TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 3906
§ 3906. Activities eligible for assistance
For purposes of this chapter, an eligible activ-
ity with respect to an eligible project includes
the cost of—
(1) development-phase activities, including
planning, feasibility analysis (including any
related analysis necessary to carry out an eli-
gible project), revenue forecasting, environ-
mental review, permitting, preliminary engi-
neering
and
design
work,
and
other
preconstruction activities;
(2) construction, reconstruction, rehabilita-
tion, and replacement activities;
(3) the acquisition of real property or an in-
terest in real property (including water rights,
land relating to the project, and improve-
ments to land), environmental mitigation (in-
cluding
acquisitions
pursuant
to
section
3905(8) of this title), construction contin-
gencies, and acquisition of equipment; and
(4) capitalized interest necessary to meet
market requirements, reasonably required re-
serve funds, capital issuance expenses, and
other carrying costs during construction.
(Pub. L. 113–121, title V, § 5027, June 10, 2014, 128
Stat. 1335; Pub. L. 114–322, title IV, § 5008(b)(2)(C),
Dec. 16, 2016, 130 Stat. 1897.)
Editorial Notes
AMENDMENTS
2016—Par. (3). Pub. L. 114–322 substituted ‘‘section
3905(8)’’ for ‘‘section 3905(7)’’.
§ 3907. Determination of eligibility and project
selection
(a) Eligibility requirements
To be eligible to receive financial assistance
under this chapter, a project shall meet the fol-
lowing criteria, as determined by the Secretary
or Administrator, as applicable:
(1) Creditworthiness
(A) In general
The project and obligor shall be credit-
worthy, which shall be determined by the
Secretary or the Administrator, as applica-
ble.
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 3907
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 3566c3dc7f9022aa8abf7cc528b6e03793a3b0c960c08afcb3e8360f889e1c6e. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-75a7dadbdc43b0f9caec0173
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-3907-determination-of-eligibility-and-project--20f36a1a47.md
Pages: Not recorded – Not recorded
Passage SHA-256: 9567d1040ea3b5e2cb38a2765a91648c1ff91cb6fa1282d517ed17dc3ca39748
Source location: USCODE-2024-title33-chap52-sec3907.pdf
Stored source content
Page 1014
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 3906
§ 3906. Activities eligible for assistance
For purposes of this chapter, an eligible activ-
ity with respect to an eligible project includes
the cost of—
(1) development-phase activities, including
planning, feasibility analysis (including any
related analysis necessary to carry out an eli-
gible project), revenue forecasting, environ-
mental review, permitting, preliminary engi-
neering
and
design
work,
and
other
preconstruction activities;
(2) construction, reconstruction, rehabilita-
tion, and replacement activities;
(3) the acquisition of real property or an in-
terest in real property (including water rights,
land relating to the project, and improve-
ments to land), environmental mitigation (in-
cluding
acquisitions
pursuant
to
section
3905(8) of this title), construction contin-
gencies, and acquisition of equipment; and
(4) capitalized interest necessary to meet
market requirements, reasonably required re-
serve funds, capital issuance expenses, and
other carrying costs during construction.
(Pub. L. 113–121, title V, § 5027, June 10, 2014, 128
Stat. 1335; Pub. L. 114–322, title IV, § 5008(b)(2)(C),
Dec. 16, 2016, 130 Stat. 1897.)
Editorial Notes
AMENDMENTS
2016—Par. (3). Pub. L. 114–322 substituted ‘‘section
3905(8)’’ for ‘‘section 3905(7)’’.
§ 3907. Determination of eligibility and project
selection
(a) Eligibility requirements
To be eligible to receive financial assistance
under this chapter, a project shall meet the fol-
lowing criteria, as determined by the Secretary
or Administrator, as applicable:
(1) Creditworthiness
(A) In general
The project and obligor shall be credit-
worthy, which shall be determined by the
Secretary or the Administrator, as applica-
ble.
(B) Considerations
In determining the creditworthiness of a
project and obligor, the Secretary or the Ad-
ministrator, as applicable, shall take into
consideration relevant factors, including—
(i) the terms, conditions, financial struc-
ture, and security features of the proposed
financing;
(ii) the dedicated revenue sources that
will secure or fund the project obligations;
(iii) the financial assumptions upon
which the project is based; and
(iv) the financial soundness and credit
history of the obligor.
