Arkansas Legal Resource Navigator

10 U.S.C. § 4325 — Major weapon systems: assessment, man-

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 4325 — Major weapon systems: assessment, man-

Page 2737 TITLE 10—ARMED FORCES § 4325 ‘‘a technical data and intellectual property manage- ment plan for product support; and’’; added subpars. (H) and (I) of par. (1); and added par. (2). Amendment add- ing par. (2) ‘‘at the end of’’ par. (1) was executed by add- ing par. (2) after par. (1) to reflect the probable intent of Congress. Subsec. (d)(7), (8). Pub. L. 117–263, § 806(b), added par. (7) and redesignated former par. (7) as (8). 2021—Pub. L. 116–283, § 1848(d)(1), renumbered section 2337 of this title as this section. Pub. L. 116–283, § 802(a)(1)–(3), substituted ‘‘covered system’’ for ‘‘major weapon system’’ and ‘‘weapon sys- tem’’ and ‘‘covered systems’’ for ‘‘major weapon sys- tems’’ wherever appearing. Subsec. (b). Pub. L. 116–283, § 802(a)(5), added subsec. (b). Former subsec. (b) redesignated (c). Subsec. (c). Pub. L. 116–283, § 802(a)(4), redesignated subsec. (b) as (c). Former subsec. (c) redesignated (d). Subsec. (c)(2)(A). Pub. L. 116–283, § 802(a)(6)(A), amend- ed subpar. (A) generally. Prior to amendment, subpar. (A) read as follows: ‘‘develop and implement a com- prehensive product support strategy for the weapon system;’’. Subsec. (c)(2)(B). Pub. L. 116–283, § 802(a)(6)(B), sub- stituted ‘‘ensure the life cycle sustainment plan is in- formed by’’ for ‘‘use’’. Subsec. (c)(2)(C). Pub. L. 116–283, § 802(a)(6)(C), in- serted ‘‘and life cycle sustainment plan’’ after ‘‘product support strategy’’. Subsec. (c)(5). Pub. L. 116–283, § 1848(d)(2), which di- rected amendment of subsec. (c)(5) by substituting ‘‘section 3041(c)(1)’’ for ‘‘section 2302d(a)’’ and could not be executed, was repealed by Pub. L. 117–81, § 1701(b)(17). Subsec. (d). Pub. L. 116–283, § 802(a)(4), redesignated subsec. (c) as (d). Subsec. (d)(5). Pub. L. 116–283,

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 4325

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: d68edf3187e52182204b329d64b9a3f9e905295c9a9cf564e672859bff64d766. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-7879f5979c2068003e8a7370
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-4325-major-weapon-systems-assessment-man--141d6c9071.md
Pages: Not recorded – Not recorded
Passage SHA-256: f2954ecdda282930bde57203030628f8110c04901e3be82fc6bed12afdd3ec5c

Source location: USCODE-2024-title10-subtitleA-partV-subpartF-chap323-sec4325.pdf

