Browse Arkansas Code titles and sections
33 U.S.C. § 2343 — Independent peer review
Federal law — U.S. Code and appendices · legal_authorities
Page 844
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2342
(A) a rural community; or
(B) an economically disadvantaged com-
munity, including an economically dis-
advantaged minority community;
(3) the amount of appropriations a project
has received;
(4) the funding capability of the Corps of En-
gineers with respect to the project;
(5) whether the project could be carried out
under other Federal authorities at an equiva-
lent cost to the non-Federal interest; and
(6) any other criteria that the Secretary con-
siders to be appropriate.
(c) Inclusion in guidance
The Secretary shall include the criteria devel-
oped under subsection (a) in the annual Civil
Works Direct Program Development Policy
Guidance of the Secretary.
(d) Report to Congress
For fiscal year 2022, and biennially thereafter,
in conjunction with the President’s annual
budget submission to Congress under section
1105(a) of title 31, the Secretary shall submit to
the Committee on Environment and Public
Works and the Committee on Appropriations of
the Senate and the Committee on Transpor-
tation and Infrastructure and the Committee on
Appropriations of the House of Representatives
a report that identifies the Secretary’s ranking
of individual environmental assistance projects
authorized by Congress for the Secretary to
carry out, in accordance with the criteria devel-
oped under this section.
(Pub. L. 116–260, div. AA, title I, § 137, Dec. 27,
2020, 134 Stat. 2650.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2343
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 9ab5793f4dff68d59638da414b067b07bf2098d3107d37805fa26a81379dcaa0. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-966c16e0f1f995fc85b416ec
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2343-independent-peer-review--6bc4cc0176.md
Pages: Not recorded – Not recorded
Passage SHA-256: 987bbe0341ebe0352e7a2685e7c9cf8d668293b19365b6df118f25613c9db0fe
Source location: USCODE-2024-title33-chap36-subchapV-sec2343.pdf
Stored source content
Page 844
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2342
(A) a rural community; or
(B) an economically disadvantaged com-
munity, including an economically dis-
advantaged minority community;
(3) the amount of appropriations a project
has received;
(4) the funding capability of the Corps of En-
gineers with respect to the project;
(5) whether the project could be carried out
under other Federal authorities at an equiva-
lent cost to the non-Federal interest; and
(6) any other criteria that the Secretary con-
siders to be appropriate.
(c) Inclusion in guidance
The Secretary shall include the criteria devel-
oped under subsection (a) in the annual Civil
Works Direct Program Development Policy
Guidance of the Secretary.
(d) Report to Congress
For fiscal year 2022, and biennially thereafter,
in conjunction with the President’s annual
budget submission to Congress under section
1105(a) of title 31, the Secretary shall submit to
the Committee on Environment and Public
Works and the Committee on Appropriations of
the Senate and the Committee on Transpor-
tation and Infrastructure and the Committee on
Appropriations of the House of Representatives
a report that identifies the Secretary’s ranking
of individual environmental assistance projects
authorized by Congress for the Secretary to
carry out, in accordance with the criteria devel-
oped under this section.
(Pub. L. 116–260, div. AA, title I, § 137, Dec. 27,
2020, 134 Stat. 2650.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of div. AA of Pub. L. 116–260, set out as a note
under section 2201 of this title.
DEFINITIONS
For definition of ‘‘economically disadvantaged com-
munity’’ as used in this section, see section 160 of div.
AA of Pub. L. 116–260, set out as a note under section
2201 of this title.
§ 2342. Access to water resource data
(a) In general
Using available funds, the Secretary shall
make publicly available, including on the Inter-
net, all data in the custody of the Corps of Engi-
neers on—
(1) the planning, design, construction, oper-
ation, and maintenance of water resources de-
velopment projects; and
(2) water quality and water management of
projects owned, operated, or managed by the
Corps of Engineers.
(b) Limitation
Nothing in this section may be construed to
compel or authorize the disclosure of data or
other information determined by the Secretary
to be confidential information, privileged infor-
mation, law enforcement information, national
security information, infrastructure security in-
formation, personal information, or information
the disclosure of which is otherwise prohibited
by law.
(c) Timing
The Secretary shall ensure that data is made
publicly available under subsection (a) as quick-
ly as practicable after the data is generated by
the Corps of Engineers.
