Browse Arkansas Code titles and sections
10 U.S.C. § 4325 — Major weapon systems: assessment, man-
Federal law — U.S. Code and appendices · legal_authorities
Page 2737
TITLE 10—ARMED FORCES
§ 4325
‘‘a technical data and intellectual property manage-
ment plan for product support; and’’; added subpars. (H)
and (I) of par. (1); and added par. (2). Amendment add-
ing par. (2) ‘‘at the end of’’ par. (1) was executed by add-
ing par. (2) after par. (1) to reflect the probable intent
of Congress.
Subsec. (d)(7), (8). Pub. L. 117–263, § 806(b), added par.
(7) and redesignated former par. (7) as (8).
2021—Pub. L. 116–283, § 1848(d)(1), renumbered section
2337 of this title as this section.
Pub. L. 116–283, § 802(a)(1)–(3), substituted ‘‘covered
system’’ for ‘‘major weapon system’’ and ‘‘weapon sys-
tem’’ and ‘‘covered systems’’ for ‘‘major weapon sys-
tems’’ wherever appearing.
Subsec. (b). Pub. L. 116–283, § 802(a)(5), added subsec.
(b). Former subsec. (b) redesignated (c).
Subsec. (c). Pub. L. 116–283, § 802(a)(4), redesignated
subsec. (b) as (c). Former subsec. (c) redesignated (d).
Subsec. (c)(2)(A). Pub. L. 116–283, § 802(a)(6)(A), amend-
ed subpar. (A) generally. Prior to amendment, subpar.
(A) read as follows: ‘‘develop and implement a com-
prehensive product support strategy for the weapon
system;’’.
Subsec. (c)(2)(B). Pub. L. 116–283, § 802(a)(6)(B), sub-
stituted ‘‘ensure the life cycle sustainment plan is in-
formed by’’ for ‘‘use’’.
Subsec. (c)(2)(C). Pub. L. 116–283, § 802(a)(6)(C), in-
serted ‘‘and life cycle sustainment plan’’ after ‘‘product
support strategy’’.
Subsec. (c)(5). Pub. L. 116–283, § 1848(d)(2), which di-
rected amendment of subsec. (c)(5) by substituting
‘‘section 3041(c)(1)’’ for ‘‘section 2302d(a)’’ and could not
be executed, was repealed by Pub. L. 117–81, § 1701(b)(17).
Subsec. (d). Pub. L. 116–283, § 802(a)(4), redesignated
subsec. (c) as (d).
Subsec. (d)(5). Pub. L. 116–283,
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 4325
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: d68edf3187e52182204b329d64b9a3f9e905295c9a9cf564e672859bff64d766. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-7879f5979c2068003e8a7370
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-4325-major-weapon-systems-assessment-man--141d6c9071.md
Pages: Not recorded – Not recorded
Passage SHA-256: f2954ecdda282930bde57203030628f8110c04901e3be82fc6bed12afdd3ec5c
Source location: USCODE-2024-title10-subtitleA-partV-subpartF-chap323-sec4325.pdf
Stored source content
Page 2737
TITLE 10—ARMED FORCES
§ 4325
‘‘a technical data and intellectual property manage-
ment plan for product support; and’’; added subpars. (H)
and (I) of par. (1); and added par. (2). Amendment add-
ing par. (2) ‘‘at the end of’’ par. (1) was executed by add-
ing par. (2) after par. (1) to reflect the probable intent
of Congress.
Subsec. (d)(7), (8). Pub. L. 117–263, § 806(b), added par.
(7) and redesignated former par. (7) as (8).
2021—Pub. L. 116–283, § 1848(d)(1), renumbered section
2337 of this title as this section.
Pub. L. 116–283, § 802(a)(1)–(3), substituted ‘‘covered
system’’ for ‘‘major weapon system’’ and ‘‘weapon sys-
tem’’ and ‘‘covered systems’’ for ‘‘major weapon sys-
tems’’ wherever appearing.
Subsec. (b). Pub. L. 116–283, § 802(a)(5), added subsec.
(b). Former subsec. (b) redesignated (c).
Subsec. (c). Pub. L. 116–283, § 802(a)(4), redesignated
subsec. (b) as (c). Former subsec. (c) redesignated (d).
Subsec. (c)(2)(A). Pub. L. 116–283, § 802(a)(6)(A), amend-
ed subpar. (A) generally. Prior to amendment, subpar.