(C) Security features
The Secretary or the Administrator, as ap-
plicable, shall ensure that any financing for
the project has appropriate security fea-
tures, such as a rate covenant, supporting
the project obligations to ensure repayment.
(D) Rating opinion letters
(i) Preliminary rating opinion letter
The Secretary or the Administrator, as
applicable, shall require each project ap-
plicant to provide, at the time of applica-
tion, a preliminary rating opinion letter
from at least 1 rating agency indicating
that the senior obligations of the project
(which may be the Federal credit instru-
ment) have the potential to achieve an in-
vestment-grade rating.
(ii) Final rating opinion letters
The Secretary or the Administrator, as
applicable, shall require each project ap-
plicant to provide, prior to final accept-
ance and financing of the project, a final
rating opinion letter from at least 1 rating
agency indicating that the senior obliga-
tions of the project have an investment-
grade rating.
(E)
Special
rule
for
certain
combined
projects
The Administrator shall develop a credit
evaluation process for a Federal credit in-
strument provided to—
(i) a State infrastructure financing au-
thority for a project under section 3905(9)
of this title, which may include requiring
the provision of a final rating opinion let-
ter from at least one rating agency; or
(ii) an entity for a project under section
3905(10) of this title, which may include re-
quiring the provision of a final rating
opinion letter from at least two rating
agencies.
(2) Eligible project costs
(A) In general
Subject to subparagraph (B), the eligible
project costs of a project shall be reasonably
anticipated to be not less than $20,000,000.
(B) Small community water infrastructure
projects
For a project described in paragraph (2) or
(3) of section 3905 of this title that serves a
community of not more than 25,000 individ-
uals, the eligible project costs of a project
shall be reasonably anticipated to be not
less than $5,000,000.
(3) Dedicated revenue sources
The Federal credit instrument for the
project shall be repayable, in whole or in part,
from dedicated revenue sources that also se-
cure the project obligations.
(4) Public sponsorship of private entities
(A) In general
If an eligible project is carried out by an
entity that is not a State or local govern-
ment or an agency or instrumentality of a
State or local government or a tribal gov-
ernment or consortium of tribal govern-
ments, the project shall be publicly spon-
sored.
(B) Public sponsorship
For purposes of this chapter, a project
shall be considered to be publicly sponsored
Page 1015
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 3907
if the obligor can demonstrate, to the satis-
faction of the Secretary or the Adminis-
trator, as appropriate, that the project ap-
plicant has consulted with the affected
State, local, or tribal government in which
the project is located, or is otherwise af-
fected by the project, and that such govern-
ment supports the proposed project.
(5) Use of existing financing mechanisms
(A) Notification
For each eligible project for which the Ad-
ministrator has authority under paragraph
(2) or (3) of section 3902(b) of this title and
for which the Administrator has received an
application for financial assistance under
this chapter, the Administrator shall notify,
not later than 30 days after the date on
which the Administrator receives a complete
application, the applicable State infrastruc-
ture financing authority of the State in
which the project is located that such appli-
cation has been submitted.
(B) Determination
If, not later than 60 days after the date of
receipt of a notification under subparagraph
(A), a State infrastructure financing author-
ity notifies the Administrator that the State
infrastructure financing authority intends
to commit funds to the project in an amount
that is equal to or greater than the amount
requested under the application, the Admin-
istrator may not provide any financial as-
sistance for that project under this chapter
unless—
(i) by the date that is 180 days after the
date of receipt of a notification under sub-
paragraph (A), the State infrastructure fi-
nancing authority fails to enter into an as-
sistance agreement to provide funds for
the project; or
(ii) the financial assistance to be pro-
vided by the State infrastructure financ-
ing authority will be at rates and terms
that are less favorable than the rates and
terms for financial assistance provided
under this chapter.
(6) Operation and maintenance plan
(A) In general
The Secretary or the Administrator, as ap-
plicable, shall determine whether an appli-
cant for assistance under this chapter has
developed, and identified adequate revenues
to implement, a plan for operating, main-
taining, and repairing the project over the
useful life of the project.
(B) Special rule
An eligible project described in section
3905(1) of this title that has not been specifi-
cally authorized by Congress shall not be eli-
gible for Federal assistance for operations
and maintenance.
(b) Selection criteria
(1) Establishment
The Secretary or the Administrator, as ap-
plicable, shall establish criteria for the selec-
tion of projects that meet the eligibility re-
quirements of subsection (a), in accordance
with paragraph (2).