(d) Partnerships
In carrying out this section, the Secretary
may develop partnerships, including through co-
operative agreements, with State, tribal, and
local governments and other Federal agencies.
(Pub. L. 110–114, title II, § 2017, Nov. 8, 2007, 121
Stat. 1077; Pub. L. 114–322, title I, § 1135, Dec. 16,
2016, 130 Stat. 1656.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2007, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2016—Pub. L. 114–322 amended section generally. Prior
to amendment, section related to access to water re-
source data.
Statutory Notes and Related Subsidiaries
DATA TRANSPARENCY
Pub. L. 116–260, div. AA, title I, § 158(b), Dec. 27, 2020,
134 Stat. 2662, provided that: ‘‘The Secretary [of the
Army] shall prioritize making publicly available water
resources data in the custody of the Corps of Engineers,
as authorized by section 2017 of the Water Resources
Development Act of 2007 (33 U.S.C. 2342).’’
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 110–114, set out as a note under section
2201 of this title.
§ 2343. Independent peer review
(a) Project studies subject to independent peer
review
(1) In general
Project studies shall be subject to a peer re-
view by an independent panel of experts as de-
termined under this section.
(2) Scope
The peer review may include a review of the
economic and environmental assumptions and
projections, project evaluation data, economic
analyses, environmental analyses, engineering
analyses, formulation of alternative plans,
methods for integrating risk and uncertainty,
models used in evaluation of economic or envi-
ronmental impacts of proposed projects, and
any biological opinions of the project study.
Page 845
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2343
(3) Project studies subject to peer review
(A) Mandatory
A project study shall be subject to peer re-
view under paragraph (1) if—
(i) the project has an estimated total
cost of more than $200,000,000, including
mitigation costs, and is not determined by
the Chief of Engineers to be exempt from
peer review under paragraph (6);
(ii) the Governor of an affected State re-
quests a peer review by an independent
panel of experts; or
(iii) the Chief of Engineers determines
that the project study is controversial con-
sidering the factors set forth in paragraph
(4).
(B) Discretionary
(i) Agency request
A project study shall be considered by
the Chief of Engineers for peer review
under this section if the head of a Federal
or State agency charged with reviewing
the project study determines that the
project is likely to have a significant ad-
verse impact on environmental, cultural,
or other resources under the jurisdiction of
the agency after implementation of pro-
posed mitigation plans and requests a peer
review by an independent panel of experts.
(ii) Deadline for decision
A decision of the Chief of Engineers
under this subparagraph whether to con-
duct a peer review shall be made within 21
days of the date of receipt of the request
by the head of the Federal or State agency
under clause (i).
(iii) Reasons for not conducting peer re-
view
If the Chief of Engineers decides not to
conduct a peer review following a request
under clause (i), the Chief shall make pub-
licly available, including on the Internet,
the reasons for not conducting the peer re-
view.
(iv) Appeal to Chairman of Council on En-
vironmental Quality
A decision by the Chief of Engineers not
to conduct a peer review following a re-
quest under clause (i) shall be subject to
appeal by a person referred to in clause (i)
to the Chairman of the Council on Envi-
ronmental Quality if such appeal is made
within the 30-day period following the date
of the decision being made available under
clause (iii). A decision of the Chairman on
an appeal under this clause shall be made
within 30 days of the date of the appeal.
(4) Factors to consider
In determining whether a project study is
controversial under paragraph (3)(A)(iii), the
Chief of Engineers shall consider if—
(A) there is a significant public dispute as
to the size, nature, or effects of the project;
or
(B) there is a significant public dispute as
to the economic or environmental costs or
benefits of the project.
(5) Project studies excluded from peer review
The Chief of Engineers may exclude a
project study from peer review under para-
graph (1)—
(A) if the project study does not include an
environmental impact statement and is a
project study subject to peer review under
paragraph (3)(A)(i) that the Chief of Engi-
neers determines—
(i) is not controversial;
(ii) has no more than negligible adverse
impacts on scarce or unique cultural, his-
toric, or tribal resources;
(iii) has no substantial adverse impacts
on fish and wildlife species and their habi-
tat prior to the implementation of mitiga-
tion measures; and
(iv) has, before implementation of miti-
gation measures, no more than a neg-
ligible adverse impact on a species listed
as endangered or threatened species under
the Endangered Species Act of 1973 (16
U.S.C. 1531 et seq.) or the critical habitat
of such species designated under such Act;
(B) if the project study—
(i) involves only the rehabilitation or re-
placement of existing hydropower tur-
bines, lock structures, or flood control
gates within the same footprint and for
the same purpose as an existing water re-
sources project;
(ii) is for an activity for which there is
ample experience within the Corps of Engi-
neers and industry to treat the activity as
being routine; and
(iii) has minimal life safety risk; or
(C) if the project study does not include an
environmental impact statement and is a
project study pursued under section 701s of
this title, section 701g of this title, section
701r of this title, section 577(a) of this title,
section 426g of this title, section 426i of this
title, section 603a of this title, section 2309a
of this title, or section 2330 of this title.
