Browse Arkansas Code titles and sections
33 U.S.C. § 2282g — Scope of feasibility studies
Federal law — U.S. Code and appendices · legal_authorities
Page 775
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2282g
§ 2282e. Post-authorization change reports
(a) In general
The completion of a post-authorization change
report prepared by the Corps of Engineers for a
water resources development project—
(1) may not be delayed as a result of consid-
eration being given to changes in policy or pri-
ority with respect to project consideration;
and
(2) shall be submitted, upon completion, to—
(A) the Committee on Environment and
Public Works of the Senate; and
(B) the Committee on Transportation and
Infrastructure of the House of Representa-
tives.
(b) Completion review
With respect to a post-authorization change
report subject to review by the Secretary, the
Secretary shall, not later than 120 days after the
date of completion of such report—
(1) review the report; and
(2) provide to Congress any recommenda-
tions of the Secretary regarding modification
of the applicable water resources development
project.
(c) Prior reports
Not later than 120 days after December 16,
2016, with respect to any post-authorization
change report that was completed prior to De-
cember 16, 2016, and is subject to a review by the
Secretary that has yet to be completed, the Sec-
retary shall complete review of, and provide rec-
ommendations to Congress with respect to, the
report.
(d) Post-authorization change report inclusions
In this section, the term ‘‘post-authorization
change report’’ includes—
(1) a general reevaluation report;
(2) a limited reevaluation report; and
(3) any other report that recommends the
modification of an authorized water resources
development project.
(Pub. L. 114–322, title I, § 1132, Dec. 16, 2016, 130
Stat. 1653.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resourc
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2282g
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 78f59018cb61037fbf1a2ee2fb9f7db7b5e7fc15759dcfae548655d563df80ef. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-64d92d54878ccd074c607afa
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2282g-scope-of-feasibility-studies--cc15f1d3e2.md
Pages: Not recorded – Not recorded
Passage SHA-256: 0731c0ced4fe85d69a87d911cfcc5f30d5e7ee7d27e112ea39572ca69e1a360b
Source location: USCODE-2024-title33-chap36-subchapV-sec2282g.pdf
Stored source content
Page 775
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2282g
§ 2282e. Post-authorization change reports
(a) In general
The completion of a post-authorization change
report prepared by the Corps of Engineers for a
water resources development project—
(1) may not be delayed as a result of consid-
eration being given to changes in policy or pri-
ority with respect to project consideration;
and
(2) shall be submitted, upon completion, to—
(A) the Committee on Environment and
Public Works of the Senate; and
(B) the Committee on Transportation and
Infrastructure of the House of Representa-
tives.
(b) Completion review
With respect to a post-authorization change
report subject to review by the Secretary, the
Secretary shall, not later than 120 days after the
date of completion of such report—
(1) review the report; and
(2) provide to Congress any recommenda-
tions of the Secretary regarding modification
of the applicable water resources development
project.
(c) Prior reports
Not later than 120 days after December 16,
2016, with respect to any post-authorization
change report that was completed prior to De-
cember 16, 2016, and is subject to a review by the
Secretary that has yet to be completed, the Sec-
retary shall complete review of, and provide rec-
ommendations to Congress with respect to, the
report.
(d) Post-authorization change report inclusions
In this section, the term ‘‘post-authorization
change report’’ includes—
(1) a general reevaluation report;
(2) a limited reevaluation report; and
(3) any other report that recommends the
modification of an authorized water resources
development project.
(Pub. L. 114–322, title I, § 1132, Dec. 16, 2016, 130
Stat. 1653.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2016, and also as part of the Water
Infrastructure Improvements for the Nation Act, also
known as the WIIN Act, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 1002 of Pub. L. 114–322, set out as a note under sec-
tion 2201 of this title.
