Browse Arkansas Code titles and sections
42 U.S.C. § 7410 — State implementation plans for national
Federal law — U.S. Code and appendices · legal_authorities
Page 7187
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7410
§ 7410. State implementation plans for national
primary and secondary ambient air quality
standards
(a) Adoption of plan by State; submission to Ad-
ministrator; content of plan; revision; new
sources; indirect source review program;
supplemental or intermittent control systems
(1) Each State shall, after reasonable notice
and public hearings, adopt and submit to the Ad-
ministrator, within 3 years (or such shorter pe-
riod as the Administrator may prescribe) after
the promulgation of a national primary ambient
air quality standard (or any revision thereof)
under section 7409 of this title for any air pollut-
ant, a plan which provides for implementation,
maintenance, and enforcement of such primary
standard in each air quality control region (or
portion thereof) within such State. In addition,
such State shall adopt and submit to the Admin-
istrator (either as a part of a plan submitted
under the preceding sentence or separately)
within 3 years (or such shorter period as the Ad-
ministrator may prescribe) after the promulga-
tion of a national ambient air quality secondary
standard (or revision thereof), a plan which pro-
vides for implementation, maintenance, and en-
forcement of such secondary standard in each
air quality control region (or portion thereof)
within such State. Unless a separate public
hearing is provided, each State shall consider its
plan implementing such secondary standard at
the hearing required by the first sentence of this
paragraph.
(2) Each implementation plan submitted by a
State under this chapter shall be adopted by the
State after reasonable notice and public hear-
ing. Each such plan shall—
(A) include enforceable emission limitations
and other control meas
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7410
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 9654059ed9b56c7270f2de10bc2e54493fabb25fd0ddc9b77938670d02a4fa39. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-526c42d788f55d9bdcf15dba
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-7410-state-implementation-plans-for-national--6a8b621c9e.md
Pages: Not recorded – Not recorded
Passage SHA-256: 3c8246d569164d81bd1435be5d6bda6def540f78d742ad215216b8bc8e9b58ea
Source location: USCODE-2024-title42-chap85-subchapI-partA-sec7410.pdf
Stored source content
Page 7187
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7410
§ 7410. State implementation plans for national
primary and secondary ambient air quality
standards
(a) Adoption of plan by State; submission to Ad-
ministrator; content of plan; revision; new
sources; indirect source review program;
supplemental or intermittent control systems
(1) Each State shall, after reasonable notice
and public hearings, adopt and submit to the Ad-
ministrator, within 3 years (or such shorter pe-
riod as the Administrator may prescribe) after
the promulgation of a national primary ambient
air quality standard (or any revision thereof)
under section 7409 of this title for any air pollut-
ant, a plan which provides for implementation,
maintenance, and enforcement of such primary
standard in each air quality control region (or
portion thereof) within such State. In addition,
such State shall adopt and submit to the Admin-
istrator (either as a part of a plan submitted
under the preceding sentence or separately)
within 3 years (or such shorter period as the Ad-
ministrator may prescribe) after the promulga-
tion of a national ambient air quality secondary
standard (or revision thereof), a plan which pro-
vides for implementation, maintenance, and en-
forcement of such secondary standard in each
air quality control region (or portion thereof)
within such State. Unless a separate public
hearing is provided, each State shall consider its
plan implementing such secondary standard at
the hearing required by the first sentence of this
paragraph.