(6) Determination of total cost
For purposes of determining the estimated
total cost of a project under paragraph (3)(A),
the total cost shall be based upon the reason-
able estimates of the Chief of Engineers at the
completion of the reconnaissance study for the
project. If the reasonable estimate of total
costs is subsequently determined to be in ex-
cess of the amount in paragraph (3)(A), the
Chief of Engineers shall make a determination
whether a project study is required to be re-
viewed under this section.
(b) Timing of peer review
(1) In general
The Chief of Engineers shall determine the
timing of a peer review of a project study
under subsection (a). In all cases, the peer re-
view shall occur during the period beginning
on the date of the signing of the feasibility
cost-sharing agreement for the study and end-
ing on the date established under subsection
(e)(1)(A) for the peer review and shall be ac-
complished concurrent with the conducting of
the project study.
Page 846
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2343
(2) Factors to consider
In any case in which the Chief of Engineers
has not initiated a peer review of a project
study, the Chief of Engineers shall consider, at
a minimum, whether to initiate a peer review
at the time that—
(A) the without-project conditions are
identified;
(B) the array of alternatives to be consid-
ered are identified; and
(C) the preferred alternative is identified.
(3) Reasons for timing
If the Chief of Engineers does not initiate a
peer review for a project study at a time de-
scribed in paragraph (2), the Chief shall—
(A) not later than 7 days after the date on
which the Chief of Engineers determines not
to initiate a peer review—
(i) notify the Committee on Environ-
ment and Public Works of the Senate and
the Committee on Transportation and In-
frastructure of the House of Representa-
tives of that decision; and
(ii) make publicly available, including
on the Internet, the reasons for not con-
ducting the review; and
(B) include the reasons for not conducting
the review in the decision document for the
project study.
(4) Limitation on multiple peer review
Nothing in this subsection shall be con-
strued to require the Chief of Engineers to
conduct multiple peer reviews for a project
study.
(c) Establishment of panels
(1) In general
For each project study subject to peer re-
view under subsection (a), as soon as prac-
ticable after the Chief of Engineers determines
that a project study will be subject to peer re-
view, the Chief of Engineers shall contract
with the National Academy of Sciences or a
similar independent scientific and technical
advisory organization or an eligible organiza-
tion to establish a panel of experts to conduct
a peer review for the project study.
(2) Membership
A panel of experts established for a project
study under this section shall be composed of
independent experts who represent a balance
of areas of expertise suitable for the review
being conducted.
(3) Limitation on appointments
The National Academy of Sciences or any
other organization the Chief of Engineers con-
tracts with under paragraph (1) to establish a
panel of experts shall apply the National
Academy of Science’s policy for selecting com-
mittee members to ensure that members se-
lected for the panel of experts have no conflict
with the project being reviewed.
(4) Congressional and public notification
Following the identification of a project
study for peer review under this section, but
prior to initiation of the review by the panel
of experts, the Chief of Engineers shall, not
later than 7 days after the date on which the
Chief of Engineers determines to conduct a re-
view—
(A) notify the Committee on Environment
and Public Works of the Senate and the
Committee on Transportation and Infra-
structure of the House of Representatives of
the review conducted under this section; and
(B) make publicly available, including on
the Internet, information on—
(i) the dates scheduled for beginning and
ending the review;
(ii) the entity that has the contract for
the review; and
(iii) the names and qualifications of the
panel of experts.
