application or statement of fact or any report, record, or inspection or other means which would warrant the Commission to refuse to grant a license on an original application, or for failure to construct or operate a facility in ac- cordance with the terms of the construction per- mit or license or the technical specifications in the application, or for violation of, or failure to Page 5530 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 2237 1 So in original. Probably should be ‘‘section’’. observe any of the terms and provisions of this chapter or of any regulation of the Commission. (b) Procedure The Commission shall follow the provisions of section 558(c) of title 5 in revoking any license. (c) Repossession of material Upon revocation of the license, the Commis- sion may immediately retake possession of all special nuclear material held by the licensee. In cases found by the Commission to be of extreme importance to the national defense and security or to the health and safety of the public, the Commission may recapture any special nuclear material held by the licensee or may enter upon and operate the facility prior to any of the pro- cedures provided under subchapter II of chapter 5 and chapter 7 of title 5. Just compensation shall be paid for the use of the facility. (Aug. 1, 1946, ch. 724, title I, § 186, as added Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 955; renumbered title I, Pub. L. 102–486, title IX, § 902(a)(8), Oct. 24, 1992, 106 Stat. 2944.) Editorial Notes REFERENCES IN TEXT This chapter, referred to in subsec. (a), was in the original ‘‘this Act’’, meaning act Aug. 1, 1946, ch. 724, as added by act Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 919, known as the Atomic Energy Act of 1954, which is clas- sified principally to this chapter. For complete classi- fication of this Act to the Code, see Short Title note set out under section 2011 of this title and Tables. CODIFICATION In subsecs. (b) and (c), ‘‘section 558(c) of title 5’’ and ‘‘subchapter II of chapter 5 and chapter 7 of title 5’’ substituted for ‘‘section 9(b) of the Administrative Pro- cedure Act [5 U.S.C. 1008(b)]’’ and ‘‘the Administration Procedure Act [5 U.S.C. 1001–1011]’’, respectively, on au- thority of Pub. L. 89–554, § 7(b), Sept. 6, 1966, 80 Stat. 631, the first section of which enacted Title 5, Government Organization and Employees. § 2237. Modification of license The terms and conditions of all licenses shall be subject to amendment, revision, or modifica- tion, by reason of amendments of this chapter or by reason of rules and regulations issued in ac- cordance with the terms of this chapter. (Aug. 1, 1946, ch. 724, title I, § 187, as added Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 955; renumbered title I, Pub. L. 102–486, title IX, § 902(a)(8), Oct. 24, 1992, 106 Stat. 2944.) Editorial Notes REFERENCES IN TEXT This chapter, referred to in text, was in the original ‘‘this Act’’, meaning act Aug. 1, 1946, ch. 724, as added by act Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 919, known as the Atomic Energy Act of 1954, which is classified prin- cipally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section 2011 of this title and Tables. § 2238. Continued operation of facilities Whenever the Commission finds that the pub- lic convenience and necessity or the production program of the Commission requires continued operation of a production facility or utilization facility the license for which has been revoked pursuant to section 2236 of this title, the Com- mission may, after consultation with the appro- priate regulatory agency, State or Federal, hav- ing jurisdiction, order that possession be taken of and such facility be operated for such period of time as the public convenience and necessity or the production program of the Commission may, in the judgment of the Commission, re- quire, or until a license for the operation of the facility shall become effective. Just compensa- tion shall be paid for the use of the facility. (Aug. 1, 1946, ch. 724, title I, § 188, as added Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 955; renumbered title I, Pub. L. 102–486, title IX, § 902(a)(8), Oct. 24, 1992, 106 Stat. 2944.) § 2239. Hearings and judicial review (a)(1)(A) In any proceeding under this chapter, for the granting, suspending, revoking, or amending of any license or construction permit, or application to transfer control, and in any proceeding for the issuance or modification of rules and regulations dealing with the activities of licensees, and in any proceeding for the pay- ment of compensation, an award or royalties under sections 1 2183, 2187, 2236(c) or 2238 of this title, the Commission shall grant a hearing upon the request of any person whose interest may be affected by the proceeding, and shall admit any such person as a party to such proceeding. The Commission shall hold a hearing after thirty days’ notice and publication once in the Federal Register, on each application under section 2133 or 2134(b) of this title for a construction permit for a facility, and on any application under sec- tion 2134(c) of this title for a construction per- mit for a testing facility. In cases where such a construction permit has been issued following the holding of such a hearing, the Commission may, in the absence of a request therefor by any person whose interest may be affected, issue an operating license or an amendment to a con- struction permit or an amendment to an oper- ating license without a hearing, but upon thirty days’ notice and publication once in the Federal Register of its intent to do so. The Commission may dispense with such thirty days’ notice and publication with respect to any application for an amendment to a construction permit or an amendment to an operating license upon a de- termination by the Commission that the amend- ment involves no significant hazards consider- ation. (B)(i) Not less than 180 days before the date scheduled for initial loading of fuel into a plant by a licensee that has been issued a combined construction permit and operating license under section 2235(b) of this title, the Commission shall publish in the Federal Register notice of intended operation. That notice shall provide that any person whose interest may be affected by operation of the plant, may within 60 days re- quest the Commission to hold a hearing on whether the facility as constructed complies, or on completion will comply, with the acceptance criteria of the license. (ii) A request for hearing under clause (i) shall show, prima facie, that one or more of the ac-

