10 U.S.C. § 3241 — Design-build selection procedures
Federal law — U.S. Code and appendices · legal_authorities
**(a) Authorization.—** Unless the traditional acquisition approach of design-bid-build established under chapter 11 of title 40 is used or another acquisition procedure authorized by law is used, the head of an agency shall use the two-phase selection procedures authorized in this section for entering into a contract for the design and construction of a public building, facility, or work when a determination is made under subsection (b) that the procedures are appropriate for use.
**(b) Criteria for Use.—** A contracting officer shall make a determination whether two-phase selection procedures are appropriate for use for entering into a contract for the design and construction of a public building, facility, or work when—
(1) the contracting officer anticipates that three or more offers will be received for such contract;
(2) design work must be performed before an offeror can develop a price or cost proposal for such contract;
(3) the offeror will incur a substantial amount of expense in preparing the offer; and
(4) the contracting officer has considered information such as the following:
(A) The extent to which the project requirements have been adequately defined.
(B) The time constraints for delivery of the project.
(C) The capability and experience of potential contractors.
(D) The suitability of the project for use of the two-phase selection procedures.
(E) The capability of the agency to manage the two-phase selection process.
(F) Other criteria established by the agency.
**(c) Procedures Described.—** Two-phase selection procedures consist of the following:
(1) **Development of scope of work statement.—** — The agency develops, either in-house or by contract, a scope of work statement for inclusion in the solicitation that defines the p
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 3241
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 6eae803d5f06dccac1fc9f05ff2b3c15be428238cf62be6d4b66ace316b0d5d3. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_cf57762a1b0a79fffb52f55e
Source file: Laws/federal/codes/united-states-code/title-10/section-3241-design-build-selection-procedures--d7e51718cf.md
Pages: Not recorded – Not recorded
Passage SHA-256: 0396e176699339d3f9e801bac23658df7c3284395499c9be194c1286dbc629ab
Source location: Title 10, Chapter 223, § 3241; chapter-223-other-provisions-relating-to-planning-and-solicitation-generally.md
Stored source content
**(a) Authorization.—** Unless the traditional acquisition approach of design-bid-build established under chapter 11 of title 40 is used or another acquisition procedure authorized by law is used, the head of an agency shall use the two-phase selection procedures authorized in this section for entering into a contract for the design and construction of a public building, facility, or work when a determination is made under subsection (b) that the procedures are appropriate for use.
**(b) Criteria for Use.—** A contracting officer shall make a determination whether two-phase selection procedures are appropriate for use for entering into a contract for the design and construction of a public building, facility, or work when—
(1) the contracting officer anticipates that three or more offers will be received for such contract;
(2) design work must be performed before an offeror can develop a price or cost proposal for such contract;
(3) the offeror will incur a substantial amount of expense in preparing the offer; and
(4) the contracting officer has considered information such as the following:
(A) The extent to which the project requirements have been adequately defined.
(B) The time constraints for delivery of the project.
(C) The capability and experience of potential contractors.
(D) The suitability of the project for use of the two-phase selection procedures.
(E) The capability of the agency to manage the two-phase selection process.
(F) Other criteria established by the agency.
**(c) Procedures Described.—** Two-phase selection procedures consist of the following:
(1) **Development of scope of work statement.—** — The agency develops, either in-house or by contract, a scope of work statement for inclusion in the solicitation that defines the project and provides prospective offerors with sufficient information regarding the Government’s requirements (which may include criteria and preliminary design, budget parameters, and schedule or delivery requirements) to enable the offerors to submit proposals which meet the Government’s needs. If the agency contracts for development of the scope of work statement, the agency shall contract for architectural and engineering services as defined by and in accordance with chapter 11 of title 40.
(2) **Solicitation of phase-one proposals.—** — The contracting officer solicits phase-one proposals that—
(A) include information on the offeror’s—
(i) technical approach; and
(ii) technical qualifications; and
(B) do not include—
(i) detailed design information; or
(ii) cost or price information.
(3) **Evaluation factors.—**
(A) *Evaluation factors to be used.—* — The evaluation factors to be used in evaluating phase-one proposals are stated in the solicitation and include—
(i) specialized experience and technical competence;
(ii) capability to perform;
(iii) past performance of the offeror’s team (including the architect-engineer and construction members of the team); and
(iv) other appropriate factors, except that cost-related or price-related evaluation factors are not permitted.
(B) *Relative importance of evaluation factors and subfactors.—* — Each solicitation establishes the relative importance assigned to the evaluation factors and subfactors that must be considered in the evaluation of phase-one proposals.