(2) Criteria
The selection criteria shall include the fol-
lowing:
(A) The extent to which the project is na-
tionally or regionally significant, with re-
spect to the generation of economic and pub-
lic benefits, such as—
(i) the reduction of flood risk;
(ii) the improvement of water quality
and quantity, including aquifer recharge;
(iii) the protection of drinking water, in-
cluding source water protection; and
(iv) the support of international com-
merce.
(B) The extent to which the project financ-
ing plan includes public or private financing
in addition to assistance under this chapter.
(C) The likelihood that assistance under
this chapter would enable the project to pro-
ceed at an earlier date than the project
would otherwise be able to proceed.
(D) The extent to which the project uses
new or innovative approaches.
(E) The amount of budget authority re-
quired to fund the Federal credit instrument
made available under this chapter.
(F) The extent to which the project—
(i) protects against extreme weather
events, such as floods or hurricanes; or
(ii) helps maintain or protect the envi-
ronment.
(G) The extent to which a project serves
regions with significant energy exploration,
development, or production areas.
(H) The extent to which a project serves
regions with significant water resource chal-
lenges, including the need to address—
(i) water quality concerns in areas of re-
gional, national, or international signifi-
cance;
(ii) water quantity concerns related to
groundwater, surface water, or other water
sources;
(iii) significant flood risk;
(iv) water resource challenges identified
in existing regional, State, or multistate
agreements; or
(v) water resources with exceptional rec-
reational value or ecological importance.
(I) The extent to which the project ad-
dresses identified municipal, State, or re-
gional priorities.
(J) The readiness of the project to proceed
toward development, including a demonstra-
tion by the obligor that there is a reasonable
expectation that the contracting process for
construction of the project can commence
by not later than 90 days after the date on
which a Federal credit instrument is obli-
gated for the project under this chapter.
(K) The extent to which assistance under
this chapter reduces the contribution of Fed-
eral assistance to the project.
(3) Special rule for certain combined projects
For a project described in section 3905(9) of
this title, the Administrator shall only con-
sider the criteria described in subparagraphs
(B) through (K) of paragraph (2).
Page 1016
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 3908
(c) Federal requirements
Nothing in this section supersedes the applica-
bility of other requirements of Federal law (in-
cluding regulations).
(Pub. L. 113–121, title V, § 5028, June 10, 2014, 128
Stat. 1335; Pub. L. 114–94, div. A, title I, § 1445,
Dec. 4, 2015, 129 Stat. 1437; Pub. L. 114–322, title
IV, § 5008(b)(2)(D), Dec. 16, 2016, 130 Stat. 1897;
Pub. L. 115–270, title IV, § 4201(a)(2), Oct. 23, 2018,
132 Stat. 3877; Pub. L. 117–58, div. E, title II,
§ 50214, Nov. 15, 2021, 135 Stat. 1173.)
Editorial Notes
AMENDMENTS
2021—Subsec. (a)(1)(D)(ii). Pub. L. 117–58 substituted
‘‘a final rating opinion letter from at least 1 rating
agency’’ for ‘‘final rating opinion letters from at least
2 rating agencies’’.
2018—Subsec. (a)(1)(E). Pub. L. 115–270 amended sub-
par. (E) generally. Prior to amendment, text read as
follows: ‘‘The Administrator shall develop a credit
evaluation process for a Federal credit instrument pro-
vided to a State infrastructure financing authority for
a project under section 3905(9) of this title or an entity
for a project under section 3905(10) of this title, which
may include requiring the provision of a final rating
opinion letter from at least 2 rating agencies.’’
2016—Subsec.
(a)(1)(E).
Pub.
L.
114–322,
§ 5008(b)(2)(D)(i), substituted ‘‘section 3905(9)’’ for ‘‘sec-
tion 3905(8)’’ and ‘‘section 3905(10)’’ for ‘‘section 3905(9)’’.
Subsec. (b)(3). Pub. L. 114–322, § 5008(b)(2)(D)(ii), sub-
stituted ‘‘section 3905(9)’’ for ‘‘section 3905(8)’’.
2015—Subsec. (a)(5) to (7). Pub. L. 114–94 redesignated
pars. (6) and (7) as (5) and (6), respectively, and struck
out former par. (5). Prior to amendment, text of par. (5)
read as follows: ‘‘No project receiving Federal credit as-
sistance under this chapter may be financed (directly
or indirectly), in whole or in part, with proceeds of any
obligation—
‘‘(A) the interest on which is exempt from the tax
imposed under chapter 1 of title 26; or
‘‘(B) with respect to which credit is allowable under
subpart I or J of part IV of subchapter A of chapter
1 of title 26.’’