(A) read as follows: ‘‘develop and implement a com-
prehensive product support strategy for the weapon
system;’’.
Subsec. (c)(2)(B). Pub. L. 116–283, § 802(a)(6)(B), sub-
stituted ‘‘ensure the life cycle sustainment plan is in-
formed by’’ for ‘‘use’’.
Subsec. (c)(2)(C). Pub. L. 116–283, § 802(a)(6)(C), in-
serted ‘‘and life cycle sustainment plan’’ after ‘‘product
support strategy’’.
Subsec. (c)(5). Pub. L. 116–283, § 1848(d)(2), which di-
rected amendment of subsec. (c)(5) by substituting
‘‘section 3041(c)(1)’’ for ‘‘section 2302d(a)’’ and could not
be executed, was repealed by Pub. L. 117–81, § 1701(b)(17).
Subsec. (d). Pub. L. 116–283, § 802(a)(4), redesignated
subsec. (c) as (d).
Subsec. (d)(5). Pub. L. 116–283, § 802(a)(7)(A), amended
par. (5) generally. Prior to amendment, par. (5) defined
‘‘major weapon system’’.
Subsec. (d)(5)(A). Pub. L. 117–81, § 1701(d)(11)(A), sub-
stituted ‘‘section 4201’’ for ‘‘section 2430’’.
Pub. L. 116–283, § 1883(b)(2), which directed that each
reference in the text of title 10 to a section that was re-
designated by title XVIII of Pub. L. 116–283, as such sec-
tion was in effect before the redesignation, be amended
by striking such reference and inserting a reference to
the appropriate redesignated section, was not executed
with respect to ‘‘section 2430’’, which was redesignated
as multiple sections.
Subsec. (d)(5)(B). Pub. L. 117–81, § 1701(d)(11)(A), which
directed the substitution of ‘‘section 4201(a)(2) of this
title’’ for ‘‘section 2430(a)(1)(B)’’, could not be executed
because of the intervening amendment by Pub. L.
116–283, § 1883(b)(2). See note below.
Pub. L. 116–283, § 1883(b)(2), substituted ‘‘section
4201(a)(2)’’ for ‘‘section 2430(a)(1)(B)’’.
Subsec. (d)(6). Pub. L. 117–81, § 1701(d)(11)(B), which di-
rected the substitution of ‘‘section 4172(e)(7)’’ for ‘‘sec-
tion 2366(e)(7)’’, could not be executed because of the in-
tervening amendment by Pub. L. 116–283, § 1883(b)(2).
See note below.
Pub. L. 116–283, § 1883(b)(2), substituted ‘‘section
4172(e)(7)’’ for ‘‘section 2366(e)(7)’’.
Pub. L. 116–283, § 802(a)(7)(B), added par. (6).
Subsec. (d)(7). Pub. L. 117–81, § 1701(d)(11)(C), which di-
rected the substitution of ‘‘section 4211(e)(3)’’ for ‘‘sec-
tion 2431a(e)(5)’’, could not be executed because of the
intervening amendment by Pub. L. 116–283, § 1883(b)(2).
See note below.
Pub. L. 116–283, § 1883(b)(2), substituted ‘‘section
4211(e)(3)’’ for ‘‘section 2431a(e)(5)’’.
Pub. L. 116–283, § 802(a)(7)(B), added par. (7).
2013—Subsec. (b)(2)(I). Pub. L. 113–66 added subpar. (I).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2021 AMENDMENT
Amendment by section 1701(d)(11) of Pub. L. 117–81 to
take effect immediately after the amendments made by
title XVIII of Pub. L. 116–283 have taken effect, see sec-
tion 1701(a)(3) of Pub. L. 117–81, set out in a note pre-
ceding section 3001 of this title and note below.
Amendment by sections 1848(d)(1), (2) and 1883(b)(2) of
Pub. L. 116–283 effective Jan. 1, 2022, with additional
provisions for delayed implementation and applica-
bility of existing law, see section 1801(d) of Pub. L.
116–283, set out as a note preceding section 3001 of this
title.
SIMILAR PROVISIONS
Provisions similar to those in this section were con-
tained in section 805 of Pub. L. 111–84, which was set
out as a note under section 2302 of this title prior to re-
peal by Pub. L. 112–239, div. A, title VIII, § 823(b), Jan.
2, 2013, 126 Stat. 1832.
