33 U.S.C. § 3907 — Determination of eligibility and project selection

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 3907 — Determination of eligibility and project selection

**(a) Eligibility requirements** To be eligible to receive financial assistance under this chapter, a project shall meet the following criteria, as determined by the Secretary or Administrator, as applicable: (1) **Creditworthiness** (A) *In general* — The project and obligor shall be creditworthy, which shall be determined by the Secretary or the Administrator, as applicable. (B) *Considerations* — In determining the creditworthiness of a project and obligor, the Secretary or the Administrator, as applicable, shall take into consideration relevant factors, including— (i) the terms, conditions, financial structure, and security features of the proposed financing; (ii) the dedicated revenue sources that will secure or fund the project obligations; (iii) the financial assumptions upon which the project is based; and (iv) the financial soundness and credit history of the obligor. (C) *Security features* — The Secretary or the Administrator, as applicable, shall ensure that any financing for the project has appropriate security features, such as a rate covenant, supporting the project obligations to ensure repayment. (D) *Rating opinion letters* (i) *Preliminary rating opinion letter* — The Secretary or the Administrator, as applicable, shall require each project applicant to provide, at the time of application, a preliminary rating opinion letter from at least 1 rating agency indicating that the senior obligations of the project (which may be the Federal credit instrument) have the potential to achieve an investment-grade rating. (ii) *Final rating opinion letters* — The Secretary or the Administrator, as applicable, shall require each project applicant to provide, prior to final acceptance and financing of the project, a final ra

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 3907

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 20155421bdd3bab07d4b12b65b38e2721e0633e0cd3daff05170f333e63c2144. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_2dcc077010f1b175d639beca
Source file: Laws/federal/codes/united-states-code/title-33/section-3907-determination-of-eligibility-and-project-selection--a99515df99.md
Pages: Not recorded – Not recorded
Passage SHA-256: 06faf2c0b612387cfa7c4a8510b91cca6d6704fc6b9a4dc0217aa565977a5065

Source location: Title 33, Chapter 52, § 3907; chapter-052-water-infrastructure-finance-and-innovation.md