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 2011 — Congressional declaration of policy

Atomic energy is capable of application for peaceful as well as military purposes. It is therefore declared to be the policy of the United States that— **(a)** the development, use, and control of atomic energy shall be directed so as to make the maximum contribution to the general welfare, subject at all times to the paramount objective of making the maximum contribution to the common defense and security; and **(b)** the development, use, and control of atomic energy shall be directed so as to promote world peace, improve the general welfare, increase the standard of living, and strengthen free competition in private enterprise.

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 2011

Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 2011. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 2011 — Congressional declaration of policy

Page 5360 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 2011 Sec. 2297f–2. Regulation of Restricted Data. SUBCHAPTER VII—DECONTAMINATION AND DECOMMISSIONING 2297g. Uranium Enrichment Decontamination and Decommissioning Fund. 2297g–1. Deposits. 2297g–2. Department facilities. 2297g–3. Employee provisions. 2297g–4. Reports to Congress. SUBCHAPTER VIII—UNITED STATES ENRICHMENT CORPORATION PRIVATIZATION 2297h. Definitions. 2297h–1. Sale of Corporation. 2297h–2. Method of sale. 2297h–3. Establishment of private corporation. 2297h–4. Transfers to private corporation. 2297h–5. Leasing of gaseous diffusion facilities. 2297h–6. Transfer of contracts. 2297h–7. Liabilities. 2297h–8. Employee protections. 2297h–9. Ownership limitations. 2297h–10. Uranium transfers and sales. 2297h–10a. Incentives for additional downblending of highly enriched uranium by the Rus- sian Federation. 2297h–10b. Secretarial determinations; congres- sional notification. 2297h–11. Low-level waste. 2297h–12. AVLIS. 2297h–13. Application of certain laws. Editorial Notes CODIFICATION The Atomic Energy Act of 1954, which is classified principally to this chapter, is act Aug. 1, 1946, ch. 724. It was originally enacted as the Atomic Energy Act of 1946, act Aug. 1, 1946, ch. 724, 60 Stat. 755, which con- sisted of sections 1 to 21 and was classified generally to chapter 14 (§ 1801 et seq.) of this title. The Atomic En- ergy Act of 1946 was renamed the Atomic Energy Act of 1954 and amended generally by act Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 919, and was subsequently transferred to this chapter. Sections that were enacted as part of the 1954 general amendment are shown herein as having been added to act Aug. 1, 1946, and not as amending it, due to the

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 2011

Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 2011. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 2235 — Construction permits and operating licenses

**(a)** All applicants for licenses to construct or modify production or utilization facilities shall, if the application is otherwise acceptable to the Commission, be initially granted a construction permit. The construction permit shall state the earliest and latest dates for the completion of the construction or modification. Unless the construction or modification of the facility is completed by the completion date, the construction permit shall expire, and all rights thereunder be forfeited, unless upon good cause shown, the Commission extends the completion date. Upon the completion of the construction or modification of the facility, upon the filing of any additional information needed to bring the original application up to date, and upon finding that the facility authorized has been constructed and will operate in conformity with the application as amended and in conformity with the provisions of this chapter and of the rules and regulations of the Commission, and in the absence of any good cause being shown to the Commission why the granting of a license would not be in accordance with the provisions of this chapter, the Commission shall thereupon issue a license to the applicant. For all other purposes of this chapter, a construction permit is deemed to be a “license”. **(b)** After holding a public hearing under [section 2239(a)(1)(A) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section2239/a/1/A&num=0&edition=prelim), the Commission shall issue to the applicant a combined construction and operating license if the application contains sufficient information to support the issuance of a combined license and the Commission determines that there is reasonable assurance that the facility will be constructed and will operat

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 2235

Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 2235. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 2235 — Construction permits and operating li-