§ 4325. Major weapon systems: assessment, man-
agement, and control of operating and sup-
port costs
(a) GUIDANCE REQUIRED.—The Secretary of De-
fense shall issue and maintain guidance on ac-
tions to be taken to assess, manage, and control
Department of Defense costs for the operation
and support of major weapon systems.
(b) ELEMENTS.—The guidance required by sub-
section (a) shall, at a minimum—
(1) be issued in conjunction with the com-
prehensive guidance on life-cycle management
and the development and implementation of
product support strategies for major weapon
systems required by section 4324 of this title;
(2) require the military departments to re-
tain each estimate of operating and support
costs that is developed at any time during the
life cycle of a major weapon system, together
with supporting documentation used to de-
velop the estimate;
(3) require the military departments to up-
date estimates of operating and support costs
periodically throughout the life cycle of a
major weapon system, to determine whether
preliminary information and assumptions re-
main relevant and accurate, and identify and
record reasons for variances;
(4) establish policies and procedures for the
collection, organization, maintenance, and
availability of standardized data on operating
and support costs for major weapon systems in
accordance with section 2222 of this title;
(5) establish standard requirements for the
collection and reporting of data on operating
and support costs for major weapon systems
by contractors performing weapon system
sustainment functions in an appropriate for-
mat, and develop contract clauses to ensure
that contractors comply with such require-
ments;
(6) require the military departments—
(A) to collect and retain data from oper-
ational and developmental testing and eval-
uation on the reliability and maintain-
ability of major weapon systems; and
(B) to use such data to inform system de-
sign
decisions,
provide
insight
into
sustainment costs, and inform estimates of
operating and support costs for such sys-
tems;
(7) require the military departments to en-
sure that sustainment factors are fully consid-
ered at key life-cycle management decision
points and that appropriate measures are
taken to reduce operating and support costs
Page 2738
TITLE 10—ARMED FORCES
§ 4325
by influencing system design early in develop-
ment, developing sound sustainment strate-
gies, and addressing key drivers of costs;
(8) require the military departments to con-
duct an independent logistics assessment of
each major weapon system prior to key acqui-
sition decision points (including milestone de-
cisions) to identify features that are likely to
drive future operating and support costs,
changes to system design that could reduce
such costs, and effective strategies for man-
aging such costs;
(9) include—
(A) reliability metrics for major weapon
systems; and
(B) requirements on the use of metrics
under subparagraph (A) as triggers—
(i) to conduct further investigation and
analysis into drivers of those metrics; and
(ii) to develop strategies for improving
reliability, availability, and maintain-
ability of such systems at an affordable
cost; and
(10) require the military departments to con-
duct periodic reviews of operating and support
costs of major weapon systems after such sys-
tems achieve initial operational capability to
identify and address factors resulting in
growth in operating and support costs and
adapt support strategies to reduce such costs.
(c) RETENTION OF DATA ON OPERATING AND SUP-
PORT COSTS.—
(1) IN GENERAL.—The Director of Cost Assess-
ment and Program Evaluation shall be respon-
sible for developing and maintaining a data-
base on operating and support estimates, sup-
porting documentation, and actual operating
and support costs for major weapon systems.
(2) SUPPORT.—The Secretary of Defense shall
ensure that the Director, in carrying out such
responsibility—
(A) promptly receives the results of all
cost estimates and cost analyses conducted
by the military departments with regard to
operating and support costs of major weapon
systems;
(B) has timely access to any records and
data of the military departments (including
classified and proprietary information) that
the Director considers necessary to carry
out such responsibility; and
(C) with the concurrence of the Under Sec-
retary
of
Defense
for
Acquisition
and
Sustainment, may direct the military de-
partments to collect and retain information
necessary to support the database.
(d) MAJOR WEAPON SYSTEM DEFINED.—In this
section, the term ‘‘major weapon system’’ has
the meaning given that term in section 3455(f) of
this title.
(Added Pub. L. 115–91, div. A, title VIII,
§ 836(a)(1), Dec. 12, 2017, 131 Stat. 1472, § 2337a;
amended Pub. L. 115–232, div. A, title X,
§ 1081(a)(20), Aug. 13, 2018, 132 Stat. 1984; renum-
bered § 4325 and amended Pub. L. 116–283, div. A,
title XVIII, § 1848(d)(1), (3), Jan. 1, 2021, 134 Stat.
4258.)