Stored source content

**(a) Eligibility requirements** To be eligible to receive financial assistance under this chapter, a project shall meet the following criteria, as determined by the Secretary or Administrator, as applicable: (1) **Creditworthiness** (A) *In general* — The project and obligor shall be creditworthy, which shall be determined by the Secretary or the Administrator, as applicable. (B) *Considerations* — In determining the creditworthiness of a project and obligor, the Secretary or the Administrator, as applicable, shall take into consideration relevant factors, including— (i) the terms, conditions, financial structure, and security features of the proposed financing; (ii) the dedicated revenue sources that will secure or fund the project obligations; (iii) the financial assumptions upon which the project is based; and (iv) the financial soundness and credit history of the obligor. (C) *Security features* — The Secretary or the Administrator, as applicable, shall ensure that any financing for the project has appropriate security features, such as a rate covenant, supporting the project obligations to ensure repayment. (D) *Rating opinion letters* (i) *Preliminary rating opinion letter* — The Secretary or the Administrator, as applicable, shall require each project applicant to provide, at the time of application, a preliminary rating opinion letter from at least 1 rating agency indicating that the senior obligations of the project (which may be the Federal credit instrument) have the potential to achieve an investment-grade rating. (ii) *Final rating opinion letters* — The Secretary or the Administrator, as applicable, shall require each project applicant to provide, prior to final acceptance and financing of the project, a final rating opinion letter from at least 1 rating agency indicating that the senior obligations of the project have an investment-grade rating. (E) *Special rule for certain combined projects* — The Administrator shall develop a credit evaluation process for a Federal credit instrument provided to— (i) a State infrastructure financing authority for a project under [section 3905(9) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section3905/9&num=0&edition=prelim), which may include requiring the provision of a final rating opinion letter from at least one rating agency; or (ii) an entity for a project under [section 3905(10) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section3905/10&num=0&edition=prelim), which may include requiring the provision of a final rating opinion letter from at least two rating agencies. (2) **Eligible project costs** (A) *In general* — Subject to subparagraph (B), the eligible project costs of a project shall be reasonably anticipated to be not less than $20,000,000. (B) *Small community water infrastructure projects* — For a project described in paragraph (2) or (3) of [section 3905 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section3905&num=0&edition=prelim) that serves a community of not more than 25,000 individuals, the eligible project costs of a project shall be reasonably anticipated to be not less than $5,000,000. (3) **Dedicated revenue sources** — The Federal credit instrument for the project shall be repayable, in whole or in part, from dedicated revenue sources that also secure the project obligations. (4) **Public sponsorship of private entities** (A) *In general* — If an eligible project is carried out by an entity that is not a State or local government or an agency or instrumentality of a State or local government or a tribal government or consortium of tribal governments, the project shall be publicly sponsored. (B) *Public sponsorship* — For purposes of this chapter, a project shall be considered to be publicly sponsored if the obligor can demonstrate, to the satisfaction of the Secretary or the Administrator, as appropriate, that the project applicant has consulted with the affected State, local, or tribal government in which the project is located, or is otherwise affected by the project, and that such government supports the proposed project. (5) **Use of existing financing mechanisms** (A) *Notification* — For each eligible project for which the Administrator has authority under paragraph (2) or (3) of [section 3902(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section3902/b&num=0&edition=prelim) and for which the Administrator has received an application for financial assistance under this chapter, the Administrator shall notify, not later than 30 days after the date on which the Administrator receives a complete application, the applicable State infrastructure financing authority of the State in which the project is located that such application has been submitted. (B) *Determination* — If, not later than 60 days after the date of receipt of a notification under subparagraph (A), a State infrastructure financing authority notifies the Administrator that the State infrastructure financing authority intends to commit funds to the project in an amount that is equal to or greater than the amount requested under the application, the Administrator may not provide any financial assistance for that project under this chapter unless— (i) by the date that is 180 days after the date of receipt of a notification under subparagraph (A), the State infrastructure financing authority fails to enter into an assistance agreement to provide funds for the project; or (ii) the financial assistance to be provided by the State infrastructure financing authority will be at rates and terms that are less favorable than the rates and terms for financial assistance provided under this chapter. (6) **Operation and maintenance plan** (A) *In general* — The Secretary or the Administrator, as applicable, shall determine whether an applicant for assistance under this chapter has developed, and identified adequate revenues to implement, a plan for operating, maintaining, and repairing the project over the useful life of the project. (B) *Special rule* — An eligible project described in [section 3905(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section3905/1&num=0&edition=prelim) that has not been specifically authorized by Congress shall not be eligible for Federal assistance for operations and maintenance. **(b) Selection criteria** (1) **Establishment** — The Secretary or the Administrator, as applicable, shall establish criteria for the selection of projects that meet the eligibility requirements of subsection (a), in accordance with paragraph (2). (2) **Criteria** — The selection criteria shall include the following: (A) The extent to which the project is nationally or regionally significant, with respect to the generation of economic and public benefits, such as— (i) the reduction of flood risk; (ii) the improvement of water quality and quantity, including aquifer recharge; (iii) the protection of drinking water, including source water protection; and (iv) the support of international commerce. (B) The extent to which the project financing plan includes public or private financing in addition to assistance under this chapter. (C) The likelihood that assistance under this chapter would enable the project to proceed at an earlier date than the project would otherwise be able to proceed. (D) The extent to which the project uses new or innovative approaches. (E) The amount of budget authority required to fund the Federal credit instrument made available under this chapter. (F) The extent to which the project— (i) protects against extreme weather events, such as floods or hurricanes; or (ii) helps maintain or protect the environment. (G) The extent to which a project serves regions with significant energy exploration, development, or production areas. (H) The extent to which a project serves regions with significant water resource challenges, including the need to address— (i) water quality concerns in areas of regional, national, or international significance; (ii) water quantity concerns related to groundwater, surface water, or other water sources; (iii) significant flood risk; (iv) water resource challenges identified in existing regional, State, or multistate agreements; or (v) water resources with exceptional recreational value or ecological importance. (I) The extent to which the project addresses identified municipal, State, or regional priorities. (J) The readiness of the project to proceed toward development, including a demonstration by the obligor that there is a reasonable expectation that the contracting process for construction of the project can commence by not later than 90 days after the date on which a Federal credit instrument is obligated for the project under this chapter. (K) The extent to which assistance under this chapter reduces the contribution of Federal assistance to the project. (3) **Special rule for certain combined projects** — For a project described in [section 3905(9) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section3905/9&num=0&edition=prelim), the Administrator shall only consider the criteria described in subparagraphs (B) through (K) of paragraph (2). **(c) Federal requirements** Nothing in this section supersedes the applicability of other requirements of Federal law (including regulations).