Page 5528 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 2233 appropriate action prior to the expiration of such 2- year period, or in the case of a committee established by the Congress, its duration is otherwise provided by law. See section 1013 of Title 5, Government Organiza- tion and Employees. § 2233. Terms of licenses Each license shall be in such form and contain such terms and conditions as the Commission may, by rule or regulation, prescribe to effec- tuate the provisions of this chapter, including the following provisions: (a) Repealed. Pub. L. 88–489, § 18, Aug. 26, 1964, 78 Stat. 607. (b) No right to the special nuclear material shall be conferred by the license except as de- fined by the license. (c) Neither the license nor any right under the license shall be assigned or otherwise trans- ferred in violation of the provisions of this chap- ter. (d) Every license issued under this chapter shall be subject to the right of recapture or con- trol reserved by section 2138 of this title, and to all of the other provisions of this chapter, now or hereafter in effect and to all valid rules and regulations of the Commission. (Aug. 1, 1946, ch. 724, title I, § 183, as added Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 954; amended Pub. L. 88–489, § 18, Aug. 26, 1964, 78 Stat. 607; renum- bered title I, Pub. L. 102–486, title IX, § 902(a)(8), Oct. 24, 1992, 106 Stat. 2944.) Editorial Notes REFERENCES IN TEXT This chapter, referred to in text, was in the original ‘‘this Act’’, meaning act Aug. 1, 1946, ch. 724, as added by act Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 919, known as the Atomic Energy Act of 1954, which is classified prin- cipally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under secti

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 2235

Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 2235. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 2236 — Revocation of licenses

**(a) False applications; failure of performance** Any license may be revoked for any material false statement in the application or any statement of fact required under [section 2232 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section2232&num=0&edition=prelim), or because of conditions revealed by such application or statement of fact or any report, record, or inspection or other means which would warrant the Commission to refuse to grant a license on an original application, or for failure to construct or operate a facility in accordance with the terms of the construction permit or license or the technical specifications in the application, or for violation of, or failure to observe any of the terms and provisions of this chapter or of any regulation of the Commission. **(b) Procedure** The Commission shall follow the provisions of [section 558(c) of title 5](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section558/c&num=0&edition=prelim) in revoking any license. **(c) Repossession of material** Upon revocation of the license, the Commission may immediately retake possession of all special nuclear material held by the licensee. In cases found by the Commission to be of extreme importance to the national defense and security or to the health and safety of the public, the Commission may recapture any special nuclear material held by the licensee or may enter upon and operate the facility prior to any of the procedures provided under subchapter II of chapter 5 and chapter 7 of title 5. Just compensation shall be paid for the use of the facility.

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 2236

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 4321 — Repealed. Pub. L. 117–58, div. G, title VIII, § 70801(h), Nov. 15, 2021, 135 Stat. 1294

### Statutory Notes Section, Pub. L. 114–94, div. D, title XLI, § 41013, Dec. 4, 2015, 129 Stat. 1761, provided that this subchapter shall terminate 7 years after Dec. 4, 2015.

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 4321

Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 4321. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 4321 — Congressional declaration of purpose

Page 6095 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 4321 Sec. 4368a. Utilization of talents of older Americans in projects of pollution prevention, abate- ment, and control. 4368b. General assistance program. 4369. Miscellaneous reports. 4369a. Reports on environmental research and devel- opment activities of Agency. 4370. Reimbursement for use of facilities. 4370a. Assistant Administrators of Environmental Protection Agency; appointment; duties. 4370b. Availability of fees and charges to carry out Agency programs. 4370c. Environmental Protection Agency fees. 4370d. Percentage of Federal funding for organiza- tions owned by socially and economically disadvantaged individuals. 4370e. Working capital fund in Treasury. 4370f. Availability of funds after expiration of pe- riod for liquidating obligations. 4370g. Availability of funds for uniforms and certain services. 4370h. Availability of funds for facilities. 4370i. Regional liaisons for minority, tribal, and low-income communities. 4370j. Municipal Ombudsman. SUBCHAPTER IV—FEDERAL PERMITTING IMPROVEMENT 4370m. Definitions. 4370m–1. Federal Permitting Improvement Steering Council. 4370m–2. Permitting process improvement. 4370m–3. Interstate compacts. 4370m–4. Coordination of required reviews. 4370m–5. Delegated State permitting programs. 4370m–6. Litigation, judicial review, and savings provi- sion. 4370m–7. Reports. 4370m–8. Funding for governance, oversight, and proc- essing of environmental reviews and per- mits. 4370m–9. Application. 4370m–10. GAO report. 4370m–11. Savings provision. 4370m–12. Repealed. § 4321. Congressional declaration of purpose The purposes of this chapter are: To declare a national policy which will encourage productive and enjoyable harmony

