Browse Arkansas Code titles and sections
43 U.S.C. § 620g — Recreational and fish and wildlife facili-
Federal law — U.S. Code and appendices · legal_authorities
Page 236
TITLE 43—PUBLIC LANDS
§ 620e
(Pub. L. 90–537, title V, § 502, Sept. 30, 1968, 82
Stat. 898.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Colorado River
Basin Project Act, and not as part of act Apr. 11, 1956,
popularly known as the Colorado River Storage Project
Act, which comprises this chapter.
§ 620e. Cost allocations; Indian lands; report to
Congress
Upon completion of each unit, participating
project or separable feature thereof, the Sec-
retary shall allocate the total costs (excluding
any expenditures authorized by section 620g of
this title) of constructing said unit, project or
feature to power, irrigation, municipal water
supply, flood control, navigation, or any other
purposes authorized under reclamation law. Al-
locations of construction, operation and mainte-
nance costs to authorized nonreimbursable pur-
poses shall be nonreturnable under the provi-
sions of this chapter. In the event that the Nav-
ajo participating project is authorized, the costs
allocated to irrigation of Indian-owned tribal or
restricted lands within, under, or served by such
project, and beyond the capability of such lands
to repay, shall be determined, and, in recogni-
tion of the fact that assistance to the Navajo In-
dians is the responsibility of the entire nation,
such costs shall be nonreimbursable. On January
1 of each year the Secretary shall report to the
Congress for the previous fiscal year, beginning
with the fiscal year 1957, upon the status of the
revenues from, and the cost of, constructing, op-
erating, and maintaining the Colorado River
storage project and the participating projects.
The Secretary’s report shall be prepared to re-
flect accurately the Federal investment allo-
cated at that time to power, to irri
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 620g
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 34d0c18868890d3899be34aab8cea5abd05d2561e0732d8c556ee0573f257a9f. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-96e6f3d6180a65889b171c79
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-620g-recreational-and-fish-and-wildlife-facili--d1e3c156de.md
Pages: Not recorded – Not recorded
Passage SHA-256: 16ece84f37044ab3537a65e54032e6766b62fae28e116533938540d4005e8bf8
Source location: USCODE-2024-title43-chap12B-sec620g.pdf
Stored source content
Page 236
TITLE 43—PUBLIC LANDS
§ 620e
(Pub. L. 90–537, title V, § 502, Sept. 30, 1968, 82
Stat. 898.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Colorado River
Basin Project Act, and not as part of act Apr. 11, 1956,
popularly known as the Colorado River Storage Project
Act, which comprises this chapter.
§ 620e. Cost allocations; Indian lands; report to
Congress
Upon completion of each unit, participating
project or separable feature thereof, the Sec-
retary shall allocate the total costs (excluding
any expenditures authorized by section 620g of
this title) of constructing said unit, project or
feature to power, irrigation, municipal water
supply, flood control, navigation, or any other
purposes authorized under reclamation law. Al-
locations of construction, operation and mainte-
nance costs to authorized nonreimbursable pur-
poses shall be nonreturnable under the provi-
sions of this chapter. In the event that the Nav-
ajo participating project is authorized, the costs
allocated to irrigation of Indian-owned tribal or
restricted lands within, under, or served by such
project, and beyond the capability of such lands
to repay, shall be determined, and, in recogni-
tion of the fact that assistance to the Navajo In-
dians is the responsibility of the entire nation,
such costs shall be nonreimbursable. On January
1 of each year the Secretary shall report to the
Congress for the previous fiscal year, beginning
with the fiscal year 1957, upon the status of the
revenues from, and the cost of, constructing, op-
erating, and maintaining the Colorado River
storage project and the participating projects.
The Secretary’s report shall be prepared to re-
flect accurately the Federal investment allo-
cated at that time to power, to irrigation, and
to other purposes, the progress of return and re-
payment thereon, and the estimated rate of
progress, year by year, in accomplishing full re-
payment.
(Apr. 11, 1956, ch. 203, § 6, 70 Stat. 109.)
