Arkansas Legal Resource Navigator

10 U.S.C. § 3241 — Design-build selection procedures

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 3241 — Design-build selection procedures

Page 2450 TITLE 10—ARMED FORCES § 3241 ‘‘(b) ASSESSMENT OF TRAINING AND EDUCATION.—The Secretary of Defense shall assess the need to establish a program, or enhance existing programs, for training and educating Department of Defense procurement offi- cials to ensure that they are aware of any Department requirements, preferences, or goals for the procurement of environmentally preferable procurement items or procurement items made with recovered material. ‘‘(c) REPORTING REQUIREMENT.—Not later than March 1, 2004, and each March 1 thereafter through 2007, the Secretary of Defense shall submit to the Committee on Armed Services of the Senate and the Committee on Armed Services of the House of Representatives a re- port detailing the results obtained from the tracking system developed under subsection (a). ‘‘(d) RELATION TO OTHER LAWS.—Nothing in this sec- tion shall be construed to alter the requirements of the Solid Waste Disposal Act (42 U.S.C. 6901 et seq.). ‘‘(e) DEFINITIONS.—In this section: ‘‘(1) The term ‘environmentally preferable’, in the case of a procurement item, means that the item has a lesser or reduced effect on human health and the environment when compared with competing prod- ucts that serve the same purpose. The comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, oper- ation, maintenance, or disposal of the product. ‘‘(2) The terms ‘procurement item’ and ‘recovered material’ have the meanings given such terms in sec- tion 1004 of the Solid Waste Disposal Act (42 U.S.C. 6903).’’ REQUIREMENT TO DISREGARD CERTAIN AGREEMENTS IN AWARDING CONTRACTS FOR PURCHASE OF FIREARMS OR AMMUNITION Pub. L. 106–398, § 1 [[div. A], title VIII, § 826], Oct. 30, 2000, 114 Stat. 1654, 1654A

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 3241

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 063b20aa17e8759f207f38ff2929bab1d4c02f17675115d3c9139e4ba278dbdc. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-706bca1d83d25c8a41888152
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-3241-design-build-selection-procedures--08e09d2e5f.md
Pages: Not recorded – Not recorded
Passage SHA-256: cc0f0dfbf34fe18a26f7773f02984cb5987cdd51cb647e91391e1a9c15169f46

Source location: USCODE-2024-title10-subtitleA-partV-subpartB-chap223-sec3241.pdf