Stored source content

Page 2737 TITLE 10—ARMED FORCES § 4325 ‘‘a technical data and intellectual property manage- ment plan for product support; and’’; added subpars. (H) and (I) of par. (1); and added par. (2). Amendment add- ing par. (2) ‘‘at the end of’’ par. (1) was executed by add- ing par. (2) after par. (1) to reflect the probable intent of Congress. Subsec. (d)(7), (8). Pub. L. 117–263, § 806(b), added par. (7) and redesignated former par. (7) as (8). 2021—Pub. L. 116–283, § 1848(d)(1), renumbered section 2337 of this title as this section. Pub. L. 116–283, § 802(a)(1)–(3), substituted ‘‘covered system’’ for ‘‘major weapon system’’ and ‘‘weapon sys- tem’’ and ‘‘covered systems’’ for ‘‘major weapon sys- tems’’ wherever appearing. Subsec. (b). Pub. L. 116–283, § 802(a)(5), added subsec. (b). Former subsec. (b) redesignated (c). Subsec. (c). Pub. L. 116–283, § 802(a)(4), redesignated subsec. (b) as (c). Former subsec. (c) redesignated (d). Subsec. (c)(2)(A). Pub. L. 116–283, § 802(a)(6)(A), amend- ed subpar. (A) generally. Prior to amendment, subpar. (A) read as follows: ‘‘develop and implement a com- prehensive product support strategy for the weapon system;’’. Subsec. (c)(2)(B). Pub. L. 116–283, § 802(a)(6)(B), sub- stituted ‘‘ensure the life cycle sustainment plan is in- formed by’’ for ‘‘use’’. Subsec. (c)(2)(C). Pub. L. 116–283, § 802(a)(6)(C), in- serted ‘‘and life cycle sustainment plan’’ after ‘‘product support strategy’’. Subsec. (c)(5). Pub. L. 116–283, § 1848(d)(2), which di- rected amendment of subsec. (c)(5) by substituting ‘‘section 3041(c)(1)’’ for ‘‘section 2302d(a)’’ and could not be executed, was repealed by Pub. L. 117–81, § 1701(b)(17). Subsec. (d). Pub. L. 116–283, § 802(a)(4), redesignated subsec. (c) as (d). Subsec. (d)(5). Pub. L. 116–283, § 802(a)(7)(A), amended par. (5) generally. Prior to amendment, par. (5) defined ‘‘major weapon system’’. Subsec. (d)(5)(A). Pub. L. 117–81, § 1701(d)(11)(A), sub- stituted ‘‘section 4201’’ for ‘‘section 2430’’. Pub. L. 116–283, § 1883(b)(2), which directed that each reference in the text of title 10 to a section that was re- designated by title XVIII of Pub. L. 116–283, as such sec- tion was in effect before the redesignation, be amended by striking such reference and inserting a reference to the appropriate redesignated section, was not executed with respect to ‘‘section 2430’’, which was redesignated as multiple sections. Subsec. (d)(5)(B). Pub. L. 117–81, § 1701(d)(11)(A), which directed the substitution of ‘‘section 4201(a)(2) of this title’’ for ‘‘section 2430(a)(1)(B)’’, could not be executed because of the intervening amendment by Pub. L. 116–283, § 1883(b)(2). See note below. Pub. L. 116–283, § 1883(b)(2), substituted ‘‘section 4201(a)(2)’’ for ‘‘section 2430(a)(1)(B)’’. Subsec. (d)(6). Pub. L. 117–81, § 1701(d)(11)(B), which di- rected the substitution of ‘‘section 4172(e)(7)’’ for ‘‘sec- tion 2366(e)(7)’’, could not be executed because of the in- tervening amendment by Pub. L. 116–283, § 1883(b)(2). See note below. Pub. L. 116–283, § 1883(b)(2), substituted ‘‘section 4172(e)(7)’’ for ‘‘section 2366(e)(7)’’. Pub. L. 116–283, § 802(a)(7)(B), added par. (6). Subsec. (d)(7). Pub. L. 117–81, § 1701(d)(11)(C), which di- rected the substitution of ‘‘section 4211(e)(3)’’ for ‘‘sec- tion 2431a(e)(5)’’, could not be executed because of the intervening amendment by Pub. L. 116–283, § 1883(b)(2). See note below. Pub. L. 116–283, § 1883(b)(2), substituted ‘‘section 4211(e)(3)’’ for ‘‘section 2431a(e)(5)’’. Pub. L. 116–283, § 802(a)(7)(B), added par. (7). 2013—Subsec. (b)(2)(I). Pub. L. 113–66 added subpar. (I). Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 2021 AMENDMENT Amendment by section 1701(d)(11) of Pub. L. 117–81 to take effect immediately after the amendments made by title XVIII of Pub. L. 116–283 have taken effect, see sec- tion 1701(a)(3) of Pub. L. 117–81, set out in a note pre- ceding section 3001 of this title and note below. Amendment by sections 1848(d)(1), (2) and 1883(b)(2) of Pub. L. 116–283 effective Jan. 1, 2022, with additional provisions for delayed implementation and applica- bility of existing law, see section 1801(d) of Pub. L. 116–283, set out as a note preceding section 3001 of this title. SIMILAR PROVISIONS Provisions similar to those in this section were con- tained in section 805 of Pub. L. 111–84, which was set out as a note under section 2302 of this title prior to re- peal by Pub. L. 112–239, div. A, title VIII, § 823(b), Jan. 2, 2013, 126 Stat. 1832. § 4325. Major weapon systems: assessment, man- agement, and control of operating and sup- port costs (a) GUIDANCE REQUIRED.—The Secretary of De- fense shall issue and maintain guidance on ac- tions to be taken to assess, manage, and control Department of Defense costs for the operation and support of major weapon systems. (b) ELEMENTS.