Statutory Notes and Related Subsidiaries
TERMINATION OF REPORTING REQUIREMENTS
For termination, effective May 15, 2000, of provisions
of law requiring submittal to Congress of any annual,
semiannual, or other regular periodic report listed in
House Document No. 103–7 (in which a report required
under this section is listed as the 11th item on page
114), see section 3003 of Pub. L. 104–66, as amended, and
section 1(a)(4) [div. A, § 1402(1)] of Pub. L. 106–554, set
out as notes under section 1113 of Title 31, Money and
Finance.
§ 620f. Powerplant operations
The hydroelectric powerplants and trans-
mission lines authorized by this chapter to be
constructed, operated, and maintained by the
Secretary shall be operated in conjunction with
other Federal powerplants, present and poten-
tial, so as to produce the greatest practicable
amount of power and energy that can be sold at
firm power and energy rates, but in the exercise
of the authority hereby granted he shall not af-
fect or interfere with the operation of the provi-
sions of the Colorado River Compact, the Upper
Colorado River Basin Compact, the Boulder Can-
yon Project Act [43 U.S.C. 617 et seq.], the Boul-
der Canyon Project Adjustment Act [43 U.S.C.
618 et seq.], and any contract lawfully entered
into under said Compacts and Acts. Subject to
the provisions of the Colorado River Compact,
neither the impounding nor the use of water for
the generation of power and energy at the plants
of the Colorado River storage project shall pre-
clude or impair the appropriation of water for
domestic or agricultural purposes pursuant to
applicable State law.
(Apr. 11, 1956, ch. 203, § 7, 70 Stat. 109; Pub. L.
87–483, § 18, June 13, 1962, 76 Stat. 102.)
Editorial Notes
REFERENCES IN TEXT
The Boulder Canyon Project Act, referred to in text,
is act Dec. 21, 1928, ch. 42, 45 Stat. 1057, which is classi-
fied generally to subchapter I (§ 617 et seq.) of chapter
12A of this title. For complete classification of this Act
to the Code, see section 617t of this title and Tables.
The Boulder Canyon Project Adjustment Act, re-
ferred to in text, is act July 19, 1940, ch. 643, 54 Stat.
774, which is classified generally to subchapter II (§ 618
et seq.) of chapter 12A of this title. For complete classi-
fication of this Act to the Code, see section 618o of this
title and Tables.
AMENDMENTS
1962—Pub. L. 87–483 substituted ‘‘into’’ for ‘‘unto’’.
§ 620g. Recreational and fish and wildlife facili-
ties
In connection with the development of the
Colorado River storage project and of the par-
ticipating projects, the Secretary is authorized
and directed to investigate, plan, construct, op-
erate, and maintain (1) public recreational fa-
cilities on lands withdrawn or acquired for the
development of said project or of said partici-
pating projects, to conserve the scenery, the
natural, historic, and archeologic objects, and
the wildlife on said lands, and to provide for
public use and enjoyment of the same and of the
water areas created by these projects by such
means as are consistent with the primary pur-
poses of said projects; and (2) facilities to miti-
gate losses of, and improve conditions for, the
propagation of fish and wildlife. The Secretary
is authorized to acquire lands necessary for the
construction, operation, and maintenance of the
facilities herein provided, and to dispose of them
to Federal, State, and local governmental agen-
cies by lease, transfer, exchange, or conveyance
upon such terms and conditions as will best pro-
mote their development and operation in the
public interest. All costs incurred pursuant to
this section shall be nonreimbursable and non-
returnable.
(Apr. 11, 1956, ch. 203, § 8, 70 Stat. 110; Pub. L.
94–579, title VII, § 704(a), Oct. 21, 1976, 90 Stat.
2792.)
Editorial Notes
AMENDMENTS
1976—Pub. L. 94–579 struck out provisions authorizing
withdrawal of public lands from entry or other disposi-
tion under the public land laws.
Page 237
TITLE 43—PUBLIC LANDS
§ 620k
1 See References in Text note below.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1976 AMENDMENT
Pub. L. 94–579, title VII, § 704(a), Oct. 21, 1976, 90 Stat.