(2) Each implementation plan submitted by a
State under this chapter shall be adopted by the
State after reasonable notice and public hear-
ing. Each such plan shall—
(A) include enforceable emission limitations
and other control measures, means, or tech-
niques (including economic incentives such as
fees, marketable permits, and auctions of
emissions rights), as well as schedules and
timetables for compliance, as may be nec-
essary or appropriate to meet the applicable
requirements of this chapter;
(B) provide for establishment and operation
of appropriate devices, methods, systems, and
procedures necessary to—
(i) monitor, compile, and analyze data on
ambient air quality, and
(ii) upon request, make such data available
to the Administrator;
(C) include a program to provide for the en-
forcement of the measures described in sub-
paragraph (A), and regulation of the modifica-
tion and construction of any stationary source
within the areas covered by the plan as nec-
essary to assure that national ambient air
quality standards are achieved, including a
permit program as required in parts C and D;
(D) contain adequate provisions—
(i) prohibiting, consistent with the provi-
sions of this subchapter, any source or other
type of emissions activity within the State
from emitting any air pollutant in amounts
which will—
(I) contribute significantly to nonattain-
ment in, or interfere with maintenance by,
any other State with respect to any such
national primary or secondary ambient air
quality standard, or
(II) interfere with measures required to
be included in the applicable implementa-
tion plan for any other State under part C
to prevent significant deterioration of air
quality or to protect visibility,
(ii) insuring compliance with the applica-
ble requirements of sections 7426 and 7415 of
this title (relating to interstate and inter-
national pollution abatement);
(E) provide (i) necessary assurances that the
State (or, except where the Administrator
deems inappropriate, the general purpose local
government or governments, or a regional
agency designated by the State or general pur-
pose local governments for such purpose) will
have adequate personnel, funding, and author-
ity under State (and, as appropriate, local) law
to carry out such implementation plan (and is
not prohibited by any provision of Federal or
State law from carrying out such implementa-
tion plan or portion thereof), (ii) requirements
that the State comply with the requirements
respecting State boards under section 7428 of
this title, and (iii) necessary assurances that,
where the State has relied on a local or re-
gional government, agency, or instrumen-
tality for the implementation of any plan pro-
vision, the State has responsibility for ensur-
ing adequate implementation of such plan pro-
vision;
(F) require, as may be prescribed by the Ad-
ministrator—
(i) the installation, maintenance, and re-
placement of equipment, and the implemen-
tation of other necessary steps, by owners or
operators of stationary sources to monitor
emissions from such sources,
(ii) periodic reports on the nature and
amounts of emissions and emissions-related
data from such sources, and
(iii) correlation of such reports by the
State agency with any emission limitations
or standards established pursuant to this
chapter, which reports shall be available at
reasonable times for public inspection;
(G) provide for authority comparable to that
in section 7603 of this title and adequate con-
tingency plans to implement such authority;
(H) provide for revision of such plan—
(i) from time to time as may be necessary
to take account of revisions of such national
primary or secondary ambient air quality
standard or the availability of improved or
more expeditious methods of attaining such
standard, and
(ii) except as provided in paragraph (3)(C),
whenever the Administrator finds on the
basis of information available to the Admin-
istrator that the plan is substantially inad-
equate to attain the national ambient air
quality standard which it implements or to
otherwise comply with any additional re-
quirements established under this chapter;
(I) in the case of a plan or plan revision for
an area designated as a nonattainment area,
meet the applicable requirements of part D
(relating to nonattainment areas);
(J) meet the applicable requirements of sec-
tion 7421 of this title (relating to consulta-
Page 7188
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7410
1 See References in Text note below.
tion), section 7427 of this title (relating to pub-
lic notification), and part C (relating to pre-
vention of significant deterioration of air
quality and visibility protection);
(K) provide for—
(i) the performance of such air quality
modeling as the Administrator may pre-
scribe for the purpose of predicting the ef-
fect on ambient air quality of any emissions
of any air pollutant for which the Adminis-
trator has established a national ambient
air quality standard, and
(ii) the submission, upon request, of data
related to such air quality modeling to the
Administrator;
(L) require the owner or operator of each
major stationary source to pay to the permit-
ting authority, as a condition of any permit
required under this chapter, a fee sufficient to
cover—
(i) the reasonable costs of reviewing and
acting upon any application for such a per-
mit, and
(ii) if the owner or operator receives a per-
mit for such source, the reasonable costs of
implementing and enforcing the terms and
conditions of any such permit (not including
any court costs or other costs associated
with any enforcement action),
until such fee requirement is superseded with
respect to such sources by the Administrator’s
approval of a fee program under subchapter V;
and
(M) provide for consultation and participa-
tion by local political subdivisions affected by
the plan.
(3)(A) Repealed. Pub. L. 101–549, title I,
§ 101(d)(1), Nov. 15, 1990, 104 Stat. 2409.
(B) As soon as practicable, the Administrator
shall, consistent with the purposes of this chap-
ter and the Energy Supply and Environmental
Coordination Act of 1974 [15 U.S.C. 791 et seq.],
review each State’s applicable implementation
plans and report to the State on whether such
plans can be revised in relation to fuel burning
stationary sources (or persons supplying fuel to
such sources) without interfering with the at-
tainment and maintenance of any national am-
bient air quality standard within the period per-
mitted in this section. If the Administrator de-
termines that any such plan can be revised, he
shall notify the State that a plan revision may
be submitted by the State. Any plan revision
which is submitted by the State shall, after pub-
lic notice and opportunity for public hearing, be
approved by the Administrator if the revision
relates only to fuel burning stationary sources
(or persons supplying fuel to such sources), and
the plan as revised complies with paragraph (2)
of this subsection. The Administrator shall ap-
prove or disapprove any revision no later than
three months after its submission.