—The guidance required by sub- section (a) shall, at a minimum— (1) be issued in conjunction with the com- prehensive guidance on life-cycle management and the development and implementation of product support strategies for major weapon systems required by section 4324 of this title; (2) require the military departments to re- tain each estimate of operating and support costs that is developed at any time during the life cycle of a major weapon system, together with supporting documentation used to de- velop the estimate; (3) require the military departments to up- date estimates of operating and support costs periodically throughout the life cycle of a major weapon system, to determine whether preliminary information and assumptions re- main relevant and accurate, and identify and record reasons for variances; (4) establish policies and procedures for the collection, organization, maintenance, and availability of standardized data on operating and support costs for major weapon systems in accordance with section 2222 of this title; (5) establish standard requirements for the collection and reporting of data on operating and support costs for major weapon systems by contractors performing weapon system sustainment functions in an appropriate for- mat, and develop contract clauses to ensure that contractors comply with such require- ments; (6) require the military departments— (A) to collect and retain data from oper- ational and developmental testing and eval- uation on the reliability and maintain- ability of major weapon systems; and (B) to use such data to inform system de- sign decisions, provide insight into sustainment costs, and inform estimates of operating and support costs for such sys- tems; (7) require the military departments to en- sure that sustainment factors are fully consid- ered at key life-cycle management decision points and that appropriate measures are taken to reduce operating and support costs Page 2738 TITLE 10—ARMED FORCES § 4325 by influencing system design early in develop- ment, developing sound sustainment strate- gies, and addressing key drivers of costs; (8) require the military departments to con- duct an independent logistics assessment of each major weapon system prior to key acqui- sition decision points (including milestone de- cisions) to identify features that are likely to drive future operating and support costs, changes to system design that could reduce such costs, and effective strategies for man- aging such costs; (9) include— (A) reliability metrics for major weapon systems; and (B) requirements on the use of metrics under subparagraph (A) as triggers— (i) to conduct further investigation and analysis into drivers of those metrics; and (ii) to develop strategies for improving reliability, availability, and maintain- ability of such systems at an affordable cost; and (10) require the military departments to con- duct periodic reviews of operating and support costs of major weapon systems after such sys- tems achieve initial operational capability to identify and address factors resulting in growth in operating and support costs and adapt support strategies to reduce such costs. (c) RETENTION OF DATA ON OPERATING AND SUP- PORT COSTS.— (1) IN GENERAL.—The Director of Cost Assess- ment and Program Evaluation shall be respon- sible for developing and maintaining a data- base on operating and support estimates, sup- porting documentation, and actual operating and support costs for major weapon systems. (2) SUPPORT.—The Secretary of Defense shall ensure that the Director, in carrying out such responsibility— (A) promptly receives the results of all cost estimates and cost analyses conducted by the military departments with regard to operating and support costs of major weapon systems; (B) has timely access to any records and data of the military departments (including classified and proprietary information) that the Director considers necessary to carry out such responsibility; and (C) with the concurrence of the Under Sec- retary of Defense for Acquisition and Sustainment, may direct the military de- partments to collect and retain information necessary to support the database. (d) MAJOR WEAPON SYSTEM DEFINED.—In this section, the term ‘‘major weapon system’’ has the meaning given that term in section 3455(f) of this title. (Added Pub. L. 115–91, div. A, title VIII, § 836(a)(1), Dec. 12, 2017, 131 Stat. 1472, § 2337a; amended Pub. L. 115–232, div. A, title X, § 1081(a)(20), Aug. 13, 2018, 132 Stat. 1984; renum- bered § 4325 and amended Pub. L. 116–283, div. A, title XVIII, § 1848(d)(1), (3), Jan. 1, 2021, 134 Stat. 4258.) Editorial Notes AMENDMENTS 2021—Pub. L. 116–283, § 1848(d)(3)(B), amended section catchline generally. Prior to amendment, section catchline read as follows: ‘‘Assessment, management, and control of operating and support costs for major weapon systems’’. Pub. L. 116–283, § 1848(d)(1), renumbered section 2337a of this title as this section. Subsec. (b)(1). Pub. L. 116–283, § 1848(d)(3)(A)(i), sub- stituted ‘‘section 4324’’ for ‘‘section 2337’’. Subsec. (d). Pub. L. 116–283, § 1848(d)(3)(A)(ii), sub- stituted ‘‘section 3455(f)’’ for ‘‘section 2379(f)’’. 2018—Subsec. (d). Pub. L. 115–232 substituted ‘‘this title’’ for ‘‘title 10, United States Code’’. Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 2021 AMENDMENT Amendment by Pub. L. 116–283 effective Jan. 1, 2022, with additional provisions for delayed implementation and applicability of existing law, see section 1801(d) of Pub. L. 116–283, set out as a note preceding section 3001 of this title. PILOT PROGRAM ON TIME-CERTAIN DEVELOPMENT IN ACQUISITION OF MAJOR WEAPON SYSTEMS Pub. L. 109–364, div. A, title VIII, § 812, Oct. 17, 2006, 120 Stat. 2317, as amended by Pub. L. 110–417, [div. A], title VIII, § 813(d)(3), Oct. 14, 2008, 122 Stat. 4527; Pub. L. 111–84, div. A, title X, § 1073(c)(5), Oct. 28, 2009, 123 Stat. 2474; Pub. L. 116–283, div. A, title XVIII, § 1806(e)(2)(D), Jan. 1, 2021, 134 Stat. 4155, provided that: ‘‘(a) PILOT PROGRAM AUTHORIZED.