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 4321

Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 4321. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

5 U.S.C. § 1001 — Definitions

In this chapter: (1) **Administrator.—** — The term “Administrator” means the Administrator of General Services. (2) **Advisory committee.—** (A) *In general.—* — The term “advisory committee” means a committee, board, commission, council, conference, panel, task force, or other similar group, or any subcommittee or other subgroup thereof (hereafter in this paragraph referred to as “committee”) that is established or utilized to obtain advice or recommendations for the President or one or more agencies or officers of the Federal Government and that is— (i) established by statute or reorganization plan; (ii) established or utilized by the President; or (iii) established or utilized by one or more agencies. (B) *Exclusions.—* — The term “advisory committee” excludes— (i) a committee that is composed wholly of full-time, or permanent part-time, officers or employees of the Federal Government; and (ii) a committee that is created by the National Academy of Sciences or the National Academy of Public Administration. (3) **Agency.—** — The term “agency” has the meaning given the term in [section 551 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section551&num=0&edition=prelim). (4) **Presidential advisory committee.—** — The term “Presidential advisory committee” means an advisory committee that advises the President.

Source: Supplied U.S. Code snapshot — release unconfirmed · 5 U.S.C. § 1001

Stored review status: release_metadata_unconfirmed. The source passage cites 5 U.S.C. § 1001. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

5 U.S.C. § 1001 — Definitions

Page 246 TITLE 5—GOVERNMENT ORGANIZATION AND EMPLOYEES [§ 913 amendment, or to a motion to postpone, or a motion to proceed to the consideration of other business. A motion to reconsider the vote by which the motion is agreed to or disagreed to shall not be in order. If a motion to proceed to the consideration of the resolution is agreed to, the resolution shall remain the unfinished busi- ness of the respective House until disposed of. (b) Debate on the resolution, and on all debat- able motions and appeals in connection there- with, shall be limited to not more than ten hours, which shall be divided equally between individuals favoring and individuals opposing the resolution. A motion further to limit debate is in order and not debatable. An amendment to, or a motion to postpone, or a motion to proceed to the consideration of other business, or a mo- tion to recommit the resolution is not in order. A motion to reconsider the vote by which the resolution is passed or rejected shall not be in order. (c) Immediately following the conclusion of the debate on the resolution with respect to a reorganization plan, and a single quorum call at the conclusion of the debate if requested in ac- cordance with the rules of the appropriate House, the vote on final passage of the resolu- tion shall occur. (d) Appeals from the decisions of the Chair re- lating to the application of the rules of the Sen- ate or the House of Representatives, as the case may be, to the procedure relating to a resolu- tion with respect to a reorganization plan shall be decided without debate. (e) If, prior to the passage by one House of a resolution of that House, that House receives a resolution with respect to the same reorganiza- tion plan from the other House, then— (1) the

Source: Supplied 2024 U.S. Code historical extraction · 5 U.S.C. § 1001

Stored review status: historical_2024_not_currentness_verified. The source passage cites 5 U.S.C. § 1001. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

5 U.S.C. § 1008 — Establishment and purpose of advisory committees

**(a) Establishment.—** An advisory committee shall not be established unless establishment is— (1) specifically authorized by statute or by the President; or (2) determined as a matter of formal record, by the head of the agency involved after consultation with the Administrator, with timely notice published in the Federal Register, to be in the public interest in connection with the performance of duties imposed on that agency by law. **(b) Purpose of Advisory Committees.—** Unless otherwise specifically provided by statute or Presidential directive, advisory committees shall be utilized solely for advisory functions. Determinations of action to be taken and policy to be expressed with respect to matters upon which an advisory committee reports or makes recommendations shall be made solely by the President or an officer of the Federal Government. **(c) Advisory Committee Charters.—** (1) **General requirement.—** — An advisory committee shall not meet or take any action until an advisory committee charter has been filed— (A) with the Administrator in the case of Presidential advisory committees; or (B) with— (i) the head of the agency to whom the advisory committee reports; and (ii) the standing committees of the Senate and House of Representatives having legislative jurisdiction over the agency to which the advisory committee reports. (2) **Contents of charter.—** — The advisory committee charter shall contain— (A) the committee’s official designation; (B) the committee’s objectives and the scope of its activity; (C) the period of time necessary for the committee to carry out its purposes; (D) the agency or official to whom the committee reports; (E) the agency responsible for providing the necessary support for the committee;

Source: Supplied U.S. Code snapshot — release unconfirmed · 5 U.S.C. § 1008

Stored review status: release_metadata_unconfirmed. The source passage cites 5 U.S.C. § 1008. This identifies an authority to review, not proof of applicability.