Arkansas Legal Resource Navigator

43 U.S.C. § 620c — Laws governing; irrigation repayment

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 620c — Laws governing; irrigation repayment

Page 233 TITLE 43—PUBLIC LANDS § 620c Animas-La Plata, Dolores, Dallas Creek, West Divide, and San Miguel participating Federal reclamation projects concurrently with the con- struction of the Central Arizona Project, to the end that such projects shall be completed not later than the date of the first delivery of water from said Central Arizona Project: Provided, That an appropriate repayment contract for each of said participating projects shall have been executed as provided in section 620c of this title before construction shall start on that par- ticular project. (Pub. L. 90–537, title V, § 501(b), Sept. 30, 1968, 82 Stat. 897.) Editorial Notes CODIFICATION Section consists of subsec. (b) of section 501 of Pub. L. 90–537. Subsecs. (a), (d), and (e) of section 501 are classified to sections 620, 620 note, 620a, 620a–2, 620c–1, and 620k note of this title. Subsec. (c) and (f) of section 501 are not classified to the Code. Section was enacted as part of the Colorado River Basin Project Act, and not as part of act Apr. 11, 1956, popularly known as the Colorado River Storage Project Act, which comprises this chapter. § 620a–2. Establishment of nonexcess irrigable acreage for participating projects The Secretary shall, for the Animas-La Plata, Dolores, Dallas Creek, San Miguel, West Divide, and Seedskadee participating projects of the Colorado River storage project, establish the nonexcess irrigable acreage for which any single ownership may receive project water at one hun- dred and sixty acres of class 1 land or the equiv- alent thereof, as determined by the Secretary, in other land classes. (Pub. L. 90–537, title V, § 501(d), Sept. 30, 1968, 82 Stat. 898.) Editorial Notes CODIFICATION Section consists of subsec. (d) of section 501 of

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 620c

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 656d8fb77ddc2eae41b72f6f4aedbcda792abf438bef6a7f685d040a0ad42852. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-913e931ad1dba38f24b1dd15
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-620c-laws-governing-irrigation-repayment--0ee9ba9899.md
Pages: Not recorded – Not recorded
Passage SHA-256: e12b2040b977d5531a4fb4ea22bd6e0f42b60ca48b3fdc2f2d0dd257e5f032af