—The Secretary of Defense may carry out a pilot program on the use of time-certain development in the acquisition of major weapon systems. ‘‘(b) PURPOSE OF PILOT PROGRAM.—The purpose of the pilot program authorized by subsection (a) is to assess the feasibility and advisability of utilizing time-certain development in the acquisition of major weapon sys- tems in order to deliver new capabilities to the warfighter more rapidly through— ‘‘(1) disciplined decision-making; ‘‘(2) emphasis on technological maturity; and ‘‘(3) appropriate trade-offs between— ‘‘(A) cost and system performance; and ‘‘(B) program schedule. ‘‘(c) INCLUSION OF SYSTEMS IN PILOT PROGRAM.— ‘‘(1) IN GENERAL.—The Secretary of Defense may in- clude a major weapon system in the pilot program only if— ‘‘(A) the major weapon system meets the criteria under paragraph (2) in accordance with that para- graph; and ‘‘(B) the Milestone Decision Authority nominates such program to the Secretary of Defense for inclu- sion in the program. ‘‘(2) CRITERIA.—For purposes of paragraph (1) a major weapon system meets the criteria under this paragraph only if the Milestone Decision Authority determines, in consultation with the service acquisi- tion executive for the military department carrying out the acquisition program for the system and one or more combatant commanders responsible for field- ing the system, that— ‘‘(A) the certification requirements of section 2366b of title 10, United States Code [now 10 U.S.C. 4252] (as amended by section 805 of this Act), have been met, and no waivers have been granted from such requirements; ‘‘(B) a preliminary design has been reviewed using systems engineering, and the system, as so de- signed, will meet battlefield needs identified by the relevant combatant commanders after appropriate requirements analysis; ‘‘(C) a representative model or prototype of the system, or key subsystems, has been demonstrated Page 2739 TITLE 10—ARMED FORCES § 4325 in a relevant environment, such as a well-simulated operational environment; ‘‘(D) an independent cost estimate has been con- ducted and used as the basis for funding require- ments for the acquisition program for the system; ‘‘(E) the budget of the military department re- sponsible for carrying out the acquisition program for the system provides the funding necessary to execute the product development and production plan consistent with the requirements identified pursuant to subparagraph (D); ‘‘(F) an appropriately qualified program manager has entered into a performance agreement with the Milestone Decision Authority that establishes ex- pected parameters for the cost, schedule, and per- formance of the acquisition program for the sys- tem, consistent with a business case for such acqui- sition program; ‘‘(G) the service acquisition executive and the program manager have developed a strategy to en- sure stability in program management until, at a minimum, the delivery of the initial operational capability under the acquisition program for the system has occurred; ‘‘(H) the service acquisition executive, the rel- evant combatant commanders, and the program manager have agreed that no additional require- ments that would be inconsistent with the agreed- upon program schedule will be added during the de- velopment phase of the acquisition program for the system; and ‘‘(I) a planned initial operational capability will be delivered to the relevant combatant com- manders within a defined period of time as pre- scribed in regulations by the Secretary of Defense. ‘‘(3) TIMING OF DECISION.—The decision whether to include a major weapon system in the pilot program shall be made at the time of milestone approval for the acquisition program for the system. ‘‘(d) LIMITATION ON NUMBER OF WEAPONS SYSTEMS IN PILOT PROGRAM.—The number of major weapon systems included in the pilot program at any time may not ex- ceed six major weapon systems. ‘‘(e) LIMITATION ON COST OF WEAPONS SYSTEMS IN PILOT PROGRAM.—The Secretary of Defense may in- clude a major weapon system in the pilot program only if, at the time a major weapon system is proposed for inclusion, the total cost for system design and develop- ment of the weapon system, as set forth in the cost es- timate referred to in subsection (c)(2)(D), does not ex- ceed $1,000,000,000 during the period covered by the cur- rent future-years defense program. ‘‘(f) SPECIAL FUNDING AUTHORITY.— ‘‘(1) AUTHORITY FOR RESERVE ACCOUNT.—Notwith- standing any other provision of law, the Secretary of Defense may establish a special reserve account uti- lizing funds made available for the major weapon sys- tems included in the pilot program. ‘‘(2) ELEMENTS.—The special reserve account may include— ‘‘(A) funds made available for any major weapon system included in the pilot program to cover ter- mination liability; ‘‘(B) funds made available for any major weapon system included in the pilot program for award fees that may be earned by contractors; and ‘‘(C) funds appropriated to the special reserve ac- count. ‘‘(3) AVAILABILITY OF FUNDS.