2792, provided that the amendment made by section
704(a) is effective on and after Oct. 21, 1976.
SAVINGS PROVISION
Amendment by Pub. L. 94–579 not to be construed as
terminating any valid lease, permit, patent, etc., exist-
ing on Oct. 21, 1976, see section 701 of Pub. L. 94–579, set
out as a note under section 1701 of this title.
§ 620h. Saving provisions
Nothing contained in this chapter shall be
construed to alter, amend, repeal, construe, in-
terpret, modify, or be in conflict with the provi-
sions of the Boulder Canyon Project Act (45
Stat. 1057) [43 U.S.C. 617 et seq.], the Boulder
Canyon Project Adjustment Act (54 Stat. 774) [43
U.S.C. 618 et seq.], the Colorado River Compact,
the Upper Colorado River Basin Compact, the
Rio Grande Compact of 1938, or the treaty with
the United Mexican States (Treaty Series 994).
(Apr. 11, 1956, ch. 203, § 9, 70 Stat. 110.)
Editorial Notes
REFERENCES IN TEXT
The Boulder Canyon Project Act, referred to in text,
is act Dec. 21, 1928, ch. 42, 45 Stat. 1057, which is classi-
fied generally to subchapter I (§ 617 et seq.) of chapter
12A of this title. For complete classification of this Act
to the Code, see section 617t of this title and Tables.
The Boulder Canyon Project Adjustment Act, re-
ferred to in text, is act July 19, 1940, ch. 643, 54 Stat.
774, which is classified generally to subchapter II (§ 618
et seq.) of chapter 12A of this title. For complete classi-
fication of this Act to the Code, see section 618o of this
title and Tables.
§ 620i. Expenditures; units excepted from soil
survey and land classification requirements
Expenditures for the Flaming Gorge, Glen
Canyon, Wayne N. Aspinall, and Navajo initial
units of the Colorado River storage project may
be made without regard to the soil survey and
land classification requirements of section 390a 1
of this title.
(Apr. 11, 1956, ch. 203, § 10, 70 Stat. 110; Pub. L.
96–375, § 7, Oct. 3, 1980, 94 Stat. 1507.)
Editorial Notes
REFERENCES IN TEXT
Section 390a of this title, referred to in text, was in
the original a reference to the Interior Department Ap-
propriation Act, 1954. The soil survey and land classi-
fication requirements of that Act (act July 31, 1953, ch.
298, 67 Stat. 261, 266) were classified to section 390a of
this title, prior to repeal by Pub. L. 105–362, title IX,
§ 901(e)(2), Nov. 10, 1998, 112 Stat. 3289.
AMENDMENTS
1980—Pub. L. 96–375 substituted ‘‘Wayne N. Aspinall’’
for ‘‘Curecanti’’.
§ 620j. Court decree; effectivity and approval
The Final Judgment, Final Decree and stipu-
lations incorporated therein in the consolidated
cases of United States of America v. Northern
Colorado Water Conservancy District, et al.,
Civil Nos. 2782, 5016 and 5017, in the United
States District Court for the District of Colo-
rado, are approved, shall become effective imme-
diately, and the proper agencies of the United
States shall act in accordance therewith.
(Apr. 11, 1956, ch. 203, § 11, 70 Stat. 110.)
§ 620k. Authorization of appropriations
There are authorized to be appropriated, out of
any moneys in the Treasury not otherwise ap-
propriated, such sums as may be required to
carry out the purposes of this chapter, but not
to exceed $760,000,000.
(Apr. 11, 1956, ch. 203, § 12, 70 Stat. 110.)
Statutory Notes and Related Subsidiaries
CHANGE OF NAME
Pub. L. 96–375, § 7, Oct. 3, 1980, 94 Stat. 1507, provided
that: ‘‘The Curecanti Storage Unit of the Colorado
River Storage Project constructed under the authority
of the Act of April 11, 1956 (70 Stat. 106) [this chapter]
is hereby designated and hereafter shall be known as
the Wayne N. Aspinall Storage Unit of the Colorado
River Storage Project. Any law, regulation, record,
map, or other document of the United States referring
to the Curecanti Storage Unit shall be held to refer to
the Wayne N. Aspinall Storage Unit.’’