Editorial Notes
AMENDMENTS
2021—Pub. L. 116–283, § 1848(d)(3)(B), amended section
catchline generally. Prior to amendment, section
catchline read as follows: ‘‘Assessment, management,
and control of operating and support costs for major
weapon systems’’.
Pub. L. 116–283, § 1848(d)(1), renumbered section 2337a
of this title as this section.
Subsec. (b)(1). Pub. L. 116–283, § 1848(d)(3)(A)(i), sub-
stituted ‘‘section 4324’’ for ‘‘section 2337’’.
Subsec. (d). Pub. L. 116–283, § 1848(d)(3)(A)(ii), sub-
stituted ‘‘section 3455(f)’’ for ‘‘section 2379(f)’’.
2018—Subsec. (d). Pub. L. 115–232 substituted ‘‘this
title’’ for ‘‘title 10, United States Code’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2021 AMENDMENT
Amendment by Pub. L. 116–283 effective Jan. 1, 2022,
with additional provisions for delayed implementation
and applicability of existing law, see section 1801(d) of
Pub. L. 116–283, set out as a note preceding section 3001
of this title.
PILOT PROGRAM ON TIME-CERTAIN DEVELOPMENT IN
ACQUISITION OF MAJOR WEAPON SYSTEMS
Pub. L. 109–364, div. A, title VIII, § 812, Oct. 17, 2006,
120 Stat. 2317, as amended by Pub. L. 110–417, [div. A],
title VIII, § 813(d)(3), Oct. 14, 2008, 122 Stat. 4527; Pub. L.
111–84, div. A, title X, § 1073(c)(5), Oct. 28, 2009, 123 Stat.
2474; Pub. L. 116–283, div. A, title XVIII, § 1806(e)(2)(D),
Jan. 1, 2021, 134 Stat. 4155, provided that:
‘‘(a) PILOT PROGRAM AUTHORIZED.—The Secretary of
Defense may carry out a pilot program on the use of
time-certain development in the acquisition of major
weapon systems.
‘‘(b) PURPOSE OF PILOT PROGRAM.—The purpose of the
pilot program authorized by subsection (a) is to assess
the feasibility and advisability of utilizing time-certain
development in the acquisition of major weapon sys-
tems in order to deliver new capabilities to the
warfighter more rapidly through—
‘‘(1) disciplined decision-making;
‘‘(2) emphasis on technological maturity; and
‘‘(3) appropriate trade-offs between—
‘‘(A) cost and system performance; and
‘‘(B) program schedule.
‘‘(c) INCLUSION OF SYSTEMS IN PILOT PROGRAM.—
‘‘(1) IN GENERAL.—The Secretary of Defense may in-
clude a major weapon system in the pilot program
only if—
‘‘(A) the major weapon system meets the criteria
under paragraph (2) in accordance with that para-
graph; and
‘‘(B) the Milestone Decision Authority nominates
such program to the Secretary of Defense for inclu-
sion in the program.
‘‘(2) CRITERIA.—For purposes of paragraph (1) a
major weapon system meets the criteria under this
paragraph only if the Milestone Decision Authority
determines, in consultation with the service acquisi-
tion executive for the military department carrying
out the acquisition program for the system and one
or more combatant commanders responsible for field-
ing the system, that—
‘‘(A) the certification requirements of section
2366b of title 10, United States Code [now 10 U.S.C.
4252] (as amended by section 805 of this Act), have
been met, and no waivers have been granted from
such requirements;
‘‘(B) a preliminary design has been reviewed using
systems engineering, and the system, as so de-
signed, will meet battlefield needs identified by the
relevant combatant commanders after appropriate
requirements analysis;
‘‘(C) a representative model or prototype of the
system, or key subsystems, has been demonstrated
Page 2739
TITLE 10—ARMED FORCES
§ 4325
in a relevant environment, such as a well-simulated
operational environment;
‘‘(D) an independent cost estimate has been con-
ducted and used as the basis for funding require-
ments for the acquisition program for the system;
‘‘(E) the budget of the military department re-
sponsible for carrying out the acquisition program
for the system provides the funding necessary to
execute the product development and production
plan consistent with the requirements identified
pursuant to subparagraph (D);
‘‘(F) an appropriately qualified program manager
has entered into a performance agreement with the
Milestone Decision Authority that establishes ex-
pected parameters for the cost, schedule, and per-
formance of the acquisition program for the sys-
tem, consistent with a business case for such acqui-
sition program;
‘‘(G) the service acquisition executive and the
program manager have developed a strategy to en-
sure stability in program management until, at a
minimum, the delivery of the initial operational
capability under the acquisition program for the
system has occurred;
‘‘(H) the service acquisition executive, the rel-
evant combatant commanders, and the program
manager have agreed that no additional require-
ments that would be inconsistent with the agreed-
upon program schedule will be added during the de-
velopment phase of the acquisition program for the
system; and
‘‘(I) a planned initial operational capability will
be delivered to the relevant combatant com-
manders within a defined period of time as pre-
scribed in regulations by the Secretary of Defense.