—Funds in the special reserve account may be used, in accordance with guidance issued by the Secretary for purposes of this section, for the following purposes: ‘‘(A) To cover termination liability for any major weapon system included in the pilot program. ‘‘(B) To pay award fees that are earned by any contractor for a major weapon system included in the pilot program. ‘‘(C) To address unforeseen contingencies that could prevent a major weapon system included in the pilot program from meeting critical schedule or performance requirements. ‘‘(4) REPORTS ON USE OF FUNDS.—Not later than 30 days after the use of funds in the special reserve ac- count for the purpose specified in paragraph (3)(C), the Secretary shall submit to the congressional de- fense committees [Committees on Armed Services and Appropriations of the Senate and the House of Representatives] a report on the use of funds in the account for such purpose. The report shall set forth the purposes for which the funds were used and the reasons for the use of the funds for such purposes. ‘‘(5) RELATIONSHIP TO APPROPRIATIONS.—Nothing in this subsection may be construed as extending any period of time for which appropriated funds are made available. ‘‘(g) ADMINISTRATION OF PILOT PROGRAM.—The Sec- retary of Defense shall prescribe policies and proce- dures on the administration of the pilot program. Such policies and procedures shall— ‘‘(1) provide for the use of program status reports based on earned value data to track progress on a major weapon system under the pilot program against baseline estimates applicable to such system at each systems engineering technical review point; and ‘‘(2) grant authority, to the maximum extent prac- ticable, to the program manager for the acquisition program for a major weapon system to make key pro- gram decisions and trade-offs, subject to manage- ment reviews only if cost or schedule deviations ex- ceed the baselines for such acquisition program by 10 percent or more. ‘‘(h) REMOVAL OF WEAPONS SYSTEMS FROM PILOT PRO- GRAM.—The Secretary of Defense shall remove a major weapon system from the pilot program if— ‘‘(1) the weapon system receives Milestone C ap- proval; or ‘‘(2) the Secretary determines that the weapon sys- tem is no longer in substantial compliance with the criteria in subsection (c)(2) or is otherwise no longer appropriate for inclusion in the pilot program. ‘‘(i) EXPIRATION OF AUTHORITY TO INCLUDE ADDI- TIONAL SYSTEMS IN PILOT PROGRAM.— ‘‘(1) EXPIRATION.—A major weapon system may not be included in the pilot program after September 30, 2012. ‘‘(2) RETENTION OF SYSTEMS.—A major weapon sys- tem included in the pilot program before the date specified in paragraph (1) in accordance with the re- quirements of this section may remain in the pilot program after that date. ‘‘(j) ANNUAL REPORT.— ‘‘(1) IN GENERAL.—Not later than one year after in- cluding the first major weapon system in the pilot program, and annually thereafter, the Secretary shall submit to the congressional defense committees [Committees on Armed Services and Appropriations of the Senate and the House of Representatives] a re- port on the pilot program, and the major weapon sys- tems included in the pilot program, during the one- year period ending on the date of such report. ‘‘(2) ELEMENTS.—Each report under this subsection shall include— ‘‘(A) a description of progress under the pilot pro- gram, and on each major weapon system included in the pilot program, during the period covered by such report; ‘‘(B) a description of the use of all funds in the special reserve account established under sub- section (f); and ‘‘(C) such other matters as the Secretary con- siders appropriate. ‘‘(k) MAJOR WEAPON SYSTEM DEFINED.—In this sec- tion, the term ‘major weapon system’ means a weapon system that is treatable as a major system under sec- tion 3041 of title 10, United States Code.’’ [Pub. L. 111–84, div. A, title X, § 1073(c), Oct. 28, 2009, 123 Stat. 2474, provided that the amendment made by section 1073(c)(5) to section 813(d)(3) of Pub. L. 110–417 (which amended section 812 of Pub. L. 109–364, set out above) is effective as of Oct. 14, 2008, and as if included in Pub. L. 110–417 as enacted.] Page 2740 TITLE 10—ARMED FORCES § 4328 § 4328. Weapon system design: sustainment fac- tors (a) IN GENERAL.—The Secretary of Defense shall ensure that the defense acquisition system gives ample emphasis to sustainment factors, particularly those factors that are affected prin- cipally by the design of a weapon system, in the development of a weapon system. (b) REQUIREMENTS PROCESS.—The Secretary shall ensure that reliability and maintainability are included in the performance attributes of the key performance parameter on sustainment during the development of capabilities require- ments. (c) SOLICITATION AND AWARD OF CONTRACTS.— (1) REQUIREMENT.—The program manager of a weapon system shall include in the solicita- tion for and terms of a covered contract for the weapon system clearly defined and meas- urable requirements for engineering activities and design specifications for reliability and maintainability. (2) EXCEPTION.