Stored source content

Page 2450 TITLE 10—ARMED FORCES § 3241 ‘‘(b) ASSESSMENT OF TRAINING AND EDUCATION.—The Secretary of Defense shall assess the need to establish a program, or enhance existing programs, for training and educating Department of Defense procurement offi- cials to ensure that they are aware of any Department requirements, preferences, or goals for the procurement of environmentally preferable procurement items or procurement items made with recovered material. ‘‘(c) REPORTING REQUIREMENT.—Not later than March 1, 2004, and each March 1 thereafter through 2007, the Secretary of Defense shall submit to the Committee on Armed Services of the Senate and the Committee on Armed Services of the House of Representatives a re- port detailing the results obtained from the tracking system developed under subsection (a). ‘‘(d) RELATION TO OTHER LAWS.—Nothing in this sec- tion shall be construed to alter the requirements of the Solid Waste Disposal Act (42 U.S.C. 6901 et seq.). ‘‘(e) DEFINITIONS.—In this section: ‘‘(1) The term ‘environmentally preferable’, in the case of a procurement item, means that the item has a lesser or reduced effect on human health and the environment when compared with competing prod- ucts that serve the same purpose. The comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, oper- ation, maintenance, or disposal of the product. ‘‘(2) The terms ‘procurement item’ and ‘recovered material’ have the meanings given such terms in sec- tion 1004 of the Solid Waste Disposal Act (42 U.S.C. 6903).’’ REQUIREMENT TO DISREGARD CERTAIN AGREEMENTS IN AWARDING CONTRACTS FOR PURCHASE OF FIREARMS OR AMMUNITION Pub. L. 106–398, § 1 [[div. A], title VIII, § 826], Oct. 30, 2000, 114 Stat. 1654, 1654A–220, provided that: ‘‘In accord- ance with the requirements contained in the amend- ments enacted in the Competition in Contracting Act of 1984 (title VII of division B of Public Law 98–369; 98 Stat. 1175) [see Tables for classification], the Secretary of Defense may not, in awarding a contract for the pur- chase of firearms or ammunition, take into account whether a manufacturer or vendor of firearms or am- munition is a party to an agreement under which the manufacturer or vendor agrees to adopt limitations with respect to importing, manufacturing, or dealing in firearms or ammunition in the commercial market.’’ PROCUREMENT OF CONVENTIONAL AMMUNITION Pub. L. 105–261, div. A, title VIII, § 806, Oct. 17, 1998, 112 Stat. 2084, provided that: ‘‘(a) AUTHORITY.—The official in the Department of Defense designated as the single manager for conven- tional ammunition in the Department shall have the authority to restrict the procurement of conventional ammunition to sources within the national technology and industrial base in accordance with the authority in section 2304(c) of title 10, United States Code [now 10 U.S.C. 3204(a)]. ‘‘(b) REQUIREMENT.—The official in the Department of Defense designated as the single manager for conven- tional ammunition in the Department of Defense shall limit a specific procurement of ammunition to sources within the national technology and industrial base in accordance with section 2304(c)(3) of title 10, United States Code [now 10 U.S.C. 3204(a)(3)], in any case in which that manager determines that such limitation is necessary to maintain a facility, producer, manufac- turer, or other supplier available for furnishing an es- sential item of ammunition or ammunition component in cases of national emergency or to achieve industrial mobilization. ‘‘(c) CONVENTIONAL AMMUNITION DEFINED.—For pur- poses of this section, the term ‘conventional ammuni- tion’ has the meaning given that term in Department of Defense Directive 5160.65, dated March 8, 1995.’’ FIGHTER AIRCRAFT ENGINE WARRANTY Pub. L. 97–377, title I, § 101(c) [title VII, § 797], Dec. 21, 1982, 96 Stat. 1865, provided that: ‘‘None of the funds made available in the Act or any subsequent Act shall be available for the purchase of the alternate or new model fighter aircraft engine that does not have a writ- ten warranty or guarantee attesting that it will per- form not less than 3,000 tactical cycles. The warranty will provide that the manufacturer must perform the necessary improvements or replace any parts to achieve the required performance at no cost to the Gov- ernment.’’ § 3241. Design-build selection procedures (a) AUTHORIZATION.—Unless the traditional ac- quisition approach of design-bid-build estab- lished under chapter 11 of title 40 is used or an- other acquisition procedure authorized by law is used, the head of an agency shall use the two- phase selection procedures authorized in this section for entering into a contract for the de- sign and construction of a public building, facil- ity, or work when a determination is made under subsection (b) that the procedures are ap- propriate for use. (b) CRITERIA FOR USE.