(C) *Evaluation of proposals.—* — The agency evaluates phase-one proposals on the basis of the phase-one evaluation factors set forth in the solicitation.
(4) **Selection by contracting officer.—**
(A) *Number of offerors selected and what is to be evaluated.—* — The contracting officer selects as the most highly qualified the number of offerors specified in the solicitation to provide the property or services under the contract and requests the selected offerors to submit phase-two competitive proposals that include technical proposals and cost or price information. Each solicitation establishes with respect to phase two—
(i) the technical submission for the proposal, including design concepts or proposed solutions to requirements addressed within the scope of work (or both), and
(ii) the evaluation factors and subfactors, including cost or price, that must be considered in the evaluations of proposals in accordance with subsections (b), (c), and (d) of [section 3206 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3206&num=0&edition=prelim).
(B) The contracting officer separately evaluates the submissions described in clauses (i) and (ii) of subparagraph (A).
(5) **Awarding of contract.—** — The agency awards the contract in accordance with [section 3303 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3303&num=0&edition=prelim).
**(d) Solicitation to State Number of Offerors To Be Selected for Phase Two Requests for Competitive Proposals.—** A solicitation issued pursuant to the procedures described in subsection (c) shall state the maximum number of offerors that are to be selected to submit competitive proposals pursuant to subsection (c)(4). If the contract value exceeds $4,000,000, the maximum number specified in the solicitation shall not exceed 5 unless—
(1) the solicitation is issued pursuant to an indefinite delivery-indefinite quantity contract for design-build construction; or
(2)
(A) the head of the contracting activity, delegable to a level no lower than the senior contracting official within the contracting activity, approves the contracting officer’s justification with respect to an individual solicitation that a maximum number greater than 5 is in the interest of the Federal Government; and
(B) the contracting officer provides written documentation of how a maximum number greater than 5 is consistent with the purposes and objectives of the two-phase selection procedures.
**(e) Requirement for Guidance and Regulations.—** The Federal Acquisition Regulation shall include guidance—
(1) regarding the factors that may be considered in determining whether the two-phase contracting procedures authorized by subsection (a) are appropriate for use in individual contracting situations;
(2) regarding the factors that may be used in selecting contractors; and
(3) providing for a uniform approach to be used Government-wide.
**(f) Special Authority for Military Construction Projects.—**
(1) Subject to paragraph (4), each Secretary concerned may use funds available to the Secretary under section 2807(a) or 18233(e) of this title to accelerate the design effort in connection with a military construction project for which the two-phase selection procedures described in subsection (c) are used to select the contractor for both the design and construction portion of the project before the project is specifically authorized by law and before funds are appropriated for the construction portion of the project. Notwithstanding the limitations contained in such sections, use of such funds for the design portion of a military construction project may continue despite the subsequent authorization of the project. The advance notice requirement of [section 2807(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2807/b&num=0&edition=prelim) shall continue to apply whenever the estimated cost of the design portion of the project exceeds the amount specified in such section.
(2) Any construction contract for a military construction project that provides for an accelerated design effort, as authorized by paragraph (1), shall include as a condition of the contract that the liability of the United States in a termination for convenience before funds are first made available for construction may not exceed an amount attributable to the final design of the project.
(3) Not later than March 1, 2028, and annually thereafter until March 1, 2033, the Secretary of Defense shall submit to the congressional defense committees a report on the use of the authority under this subsection that includes the following:
(A) A description of the military construction project for which such authority was used, including project title, location, scope, and rationale for selecting such project.
(B) The date of award of a contract for such military construction project, the initial estimated contract value, and the current projected total cost of such project.
(C) A comparison of projected schedule for completion of such project with the actual schedule, including dates for completing the design of such project and commencing construction.
(D) Any realized or anticipated cost savings or efficiencies, including those related to time, resources, or design innovation, attributable to the use of the authority under this subsection for a military construction project.
(E) An assessment of risk management benefits, including any improvements in design flexibility or coordination between contractors and the Secretary concerned.
(F) Any challenges encountered, and mitigation efforts made, in the use of such authority for a military construction project.
(4) Each Secretary concerned may exercise the authority under this subsection using amounts appropriated for such purpose on or after the date of the enactment of this paragraph.
**(g) Authorization of Progressive Design-build Contracts.—**
(1) Notwithstanding subsections (b) through (e), the Secretary concerned may enter into a progressive design-build contract for a military construction project under the authority of subsection (a) in accordance with the following requirements:
(A) The contract is awarded in a single phase based on qualifications and demonstrated capabilities of the offeror without submission of a detailed construction cost or price proposal at the time of award.