—If the program manager de- termines that engineering activities and de- sign specifications for reliability or maintain- ability should not be a requirement in a cov- ered contract or a solicitation for such a con- tract, the program manager shall document in writing the justification for the decision. (3) SOURCE SELECTION CRITERIA.—The Sec- retary shall ensure that sustainment factors, including reliability and maintainability, are given ample emphasis in the process for source selection. The Secretary shall encourage the use of objective reliability and maintain- ability criteria in the evaluation of competi- tive proposals. (d) CONTRACT PERFORMANCE.— (1) IN GENERAL.—The Secretary shall ensure that the Department of Defense uses best practices for responding to the positive or neg- ative performance of a contractor in meeting the sustainment requirements of a covered contract for a weapon system. The Secretary shall encourage the use of incentive fees and penalties as appropriate and authorized in paragraph (2) in all covered contracts for weapons systems. (2) AUTHORITY FOR INCENTIVE FEES AND PEN- ALTIES.—The Secretary of Defense is author- ized to include in any covered contract provi- sions for the payment of incentive fees to the contractor based on achievement of design specification requirements for reliability and maintainability of weapons systems under the contract, or the imposition of penalties to be paid by the contractor to the Government for failure to achieve such design specification re- quirements. Information about such fees or penalties shall be included in the solicitation for any covered contract that includes such fees or penalties. (3) MEASUREMENT OF RELIABILITY AND MAIN- TAINABILITY.—In carrying out paragraph (2), the program manager shall base determina- tions of a contractor’s performance on reli- ability and maintainability data collected dur- ing the program. Such data collection and as- sociated evaluation metrics shall be described in detail in the covered contract. To the max- imum extent practicable, such data shall be shared with appropriate contractor and gov- ernment organizations. (4) NOTIFICATION.—The Secretary of Defense shall notify the congressional defense commit- tees upon entering into a covered contract that includes incentive fees or penalties au- thorized in paragraph (2). (e) COVERED CONTRACT DEFINED.—In this sec- tion, the term ‘‘covered contract’’, with respect to a weapon system, means a contract— (1) for the engineering and manufacturing development of a weapon system, including embedded software; or (2) for the production of a weapon system, including embedded software. (Added Pub. L. 115–91, div. A, title VIII, § 834(a)(1), Dec. 12, 2017, 131 Stat. 1469, § 2443; re- numbered § 4328 and amended Pub. L. 116–283, div. A, title XVIII, § 1848(e), Jan. 1, 2021, 134 Stat. 4259.) Editorial Notes PRIOR PROVISIONS Prior sections 4331 to 4338 were renumbered sections 7431 to 7438 of this title, respectively. A prior section 4339, act Aug. 10, 1956, ch. 1041, 70A Stat. 240, authorized public quarters and fuel and light therefor for the organist and choirmaster of the Acad- emy and for civilian instructors in the departments of foreign languages and tactics, prior to repeal by Pub. L. 89–716, § 1, Nov. 2, 1966, 80 Stat. 1114. Prior sections 4340 to 4343 were renumbered sections 7440 to 7443 of this title, respectively. Prior sections 4344 to 4345a were repealed by Pub. L. 114–328, div. A, title XII, § 1248(b)(1), Dec. 23, 2016, 130 Stat. 2525. Section 4344, act Aug. 10, 1956, ch. 1041, 70A Stat. 242; Pub. L. 98–94, title X, § 1004(a)(1), Sept. 24, 1983, 97 Stat. 657; Pub. L. 105–85, div. A, title V, § 543(a), Nov. 18, 1997, 111 Stat. 1743; Pub. L. 106–65, div. A, title V, § 534(a), Oct. 5, 1999, 113 Stat. 605; Pub. L. 106–398, § 1 [[div. A], title V, § 532(a)], Oct. 30, 2000, 114 Stat. 1654, 1654A-110; Pub. L. 107–107, div. A, title V, § 533(a)(1), (2), Dec. 28, 2001, 115 Stat. 1105, related to selection of persons from foreign countries to receive instruction at the United States Military Academy. See section 347 of this title. Section 4345, added Pub. L. 105–85, div. A, title V, § 542(a)(1), Nov. 18, 1997, 111 Stat. 1740; amended Pub. L. 106–65, div. A, title V, § 535(a), Oct. 5, 1999, 113 Stat. 605; Pub. L. 109–364, div. A, title V, § 531(a), Oct. 17, 2006, 120 Stat. 2198, related to an exchange program with foreign military academies. A prior section 4345, act Aug. 10, 1956, ch. 1041, 70A Stat. 242, related to selection of Filipinos for instruc- tion at the Military Academy, prior to repeal by Pub. L. 98–94, title X, § 1004(a)(2), (d), Sept. 24, 1983, 97 Stat. 658, 660, effective one year after Sept. 24, 1983. Section 4345a, added Pub. L. 110–417, [div. A], title V, § 541(a)(1), Oct. 14, 2008, 122 Stat. 4454; amended Pub. L. 113–291, div. A, title V, § 553(a), Dec. 19, 2014, 128 Stat. 3377, related to foreign and cultural exchange activi- ties. Prior sections 4346 to 4349 were renumbered sections 7446 to 7449 of this title, respectively. AMENDMENTS 2021—Pub. L. 116–283, § 1848(e)(2), amended section catchline generally. Prior to amendment, section catchline read as follows: ‘‘Sustainment factors in weapon system design’’. Pub. L. 116–283, § 1848(e)(1), renumbered section 2443 of this title as this section. Section was inserted after sec- tion 4325 of this title to reflect the probable intent of