‘‘(3) TIMING OF DECISION.—The decision whether to
include a major weapon system in the pilot program
shall be made at the time of milestone approval for
the acquisition program for the system.
‘‘(d) LIMITATION ON NUMBER OF WEAPONS SYSTEMS IN
PILOT PROGRAM.—The number of major weapon systems
included in the pilot program at any time may not ex-
ceed six major weapon systems.
‘‘(e) LIMITATION
ON COST
OF WEAPONS SYSTEMS
IN
PILOT PROGRAM.—The Secretary of Defense may in-
clude a major weapon system in the pilot program only
if, at the time a major weapon system is proposed for
inclusion, the total cost for system design and develop-
ment of the weapon system, as set forth in the cost es-
timate referred to in subsection (c)(2)(D), does not ex-
ceed $1,000,000,000 during the period covered by the cur-
rent future-years defense program.
‘‘(f) SPECIAL FUNDING AUTHORITY.—
‘‘(1) AUTHORITY
FOR
RESERVE
ACCOUNT.—Notwith-
standing any other provision of law, the Secretary of
Defense may establish a special reserve account uti-
lizing funds made available for the major weapon sys-
tems included in the pilot program.
‘‘(2) ELEMENTS.—The special reserve account may
include—
‘‘(A) funds made available for any major weapon
system included in the pilot program to cover ter-
mination liability;
‘‘(B) funds made available for any major weapon
system included in the pilot program for award fees
that may be earned by contractors; and
‘‘(C) funds appropriated to the special reserve ac-
count.
‘‘(3) AVAILABILITY OF FUNDS.—Funds in the special
reserve account may be used, in accordance with
guidance issued by the Secretary for purposes of this
section, for the following purposes:
‘‘(A) To cover termination liability for any major
weapon system included in the pilot program.
‘‘(B) To pay award fees that are earned by any
contractor for a major weapon system included in
the pilot program.
‘‘(C) To address unforeseen contingencies that
could prevent a major weapon system included in
the pilot program from meeting critical schedule or
performance requirements.
‘‘(4) REPORTS ON USE OF FUNDS.—Not later than 30
days after the use of funds in the special reserve ac-
count for the purpose specified in paragraph (3)(C),
the Secretary shall submit to the congressional de-
fense committees [Committees on Armed Services
and Appropriations of the Senate and the House of
Representatives] a report on the use of funds in the
account for such purpose. The report shall set forth
the purposes for which the funds were used and the
reasons for the use of the funds for such purposes.
‘‘(5) RELATIONSHIP TO APPROPRIATIONS.—Nothing in
this subsection may be construed as extending any
period of time for which appropriated funds are made
available.
‘‘(g) ADMINISTRATION
OF PILOT PROGRAM.—The Sec-
retary of Defense shall prescribe policies and proce-
dures on the administration of the pilot program. Such
policies and procedures shall—
‘‘(1) provide for the use of program status reports
based on earned value data to track progress on a
major weapon system under the pilot program
against baseline estimates applicable to such system
at each systems engineering technical review point;
and
‘‘(2) grant authority, to the maximum extent prac-
ticable, to the program manager for the acquisition
program for a major weapon system to make key pro-
gram decisions and trade-offs, subject to manage-
ment reviews only if cost or schedule deviations ex-
ceed the baselines for such acquisition program by 10
percent or more.
‘‘(h) REMOVAL OF WEAPONS SYSTEMS FROM PILOT PRO-
GRAM.—The Secretary of Defense shall remove a major
weapon system from the pilot program if—
‘‘(1) the weapon system receives Milestone C ap-
proval; or
‘‘(2) the Secretary determines that the weapon sys-
tem is no longer in substantial compliance with the
criteria in subsection (c)(2) or is otherwise no longer
appropriate for inclusion in the pilot program.