(B) The contract provides for collaboration between the Secretary concerned and the contractor to develop and refine the project scope and design, including cost estimates.
(C) Following development of the project scope and preliminary design, the contract provide for the Secretary concerned and contractor to negotiate a guaranteed maximum price or other fixed-price agreement for the construction phase of the military construction project.
(D) If negotiations described in subparagraph (C) fail, the contract includes terms for termination or renegotiation.
(2) The Secretary concerned shall issue rules to ensure appropriate oversight, risk management, and contract administration consistent with the requirements of this subsection.
(3) Not later than March 1, 2028, and annually thereafter until March 1, 2033, the Secretary of Defense shall submit to the congressional defense committees a report on the use of the authority under this subsection that includes the following:
(A) A description of the military construction project for which such authority was used, including project title, location, scope, and rationale for selecting such project.
(B) The date of award of a contract for such military construction project, the initial estimated contract value, and the current projected total cost of such project.
(C) A comparison of projected schedule for completion of such project with the actual schedule, including dates for completing the design of such project and commencing construction.
(D) Any realized or anticipated cost savings or efficiencies, including those related to time, resources, or design innovation, attributable to the use of the authority under this subsection for a military construction project.
(E) An assessment of risk management benefits, including any improvements in design flexibility or coordination between contractors and the Secretary concerned.
(F) Any challenges encountered, and mitigation efforts made, in the use of such authority for the military construction project.
(4) Each Secretary concerned may exercise the authority under this subsection using amounts appropriated for such purpose on or after the date of the enactment of this paragraph.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Establishment of Goals.—** The Secretary of Defense shall approve or define the cost, performance, and schedule goals for major defense acquisition programs of the Department of Defense and for each phase of the acquisition cycle of such programs.
**(b) Evaluation of Cost Goals.—** The Under Secretary of Defense (Comptroller) shall evaluate the cost goals proposed for each major defense acquisition program of the Department.
**(c) Sunset.—** The authority under this section shall terminate on September 30, 2018.
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2220
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
#### Prior Provisions
A prior section 2305a was renumbered [section 2439 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2439&num=0&edition=prelim) and was subsequently repealed.
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2305a
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Evaluation and Award.—** The head of an agency shall evaluate competitive proposals in accordance with [section 3301(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3301/a&num=0&edition=prelim) and may award a contract—
(1) after discussions with the offerors, provided that written or oral discussions have been conducted with all responsible offerors who submit proposals within the competitive range; or
(2) based on the proposals received, without discussions with the offerors (other than discussions conducted for the purpose of minor clarification) provided that the solicitation included a statement that proposals are intended to be evaluated, and award made, without discussions, unless discussions are determined to be necessary.
**(b) Limit on Number of Proposals.—** If the contracting officer determines that the number of offerors that would otherwise be included in the competitive range under subsection (a)(1) exceeds the number at which an efficient competition can be conducted, the contracting officer may limit the number of proposals in the competitive range, in accordance with the criteria specified in the solicitation, to the greatest number that will permit an efficient competition among the offerors rated most highly in accordance with such criteria.
**(c) Criteria for Awarding Contract.—** Except as provided in [section 3301(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3301/b&num=0&edition=prelim), the head of the agency shall award a contract with reasonable promptness to the responsible source whose proposal is most advantageous to the United States, considering only cost or price and the other factors included in the solicitation.
**(d) Notice of Awar
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 3303
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** The rate of basic pay to which an employee is entitled is governed by regulations prescribed by the Office of Personnel Management in conformity with this subchapter and chapter 51 of this title when—
(1) he is transferred from a position in the legislative, judicial, or executive branch to which this subchapter does not apply;
(2) he is transferred from a position in the legislative, judicial, or executive branch to which this subchapter applies to another such position;
(3) he is demoted to a position in a lower grade;
(4) he is reinstated, reappointed, or reemployed in a position to which this subchapter applies following service in any position in the legislative, judicial, or executive branch;
(5) his type of appointment is changed;
(6) his employment status is otherwise changed; or
(7) his position is changed from one grade to another grade.
For the purpose of this subsection, an individual employed by the Appalachian Regional Commission under [section 14306(a)(2) of title 40](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title40-section14306/a/2&num=0&edition=prelim), who was a Federal employee immediately prior to such employment by a commission and within 6 months after separation from such employment is employed in a position to which this subchapter applies, shall be treated as if transferred from a position in the executive branch to which this subchapter does not apply.