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 4252 — Major defense acquisition programs: factors to be considered before Milestone B approval

**(a) Responsibilities.—** Before granting Milestone B approval for a major defense acquisition program or major subprogram, the milestone decision authority for the program or subprogram shall ensure that— (1) information about the program or subprogram is sufficient to warrant entry of the program or subprogram into the engineering and manufacturing development phase; (2) appropriate trade-offs among cost, schedule, technical feasibility, and performance objectives have been made to ensure that the program or subprogram is affordable when considering the per-unit cost and the total life-cycle cost, and the Secretary of the military department concerned and the Chief of the armed force concerned concur with these trade-offs; and (3) there are sound plans for progression of the program or subprogram to the production phase. **(b) Factors to Be Considered for Milestone B Approval.—** A major defense acquisition program or major subprogram may not receive Milestone B approval until the milestone decision authority confirms the following factors were considered in the decision to grant Milestone B approval: (1) The program or subprogram has received a preliminary design review and a formal post-preliminary design review or an equivalent assessment was conducted. (2) The technology in the program or subprogram has been demonstrated in a relevant environment. (3) The program or subprogram is affordable when considering the ability of the Department of Defense to accomplish the program’s or subprogram’s general mission using alternative systems. (4) Reasonable lifecycle cost and schedule estimates have been developed to execute, with the concurrence of the Director of Cost Assessment and Program Evaluation, the plan under the program or subprogram. (5) The estimated