(d) Duties of panels
A panel of experts established for a peer re-
view for a project study under this section
shall—
(1) conduct the peer review for the project
study;
(2) assess the adequacy and acceptability of
the economic, engineering, and environmental
methods, models, and analyses used by the
Chief of Engineers;
(3) receive from the Chief of Engineers the
public written and oral comments provided to
the Chief of Engineers;
(4) provide timely written and oral com-
ments to the Chief of Engineers throughout
the development of the project study, as re-
quested; and
(5) submit to the Chief of Engineers a final
report containing the panel’s economic, engi-
neering, and environmental analysis of the
project study, including the panel’s assess-
ment of the adequacy and acceptability of the
economic, engineering, and environmental
methods, models, and analyses used by the
Chief of Engineers, to accompany the publica-
tion of the report of the Chief of Engineers for
the project.
(e) Duration of project study peer reviews
(1) Deadline
A panel of experts established under this
section shall—
(A) complete its peer review under this
section for a project study and submit a re-
port to the Chief of Engineers under sub-
section (d)(5) not more than 60 days after the
last day of the public comment period for
the draft project study, or, if the Chief of
Engineers determines that a longer period of
time is necessary, such period of time deter-
mined necessary by the Chief of Engineers;
and
(B) terminate on the date of initiation of
the State and agency review required by sec-
tion 701–1 of this title.
(2) Failure to meet deadline
If a panel of experts does not complete its
peer review of a project study under this sec-
tion and submit a report to the Chief of Engi-
neers under subsection (d)(5) on or before the
deadline established by paragraph (1) for the
peer review, the Chief of Engineers shall com-
plete the project study without delay.
Page 847
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2343
(f) Recommendations of panel
(1) Consideration by the Chief of Engineers
After receiving a report on a project study
from a panel of experts under this section and
before entering a final record of decision for
the project, the Chief of Engineers shall con-
sider any recommendations contained in the
report and prepare a written response for any
recommendations adopted or not adopted.
(2) Public availability and submission to Con-
gress
After receiving a report on a project study
from a panel of experts under this section, the
Chief of Engineers shall make available to the
public, including on the Internet, and submit
to the Committee on Environment and Public
Works of the Senate and the Committee on
Transportation
and
Infrastructure
of
the
House of Representatives—
(A) a copy of the report not later than 7
days after the date on which the report is de-
livered to the Chief of Engineers; and
(B) a copy of any written response of the
Chief of Engineers on recommendations con-
tained in the report not later than 3 days
after the date on which the response is deliv-
ered to the Chief of Engineers.
(3) Inclusion in project study
A report on a project study from a panel of
experts under this section and the written re-
sponse of the Chief of Engineers shall be in-
cluded in the final decision document for the
project study.
(g) Costs
(1) In general
The costs of a panel of experts established
for a peer review under this section—
(A) shall be a Federal expense; and
(B) shall not exceed $500,000.
(2) Waiver
The Chief of Engineers may waive the
$500,000 limitation contained in paragraph
(1)(B) in cases that the Chief of Engineers de-
termines appropriate.
(h) Reports
(1) Initial report
Not later than 3 years after November 8,
2007, the Chief of Engineers shall submit to the
Committee on Environment and Public Works
of the Senate and the Committee on Transpor-
tation and Infrastructure of the House of Rep-
resentatives a report on the implementation
of this section.
(2) Additional report
Not later than 6 years after November 8,
2007, the Chief of Engineers shall update the
report under paragraph (1) taking into account
any further information on implementation of
this section and submit such updated report to
the Committee on Environment and Public
Works of the Senate and the Committee on
Transportation
and
Infrastructure
of
the
House of Representatives.
(i) Nonapplicability of chapter 10 of title 5
Chapter 10 of title 5 shall not apply to a peer
review panel established under this section.
(j) Savings clause
Nothing in this section shall be construed to
affect any authority of the Chief of Engineers to
cause or conduct a peer review of a water re-
sources project existing on November 8, 2007.
(k) Definitions
In this section, the following definitions
apply:
(1) Project study
The term ‘‘project study’’ means—
(A) a feasibility study or reevaluation
study for a water resources project, includ-
ing the environmental impact statement
prepared for the study; and
(B) any other study associated with a
modification of a water resources project
that includes an environmental impact
statement, including the environmental im-
pact statement prepared for the study.
(2) Affected State
The term ‘‘affected State’’, as used with re-
spect to a water resources project, means a
State all or a portion of which is within the
drainage basin in which the project is or would
be located and would be economically or envi-
ronmentally affected as a consequence of the
project.