‘‘(i) EXPIRATION
OF
AUTHORITY
TO
INCLUDE
ADDI-
TIONAL SYSTEMS IN PILOT PROGRAM.—
‘‘(1) EXPIRATION.—A major weapon system may not
be included in the pilot program after September 30,
2012.
‘‘(2) RETENTION OF SYSTEMS.—A major weapon sys-
tem included in the pilot program before the date
specified in paragraph (1) in accordance with the re-
quirements of this section may remain in the pilot
program after that date.
‘‘(j) ANNUAL REPORT.—
‘‘(1) IN GENERAL.—Not later than one year after in-
cluding the first major weapon system in the pilot
program, and annually thereafter, the Secretary shall
submit to the congressional defense committees
[Committees on Armed Services and Appropriations
of the Senate and the House of Representatives] a re-
port on the pilot program, and the major weapon sys-
tems included in the pilot program, during the one-
year period ending on the date of such report.
‘‘(2) ELEMENTS.—Each report under this subsection
shall include—
‘‘(A) a description of progress under the pilot pro-
gram, and on each major weapon system included
in the pilot program, during the period covered by
such report;
‘‘(B) a description of the use of all funds in the
special reserve account established under sub-
section (f); and
‘‘(C) such other matters as the Secretary con-
siders appropriate.
‘‘(k) MAJOR WEAPON SYSTEM DEFINED.—In this sec-
tion, the term ‘major weapon system’ means a weapon
system that is treatable as a major system under sec-
tion 3041 of title 10, United States Code.’’
[Pub. L. 111–84, div. A, title X, § 1073(c), Oct. 28, 2009,
123 Stat. 2474, provided that the amendment made by
section 1073(c)(5) to section 813(d)(3) of Pub. L. 110–417
(which amended section 812 of Pub. L. 109–364, set out
above) is effective as of Oct. 14, 2008, and as if included
in Pub. L. 110–417 as enacted.]
Page 2740
TITLE 10—ARMED FORCES
§ 4328
§ 4328. Weapon system design: sustainment fac-
tors
(a) IN
GENERAL.—The Secretary of Defense
shall ensure that the defense acquisition system
gives ample emphasis to sustainment factors,
particularly those factors that are affected prin-
cipally by the design of a weapon system, in the
development of a weapon system.
(b) REQUIREMENTS
PROCESS.—The Secretary
shall ensure that reliability and maintainability
are included in the performance attributes of
the key performance parameter on sustainment
during the development of capabilities require-
ments.
(c) SOLICITATION AND AWARD OF CONTRACTS.—
(1) REQUIREMENT.—The program manager of
a weapon system shall include in the solicita-
tion for and terms of a covered contract for
the weapon system clearly defined and meas-
urable requirements for engineering activities
and design specifications for reliability and
maintainability.
(2) EXCEPTION.—If the program manager de-
termines that engineering activities and de-
sign specifications for reliability or maintain-
ability should not be a requirement in a cov-
ered contract or a solicitation for such a con-
tract, the program manager shall document in
writing the justification for the decision.
(3) SOURCE
SELECTION
CRITERIA.—The Sec-
retary shall ensure that sustainment factors,
including reliability and maintainability, are
given ample emphasis in the process for source
selection. The Secretary shall encourage the
use of objective reliability and maintain-
ability criteria in the evaluation of competi-
tive proposals.
(d) CONTRACT PERFORMANCE.—
(1) IN GENERAL.—The Secretary shall ensure
that the Department of Defense uses best
practices for responding to the positive or neg-
ative performance of a contractor in meeting
the sustainment requirements of a covered
contract for a weapon system. The Secretary
shall encourage the use of incentive fees and
penalties as appropriate and authorized in
paragraph (2) in all covered contracts for
weapons systems.
(2) AUTHORITY FOR INCENTIVE FEES AND PEN-
ALTIES.—The Secretary of Defense is author-
ized to include in any covered contract provi-
sions for the payment of incentive fees to the
contractor based on achievement of design
specification requirements for reliability and
maintainability of weapons systems under the
contract, or the imposition of penalties to be
paid by the contractor to the Government for
failure to achieve such design specification re-
quirements. Information about such fees or
penalties shall be included in the solicitation
for any covered contract that includes such
fees or penalties.