Source location: USCODE-2024-title43-chap12B-sec620c.pdf

Stored source content

Page 233 TITLE 43—PUBLIC LANDS § 620c Animas-La Plata, Dolores, Dallas Creek, West Divide, and San Miguel participating Federal reclamation projects concurrently with the con- struction of the Central Arizona Project, to the end that such projects shall be completed not later than the date of the first delivery of water from said Central Arizona Project: Provided, That an appropriate repayment contract for each of said participating projects shall have been executed as provided in section 620c of this title before construction shall start on that par- ticular project. (Pub. L. 90–537, title V, § 501(b), Sept. 30, 1968, 82 Stat. 897.) Editorial Notes CODIFICATION Section consists of subsec. (b) of section 501 of Pub. L. 90–537. Subsecs. (a), (d), and (e) of section 501 are classified to sections 620, 620 note, 620a, 620a–2, 620c–1, and 620k note of this title. Subsec. (c) and (f) of section 501 are not classified to the Code. Section was enacted as part of the Colorado River Basin Project Act, and not as part of act Apr. 11, 1956, popularly known as the Colorado River Storage Project Act, which comprises this chapter. § 620a–2. Establishment of nonexcess irrigable acreage for participating projects The Secretary shall, for the Animas-La Plata, Dolores, Dallas Creek, San Miguel, West Divide, and Seedskadee participating projects of the Colorado River storage project, establish the nonexcess irrigable acreage for which any single ownership may receive project water at one hun- dred and sixty acres of class 1 land or the equiv- alent thereof, as determined by the Secretary, in other land classes. (Pub. L. 90–537, title V, § 501(d), Sept. 30, 1968, 82 Stat. 898.) Editorial Notes CODIFICATION Section consists of subsec. (d) of section 501 of Pub. L. 90–537. Subsecs. (a), (b), and (e) of section 501 are classified to sections 620, 620 note, 620a, 620a–1, 620c–1, and 620k note of this title. Subsecs. (c) and (f) of section 501 are not classified to the Code. Section was enacted as part of the Colorado River Basin Project Act, and not as part of act Apr. 11, 1956, popularly known as the Colorado River Storage Project Act, which comprises this chapter. § 620b. Congressional intent; additional undesig- nated projects not precluded; construction not authorized within national park or monument It is not the intention of Congress, in author- izing only those projects designated in section 620 of this title, and in authorizing priority in planning only those additional projects des- ignated in section 620a of this title, to limit, re- strict, or otherwise interfere with such com- prehensive development as will provide for the consumptive use by States of the Upper Colo- rado River Basin of waters, the use of which is apportioned to the Upper Colorado River Basin by the Colorado River Compact and to each State thereof by the Upper Colorado River Basin Compact, nor to preclude consideration and au- thorization by the Congress of additional projects under the allocations in the compacts as additional needs are indicated. It is the inten- tion of Congress that no dam or reservoir con- structed under the authorization of this chapter shall be within any national park or monument. (Apr. 11, 1956, ch. 203, § 3, 70 Stat. 107.) § 620c. Laws governing; irrigation repayment contracts; time for making contract; con- tracts for municipal water; payment by In- dian lands; restricted delivery of water for excess commodity; apportionments of use Except as otherwise provided in this chapter, in constructing, operating, and maintaining the units of the Colorado River storage project and the participating projects listed in section 620 of this title, the Secretary shall be governed by the Federal reclamation laws (Act of June 17, 1902, 32 Stat. 388, and Acts amendatory thereof or supplementary thereto): Provided, That (a) irri- gation repayment contracts shall be entered into which, except as otherwise provided for the Paonia and Eden projects, provide for repay- ment of the obligation assumed thereunder with respect to any project contract unit over a pe- riod of not more than fifty years exclusive of any development period authorized by law; (b) prior to construction of irrigation distribution facilities, repayment contracts shall be made with an ‘‘organization’’ as defined in section 485a(g) of this title which has the capacity to levy assessments upon all taxable real property located within its boundaries to assist in mak- ing repayments, except where a substantial pro- portion of the lands to be served are owned by the United States; (c) contracts relating to mu- nicipal water supply may be made without re- gard to the limitations of the last sentence of section 485h(c) of this title; and (d), as to Indian lands within, under or served by any partici- pating project, payment of construction costs within the capability of the land to repay shall be subject to section 386a of title 25: Provided further, That for a period of ten years from April 11, 1956, no water from any participating project authorized by this chapter shall be delivered to any water user for the production on newly irri- gated lands of any basic agricultural com- modity, as defined in the Agricultural Act of 1949 [7 U.S.C. 1421 et seq.], or any amendment thereof, if the total supply of such commodity for the marketing year in which the bulk of the crop would normally be marketed is in excess of the normal supply as defined in section 1301(b)(10) of title 7 unless the Secretary of Agri- culture calls for an increase in production of such commodity in the interest of national secu- rity. All units and participating projects shall be subject to the apportionments of the use of water between the Upper and Lower Basins of the Colorado River and among the States of the Upper Basin fixed in the Colorado River Com- pact and the Upper Colorado River Basin Com- pact, respectively, and to the terms of the trea- ty with the United Mexican States (Treaty