—A contracting officer shall make a determination whether two-phase selection procedures are appropriate for use for entering into a contract for the design and con- struction of a public building, facility, or work when— (1) the contracting officer anticipates that three or more offers will be received for such contract; (2) design work must be performed before an offeror can develop a price or cost proposal for such contract; (3) the offeror will incur a substantial amount of expense in preparing the offer; and (4) the contracting officer has considered in- formation such as the following: (A) The extent to which the project re- quirements have been adequately defined. (B) The time constraints for delivery of the project. (C) The capability and experience of poten- tial contractors. (D) The suitability of the project for use of the two-phase selection procedures. (E) The capability of the agency to man- age the two-phase selection process. (F) Other criteria established by the agen- cy. (c) PROCEDURES DESCRIBED.—Two-phase selec- tion procedures consist of the following: (1) DEVELOPMENT OF SCOPE OF WORK STATE- MENT.—The agency develops, either in-house or by contract, a scope of work statement for inclusion in the solicitation that defines the project and provides prospective offerors with sufficient information regarding the Govern- ment’s requirements (which may include cri- teria and preliminary design, budget param- eters, and schedule or delivery requirements) to enable the offerors to submit proposals which meet the Government’s needs. If the agency contracts for development of the scope of work statement, the agency shall contract for architectural and engineering services as defined by and in accordance with chapter 11 of title 40. (2) SOLICITATION OF PHASE-ONE PROPOSALS.— The contracting officer solicits phase-one pro- posals that— Page 2451 TITLE 10—ARMED FORCES § 3241 (A) include information on the offeror’s— (i) technical approach; and (ii) technical qualifications; and (B) do not include— (i) detailed design information; or (ii) cost or price information. (3) EVALUATION FACTORS.— (A) EVALUATION FACTORS TO BE USED.—The evaluation factors to be used in evaluating phase-one proposals are stated in the solici- tation and include— (i) specialized experience and technical competence; (ii) capability to perform; (iii) past performance of the offeror’s team (including the architect-engineer and construction members of the team); and (iv) other appropriate factors, except that cost-related or price-related evalua- tion factors are not permitted. (B) RELATIVE IMPORTANCE OF EVALUATION FACTORS AND SUBFACTORS.—Each solicitation establishes the relative importance assigned to the evaluation factors and subfactors that must be considered in the evaluation of phase-one proposals. (C) EVALUATION OF PROPOSALS.—The agen- cy evaluates phase-one proposals on the basis of the phase-one evaluation factors set forth in the solicitation. (4) SELECTION BY CONTRACTING OFFICER.— (A) NUMBER OF OFFERORS SELECTED AND WHAT IS TO BE EVALUATED.—The contracting officer selects as the most highly qualified the number of offerors specified in the solici- tation to provide the property or services under the contract and requests the selected offerors to submit phase-two competitive proposals that include technical proposals and cost or price information. Each solicita- tion establishes with respect to phase two— (i) the technical submission for the pro- posal, including design concepts or pro- posed solutions to requirements addressed within the scope of work (or both), and (ii) the evaluation factors and subfac- tors, including cost or price, that must be considered in the evaluations of proposals in accordance with subsections (b), (c), and (d) of section 3206 of this title. (B) The contracting officer separately evaluates the submissions described in clauses (i) and (ii) of subparagraph (A). (5) AWARDING OF CONTRACT.—The agency awards the contract in accordance with sec- tion 3303 of this title. (d) SOLICITATION TO STATE NUMBER OF OFFERORS TO BE SELECTED FOR PHASE TWO RE- QUESTS FOR COMPETITIVE PROPOSALS.—A solici- tation issued pursuant to the procedures de- scribed in subsection (c) shall state the max- imum number of offerors that are to be selected to submit competitive proposals pursuant to subsection (c)(4). If the contract value exceeds $4,000,000, the maximum number specified in the solicitation shall not exceed 5 unless— (1) the solicitation is issued pursuant to an indefinite delivery-indefinite quantity con- tract for design-build construction; or (2)(A) the head of the contracting activity, delegable to a level no lower than the senior contracting official within the contracting ac- tivity, approves the contracting officer’s jus- tification with respect to an individual solici- tation that a maximum number greater than 5 is in the interest of the Federal Government; and (B) the contracting officer provides written documentation of how a maximum number greater than 5 is consistent with the purposes and objectives of the two-phase selection pro- cedures. (e) REQUIREMENT FOR GUIDANCE AND REGULA- TIONS.