(3) MEASUREMENT OF RELIABILITY AND MAIN-
TAINABILITY.—In carrying out paragraph (2),
the program manager shall base determina-
tions of a contractor’s performance on reli-
ability and maintainability data collected dur-
ing the program. Such data collection and as-
sociated evaluation metrics shall be described
in detail in the covered contract. To the max-
imum extent practicable, such data shall be
shared with appropriate contractor and gov-
ernment organizations.
(4) NOTIFICATION.—The Secretary of Defense
shall notify the congressional defense commit-
tees upon entering into a covered contract
that includes incentive fees or penalties au-
thorized in paragraph (2).
(e) COVERED CONTRACT DEFINED.—In this sec-
tion, the term ‘‘covered contract’’, with respect
to a weapon system, means a contract—
(1) for the engineering and manufacturing
development of a weapon system, including
embedded software; or
(2) for the production of a weapon system,
including embedded software.
(Added Pub. L. 115–91, div. A, title VIII,
§ 834(a)(1), Dec. 12, 2017, 131 Stat. 1469, § 2443; re-
numbered § 4328 and amended Pub. L. 116–283,
div. A, title XVIII, § 1848(e), Jan. 1, 2021, 134 Stat.
4259.)
Editorial Notes
PRIOR PROVISIONS
Prior sections 4331 to 4338 were renumbered sections
7431 to 7438 of this title, respectively.
A prior section 4339, act Aug. 10, 1956, ch. 1041, 70A
Stat. 240, authorized public quarters and fuel and light
therefor for the organist and choirmaster of the Acad-
emy and for civilian instructors in the departments of
foreign languages and tactics, prior to repeal by Pub.
L. 89–716, § 1, Nov. 2, 1966, 80 Stat. 1114.
Prior sections 4340 to 4343 were renumbered sections
7440 to 7443 of this title, respectively.
Prior sections 4344 to 4345a were repealed by Pub. L.
114–328, div. A, title XII, § 1248(b)(1), Dec. 23, 2016, 130
Stat. 2525.
Section 4344, act Aug. 10, 1956, ch. 1041, 70A Stat. 242;
Pub. L. 98–94, title X, § 1004(a)(1), Sept. 24, 1983, 97 Stat.
657; Pub. L. 105–85, div. A, title V, § 543(a), Nov. 18, 1997,
111 Stat. 1743; Pub. L. 106–65, div. A, title V, § 534(a),
Oct. 5, 1999, 113 Stat. 605; Pub. L. 106–398, § 1 [[div. A],
title V, § 532(a)], Oct. 30, 2000, 114 Stat. 1654, 1654A-110;
Pub. L. 107–107, div. A, title V, § 533(a)(1), (2), Dec. 28,
2001, 115 Stat. 1105, related to selection of persons from
foreign countries to receive instruction at the United
States Military Academy. See section 347 of this title.
Section 4345, added Pub. L. 105–85, div. A, title V,
§ 542(a)(1), Nov. 18, 1997, 111 Stat. 1740; amended Pub. L.
106–65, div. A, title V, § 535(a), Oct. 5, 1999, 113 Stat. 605;
Pub. L. 109–364, div. A, title V, § 531(a), Oct. 17, 2006, 120
Stat. 2198, related to an exchange program with foreign
military academies.
A prior section 4345, act Aug. 10, 1956, ch. 1041, 70A
Stat. 242, related to selection of Filipinos for instruc-
tion at the Military Academy, prior to repeal by Pub.
L. 98–94, title X, § 1004(a)(2), (d), Sept. 24, 1983, 97 Stat.
658, 660, effective one year after Sept. 24, 1983.
Section 4345a, added Pub. L. 110–417, [div. A], title V,
§ 541(a)(1), Oct. 14, 2008, 122 Stat. 4454; amended Pub. L.
113–291, div. A, title V, § 553(a), Dec. 19, 2014, 128 Stat.
3377, related to foreign and cultural exchange activi-
ties.
Prior sections 4346 to 4349 were renumbered sections
7446 to 7449 of this title, respectively.
AMENDMENTS
2021—Pub. L. 116–283, § 1848(e)(2), amended section
catchline generally. Prior to amendment, section
catchline read as follows: ‘‘Sustainment factors in
weapon system design’’.