(3) Eligible organization
The term ‘‘eligible organization’’ means an
organization that—
(A) is described in section 501(c)(3), and ex-
empt from Federal tax under section 501(a),
of title 26;
(B) is independent;
(C) is free from conflicts of interest;
(D) does not carry out or advocate for or
against Federal water resources projects;
and
(E) has experience in establishing and ad-
ministering peer review panels.
(4) Total cost
The term ‘‘total cost’’, as used with respect
to a water resources project, means the cost of
construction (including planning and design-
ing) of the project. In the case of a project for
hurricane and storm damage reduction or
flood damage reduction that includes periodic
nourishment over the life of the project, the
term includes the total cost of the nourish-
ment.
(Pub. L. 110–114, title II, § 2034, Nov. 8, 2007, 121
Stat. 1086; Pub. L. 113–121, title I, § 1044, June 10,
2014, 128 Stat. 1250; Pub. L. 115–270, title I, § 1141,
Oct. 23, 2018, 132 Stat. 3785; Pub. L. 117–286,
§ 4(a)(203), Dec. 27, 2022, 136 Stat. 4328; Pub. L.
118–272, div. A, title I, § 1122, Jan. 4, 2025, 138
Stat. 3015.)
Editorial Notes
REFERENCES IN TEXT
The Endangered Species Act of 1973, referred to in
subsec. (a)(5)(A)(iv), is Pub. L. 93–205, Dec. 28, 1973, 87
Stat. 884, which is classified principally to chapter 35
(§ 1531 et seq.) of Title 16, Conservation. For complete
classification of this Act to the Code, see Short Title
note set out under section 1531 of Title 16 and Tables.
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2007, and not as part of the Water
Page 848
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2344
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2025—Subsecs. (h) to (l). Pub. L. 118–272 redesignated
subsecs. (i) to (l) as (h) to (k), respectively, and struck
out former subsec. (h) which related to applicability of
this section based on when project studies were initi-
ated relative to Nov. 8, 2007.
2022—Subsec. (j). Pub. L. 117–286 substituted ‘‘chapter
10 of title 5’’ for ‘‘FACA’’ in heading and ‘‘Chapter 10 of
title 5’’ for ‘‘The Federal Advisory Committee Act (5
U.S.C. App.)’’ in text.
2018—Subsec. (h)(2). Pub. L. 115–270 substituted ‘‘17
years’’ for ‘‘12 years’’.
2014—Subsec. (a)(3)(A)(i). Pub. L. 113–121, § 1044(a),
substituted ‘‘$200,000,000’’ for ‘‘$45,000,000’’.
Subsec. (b)(3), (4). Pub. L. 113–121, § 1044(b), added par.
(3) and redesignated former par. (3) as (4).
Subsec. (c)(4). Pub. L. 113–121, § 1044(c), added par. (4)
and struck out former par. (4). Prior to amendment,
text read as follows: ‘‘Upon identification of a project
study for peer review under this section, but prior to
initiation of the review, the Chief of Engineers shall
notify the Committee on Environment and Public
Works of the Senate and the Committee on Transpor-
tation and Infrastructure of the House of Representa-
tives of the review.’’
Subsec. (f)(2), (3). Pub. L. 113–121, § 1044(d), added pars.
(2) and (3) and struck out former par. (2) which related
to public availability and transmittal to Congress of a
report on a project study from a panel of experts under
this section.
Subsec. (h)(2). Pub. L. 113–121, § 1044(e), substituted
‘‘12 years’’ for ‘‘7 years’’.
§ 2344. Safety assurance review
(a) Projects subject to safety assurance review
The Chief of Engineers shall ensure that the
design and construction activities for hurricane
and storm damage reduction and flood damage
reduction projects are reviewed by independent
experts under this section if the Chief of Engi-
neers determines that a review by independent
experts is necessary to assure public health,
safety, and welfare.
(b) Factors
In determining whether a review of design and
construction of a project is necessary under this
section, the Chief of Engineers shall consider
whether—
(1) the failure of the project would pose a
significant threat to human life;
(2) the project involves the use of innovative
materials or techniques;
(3) the project design lacks redundancy; or
(4) the project has a unique construction se-
quencing or a reduced or overlapping design
construction schedule.