(C) Neither the State, in the case of a plan (or
portion thereof) approved under this subsection,
nor the Administrator, in the case of a plan (or
portion thereof) promulgated under subsection
(c), shall be required to revise an applicable im-
plementation plan because one or more exemp-
tions under section 7418 of this title (relating to
Federal facilities), enforcement orders under
section 7413(d) 1 of this title, suspensions under
subsection (f) or (g) (relating to temporary en-
ergy or economic authority), orders under sec-
tion 7419 of this title (relating to primary non-
ferrous smelters), or extensions of compliance in
decrees entered under section 7413(e) 1 of this
title (relating to iron- and steel-producing oper-
ations) have been granted, if such plan would
have met the requirements of this section if no
such exemptions, orders, or extensions had been
granted.
(4) Repealed. Pub. L. 101–549, title I, § 101(d)(2),
Nov. 15, 1990, 104 Stat. 2409.
(5)(A)(i) Any State may include in a State im-
plementation plan, but the Administrator may
not require as a condition of approval of such
plan under this section, any indirect source re-
view program. The Administrator may approve
and enforce, as part of an applicable implemen-
tation plan, an indirect source review program
which the State chooses to adopt and submit as
part of its plan.
(ii) Except as provided in subparagraph (B), no
plan promulgated by the Administrator shall in-
clude any indirect source review program for
any air quality control region, or portion there-
of.
(iii) Any State may revise an applicable imple-
mentation plan approved under this subsection
to suspend or revoke any such program included
in such plan, provided that such plan meets the
requirements of this section.
(B) The Administrator shall have the author-
ity to promulgate, implement and enforce regu-
lations under subsection (c) respecting indirect
source review programs which apply only to fed-
erally assisted highways, airports, and other
major federally assisted indirect sources and
federally owned or operated indirect sources.
(C) For purposes of this paragraph, the term
‘‘indirect source’’ means a facility, building,
structure, installation, real property, road, or
highway which attracts, or may attract, mobile
sources of pollution. Such term includes parking
lots, parking garages, and other facilities sub-
ject to any measure for management of parking
supply
(within
the
meaning
of
subsection
(c)(2)(D)(ii)), including regulation of existing off-
street parking but such term does not include
new or existing on-street parking. Direct emis-
sions sources or facilities at, within, or associ-
ated with, any indirect source shall not be
deemed indirect sources for the purpose of this
paragraph.
(D) For purposes of this paragraph the term
‘‘indirect source review program’’ means the fa-
cility-by-facility review of indirect sources of
air pollution, including such measures as are
necessary to assure, or assist in assuring, that a
new or modified indirect source will not attract
mobile sources of air pollution, the emissions
from which would cause or contribute to air pol-
lution concentrations—
(i) exceeding any national primary ambient
air quality standard for a mobile source-re-
lated air pollutant after the primary standard
attainment date, or
(ii) preventing maintenance of any such
standard after such date.
Page 7189
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7410
(E) For purposes of this paragraph and para-
graph (2)(B), the term ‘‘transportation control
measure’’ does not include any measure which is
an ‘‘indirect source review program’’.
(6) No State plan shall be treated as meeting
the requirements of this section unless such
plan provides that in the case of any source
which uses a supplemental, or intermittent con-
trol system for purposes of meeting the require-
ments of an order under section 7413(d) 1 of this
title or section 7419 of this title (relating to pri-
mary nonferrous smelter orders), the owner or
operator of such source may not temporarily re-
duce the pay of any employee by reason of the
use of such supplemental or intermittent or
other dispersion dependent control system.
(b) Extension of period for submission of plans
The Administrator may, wherever he deter-
mines necessary, extend the period for submis-
sion of any plan or portion thereof which imple-
ments a national secondary ambient air quality
standard for a period not to exceed 18 months
from the date otherwise required for submission
of such plan.
(c) Preparation and publication by Adminis-
trator of proposed regulations setting forth
implementation plan; transportation regula-
tions study and report; parking surcharge;
suspension authority; plan implementation
(1) The Administrator shall promulgate a Fed-
eral implementation plan at any time within 2
years after the Administrator—
(A) finds that a State has failed to make a
required submission or finds that the plan or
plan revision submitted by the State does not
satisfy the minimum criteria established
under subsection (k)(1)(A), or
(B) disapproves a State implementation plan
submission in whole or in part,
unless the State corrects the deficiency, and the
Administrator approves the plan or plan revi-
sion, before the Administrator promulgates such
Federal implementation plan.
(2)(A) Repealed. Pub. L. 101–549, title I,
§ 101(d)(3)(A), Nov. 15, 1990, 104 Stat. 2409.