—The Federal Acquisition Regulation shall include guidance— (1) regarding the factors that may be consid- ered in determining whether the two-phase contracting procedures authorized by sub- section (a) are appropriate for use in indi- vidual contracting situations; (2) regarding the factors that may be used in selecting contractors; and (3) providing for a uniform approach to be used Government-wide. (f) SPECIAL AUTHORITY FOR MILITARY CON- STRUCTION PROJECTS.—(1) The Secretary of a military department may use funds available to the Secretary under section 2807(a) or 18233(e) of this title to accelerate the design effort in con- nection with a military construction project for which the two-phase selection procedures de- scribed in subsection (c) are used to select the contractor for both the design and construction portion of the project before the project is spe- cifically authorized by law and before funds are appropriated for the construction portion of the project. Notwithstanding the limitations con- tained in such sections, use of such funds for the design portion of a military construction project may continue despite the subsequent authoriza- tion of the project. The advance notice require- ment of section 2807(b) of this title shall con- tinue to apply whenever the estimated cost of the design portion of the project exceeds the amount specified in such section. (2) Any military construction contract that provides for an accelerated design effort, as au- thorized by paragraph (1), shall include as a con- dition of the contract that the liability of the United States in a termination for convenience before funds are first made available for con- struction may not exceed an amount attrib- utable to the final design of the project. (3) For each fiscal year during which the au- thority provided by this subsection is in effect, the Secretary of a military department may se- lect not more than two military construction projects to include the accelerated design effort authorized by paragraph (1) for each armed force under the jurisdiction of the Secretary. To be el- igible for selection under this subsection, a re- quest for the authorization of the project, and for the authorization of appropriations for the project, must have been included in the annual budget of the President for a fiscal year sub- mitted to Congress under section 1105(a) of title 31. (4) Not later than March 1, 2008, the Secretary of Defense shall submit to the congressional de- Page 2452 TITLE 10—ARMED FORCES § 3242 fense committees a report evaluating the useful- ness of the authority provided by this subsection in expediting the design and construction of military construction projects. The authority provided by this subsection expires September 30, 2008, except that, if the report required by this paragraph is not submitted by March 1, 2008, the authority shall expire on that date. (Added Pub. L. 104–106, div. D, title XLI, § 4105(a)(1), Feb. 10, 1996, 110 Stat. 645, § 2305a; amended Pub. L. 105–85, div. A, title X, § 1073(a)(44), Nov. 18, 1997, 111 Stat. 1902; Pub. L. 107–217, § 3(b)(4), Aug. 21, 2002, 116 Stat. 1295; Pub. L. 108–178, § 4(b)(3), Dec. 15, 2003, 117 Stat. 2641; Pub. L. 108–375, div. B, title XXVIII, § 2807, Oct. 28, 2004, 118 Stat. 2123; Pub. L. 109–163, div. B, title XXVIII, § 2807, Jan. 6, 2006, 119 Stat. 3508; Pub. L. 113–291, div. A, title VIII, § 814, Dec. 19, 2014, 128 Stat. 3430; Pub. L. 115–91, div. A, title VIII, § 823, Dec. 12, 2017, 131 Stat. 1465; Pub. L. 116–92, div. A, title XVII, § 1731(a)(38), Dec. 20, 2019, 133 Stat. 1814; renumbered § 3241 and amend- ed Pub. L. 116–283, div. A, title XVIII, § 1813(b), Jan. 1, 2021, 134 Stat. 4177.) Editorial Notes AMENDMENTS 2021—Pub. L. 116–283, § 1813(b), renumbered section 2305a of this title as this section. Subsec. (b). Pub. L. 116–283, § 1813(b)(1), inserted dash after ‘‘or work when’’, reorganized remainder of former introductory provisions of subsec. (b) into designated pars. (1) to (4), and redesignated former pars. (1) to (6) as subpars. (A) to (F), respectively, of par. (4) and re- aligned margins. Subsec. (c)(1), (2). Pub. L. 116–283, § 1813(b)(2)(A), (B), inserted headings. Subsec. (c)(3). Pub. L. 116–283, § 1813(b)(2)(C)(i), (ii), in- serted par. heading, designated first, second, and third sentences of existing provisions as subpars. (A), (B), and (C), respectively, and inserted subpar. headings. Subsec. (c)(3)(A). Pub. L. 116–283, § 1813(b)(2)(C)(iii), in- serted dash after ‘‘and include—’’ and reorganized re- mainder of subpar. (A) into designated cls. (i) to (iv). Subsec. (c)(4). Pub. L. 116–283, § 1813(b)(2)(D)(i), (ii), (iv), inserted par. heading, designated first sentence as subpar. (A), inserted subpar. heading, and redesignated former subpars. (A) and (B) as cls. (i) and (ii), respec- tively, and designated concluding provisions as subpar. (B) and realigned margin. Subsec. (c)(4)(A)(ii). Pub. L. 116–283, § 1813(b)(2)(D)(iii), substituted ‘‘subsections (b), (c), and (d) of section 3206’’ for ‘‘paragraphs (2), (3), and (4) of section 2305(a)’’. Subsec. (c)(4)(B). Pub. L. 116–283, § 1813(b)(2)(D)(v), substituted ‘‘clauses (i) and (ii) of subparagraph (A)’’ for ‘‘subparagraphs (A) and (B)’’. Subsec. (c)(5). Pub. L. 116–283, § 1813(b)(2)(E), inserted heading and substituted ‘‘section 3303’’ for ‘‘section 2305(b)(4)’’. 2019—Subsec. (d)(1). Pub. L. 116–92 substituted ‘‘an in- definite’’ for ‘‘a indefinite’’. 2017—Subsec. (d). Pub. L. 115–91 substituted ‘‘If the contract value exceeds $4,000,000, the maximum number specified in the solicitation shall not exceed 5 unless— ’’ and pars. (1) and (2) for ‘‘If the contract value exceeds $4,000,000, the maximum number specified in the solici- tation shall not exceed 5 unless the head of the con- tracting activity, delegable to a level no lower than the senior contracting official within the contracting ac- tivity, approves the contracting officer’s justification with respect to an individual solicitation that a num- ber greater than 5 is in the Federal Government’s inter- est. The contracting officer shall provide written docu- mentation of how a maximum number exceeding 5 is consistent with the purposes and objectives of the two- phase selection procedures.’’ 2014—Subsec. (d). Pub. L. 113–291 substituted ‘‘If the contract value exceeds $4,000,000, the maximum number specified in the solicitation shall not exceed 5 unless the head of the contracting activity, delegable to a level no lower than the senior contracting official with- in the contracting activity, approves the contracting officer’s justification with respect to an individual so- licitation that a number greater than 5 is in the Fed- eral Government’s interest. The contracting officer shall provide written documentation of how a max- imum number exceeding 5 is consistent with the pur- poses and objectives of the two-phase selection proce- dures.’’ for ‘‘The maximum number specified in the so- licitation shall not exceed 5 unless the agency deter- mines with respect to an individual solicitation that a specified number greater than 5 is in the Government’s interest and is consistent with the purposes and objec- tives of the two-phase selection process.’’ 2006—Subsec. (f)(2). Pub. L. 109–163, § 2807(a), amended par. (2) generally. Prior to amendment, par. (2) read as follows: ‘‘Any military construction contract that pro- vides for an accelerated design effort, as authorized by paragraph (1), shall include as a condition of the con- tract that the liability of the United States in a termi- nation for convenience may not exceed the actual costs incurred as of the termination date.’’ Subsec. (f)(4). Pub. L. 109–163, § 2807(b), substituted ‘‘2008’’ for ‘‘2007’’ wherever appearing. 2004—Subsec. (f). Pub. L. 108–375 added subsec. (f). 2003—Subsec. (c)(1). Pub. L. 108–178 substituted ‘‘chap- ter 11 of title 40’’ for ‘‘the Brooks Architect-Engineers Act (40 U.S.C. 541 et seq.)’’. 2002—Subsec. (a). Pub. L. 107–217 substituted ‘‘chapter 11 of title 40’’ for ‘‘the Brooks Architect-Engineers Act (40 U.S.C. 541 et seq.)’’. 1997—Subsec. (a). Pub. L. 105–85 substituted ‘‘(40 U.S.C.’’ for ‘‘(41 U.S.C.’’. Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 2021 AMENDMENT Amendment by Pub. L. 116–283 effective Jan. 1, 2022, with additional provisions for delayed implementation and applicability of existing law, see section 1801(d) of Pub. L. 116–283, set out as a note preceding section 3001 of this title. EFFECTIVE DATE OF 2003 AMENDMENT Amendment by Pub. L. 108–178 effective Aug. 21, 2002, see section 5 of Pub. L. 108–178, set out as a note under section 5334 of Title 5, Government Organization and Employees. EFFECTIVE DATE For effective date and applicability of section, see section 4401 of Pub. L. 104–106, set out as an Effective Date of 1996 Amendment note under section 2220 of this title. § 3242. Supplies: economic order quantities (a) QUANTITY TO PROCURE.— (1) An agency referred to in section 3063 of this title shall procure supplies in such quan- tity as— (A) will result in the total cost and unit cost most advantageous to the United States, where practicable; and (B) does not exceed the quantity reason- ably expected to be required by the agency. (2) The Secretary of Defense shall take para- graph (1) into account in approving rates of obligation of appropriations under section 2204 of this title. (b) OPINION OF OFFEROR WITH RESPECT TO QUANTITY TO BE PROCURED.—Each solicitation