§ 2282f. Review of resiliency assessments
(a) Resiliency assessment
(1) In general
Not later than 180 days after December 27,
2020, and in conjunction with the development
of procedures under section 1962–4 of title 42,
the Secretary is directed to review, and where
appropriate, revise the existing planning guid-
ance documents and regulations of the Corps
of Engineers on the assessment of the effects
of sea level rise or inland flooding on future
water resources development projects to en-
sure that such guidance documents and regu-
lations are based on the best available, peer-
reviewed science and data on the current and
future effects of sea level rise or inland flood-
ing on relevant communities.
(2) Coordination
In carrying out this subsection, the Sec-
retary shall—
(A) coordinate the review with the Engi-
neer Research and Development Center,
other Federal and State agencies, and other
relevant entities; and
(B) to the maximum extent practicable
and where appropriate, utilize data provided
to the Secretary by such agencies.
(b) Assessment of benefits from addressing sea
level rise and inland flooding resiliency in
feasibility reports
(1) In general
Upon the request of a non-Federal interest,
in carrying out a feasibility study for a
project for flood risk mitigation, hurricane
and storm damage risk reduction, or eco-
system restoration under section 2282 of this
title, the Secretary shall consider whether the
need for the project is predicated upon or ex-
acerbated by conditions related to sea level
rise or inland flooding.
(2) Addressing sea level rise and inland flood-
ing resiliency benefits
To the maximum extent practicable, in car-
rying out a study pursuant to paragraph (1),
the Secretary shall document the potential ef-
fects of sea level rise or inland flooding on the
project, and the expected benefits of the
project relating to sea level rise or inland
flooding, during the 50-year period after the
date of completion of the project.
(Pub. L. 116–260, div. AA, title I, § 113, Dec. 27,
2020, 134 Stat. 2626.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of div. AA of Pub. L. 116–260, set out as a note
under section 2201 of this title.
§ 2282g. Scope of feasibility studies
(a) Flood risk management or hurricane and
storm damage risk reduction
In carrying out a feasibility study for a
project for flood risk management or hurricane
and storm damage risk reduction, the Secretary,
Page 776
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2282h
at the request of the non-Federal interest for
the study, shall formulate alternatives to maxi-
mize the net benefits from the reduction of the
comprehensive flood risk within the geographic
scope of the study from the isolated and com-
pound effects of—
(1) a riverine discharge of any magnitude or
frequency;
(2) inundation, wave attack, and erosion co-
inciding with a hurricane or coastal storm;
(3) flooding associated with tidally influ-
enced portions of rivers, bays, and estuaries
that are hydrologically connected to the
coastal water body;
(4) a rainfall event of any magnitude or fre-
quency;
(5) a tide of any magnitude or frequency;
(6) seasonal variation in water levels;
(7) groundwater emergence;
(8) sea level rise;
(9) subsidence; or
(10) any other driver of flood risk affecting
the area within the geographic scope of the
study.
(b)
Water
supply,
water
conservation,
and
drought risk reduction
In carrying out a feasibility study for any pur-
pose, the Secretary, at the request of the non-
Federal interest for the study, shall formulate
alternatives—
(1) to maximize combined net benefits for
the primary purpose of the study and for the
purposes of water supply or water conserva-
tion (including the use of water supply con-
servation measures described in section 1116 of
the Water Resources Development Act of 2016
(130 Stat. 1639)); or
(2) to include 1 or more measures for the
purposes of water supply or water conserva-
tion if the Secretary determines that such
measures may reduce potential adverse im-
pacts of extreme weather events, including
drought, on water resources within the geo-
graphic scope of the study.
(c) Cost sharing
All costs to carry out a feasibility study in ac-
cordance with this section shall be shared in ac-
cordance with the cost share requirements oth-
erwise applicable to the study.
(Pub. L. 117–263, div. H, title LXXXI, § 8106, Dec.
23, 2022, 136 Stat. 3699.)
Editorial Notes
REFERENCES IN TEXT
Section 1116 of the Water Resources Development Act
of 2016, referred to in subsec. (b)(1), is section 1116 of
Pub. L. 114–322, title I, Dec. 16, 2016, 130 Stat. 1639,
which is not classified to the Code.