(c) Safety assurance review
(1) Initiation of review
At the appropriate point in the development
of detailed engineering and design specifica-
tions for each water resources project subject
to review under this section, the Chief of Engi-
neers shall initiate a safety assurance review
by independent experts on the design and con-
struction activities for the project.
(2) Selection of reviewers
A safety assurance review under this section
shall include participation by experts selected
by the Chief of Engineers from among individ-
uals who are distinguished experts in engi-
neering, hydrology, or other appropriate dis-
ciplines. The Chief of Engineers shall apply
the National Academy of Science’s policy for
selecting reviewers to ensure that reviewers
have no conflict of interest with the project
being reviewed.
(3) Compensation
An individual serving as an independent re-
viewer under this section shall be com-
pensated at a rate of pay to be determined by
the Secretary and shall be allowed travel ex-
penses.
(d) Scope of safety assurance reviews
A safety assurance review under this section
shall include a review of the design and con-
struction activities prior to the initiation of
physical construction and periodically there-
after until construction activities are completed
on a regular schedule sufficient to inform the
Chief of Engineers on the adequacy, appropriate-
ness, and acceptability of the design and con-
struction activities for the purpose of assuring
public health, safety, and welfare. The Chief of
Engineers shall ensure that reviews under this
section do not create any unnecessary delays in
design and construction activities.
(e) Safety assurance review record
The written recommendations of a reviewer or
panel of reviewers under this section and the re-
sponses of the Chief of Engineers shall be avail-
able to the public, including through electronic
means on the Internet.
(f) Applicability
This section shall apply to any project in de-
sign or under construction on November 8, 2007,
and to any project with respect to which design
or construction is initiated during the period be-
ginning on November 8, 2007, and ending 7 years
after November 8, 2007.
(g) Nonapplicability of chapter 10 of title 5
Chapter 10 of title 5 shall not apply to a safety
assurance review conducted under this section.
(Pub. L. 110–114, title II, § 2035, Nov. 8, 2007, 121
Stat. 1091; Pub. L. 113–121, title III, § 3028, June
10, 2014, 128 Stat. 1305; Pub. L. 117–286, § 4(a)(204),
Dec. 27, 2022, 136 Stat. 4328.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2007, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2022—Subsec. (g). Pub. L. 117–286 substituted ‘‘chapter
10 of title 5’’ for ‘‘FACA’’ in heading and ‘‘Chapter 10 of
title 5’’ for ‘‘The Federal Advisory Committee Act (5
U.S.C. App.)’’ in text.
2014—Subsec. (g). Pub. L. 113–121 added subsec. (g).
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 110–114, set out as a note under section
2201 of this title.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Findings** The Congress finds and declares that—
(1) various species of fish, wildlife, and plants in the United States have been rendered extinct as a consequence of economic growth and development untempered by adequate concern and conservation;
(2) other species of fish, wildlife, and plants have been so depleted in numbers that they are in danger of or threatened with extinction;
(3) these species of fish, wildlife, and plants are of esthetic, ecological, educational, historical, recreational, and scientific value to the Nation and its people;
(4) the United States has pledged itself as a sovereign state in the international community to conserve to the extent practicable the various species of fish or wildlife and plants facing extinction, pursuant to—
(A) migratory bird treaties with Canada and Mexico;
(B) the Migratory and Endangered Bird Treaty with Japan;
(C) the Convention on Nature Protection and Wildlife Preservation in the Western Hemisphere;
(D) the International Convention for the Northwest Atlantic Fisheries;
(E) the International Convention for the High Seas Fisheries of the North Pacific Ocean;
(F) the Convention on International Trade in Endangered Species of Wild Fauna and Flora; and
(G) other international agreements; and
(5) encouraging the States and other interested parties, through Federal financial assistance and a system of incentives, to develop and maintain conservation programs which meet national and international standards is a key to meeting the Nation’s international commitments and to better safeguarding, for the benefit of all citizens, the Nation’s heritage in fish, wildlife, and plants.
**(b) Purposes** The purposes of this chapter are to provide a means whereby the ecosystems upon which endangered
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 1531
Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 1531. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 1909
TITLE 16—CONSERVATION
§ 1531
maintenance of continuing and stable supply of agri-
cultural commodities and forest products.
Section 1502, Pub. L. 91–524, title X, § 1002, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 242, required
eligible landowners and operators to furnish plan of
farming operations or land use to Secretary.