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 3204 — Use of procedures other than competitive procedures

**(a) When Procedures Other Than Competitive Procedures May Be Used.—** The head of an agency may use procedures other than competitive procedures only when— (1) the property or services needed by the agency are available from only one responsible source or only from a limited number of responsible sources and no other type of property or services will satisfy the needs of the agency; (2) the agency’s need for the property or services is of such an unusual and compelling urgency that the United States would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals; (3) it is necessary to award the contract to a particular source or sources in order— (A) to maintain a facility, producer, manufacturer, or other supplier available for furnishing property or services in case of a national emergency or to achieve industrial mobilization; (B) to establish or maintain an essential engineering, research, or development capability to be provided by an educational or other nonprofit institution or a federally funded research and development center; or (C) to procure the services of an expert for use, in any litigation or dispute (including any reasonably foreseeable litigation or dispute) involving the Federal Government, in any trial, hearing, or proceeding before any court, administrative tribunal, or agency, or to procure the services of an expert or neutral for use in any part of an alternative dispute resolution or negotiated rulemaking process, whether or not the expert is expected to testify; (4) the terms of an international agreement or a treaty between the United States and a foreign government or international organization, or the written directions of a foreign government reimbursing the ag

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 3204

Stored review status: release_metadata_unconfirmed. The source passage cites 10 U.S.C. § 3204. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 3204 — Use of procedures other than competitive

Page 2423 TITLE 10—ARMED FORCES § 3204 Subsec. (a)(1). Pub. L. 116–283, § 1811(d)(2)(A)–(C), in- serted heading, substituted ‘‘covered by chapter 137 leg- acy provisions’’ for ‘‘covered by this chapter’’ in intro- ductory provisions, and realigned margins of subpars. (A) to (F). Subsec. (a)(2). Pub. L. 116–283, § 1811(d)(2)(F), redesig- nated par. (4) as (2), inserted heading, and realigned margin. Former pars. (2) and (3) redesignated subsecs. (b) and (c), respectively. Subsec. (b). Pub. L. 116–283, § 1811(d)(2)(D), redesig- nated subsec. (a)(2) as (b), inserted heading, and sub- stituted ‘‘chapter 137 legacy provisions’’ for ‘‘this sec- tion’’. Subsec. (c). Pub. L. 117–81 substituted ‘‘subsections (a)(1) and (b)’’ for ‘‘paragraphs (1) and (2)’’. Pub. L. 116–283, § 1811(d)(2)(E), redesignated subsec. (a)(3) as (c), inserted heading, and substituted ‘‘section 3204(e)(1) of this title’’ for ‘‘subsection (f)(1)’’. Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 2021 AMENDMENT Amendment by Pub. L. 117–81 to take effect imme- diately after the amendments made by title XVIII of Pub. L. 116–283 have taken effect, see section 1701(a)(3) of Pub. L. 117–81, set out in a note preceding section 3001 of this title and Effective Date note below. EFFECTIVE DATE Section and amendment by Pub. L. 116–283 effective Jan. 1, 2022, with additional provisions for delayed im- plementation and applicability of existing law, see sec- tion 1801(d) of Pub. L. 116–283, set out as an Effective Date of 2021 Amendment note preceding section 3001 of this title. § 3204. Use of procedures other than competitive procedures (a) WHEN PROCEDURES OTHER THAN COMPETI- TIVE PROCEDURES MAY BE USED.—The head of an agency may use procedures other than competi- tive procedures onl

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 3204

Stored review status: historical_2024_not_currentness_verified. The source passage cites 10 U.S.C. § 3204. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 3241 — Design-build selection procedures

**(a) Authorization.—** Unless the traditional acquisition approach of design-bid-build established under chapter 11 of title 40 is used or another acquisition procedure authorized by law is used, the head of an agency shall use the two-phase selection procedures authorized in this section for entering into a contract for the design and construction of a public building, facility, or work when a determination is made under subsection (b) that the procedures are appropriate for use. **(b) Criteria for Use.—** A contracting officer shall make a determination whether two-phase selection procedures are appropriate for use for entering into a contract for the design and construction of a public building, facility, or work when— (1) the contracting officer anticipates that three or more offers will be received for such contract; (2) design work must be performed before an offeror can develop a price or cost proposal for such contract; (3) the offeror will incur a substantial amount of expense in preparing the offer; and (4) the contracting officer has considered information such as the following: (A) The extent to which the project requirements have been adequately defined. (B) The time constraints for delivery of the project. (C) The capability and experience of potential contractors. (D) The suitability of the project for use of the two-phase selection procedures. (E) The capability of the agency to manage the two-phase selection process. (F) Other criteria established by the agency. **(c) Procedures Described.—** Two-phase selection procedures consist of the following: (1) **Development of scope of work statement.—** — The agency develops, either in-house or by contract, a scope of work statement for inclusion in the solicitation that defines the p

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 3241

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

40 U.S.C. § 541 — Supervision and direction

Except as otherwise provided in this subchapter, the Administrator of General Services shall supervise and direct the disposition of surplus property in accordance with this subtitle.