TERMINATION OF AUTHORIZATION OF APPROPRIATIONS
Pub. L. 102–575, title II, § 201(c), Oct. 30, 1992, 106 Stat.
4607, provided that: ‘‘Notwithstanding any provision of
the Act of April 11, 1956 (70 Stat. 110; 43 U.S.C. 620k)
[this chapter], the Act of September 2, 1964 (78 Stat.
852) [Pub. L. 88–568, see Tables for classification], the
Act of September 30, 1968 (82 Stat. 885) [see Short Title
note set out under section 1501 of this title], the Act of
August 10, 1972 (86 Stat. 525; 43 U.S.C. 620k note), and
the Act of October 31, 1988 (102 Stat. 2826) [enacting sec-
tion 79–1 of Title 16, Conservation, and provisions set
out as notes under this section and section 461 of Title
16] to the contrary, the authorization of appropriations
for construction of any Colorado River Storage Project
participating project located in the State of Utah shall
terminate five years after the date of enactment of this
Act [Oct. 30, 1992] unless: (1) the Secretary [of the Inte-
rior] executes a cost-sharing agreement with the Dis-
trict [Central Utah Water Conservancy District] for
construction of such project, and (2) the Secretary has
requested, or the Congress has appropriated, construc-
tion funds for such project.’’
AUTHORIZATION OF ADDITIONAL AMOUNTS FOR
COLORADO RIVER STORAGE PROJECT
Pub. L. 102–575, title II, § 201(a)(1), Oct. 30, 1992, 106
Stat. 4606, provided that: ‘‘In order to provide for the
completion of the Central Utah Project and other fea-
tures described in this Act [see Short Title of 1992
Amendment note set out under section 371 of this title],
the amount which section 12 of the Act of April 11, 1956
(70 Stat. 110; 43 U.S.C. 620k), authorizes to be appro-
priated, which was increased by the Act of August 10,
1972 (86 Stat. 525; 43 U.S.C. 620k note) and the Act of Oc-
tober 31, 1988 (102 Stat. 2826) [43 U.S.C. 620k note], is
hereby further increased by $924,206,000 (January 1991)
plus or minus such amounts, if any, as may be required
by reason of changes in construction costs as indicated
by engineering cost indexes applicable to the type of
construction involved: Provided, however, That of the
amounts authorized to be appropriated by this section,
the Secretary [of the Interior] is not authorized to obli-
gate or expend amounts in excess of $214,352,000 for the
features identified in the Report of the Senate Com-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
For the purpose of controlling the floods, improving navigation, and regulating the flow of the Colorado River, providing for storage and for the delivery of the stored waters thereof for reclamation of public lands and other beneficial uses exclusively within the United States, and for the generation of electrical energy as a means of making the project herein authorized a self-supporting and financially solvent undertaking, the Secretary of the Interior subject to the terms of the Colorado River compact hereinafter mentioned in this chapter, is authorized to construct, operate, and maintain a dam and incidental works in the main stream of the Colorado River at Black Canyon or Boulder Canyon adequate to create a storage reservoir of a capacity of not less than twenty million acre-feet of water and a main canal and appurtenant structures located entirely within the United States connecting the Laguna Dam, or other suitable diversion dam, which the Secretary of the Interior is authorized to construct if deemed necessary or advisable by him upon engineering or economic considerations, with the Imperial and Coachella Valleys in California, the expenditures for said main canal and appurtenant structures to be reimbursable, as provided in the reclamation law, and shall not be paid out of revenues derived from the sale or disposal of water power or electric energy at the dam authorized to be constructed at said Black Canyon or Boulder Canyon, or for water for potable purposes outside of the Imperial and Coachella Valleys: Provided, however, That no charge shall be made for water for the use, storage, or delivery of water for irrigation or water for potable purposes in the Imperial or Coachella Valleys; also to construct and equip, operate, and maintain at or near said dam, or
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 617
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 617. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 209
TITLE 43—PUBLIC LANDS
§ 617
Sec.