(B) No parking surcharge regulation may be
required by the Administrator under paragraph
(1) of this subsection as a part of an applicable
implementation plan. All parking surcharge reg-
ulations previously required by the Adminis-
trator shall be void upon June 22, 1974. This sub-
paragraph shall not prevent the Administrator
from approving parking surcharges if they are
adopted and submitted by a State as part of an
applicable implementation plan. The Adminis-
trator may not condition approval of any imple-
mentation plan submitted by a State on such
plan’s including a parking surcharge regulation.
(C)
Repealed.
Pub.
L.
101–549,
title
I,
§ 101(d)(3)(B), Nov. 15, 1990, 104 Stat. 2409.
(D) For purposes of this paragraph—
(i) The term ‘‘parking surcharge regulation’’
means a regulation imposing or requiring the
imposition of any tax, surcharge, fee, or other
charge on parking spaces, or any other area
used for the temporary storage of motor vehi-
cles.
(ii) The term ‘‘management of parking sup-
ply’’ shall include any requirement providing
that any new facility containing a given num-
ber of parking spaces shall receive a permit or
other prior approval, issuance of which is to be
conditioned on air quality considerations.
(iii) The term ‘‘preferential bus/carpool
lane’’ shall include any requirement for the
setting aside of one or more lanes of a street
or highway on a permanent or temporary basis
for the exclusive use of buses or carpools, or
both.
(E) No standard, plan, or requirement, relating
to management of parking supply or pref-
erential bus/carpool lanes shall be promulgated
after June 22, 1974, by the Administrator pursu-
ant to this section, unless such promulgation
has been subjected to at least one public hearing
which has been held in the area affected and for
which reasonable notice has been given in such
area. If substantial changes are made following
public hearings, one or more additional hearings
shall be held in such area after such notice.
(3) Upon application of the chief executive of-
ficer of any general purpose unit of local govern-
ment, if the Administrator determines that such
unit has adequate authority under State or local
law, the Administrator may delegate to such
unit the authority to implement and enforce
within the jurisdiction of such unit any part of
a plan promulgated under this subsection. Noth-
ing in this paragraph shall prevent the Adminis-
trator from implementing or enforcing any ap-
plicable provision of a plan promulgated under
this subsection.
(4)
Repealed.
Pub.
L.
101–549,
title
I,
§ 101(d)(3)(C), Nov. 15, 1990, 104 Stat. 2409.
(5)(A) Any measure in an applicable implemen-
tation plan which requires a toll or other charge
for the use of a bridge located entirely within
one city shall be eliminated from such plan by
the Administrator upon application by the Gov-
ernor of the State, which application shall in-
clude a certification by the Governor that he
will revise such plan in accordance with sub-
paragraph (B).
(B) In the case of any applicable implementa-
tion plan with respect to which a measure has
been eliminated under subparagraph (A), such
plan shall, not later than one year after August
7, 1977, be revised to include comprehensive
measures to:
(i) establish, expand, or improve public
transportation measures to meet basic trans-
portation needs, as expeditiously as is prac-
ticable; and
(ii) implement transportation control meas-
ures necessary to attain and maintain na-
tional ambient air quality standards,
and such revised plan shall, for the purpose of
implementing such comprehensive public trans-
portation measures, include requirements to use
(insofar as is necessary) Federal grants, State or
local funds, or any combination of such grants
and funds as may be consistent with the terms
of the legislation providing such grants and
funds. Such measures shall, as a substitute for
the tolls or charges eliminated under subpara-
graph (A), provide for emissions reductions
equivalent to the reductions which may reason-
ably be expected to be achieved through the use
of the tolls or charges eliminated.
Page 7190
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7410
(C) Any revision of an implementation plan for
purposes of meeting the requirements of sub-
paragraph (B) shall be submitted in coordination
with any plan revision required under part D.
(d), (e) Repealed. Pub. L. 101–549, title I,
§ 101(d)(4), (5), Nov. 15, 1990, 104 Stat. 2409
(f) National or regional energy emergencies; de-
termination by President
(1) Upon application by the owner or operator
of a fuel burning stationary source, and after no-
tice and opportunity for public hearing, the
Governor of the State in which such source is lo-
cated may petition the President to determine
that a national or regional energy emergency
exists of such severity that—
(A) a temporary suspension of any part of
the applicable implementation plan or of any
requirement under section 7651j of this title
(concerning excess emissions penalties or off-
sets) may be necessary, and
(B) other means of responding to the energy
emergency may be inadequate.