Source: Supplied U.S. Code snapshot — release unconfirmed · 40 U.S.C. § 541

Stored review status: release_metadata_unconfirmed. The source passage cites 40 U.S.C. § 541. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

40 U.S.C. § 541 — Supervision and direction

Page 45 TITLE 40—PUBLIC BUILDINGS, PROPERTY, AND WORKS § 545 Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF REPEAL Pub. L. 118–99, § 2(e), Oct. 1, 2024, 138 Stat. 1579, pro- vided that the repeal of this section by section 2(e)(2) is effective on the date that is 5 years after Oct. 1, 2024. SUBCHAPTER III—DISPOSING OF PROPERTY § 541. Supervision and direction Except as otherwise provided in this sub- chapter, the Administrator of General Services shall supervise and direct the disposition of sur- plus property in accordance with this subtitle. (Pub. L. 107–217, Aug. 21, 2002, 116 Stat. 1086.) HISTORICAL AND REVISION NOTES Revised Section Source (U.S. Code) Source (Statutes at Large) 541 ............. 40:484(a). June 30, 1949, ch. 288, title II, § 203(a), 63 Stat. 385. The words ‘‘shall supervise and direct the disposition of surplus property in accordance with this subtitle’’ are substituted for ‘‘shall have supervision and direc- tion over the disposition of surplus property. Such property shall be disposed of to such extent, at such time, in such areas, by such agencies, at such terms and conditions, and in such manner, as may be pre- scribed in or pursuant to this Act’’ for clarity and to eliminate unnecessary words. Statutory Notes and Related Subsidiaries TRANSFERRED PROPERTIES; REQUESTS PRIOR TO NOVEMBER 30, 1983 Pub. L. 98–181, title I [title I, § 126(a)(2), (3)], Nov. 30, 1983, 97 Stat. 1175, provided that: ‘‘(2) Notwithstanding paragraph (1) [repealing former 40 U.S.C. 484b], the Secretary of Housing and Urban De- velopment and the Secretary of Agriculture may dis- pose of Federal surplus real property pursuant to the terms of section 414 of such Act [former 40 U.S.C. 484b] if, prior to the date of the enactment of this A

Source: Supplied 2024 U.S. Code historical extraction · 40 U.S.C. § 541

Stored review status: historical_2024_not_currentness_verified. The source passage cites 40 U.S.C. § 541. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 6901 — Congressional findings

**(a) Solid waste** The Congress finds with respect to solid waste— (1) that the continuing technological progress and improvement in methods of manufacture, packaging, and marketing of consumer products has resulted in an ever-mounting increase, and in a change in the characteristics, of the mass material discarded by the purchaser of such products; (2) that the economic and population growth of our Nation, and the improvements in the standard of living enjoyed by our population, have required increased industrial production to meet our needs, and have made necessary the demolition of old buildings, the construction of new buildings, and the provision of highways and other avenues of transportation, which, together with related industrial, commercial, and agricultural operations, have resulted in a rising tide of scrap, discarded, and waste materials; (3) that the continuing concentration of our population in expanding metropolitan and other urban areas has presented these communities with serious financial, management, intergovernmental, and technical problems in the disposal of solid wastes resulting from the industrial, commercial, domestic, and other activities carried on in such areas; (4) that while the collection and disposal of solid wastes should continue to be primarily the function of State, regional, and local agencies, the problems of waste disposal as set forth above have become a matter national in scope and in concern and necessitate Federal action through financial and technical assistance and leadership in the development, demonstration, and application of new and improved methods and processes to reduce the amount of waste and unsalvage­able materials and to provide for proper and economical solid waste disposal practices. **(b) Environment and

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 6901

Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 6901. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 6901 — Congressional findings