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 4252

Stored review status: release_metadata_unconfirmed. The source passage cites 10 U.S.C. § 4252. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 4252 — Major defense acquisition programs: fac-

Page 2719 TITLE 10—ARMED FORCES § 4252 title VIII, § 813(e)(2)(B), Oct. 14, 2008, 122 Stat. 4528, pro- vided that: ‘‘Section 2366b of title 10, United States Code [now 10 U.S.C. 4251], as added by subsection (a), shall apply to major defense acquisition programs on and after March 1, 2008. In the case of the certification required by [former] paragraph (2) of subsection (a) of such section, during the period prior to the completion of the first quadrennial roles and missions review re- quired by [former] section 118b of title 10, United States Code, the certification required by that paragraph shall be that the system is being executed by an entity with a relevant core competency as identified by the Sec- retary of Defense.’’ ANALYSIS OF ALTERNATIVES PURSUANT TO MATERIEL DEVELOPMENT DECISIONS Pub. L. 116–92, div. A, title VIII, § 832, Dec. 20, 2019, 133 Stat. 1493, provided that: ‘‘(a) TIMELINE.—Not later than 180 days after the date of the enactment of this Act [Dec. 20, 2019], the Sec- retary of Defense shall update existing guidance for analyses of alternatives conducted pursuant to a mate- riel development decision for a major defense acquisi- tion program to incorporate the following: ‘‘(1) Study completion within nine months. ‘‘(2) Study guidance issued by the Director, Cost Assessment and Program Evaluation of a scope de- signed to provide for reasonable completion of the study within the nine-month period. ‘‘(3) Procedures for waiver of the timeline require- ments of this subsection on a case-by-case basis if— ‘‘(A) the subject of the analysis is of extreme technical complexity; ‘‘(B) collection of additional intelligence is re- quired to inform the analysis; ‘‘(C) insufficient technical expertise is available to complete the analysis; or

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 4252

Stored review status: historical_2024_not_currentness_verified. The source passage cites 10 U.S.C. § 4252. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 4325 — Major weapon systems: assessment, management, and control of operating and support costs

**(a) Guidance Required.—** The Secretary of Defense shall issue and maintain guidance on actions to be taken to assess, manage, and control Department of Defense costs for the operation and support of major weapon systems. **(b) Elements.—** The guidance required by subsection (a) shall, at a minimum— (1) be issued in accordance with the requirements of [section 118 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section118&num=0&edition=prelim) and in conjunction with the comprehensive guidance on life-cycle management and the development and implementation of product support strategies for major weapon systems required by [section 4324 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4324&num=0&edition=prelim); (2) require the military departments to retain each estimate of operating and support costs that is developed at any time during the life cycle of a major weapon system, together with supporting documentation used to develop the estimate; (3) require each Secretary of a military department to update estimates of operating and support costs periodically throughout the life cycle of a major weapon system, and make necessary adjustments to the life-cycle sustainment plan required by [section 4324 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4324&num=0&edition=prelim) to ensure such major weapon system meets applicable operational readiness requirements and materiel readiness objectives (established in accordance with [section 118(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section118/c&num=0&edition=prelim)) in the most cost-effective manner practicable; (4) establish policies and procedures fo

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 4325

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.