Se- ries 994). (Apr. 11, 1956, ch. 203, § 4, 70 Stat. 107.) Page 234 TITLE 43—PUBLIC LANDS § 620c–1 Editorial Notes REFERENCES IN TEXT Act of June 17, 1902, referred to in text, is popularly known as the Reclamation Act, which is classified gen- erally to chapter 12 (§ 371 et seq.) of this title. For com- plete classification of this Act to the Code, see Short Title note set out under section 371 of this title and Ta- bles. The Agricultural Act of 1949, referred to in text, is act Oct. 31, 1949, ch. 792, 63 Stat. 1051, which is classified principally to chapter 35A (§ 1421 et seq.) of Title 7, Ag- riculture. For complete classification of this Act to the Code, see Short Title note set out under section 1421 of Title 7 and Tables. § 620c–1. Laws governing priority of appropria- tion In the diversion and storage of water for any project or any parts thereof constructed under the authority of the Colorado River Basin Project Act [43 U.S.C. 1501 et seq.] or the Colo- rado River Storage Project Act [43 U.S.C. 620 et seq.] within and for the benefit of the State of Colorado only, the Secretary is directed to com- ply with the constitution and statutes of the State of Colorado relating to priority of appro- priation; with State and Federal court decrees entered pursuant thereto; and with operating principles, if any, adopted by the Secretary and approved by the State of Colorado. (Pub. L. 90–537, title V, § 501(e), Sept. 30, 1968, 82 Stat. 898.) Editorial Notes REFERENCES IN TEXT The Colorado River Basin Project Act, referred to in text, is Pub. L. 90–537, Sept. 30, 1968, 82 Stat. 885, which is classified principally to chapter 32 (§ 1501 et seq.) of this title. For complete classification of this Act to the Code, see Short Title note set out under section 1501 of this title and Tables. The Colorado River Storage Project Act, referred to in text, is act Apr. 11, 1956, ch. 203, 70 Stat. 105, which is classified generally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section 620 of this title and Tables. CODIFICATION Section consists of subsec. (e) of section 501 of Pub. L. 90–537. Subsecs. (a), (b), and (d) of section 501 are classi- fied to sections 620, 620 note, 620a, 620a–1, 620a–2, and 620k note of this title. Subsecs. (c) and (f) of section 501 are not classified to the Code. Section was enacted as part of the Colorado River Basin Project Act, and not as part of act Apr. 11, 1956, popularly known as the Colorado River Storage Project Act, which comprises this chapter. § 620d. Upper Colorado River Basin Fund (a) Authorization and availability There is authorized a separate fund in the Treasury of the United States to be known as the Upper Colorado River Basin Fund (herein- after referred to as the Basin Fund), which shall remain available until expended, as hereafter provided, for carrying out provisions of this chapter other than section 620g of this title. (b) Crediting of appropriations All appropriations made for the purpose of carrying out the provisions of this chapter, other than section 620g of this title shall be credited to the Basin Fund as advances from the general fund of the Treasury. (c) Crediting and availability of revenues All revenues collected in connection with the operation of the Colorado River storage project and participating projects shall be credited to the Basin Fund, and shall be available, without further appropriation, for (1) defraying the costs of operation, maintenance, and replacements of, and emergency expenditures for, all facilities of the Colorado River storage project and partici- pating projects, within such separate limita- tions as may be included in annual appropria- tion acts: Provided, That with respect to each participating project, such costs shall be paid from revenues received from each such project; (2) payment as required by subsection (d) of this section; and (3) payment as required by sub- section (e) of this section. Revenues credited to the Basin Fund shall not be available for appro- priation for construction of the units and par- ticipating projects authorized by or pursuant to this chapter. (d) Payments of revenues in excess of operating needs to Treasury Revenues in the Basin Fund in excess of oper- ating needs shall be paid annually to the general fund of the Treasury to return— (1) the costs of each unit, participating project, or any separable feature thereof which are allocated to power pursuant to section 620e of this title, within a period not exceeding fifty years from the date of completion of such unit, participating project, or separable fea- ture thereof; (2) the costs of each unit, participating project, or any separable feature thereof which are allocated to municipal water supply pursu- ant to section 620e of this title, within a period not exceeding fifty years from the date of completion of such unit, participating project, or separable feature thereof; (3) interest on the unamortized balance of the investment (including interest during con- struction) in the power and municipal water supply features of each unit, participating project, or any separable feature thereof, at a rate determined by the Secretary of the Treas- ury as provided in subsection (f), and interest due shall be a first charge; (4) the costs of each storage unit which are allocated to irrigation pursuant to section 620e of this title within a period not exceeding fifty years; and (5) the costs of each salinity control unit or separable feature thereof, the costs of meas- ures to replace incidental fish and wildlife val- ues foregone, and the costs of the on-farm measures payable from the Upper Colorado River Basin Fund in accordance with sections 1595(a)(2), 1595(a)(3), and 1595(c) of this title. (e) Apportionment of excess revenues among States Revenues in the Basin Fund in excess of the amounts needed to meet the requirements of clause (1) of subsection (c) of this section, and to return to the general fund of the Treasury the costs set out in subsection (d) of this section, shall be apportioned among the States of the