Section 1503, Pub. L. 91–524, title X, § 1003, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 242; amended
Pub. L. 93–125, § 1(g)(i), Oct. 18, 1973, 87 Stat. 450, related
to approved conservation plans as basis for contracts,
duties under contracts, and termination or modifica-
tion of contracts.
Section 1504, Pub. L. 91–524, title X, § 1004, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 243, author-
ized furnishing of conservation materials to eligible
owners and operators.
Section 1505, Pub. L. 91–524, title X, § 1005, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 243; amended
Pub. L. 95–113, title XV, § 1509, Sept. 29, 1977, 91 Stat.
1022, authorized establishment of multiyear set-aside
contracts.
Section 1506, Pub. L. 91–524, title X, § 1006, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 244, author-
ized issuance of rules and regulations as well as limita-
tions on total retired acreage.
Section 1507, Pub. L. 91–524, title X, § 1007, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 244; amended
Pub. L. 93–125, § 1(g)(ii), Oct. 18, 1973, 87 Stat. 450, di-
rected appointment of advisory boards to assist in de-
velopment of programs under this chapter.
Section 1508, Pub. L. 91–524, title X, § 1008, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 244, directed
coordination with and utilization of Federal, State, and
local services and facili
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 1531
Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 1531. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Prioritization of hurricane and storm damage risk reduction efforts**
(1) **Priority** — For authorized projects and ongoing feasibility studies with a primary purpose of hurricane and storm damage risk reduction, the Secretary shall give funding priority to projects and ongoing studies that—
(A) address an imminent threat to life and property;
(B) prevent storm surge from inundating populated areas;
(C) restore or prevent the loss of coastal wetlands that help reduce the impact of storm surge;
(D) protect emergency hurricane evacuation routes or shelters;
(E) prevent adverse impacts to publicly owned or funded infrastructure and assets;
(F) minimize disaster relief costs to the Federal Government; and
(G) address hurricane and storm damage risk reduction in an area for which the President declared a major disaster in accordance with [section 5170 of title 42](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section5170&num=0&edition=prelim).
(2) **Expedited consideration of currently authorized projects** — Not later than 180 days after December 16, 2016, the Secretary shall—
(A) submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a list of all—
(i) ongoing hurricane and storm damage reduction feasibility studies that have signed feasibility cost-share agreements and have received Federal funds since 2009; and
(ii) authorized hurricane and storm damage reduction projects;
(B) identify those projects on the list required under subparagraph (A) that meet the criteria described in paragraph (1); and
(C) provide a plan for expeditiously completing the projects identified under subparagraph (B), subject
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2342
Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2342. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 844
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2342
(A) a rural community; or
(B) an economically disadvantaged com-
munity, including an economically dis-
advantaged minority community;
(3) the amount of appropriations a project
has received;
(4) the funding capability of the Corps of En-
gineers with respect to the project;
(5) whether the project could be carried out
under other Federal authorities at an equiva-
lent cost to the non-Federal interest; and
(6) any other criteria that the Secretary con-
siders to be appropriate.
(c) Inclusion in guidance
The Secretary shall include the criteria devel-
oped under subsection (a) in the annual Civil
Works Direct Program Development Policy
Guidance of the Secretary.
(d) Report to Congress
For fiscal year 2022, and biennially thereafter,
in conjunction with the President’s annual
budget submission to Congress under section
1105(a) of title 31, the Secretary shall submit to
the Committee on Environment and Public
Works and the Committee on Appropriations of
the Senate and the Committee on Transpor-
tation and Infrastructure and the Committee on
Appropriations of the House of Representatives
a report that identifies the Secretary’s ranking
of individual environmental assistance projects
authorized by Congress for the Secretary to
carry out, in accordance with the criteria devel-
oped under this section.
(Pub. L. 116–260, div. AA, title I, § 137, Dec. 27,
2020, 134 Stat. 2650.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2342
Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 2342. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
The Secretary shall give priority to a project for flood risk management if—
(1) there is an executed project partnership agreement for the project; and
(2) the project is located in an area—
(A) with respect to which—
(i) there has been a loss of life due to flood events; and
(ii) the President has declared that a major disaster or emergency exists under [section 5170 of title 42](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section5170&num=0&edition=prelim); or
(B) that is at significant risk for catastrophic flooding.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2343
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.