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2022, and also as part of the James
M. Inhofe National Defense Authorization Act for Fis-
cal Year 2023, and not as part of the Water Resources
Development Act of 1986 which comprises this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 8002 of Pub. L. 117–263, set out as a note under sec-
tion 2201 of this title.
§ 2282h. Economic, hydraulic, and hydrologic
modeling
(a) Model development
The Secretary, in collaboration with other
Federal and State agencies, National Labora-
tories, and nonprofit research institutions (in-
cluding institutions of higher education and
centers and laboratories focused on economics
or water resources), shall develop, update, and
maintain economic, hydraulic, and hydrologic
models, including models for compound flood-
ing, for use in the planning, design formulation,
modification, and operation of water resources
development projects and water resources plan-
ning.
(b) Coordination and use of models and data
In carrying out subsection (a), to the extent
practicable, the Secretary shall—
(1) work with the non-Federal interest for a
water resources development project to iden-
tify existing relevant economic, hydraulic,
and hydrologic models and data;
(2) utilize, where appropriate, economic, hy-
draulic, and hydrologic models and data pro-
vided to the Secretary by the agencies, labora-
tories, and institutions described in subsection
(a); and
(3) upon written request by a non-Federal in-
terest for a project, provide to the non-Federal
interest draft or working economic, hydraulic,
and hydrologic models, and any data gen-
erated by such models with respect to the
project, not later than 30 days after receiving
such request; and
(4) in accordance with section 2342 of this
title, make final economic, hydraulic, and hy-
drologic models, and any data generated by
such models, available to the public, as quick-
ly as practicable, but not later than 30 days
after receiving a written request for such mod-
els or data.
(c) Limitation
Nothing in this section may be construed to
compel or authorize the disclosure of data or
other information determined by the Secretary
to be confidential information, privileged infor-
mation, law enforcement information, national
security information, infrastructure security in-
formation, personal information, or information
the disclosure of which is otherwise prohibited
by law.
(d) Model outputs
To the extent practicable and appropriate, the
Secretary shall incorporate data generated by
models developed under this section into the for-
mulation of feasibility studies for, and the oper-
ation of, water resources development projects.
(e) Funding
The Secretary is authorized, to the extent and
in the amounts provided in advance in appro-
priations Acts, to transfer to other Federal and
State agencies, National Laboratories, and non-
profit research institutions, including institu-
tions of higher education, such funds as may be
necessary to carry out subsection (a) from
amounts available to the Secretary.
(f) In-kind contribution credit
A partnership agreement entered into under
section 1962d–5b of title 42 may provide, at the
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** Not later than February 1 of each year, the Secretary shall develop and submit to Congress an annual report, to be entitled “Report to Congress on Authorized Water Resources Development Projects and Studies”, that identifies—
(1) ongoing or new feasibility studies, authorized within the previous 20 years, for which a Report of the Chief of Engineers has not been issued;
(2) authorized feasibility studies for projects in the preconstruction, engineering and design phase;
(3) ongoing or new water resources development projects authorized for construction within the previous 20 years; and
(4) authorized and constructed water resources development projects the Secretary has the responsibility to operate or maintain.
**(b) Contents**
(1) **Inclusions**
(A) *Criteria* — The Secretary shall include in each report submitted under this section only a feasibility study or water resources development project—
(i) that has been authorized by Congress to be carried out by the Secretary and does not require any additional congressional authorization to be carried out;
(ii) that the Secretary has the capability to carry out if funds are appropriated for such study or project under any of the “Investigations”, “Construction”, “Operation and Maintenance”, or “Mississippi River and Tributaries” appropriations accounts for the Corps of Engineers; and
(iii) for which a non-Federal interest—
(I) in the case of a study or a project other than a project for which funds may be appropriated for operation and maintenance, has entered into a feasibility cost-sharing agreement, design agreement, or project partnership agreement with the Corps of Engineers, or has informed the Secretary that the non-Federal interest has the financial capability to e
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2282g
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.