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1501 — Congressional declaration of purpose and policy

**(a)** It is the object of this chapter to provide a program for the further comprehensive development of the water resources of the Colorado River Basin and for the provision of additional and adequate water supplies for use in the upper as well as in the lower Colorado River Basin. This program is declared to be for the purposes, among others, of regulating the flow of the Colorado River; controlling floods; improving navigation; providing for the storage and delivery of the waters of the Colorado River for reclamation of lands, including supplemental water supplies, and for municipal, industrial, and other beneficial purposes; improving water quality; providing for basic public outdoor recreation facilities; improving conditions for fish and wildlife, and the generation and sale of electrical power as an incident of the foregoing purposes. **(b)** It is the policy of the Congress that the Secretary of the Interior (hereinafter referred to the “Secretary”) shall continue to develop, after consultation with affected States and appropriate Federal agencies, a regional water plan, consistent with the provisions of this chapter and with future authorizations, to serve as the framework under which projects in the Colorado River Basin may be coordinated and constructed with proper timing to the end that an adequate supply of water may be made available for such projects, whether heretofore, herein, or hereafter authorized.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1501

Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 1501. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1501 — Congressional declaration of purpose and

Page 398 TITLE 43—PUBLIC LANDS § 1501 documents, handbooks, standard operating pro- cedures, and statements of policy specific to the scoping, contracting, and review of appraisals performed for the Department by Federal or non-Federal covered appraisers, shall be made publicly available online and provided upon re- quest. (f) Definitions In this section: (1) Covered appraiser The term ‘‘covered appraiser’’ means a State-licensed or -certified real property ap- praiser. (2) Department The term ‘‘Department’’ means the Depart- ment of the Interior. (3) Reporting period The term ‘‘reporting period’’ means the 1- year period before the date on which a report is submitted under subsection (c). (4) Secretary The term ‘‘Secretary’’ means the Secretary of the Interior. (5) State The term ‘‘State’’ means each of the several States, the District of Columbia, and each ter- ritory and possession of the United States. (Pub. L. 118–230, § 2, Jan. 4, 2025, 138 Stat. 2826.) CHAPTER 32—COLORADO RIVER BASIN PROJECT SUBCHAPTER I—OBJECTIVES Sec. 1501. Congressional declaration of purpose and pol- icy. SUBCHAPTER II—INVESTIGATIONS AND PLANNING 1511. Reconnaissance investigations by Secretary of the Interior; reports; 10-year moratorium on water importation studies. 1511a. Cooperation and participation by Secretary of the Army with Federal, State, and local agencies. 1512. Mexican Water Treaty. 1513. Importation of water; protection of exporting areas. 1514. Authorization of appropriations. SUBCHAPTER III—AUTHORIZED UNITS; PROTECTION OF EXISTING USES 1521. Central Arizona Project. 1522. Orme Dam and Reservoir. 1523. Power requirements of Central Arizona Project and augmentation of Lower Colo- rado River Basin Development Fund. 1524.