618i.
Effective date.
618j.
Effect of refusal to modify existing contracts.
618k.
Definitions.
618l.
Repealed.
618m.
Effect on existing laws and States’ rights.
618n.
Wages of employees.
618o.
Short title.
618p.
Omitted.
SUBCHAPTER III—HOOVER DAM CONTRACTS AND
FACILITIES
619.
Increase in capacity of existing generating
equipment at Hoover Powerplant; construc-
tion of Colorado River bridge crossing.
619a.
Renewal contracts for power.
619b.
Reimbursement of funds advanced by non-
Federal purchasers; uprating program; re-
payment requirement; visitor facilities pro-
gram.
Statutory Notes and Related Subsidiaries
CONSOLIDATION OF CERTAIN PROJECTS; EFFECT ON THIS
CHAPTER
Act May 28, 1954, ch. 241, 68 Stat. 143, provided that:
‘‘For the purposes of effecting economies and in-
creased efficiency in the construction, operation, and
maintenance thereof and of accounting for the return
of reimbursable costs, the Secretary of the Interior is
authorized and directed to consolidate and administer
as a single project to be known as the Parker-Davis
project, Arizona-California-Nevada, the projects known
as the Parker Dam power project, Arizona-California,
and the Davis Dam project, Arizona-Nevada: Provided,
That nothing in this Act shall be construed to alter or
affect in any way the Boulder Canyon Project Act (45
Stat. 1057) [subchapter I of this chapter], the Boulder
Canyon Project Adjustment Act (54 Stat. 774) [sub-
chapter II of this chapter], or the treaty between the
United States of America and the United Mexican
States, signed at Washington on February 3, 1944, relat-
ing to the utilization of the waters of the Colorado and
Tijuana Rivers and of the Rio Grande from Fort
Quitman, Texas, to th
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 617
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 617. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
The Secretary of the Interior is authorized and directed to, and he shall, promulgate charges, or the basis of computation thereof, for electrical energy generated at Hoover Dam beginning June 1, 1937, computed to be sufficient, together with other net revenues from the project, to accomplish the following purposes:
**(a)** To meet the cost of operation and maintenance, and to provide for replacements, of the project beginning June 1, 1937;
**(b)** To repay to the Treasury, with interest, the advances to the Colorado River Dam Fund for the project made prior to June 1, 1937, within fifty years from that date (excluding advances allocated to flood control by [section 617a(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617a/b&num=0&edition=prelim), which shall be repayable as provided in [section 618f of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618f&num=0&edition=prelim)), and such advances made on and after June 1, 1937, over fifty-year periods;
**(c)** To provide $600,000 for each of the years and for the purposes specified in [section 618a(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618a/c&num=0&edition=prelim);
**(d)** To provide $500,000 for each of the years and for the purposes specified in [section 618a(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618a/d&num=0&edition=prelim); and
**(e)** To provide, by application of the increments to rates specified in section 403(c)(2) of the Colorado River Basin Project Act of 1968, as amended and supplemented [[43 U.S.C. 1543(c)(2)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1543/c/2&num=0&edition=p
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 618
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 618. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 217
TITLE 43—PUBLIC LANDS
§ 618
islature of each of such States and by the Con-
gress of the United States.
(Dec. 21, 1928, ch. 42, § 19, 45 Stat. 1065.)
§ 617s. Recognition of rights of Mexico to Colo-
rado River waters
Nothing in this subchapter shall be construed
as a denial or recognition of any rights, if any,
in Mexico to the use of the waters of the Colo-
rado River system.
(Dec. 21, 1928, ch. 42, § 20, 45 Stat. 1066.)
§ 617t. Short title
The short title of this subchapter shall be
‘‘Boulder Canyon Project Act.’’
(Dec. 21, 1928, ch. 42, § 21, 45 Stat. 1066.)