Pub. L. 116–283, § 1848(e)(1), renumbered section 2443 of
this title as this section. Section was inserted after sec-
tion 4325 of this title to reflect the probable intent of
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Responsibilities.—** Before granting Milestone B approval for a major defense acquisition program or major subprogram, the milestone decision authority for the program or subprogram shall ensure that—
(1) information about the program or subprogram is sufficient to warrant entry of the program or subprogram into the engineering and manufacturing development phase;
(2) appropriate trade-offs among cost, schedule, technical feasibility, and performance objectives have been made to ensure that the program or subprogram is affordable when considering the per-unit cost and the total life-cycle cost, and the Secretary of the military department concerned and the Chief of the armed force concerned concur with these trade-offs; and
(3) there are sound plans for progression of the program or subprogram to the production phase.
**(b) Factors to Be Considered for Milestone B Approval.—** A major defense acquisition program or major subprogram may not receive Milestone B approval until the milestone decision authority confirms the following factors were considered in the decision to grant Milestone B approval:
(1) The program or subprogram has received a preliminary design review and a formal post-preliminary design review or an equivalent assessment was conducted.
(2) The technology in the program or subprogram has been demonstrated in a relevant environment.
(3) The program or subprogram is affordable when considering the ability of the Department of Defense to accomplish the program’s or subprogram’s general mission using alternative systems.
(4) Reasonable lifecycle cost and schedule estimates have been developed to execute, with the concurrence of the Director of Cost Assessment and Program Evaluation, the plan under the program or subprogram.
(5) The estimated
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 4252
Stored review status: release_metadata_unconfirmed. The source passage cites 10 U.S.C. § 4252. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 2719
TITLE 10—ARMED FORCES
§ 4252
title VIII, § 813(e)(2)(B), Oct. 14, 2008, 122 Stat. 4528, pro-
vided that: ‘‘Section 2366b of title 10, United States
Code [now 10 U.S.C. 4251], as added by subsection (a),
shall apply to major defense acquisition programs on
and after March 1, 2008. In the case of the certification
required by [former] paragraph (2) of subsection (a) of
such section, during the period prior to the completion
of the first quadrennial roles and missions review re-
quired by [former] section 118b of title 10, United States
Code, the certification required by that paragraph shall
be that the system is being executed by an entity with
a relevant core competency as identified by the Sec-
retary of Defense.’’
ANALYSIS OF ALTERNATIVES PURSUANT TO MATERIEL
DEVELOPMENT DECISIONS
Pub. L. 116–92, div. A, title VIII, § 832, Dec. 20, 2019, 133
Stat. 1493, provided that:
‘‘(a) TIMELINE.—Not later than 180 days after the date
of the enactment of this Act [Dec. 20, 2019], the Sec-
retary of Defense shall update existing guidance for
analyses of alternatives conducted pursuant to a mate-
riel development decision for a major defense acquisi-
tion program to incorporate the following:
‘‘(1) Study completion within nine months.
‘‘(2) Study guidance issued by the Director, Cost
Assessment and Program Evaluation of a scope de-
signed to provide for reasonable completion of the
study within the nine-month period.
‘‘(3) Procedures for waiver of the timeline require-
ments of this subsection on a case-by-case basis if—
‘‘(A) the subject of the analysis is of extreme
technical complexity;
‘‘(B) collection of additional intelligence is re-
quired to inform the analysis;
‘‘(C) insufficient technical expertise is available
to complete the analysis; or
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 4252
Stored review status: historical_2024_not_currentness_verified. The source passage cites 10 U.S.C. § 4252. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Guidance Required.—** The Secretary of Defense shall issue and maintain guidance on actions to be taken to assess, manage, and control Department of Defense costs for the operation and support of major weapon systems.
**(b) Elements.—** The guidance required by subsection (a) shall, at a minimum—
(1) be issued in accordance with the requirements of [section 118 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section118&num=0&edition=prelim) and in conjunction with the comprehensive guidance on life-cycle management and the development and implementation of product support strategies for major weapon systems required by [section 4324 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4324&num=0&edition=prelim);
(2) require the military departments to retain each estimate of operating and support costs that is developed at any time during the life cycle of a major weapon system, together with supporting documentation used to develop the estimate;
(3) require each Secretary of a military department to update estimates of operating and support costs periodically throughout the life cycle of a major weapon system, and make necessary adjustments to the life-cycle sustainment plan required by [section 4324 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4324&num=0&edition=prelim) to ensure such major weapon system meets applicable operational readiness requirements and materiel readiness objectives (established in accordance with [section 118(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section118/c&num=0&edition=prelim)) in the most cost-effective manner practicable;
(4) establish policies and procedures fo
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 4325
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.