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1501

Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 1501. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 620 — Upper Colorado River Basin; purpose of development of water resources; initial units; construction of Wayne N. Aspinall unit contingent upon certification; participating projects; Rainbow Bridge National Monument

In order to initiate the comprehensive development of the water resources of the Upper Colorado River Basin, for the purposes, among others, of regulating the flow of the Colorado River, storing water for beneficial consumptive use, making it possible for the States of the Upper Basin to utilize, consistently with the provisions of the Colorado River Compact, the apportionments made to and among them in the Colorado River Compact and the Upper Colorado River Basin Compact, respectively, providing for the reclamation of arid and semiarid land, for the control of floods, and for the generation of hydroelectric power, as an incident of the foregoing purposes, the Secretary of the Interior is authorized (1) to construct, operate, and maintain the following initial units of the Colorado River storage project, consisting of dams, reservoirs, powerplants, transmission facilities and appurtenant works: Wayne N. Aspinall, Flaming Gorge, Navajo (dam and reservoir only), and Glen Canyon: Provided, That the Wayne N. Aspinall Dam shall be constructed to a height which will impound not less than nine hundred and forty thousand acre-feet of water or will create a reservoir of such greater capacity as can be obtained by a high waterline located at seven thousand five hundred and twenty feet above mean sea level, and that construction thereof shall not be undertaken until the Secretary has, on the basis of further engineering and economic investigations, reexamined the economic justification of such unit and, accompanied by appropriate documentation in the form of a supplemental report, has certified to the Congress and to the President that, in his judgment, the benefits of such unit will exceed its costs; and (2) to construct, operate, and maintain the following additional reclamation

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620

Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 620. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 620 — Upper Colorado River Basin; purpose of

Page 228 TITLE 43—PUBLIC LANDS § 620 Sec. 620d. Upper Colorado River Basin Fund. 620d–1. Reimbursement of Fund from Colorado River Development Fund; operation of Hoover Dam. 620e. Cost allocations; Indian lands; report to Con- gress. 620f. Powerplant operations. 620g. Recreational and fish and wildlife facilities. 620h. Saving provisions. 620i. Expenditures; units excepted from soil survey and land classification requirements. 620j. Court decree; effectivity and approval. 620k. Authorization of appropriations. 620l. Net power revenues. 620m. Compliance with law required in operation of facilities; enforcement of provisions. 620n. Water quality study and reports. 620n–1. Top water bank. 620o. Definitions. § 620. Upper Colorado River Basin; purpose of development of water resources; initial units; construction of Wayne N. Aspinall unit con- tingent upon certification; participating projects; Rainbow Bridge National Monu- ment In order to initiate the comprehensive devel- opment of the water resources of the Upper Col- orado River Basin, for the purposes, among oth- ers, of regulating the flow of the Colorado River, storing water for beneficial consumptive use, making it possible for the States of the Upper Basin to utilize, consistently with the provi- sions of the Colorado River Compact, the appor- tionments made to and among them in the Colo- rado River Compact and the Upper Colorado River Basin Compact, respectively, providing for the reclamation of arid and semiarid land, for the control of floods, and for the generation of hydroelectric power, as an incident of the fore- going purposes, the Secretary of the Interior is authorized (1) to construct, operate, and main- tain the following initial units of the Colorado Rive

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 620

Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 620. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 620c — Laws governing; irrigation repayment contracts; time for making contract; contracts for municipal water; payment by Indian lands; restricted delivery of water for excess commodity; apportionments of use

Except as otherwise provided in this chapter, in constructing, operating, and maintaining the units of the Colorado River storage project and the participating projects listed in [section 620 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620&num=0&edition=prelim), the Secretary shall be governed by the Federal reclamation laws (Act of June 17, 1902, 32 Stat. 388, and Acts amendatory thereof or supplementary thereto): Provided, That (a) irrigation repayment contracts shall be entered into which, except as otherwise provided for the Paonia and Eden projects, provide for repayment of the obligation assumed thereunder with respect to any project contract unit over a period of not more than fifty years exclusive of any development period authorized by law; (b) prior to construction of irrigation distribution facilities, repayment contracts shall be made with an “organization” as defined in [section 485a(g) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section485a/g&num=0&edition=prelim) which has the capacity to levy assessments upon all taxable real property located within its boundaries to assist in making repayments, except where a substantial proportion of the lands to be served are owned by the United States; (c) contracts relating to municipal water supply may be made without regard to the limitations of the last sentence of [section 485h(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section485h/c&num=0&edition=prelim); and (d), as to Indian lands within, under or served by any participating project, payment of construction costs within the capability of the land to repay shall be subject to [section 386a of title 25](https://uscode.house.gov/view