§ 617u. Lease of reserved lands in Boulder City,
Nevada; disposition of revenues
The Secretary of the Interior is authorized and
empowered, under such rules and regulations as
he may prescribe, to establish rental rates for
the lease of reserved lands of the United States
situate within the exterior boundaries of Boul-
der City, Nevada, and, without prior advertising,
to enter into leases therefor at not less than
rates so established and for periods not exceed-
ing fifty-three years from the date of such
leases: Provided, That all revenues which may
accrue to the United States under the provisions
of such leases shall be deposited in the Treasury
and credited to the Colorado River Dam fund es-
tablished by section 617a of this title.
(June 18, 1940, ch. 395, 54 Stat. 437.)
Editorial Notes
CODIFICATION
Section was not enacted as part of the Boulder Can-
yon Project Act which comprises this subchapter.
Statutory Notes and Related Subsidiaries
BOULDER CITY ACT OF 1958
Public Law 85–900, Sept. 2, 1958, 72 Stat. 1726, provided
for disposal of certain Federal property in Boulder City
for purposes of establishment of a municipal corpora-
tion incorporated under laws of Nevada.
§ 61
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 618
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 618. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
In connection with the development of the Colorado River storage project and of the participating projects, the Secretary is authorized and directed to investigate, plan, construct, operate, and maintain (1) public recreational facilities on lands withdrawn or acquired for the development of said project or of said participating projects, to conserve the scenery, the natural, historic, and archeologic objects, and the wildlife on said lands, and to provide for public use and enjoyment of the same and of the water areas created by these projects by such means as are consistent with the primary purposes of said projects; and (2) facilities to mitigate losses of, and improve conditions for, the propagation of fish and wildlife. The Secretary is authorized to acquire lands necessary for the construction, operation, and maintenance of the facilities herein provided, and to dispose of them to Federal, State, and local governmental agencies by lease, transfer, exchange, or conveyance upon such terms and conditions as will best promote their development and operation in the public interest. All costs incurred pursuant to this section shall be nonreimbursable and nonreturnable.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620g
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
There are authorized to be appropriated, out of any moneys in the Treasury not otherwise appropriated, such sums as may be required to carry out the purposes of this chapter, but not to exceed $760,000,000.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620k
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 620k. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 237
TITLE 43—PUBLIC LANDS
§ 620k
1 See References in Text note below.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1976 AMENDMENT
Pub. L. 94–579, title VII, § 704(a), Oct. 21, 1976, 90 Stat.
2792, provided that the amendment made by section
704(a) is effective on and after Oct. 21, 1976.
SAVINGS PROVISION
Amendment by Pub. L. 94–579 not to be construed as
terminating any valid lease, permit, patent, etc., exist-
ing on Oct. 21, 1976, see section 701 of Pub. L. 94–579, set
out as a note under section 1701 of this title.
§ 620h. Saving provisions
Nothing contained in this chapter shall be
construed to alter, amend, repeal, construe, in-
terpret, modify, or be in conflict with the provi-
sions of the Boulder Canyon Project Act (45
Stat. 1057) [43 U.S.C. 617 et seq.], the Boulder
Canyon Project Adjustment Act (54 Stat. 774) [43
U.S.C. 618 et seq.], the Colorado River Compact,
the Upper Colorado River Basin Compact, the
Rio Grande Compact of 1938, or the treaty with
the United Mexican States (Treaty Series 994).
(Apr. 11, 1956, ch. 203, § 9, 70 Stat. 110.)
Editorial Notes
REFERENCES IN TEXT
The Boulder Canyon Project Act, referred to in text,
is act Dec. 21, 1928, ch. 42, 45 Stat. 1057, which is classi-
fied generally to subchapter I (§ 617 et seq.) of chapter
12A of this title. For complete classification of this Act
to the Code, see section 617t of this title and Tables.
The Boulder Canyon Project Adjustment Act, re-
ferred to in text, is act July 19, 1940, ch. 643, 54 Stat.
774, which is classified generally to subchapter II (§ 618
et seq.) of chapter 12A of this title. For complete classi-
fication of this Act to the Code, see section 618o of this
title and Tables.
§ 620i. Expenditures; units excepted from soil
survey and
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 620k
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 620k. This identifies an authority to review, not proof of applicability.