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 3905 — Projects eligible for assistance

The following projects may be carried out with amounts made available under this chapter: (1) Any project for flood damage reduction, hurricane and storm damage reduction, environmental restoration, coastal or inland harbor navigation improvement, or inland and intracoastal waterways navigation improvement that the Secretary determines is technically sound, economically justified, and environmentally acceptable, including— (A) a project to reduce flood damage; (B) a project to restore aquatic ecosystems; (C) a project to improve the inland and intracoastal waterways navigation system of the United States; and (D) a project to improve navigation of a coastal or inland harbor of the United States, including channel deepening and construction of associated general navigation features. (2) 1 or more activities that are eligible for assistance under [section 1383(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1383/c&num=0&edition=prelim), notwithstanding the public ownership requirement under paragraph (1) of that subsection. (3) 1 or more activities described in [section 300j–12(a)(2) of title 42](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section300j–12/a/2&num=0&edition=prelim). (4) A project for enhanced energy efficiency in the operation of a public water system or a publicly owned treatment works. (5) A project for repair, rehabilitation, or replacement of a treatment works, community water system, or aging water distribution or waste collection facility (including a facility that serves a population or community of an Indian reservation). (6) A brackish or sea water desalination project, including chloride control, a managed aquifer recharge project, a water recycling project, o

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 3905

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2201 — Prior project authorization

In any case in which a project under the jurisdiction of the Secretary is budgeted under a different business line than the business line under which the project was originally authorized, the Secretary shall ensure that the project is carried out in accordance with any requirements that apply to the business line under which the project was originally authorized.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2201

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

5 U.S.C. § 5313 — Positions at level II

Level II of the Executive Schedule applies to the following positions, for which the annual rate of basic pay shall be the rate determined with respect to such level under chapter 11 of title 2, as adjusted by [section 5318 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section5318&num=0&edition=prelim):

Source: Supplied U.S. Code snapshot — release unconfirmed · 5 U.S.C. § 5313

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 3908 — Secured loans

**(a) Agreements** (1) **In general** — Subject to paragraphs (2) and (3), the Secretary or the Administrator, as applicable, may enter into agreements with 1 or more obligors to make secured loans, the proceeds of which shall be used to finance eligible project costs of any project selected under [section 3907 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section3907&num=0&edition=prelim). (2) **Financial risk assessment** — Before entering into an agreement under this subsection for a secured loan, the Secretary or the Administrator, as applicable, in consultation with the Director of the Office of Management and Budget and each rating agency providing a rating opinion letter under [section 3907(a)(1)(D) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section3907/a/1/D&num=0&edition=prelim), shall determine an appropriate capital reserve subsidy amount for the secured loan, taking into account each such rating opinion letter. (3) **Investment-grade rating requirement** — The execution of a secured loan under this section shall be contingent on receipt by the senior obligations of the project of an investment-grade rating. **(b) Terms and limitations** (1) **In general** — A secured loan provided for a project under this section shall be subject to such terms and conditions, and contain such covenants, representations, warranties, and requirements (including requirements for audits), as the Secretary or the Administrator, as applicable, determines to be appropriate. (2) **Maximum amount** — The amount of a secured loan under this section shall not exceed the lesser of— (A) an amount equal to 49 percent of the reasonably anticipated eligible project costs; and (B) if the secured loan d

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 3908

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 3907 — Determination of eligibility and project

Page 1014 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 3906 § 3906. Activities eligible for assistance For purposes of this chapter, an eligible activ- ity with respect to an eligible project includes the cost of— (1) development-phase activities, including planning, feasibility analysis (including any related analysis necessary to carry out an eli- gible project), revenue forecasting, environ- mental review, permitting, preliminary engi- neering and design work, and other preconstruction activities; (2) construction, reconstruction, rehabilita- tion, and replacement activities; (3) the acquisition of real property or an in- terest in real property (including water rights, land relating to the project, and improve- ments to land), environmental mitigation (in- cluding acquisitions pursuant to section 3905(8) of this title), construction contin- gencies, and acquisition of equipment; and (4) capitalized interest necessary to meet market requirements, reasonably required re- serve funds, capital issuance expenses, and other carrying costs during construction. (Pub. L. 113–121, title V, § 5027, June 10, 2014, 128 Stat. 1335; Pub. L. 114–322, title IV, § 5008(b)(2)(C), Dec. 16, 2016, 130 Stat. 1897.) Editorial Notes AMENDMENTS 2016—Par. (3). Pub. L. 114–322 substituted ‘‘section 3905(8)’’ for ‘‘section 3905(7)’’. § 3907. Determination of eligibility and project selection (a) Eligibility requirements To be eligible to receive financial assistance under this chapter, a project shall meet the fol- lowing criteria, as determined by the Secretary or Administrator, as applicable: (1) Creditworthiness (A) In general The project and obligor shall be credit- worthy, which shall be determined by the Secretary or the Administrator, as applica- ble.

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 3907

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.