**(b)** An employee who is promoted or transferred to a position in a higher grade is entitled to basic pay at the lowest rate of the higher grade which exceeds his existing rate of basic pay by not less than two step-increases of the grade from which he is promoted or transferred. If, in the case of an employee so promoted or transferred who is receiving basic
Source: Supplied U.S. Code snapshot — release unconfirmed · 5 U.S.C. § 5334
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Defense Acquisition System.—** In this part, the term “defense acquisition system” means—
(1) the workforce engaged in carrying out the acquisition of property and services for the Department of Defense;
(2) the management structure responsible for directing and overseeing the acquisition of property and services for the Department of Defense; and
(3) the statutory, regulatory, and policy framework that guides the acquisition of property and services for the Department of Defense.
**(b) Element of the Defense Acquisition System.—** In this part, the term “element of the defense acquisition system” means an organization that—
(1) employs members of the acquisition workforce;
(2) carries out acquisition functions; and
(3) focuses primarily on acquisition.
**(c) Acquisition.—** In this part, the term “acquisition” has the meaning provided in [section 131 of title 41](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section131&num=0&edition=prelim).
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 3001
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Except as otherwise provided in this subchapter, the Administrator of General Services shall supervise and direct the disposition of surplus property in accordance with this subtitle.
Source: Supplied U.S. Code snapshot — release unconfirmed · 40 U.S.C. § 541
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Planning and Specifications.—**
(1) **Preparing for procurement.—** — In preparing for the procurement of property or services, the head of an agency shall—
(A) specify the agency’s needs and solicit bids or proposals in a manner designed to achieve full and open competition for the procurement;
(B) use advance procurement planning and market research; and
(C) develop specifications in such manner as is necessary to obtain full and open competition with due regard to the nature of the property or services to be acquired.
(2) **Requirements of specifications.—** — Each solicitation under chapter 137 legacy provisions shall include specifications which—
(A) consistent with the provisions of chapter 137 legacy provisions, permit full and open competition; and
(B) include restrictive provisions or conditions only to the extent necessary to satisfy the needs of the agency or as authorized by law.
(3) **Types of specifications.—** — For the purposes of paragraphs (1) and (2), the type of specification included in a solicitation shall depend on the nature of the needs of the agency and the market available to satisfy such needs. Subject to such needs, specifications may be stated in terms of—
(A) function, so that a variety of products or services may qualify;
(B) performance, including specifications of the range of acceptable characteristics or of the minimum acceptable standards; or
(C) design requirements.
**(b) Contents of solicitation.—** In addition to the specifications described in subsection (a), a solicitation for sealed bids or competitive proposals (other than for a procurement for commercial products or commercial services using special simplified procedures or a purchase for an amount not greater than the simplified acquisition
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 3206
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 2450
TITLE 10—ARMED FORCES
§ 3241
‘‘(b) ASSESSMENT OF TRAINING AND EDUCATION.—The
Secretary of Defense shall assess the need to establish
a program, or enhance existing programs, for training
and educating Department of Defense procurement offi-
cials to ensure that they are aware of any Department
requirements, preferences, or goals for the procurement
of environmentally preferable procurement items or
procurement items made with recovered material.
‘‘(c) REPORTING REQUIREMENT.—Not later than March
1, 2004, and each March 1 thereafter through 2007, the
Secretary of Defense shall submit to the Committee on
Armed Services of the Senate and the Committee on
Armed Services of the House of Representatives a re-
port detailing the results obtained from the tracking
system developed under subsection (a).
‘‘(d) RELATION TO OTHER LAWS.—Nothing in this sec-
tion shall be construed to alter the requirements of the
Solid Waste Disposal Act (42 U.S.C. 6901 et seq.).
‘‘(e) DEFINITIONS.—In this section:
‘‘(1) The term ‘environmentally preferable’, in the
case of a procurement item, means that the item has
a lesser or reduced effect on human health and the
environment when compared with competing prod-
ucts that serve the same purpose. The comparison
may consider raw materials acquisition, production,
manufacturing, packaging, distribution, reuse, oper-
ation, maintenance, or disposal of the product.
‘‘(2) The terms ‘procurement item’ and ‘recovered
material’ have the meanings given such terms in sec-
tion 1004 of the Solid Waste Disposal Act (42 U.S.C.
6903).’’
REQUIREMENT TO DISREGARD CERTAIN AGREEMENTS IN
AWARDING CONTRACTS
FOR PURCHASE
OF FIREARMS
OR AMMUNITION
Pub. L. 106–398, § 1 [[div. A], title VIII, § 826], Oct. 30,
2000, 114 Stat. 1654, 1654A
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 3241
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.