Page 6921 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 6901 Sec. 6985. Special study and demonstration projects on recovery of useful energy and materials. 6986. Grants for resource recovery systems and im- proved solid waste disposal facilities. 6987. Authorization of appropriations. SUBCHAPTER IX—REGULATION OF UNDERGROUND STORAGE TANKS 6991. Definitions and exemptions. 6991a. Notification. 6991b. Release detection, prevention, and correction regulations. 6991c. Approval of State programs. 6991d. Inspections, monitoring, testing, and correc- tive action. 6991e. Federal enforcement. 6991f. Federal facilities. 6991g. State authority. 6991h. Study of underground storage tanks. 6991i. Operator training. 6991j. Use of funds for release prevention and com- pliance. 6991k. Delivery prohibition. 6991l. Tanks on tribal lands. 6991m. Authorization of appropriations. SUBCHAPTER X—DEMONSTRATION MEDICAL WASTE TRACKING PROGRAM 6992. Scope of demonstration program for medical waste. 6992a. Listing of medical wastes. 6992b. Tracking of medical waste. 6992c. Inspections. 6992d. Enforcement. 6992e. Federal facilities. 6992f. Relationship to State law. 6992g. Repealed. 6992h. Health impacts report. 6992i. General provisions. 6992j. Effective date. 6992k. Authorization of appropriations. SUBCHAPTER I—GENERAL PROVISIONS § 6901. Congressional findings (a) Solid waste The Congress finds with respect to solid waste— (1) that the continuing technological progress and improvement in methods of man- ufacture, packaging, and marketing of con- sumer products has resulted in an ever-mount- ing increase, and in a change in the character- istics, of the mass material discarded by the purchaser of such products; (2) that the econo

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 6901

Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 6901. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 6903 — Definitions

As used in this chapter: (1) The term “Administrator” means the Administrator of the Environmental Protection Agency. (2) The term “construction,” with respect to any project of construction under this chapter, means (A) the erection or building of new structures and acquisition of lands or interests therein, or the acquisition, replacement, expansion, remodeling, alteration, modernization, or extension of existing structures, and (B) the acquisition and installation of initial equipment of, or required in connection with, new or newly acquired structures or the expanded, remodeled, altered, modernized or extended part of existing structures (including trucks and other motor vehicles, and tractors, cranes, and other machinery) necessary for the proper utilization and operation of the facility after completion of the project; and includes preliminary planning to determine the economic and engineering feasibility and the public health and safety aspects of the project, the engineering, architectural, legal, fiscal, and economic investigations and studies, and any surveys, designs, plans, working drawings, specifications, and other action necessary for the carrying out of the project, and (C) the inspection and supervision of the process of carrying out the project to completion. (2A) The term “demonstration” means the initial exhibition of a new technology process or practice or a significantly new combination or use of technologies, processes or practices, subsequent to the development stage, for the purpose of proving technological feasibility and cost effectiveness. (3) The term “disposal” means the discharge, deposit, injection, dumping, spilling, leaking, or placing of any solid waste or hazardous waste into or on any land or water so that such solid waste or haz

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 6903

Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 6903. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 6903 — Definitions

Page 6924 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 6903 Subsec. (a)(4) to (11). Pub. L. 98–616, § 101(b)(2), struck out par. (4) which provided for regulating the treat- ment, storage, transportation, and disposal of haz- ardous wastes which have adverse effects on health and the environment, added pars. (4) to (7), and redesig- nated former pars. (5) to (8) as (8) to (11), respectively. Subsec. (b). Pub. L. 98–616, § 101(b)(1), added subsec. (b). § 6903. Definitions As used in this chapter: (1) The term ‘‘Administrator’’ means the Ad- ministrator of the Environmental Protection Agency. (2) The term ‘‘construction,’’ with respect to any project of construction under this chapter, means (A) the erection or building of new struc- tures and acquisition of lands or interests there- in, or the acquisition, replacement, expansion, remodeling, alteration, modernization, or exten- sion of existing structures, and (B) the acquisi- tion and installation of initial equipment of, or required in connection with, new or newly ac- quired structures or the expanded, remodeled, altered, modernized or extended part of existing structures (including trucks and other motor ve- hicles, and tractors, cranes, and other machin- ery) necessary for the proper utilization and op- eration of the facility after completion of the project; and includes preliminary planning to determine the economic and engineering feasi- bility and the public health and safety aspects of the project, the engineering, architectural, legal, fiscal, and economic investigations and studies, and any surveys, designs, plans, work- ing drawings, specifications, and other action necessary for the carrying out of the project, and (C) the inspection and supervision of the process of carrying out the proj

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 6903

Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 6903. This identifies an authority to review, not proof of applicability.