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620c

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

7 U.S.C. § 1421 — Price support

**(a) Source** The Secretary shall provide the price support authorized or required herein through the Commodity Credit Corporation and other means available to him. **(b) Authority of Secretary; factors considered** Except as otherwise provided in this Act, the amounts, terms, and conditions of price support operations and the extent to which such operations are carried out, shall be determined or approved by the Secretary. The following factors shall be taken into consideration in determining, in the case of any commodity for which price support is discretionary, whether a price-support operation shall be undertaken and the level of such support and, in the case of any commodity for which price support is mandatory, the level of support in excess of the minimum level prescribed for such commodity: (1) the supply of the commodity in relation to the demand therefor, (2) the price levels at which other commodities are being supported and, in the case of feed grains, the feed values of such grains in relation to corn, (3) the availability of funds, (4) the perishability of the commodity, (5) the importance of the commodity to agriculture and the national economy, (6) the ability to dispose of stocks acquired through a price-support operation, (7) the need for offsetting temporary losses of export markets, (8) the ability and willingness of producers to keep supplies in line with demand and (9), in the case of upland cotton, changes in the cost of producing such cotton. **(c) Compliance by producer; program for diverted acres** Compliance by the producer with acreage allotments, production goals and marketing practices (including marketing quotas when authorized by law), prescribed by the Secretary, may be required as a condition of eligibility for price support. In admi

Source: Supplied U.S. Code snapshot — release unconfirmed · 7 U.S.C. § 1421

Stored review status: release_metadata_unconfirmed. The source passage cites 7 U.S.C. § 1421. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

7 U.S.C. § 1421 — Price support

Page 701 TITLE 7—AGRICULTURE § 1421 Sec. 1430. Retroactive effect. 1431. Disposition of commodities to prevent waste. 1431a. Cotton donations to educational institu- tions. 1431b. Distribution of surplus commodities to other United States areas. 1431c. Enrichment and packaging of cornmeal, grits, rice, and white flour available for distribution. 1431d. Donations for school feeding programs abroad; student financing; priorities. 1431e. Distribution of surplus commodities to special nutrition projects; reprocessing agreements with private companies. 1431f. Assistance to foreign countries to miti- gate effects of HIV and AIDS. 1432. Extension of price support on long staple cotton seeds and products. 1433. Repealed. 1433a. Forgiveness of violations; determina- tions. 1433b. Processing of surplus agricultural com- modities into liquid fuels and agricul- tural commodity byproducts. 1433c. Advance recourse commodity loans. 1433c–1. Advance recourse loans. 1433d to 1433f. Omitted or Repealed. 1434. Encouragement of production of crops of which United States is a net importer and for which price support programs are not in effect; authority to plant on set-aside acreage with no reduction in payment rate. 1435. Production of commodities for conver- sion into alcohol or hydrocarbons for use as motor fuels or other fuels; terms and conditions; determinations; pay- ments, etc., for program. 1436. Reimbursement of appropriations avail- able for classing or grading agriculture commodities without charge. 1436a. Transfer of nonadministrative funds of Commodity Credit Corporation for classing and grading purposes. SUBCHAPTER II—BASIC AGRICULTURAL COMMODITIES 1441. Price support levels. 1441–1. Omitted. 1441–1a. Marketing

Source: Supplied 2024 U.S. Code historical extraction · 7 U.S.C. § 1421

Stored review status: historical_2024_not_currentness_verified. The source passage cites 7 U.S.C. § 1421. This identifies an authority to review, not proof of applicability.