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2015 AMENDMENT
Amendment by Pub. L. 114–94 effective Oct. 1, 2015,
see section 1003 of Pub. L. 114–94, set out as a note
under section 5313 of Title 5, Government Organization
and Employees.
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 113–121, set out as a note under section
2201 of this title.
§ 3908. Secured loans
(a) Agreements
(1) In general
Subject to paragraphs (2) and (3), the Sec-
retary or the Administrator, as applicable,
may enter into agreements with 1 or more ob-
ligors to make secured loans, the proceeds of
which shall be used to finance eligible project
costs of any project selected under section 3907
of this title.
(2) Financial risk assessment
Before entering into an agreement under
this subsection for a secured loan, the Sec-
retary or the Administrator, as applicable, in
consultation with the Director of the Office of
Management and Budget and each rating
agency providing a rating opinion letter under
section 3907(a)(1)(D) of this title, shall deter-
mine an appropriate capital reserve subsidy
amount for the secured loan, taking into ac-
count each such rating opinion letter.
(3) Investment-grade rating requirement
The execution of a secured loan under this
section shall be contingent on receipt by the
senior obligations of the project of an invest-
ment-grade rating.
(b) Terms and limitations
(1) In general
A secured loan provided for a project under
this section shall be subject to such terms and
conditions, and contain such covenants, rep-
resentations, warranties, and requirements
(including requirements for audits), as the
Secretary or the Administrator, as applicable,
determines to be appropriate.
(2) Maximum amount
The amount of a secured loan under this sec-
tion shall not exceed the lesser of—
(A) an amount equal to 49 percent of the
reasonably anticipated eligible project costs;
and
(B) if the secured loan does not receive an
investment-grade rating, the amount of the
senior project obligations of the project.
(3) Payment
A secured loan under this section—
(A) shall be payable, in whole or in part,
from State or local taxes, user fees, or other
dedicated revenue sources that also secure
the senior project obligations of the relevant
project;
(B) shall include a rate covenant, coverage
requirement, or similar security feature sup-
porting the project obligations; and
(C) may have a lien on revenues described
in subparagraph (A), subject to any lien se-
curing project obligations.
(4) Interest rate
The interest rate on a secured loan under
this section shall be not less than the yield on
United States Treasury securities of a similar
maturity to the maturity of the secured loan
on the date of execution of the loan agree-
ment.
(5) Maturity date
(A) In general
The final maturity date of a secured loan
under this section shall be the earlier of—
(i) the date that is 35 years after the date
of substantial completion of the relevant
project (as determined by the Secretary or
the Administrator, as applicable); and
(ii) if the useful life of the project (as de-
termined by the Secretary or Adminis-
trator, as applicable) is less than 35 years,
the useful life the project.
(B) Special rule for State infrastructure fi-
nancing authorities
The final maturity date of a secured loan
to a State infrastructure financing author-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Eligibility requirements** To be eligible to receive financial assistance under this chapter, a project shall meet the following criteria, as determined by the Secretary or Administrator, as applicable:
(1) **Creditworthiness**
(A) *In general* — The project and obligor shall be creditworthy, which shall be determined by the Secretary or the Administrator, as applicable.
(B) *Considerations* — In determining the creditworthiness of a project and obligor, the Secretary or the Administrator, as applicable, shall take into consideration relevant factors, including—
(i) the terms, conditions, financial structure, and security features of the proposed financing;
(ii) the dedicated revenue sources that will secure or fund the project obligations;
(iii) the financial assumptions upon which the project is based; and
(iv) the financial soundness and credit history of the obligor.
(C) *Security features* — The Secretary or the Administrator, as applicable, shall ensure that any financing for the project has appropriate security features, such as a rate covenant, supporting the project obligations to ensure repayment.
(D) *Rating opinion letters*
(i) *Preliminary rating opinion letter* — The Secretary or the Administrator, as applicable, shall require each project applicant to provide, at the time of application, a preliminary rating opinion letter from at least 1 rating agency indicating that the senior obligations of the project (which may be the Federal credit instrument) have the potential to achieve an investment-grade rating.
(ii) *Final rating opinion letters* — The Secretary or the Administrator, as applicable, shall require each project applicant to provide, prior to final acceptance and financing of the project, a final ra
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 3907
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.