Such determination shall not be delegable by
the President to any other person. If the Presi-
dent determines that a national or regional en-
ergy emergency of such severity exists, a tem-
porary emergency suspension of any part of an
applicable implementation plan or of any re-
quirement under section 7651j of this title (con-
cerning excess emissions penalties or offsets)
adopted by the State may be issued by the Gov-
ernor of any State covered by the President’s
determination under the condition specified in
paragraph (2) and may take effect immediately.
(2) A temporary emergency suspension under
this subsection shall be issued to a source only
if the Governor of such State finds that—
(A) there exists in the vicinity of such
source a temporary energy emergency involv-
ing high levels of unemployment or loss of
necessary
energy
supplies
for
residential
dwellings; and
(B) such unemployment or loss can be to-
tally or partially alleviated by such emer-
gency suspension.
Not more than one such suspension may be
issued for any source on the basis of the same
set of circumstances or on the basis of the same
emergency.
(3) A temporary emergency suspension issued
by a Governor under this subsection shall re-
main in effect for a maximum of four months or
such lesser period as may be specified in a dis-
approval order of the Administrator, if any. The
Administrator may disapprove such suspension
if he determines that it does not meet the re-
quirements of paragraph (2).
(4) This subsection shall not apply in the case
of a plan provision or requirement promulgated
by the Administrator under subsection (c) of
this section, but in any such case the President
may grant a temporary emergency suspension
for a four month period of any such provision or
requirement if he makes the determinations and
findings specified in paragraphs (1) and (2).
(5) The Governor may include in any tem-
porary emergency suspension issued under this
subsection a provision delaying for a period
identical to the period of such suspension any
compliance schedule (or increment of progress)
to which such source is subject under section
1857c–10 1 of this title, as in effect before August
7, 1977, or section 7413(d) 1 of this title, upon a
finding that such source is unable to comply
with such schedule (or increment) solely because
of the conditions on the basis of which a suspen-
sion was issued under this subsection.
(g) Governor’s authority to issue temporary
emergency suspensions
(1) In the case of any State which has adopted
and submitted to the Administrator a proposed
plan revision which the State determines—
(A) meets the requirements of this section,
and
(B) is necessary (i) to prevent the closing for
one year or more of any source of air pollu-
tion, and (ii) to prevent substantial increases
in unemployment which would result from
such closing, and
which the Administrator has not approved or
disapproved under this section within 12 months
of submission of the proposed plan revision, the
Governor may issue a temporary emergency sus-
pension of the part of the applicable implemen-
tation plan for such State which is proposed to
be revised with respect to such source. The de-
termination under subparagraph (B) may not be
made with respect to a source which would close
without regard to whether or not the proposed
plan revision is approved.
(2) A temporary emergency suspension issued
by a Governor under this subsection shall re-
main in effect for a maximum of four months or
such lesser period as may be specified in a dis-
approval order of the Administrator. The Ad-
ministrator may disapprove such suspension if
he determines that it does not meet the require-
ments of this subsection.
(3) The Governor may include in any tem-
porary emergency suspension issued under this
subsection a provision delaying for a period
identical to the period of such suspension any
compliance schedule (or increment of progress)
to which such source is subject under section
1857c–10 1 of this title as in effect before August
7, 1977, or under section 7413(d) 1 of this title
upon a finding that such source is unable to
comply with such schedule (or increment) solely
because of the conditions on the basis of which
a suspension was issued under this subsection.
(h) Publication of comprehensive document for
each State setting forth requirements of ap-
plicable implementation plan
(1) Not later than 5 years after November 15,
1990, and every 3 years thereafter, the Adminis-
trator shall assemble and publish a comprehen-
sive document for each State setting forth all
requirements of the applicable implementation
plan for such State and shall publish notice in
the Federal Register of the availability of such
documents.
(2) The Administrator may promulgate such
regulations as may be reasonably necessary to
carry out the purpose of this subsection.
(i) Modification of requirements prohibited
Except for a primary nonferrous smelter order
under section 7419 of this title, a suspension
under subsection (f) or (g) (relating to emer-
Page 7191
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7410
gency suspensions), an exemption under section
7418 of this title (relating to certain Federal fa-
cilities), an order under section 7413(d) 1 of this
title (relating to compliance orders), a plan pro-
mulgation under subsection (c), or a plan revi-
sion under subsection (a)(3); no order, suspen-
sion, plan revision, or other action modifying
any requirement of an applicable implementa-
tion plan may be taken with respect to any sta-
tionary source by the State or by the Adminis-
trator.
(j) Technological systems of continuous emission
reduction on new or modified stationary
sources; compliance with performance stand-
ards
As a condition for issuance of any permit re-
quired under this subchapter, the owner or oper-
ator of each new or modified stationary source
which is required to obtain such a permit must
show to the satisfaction of the permitting au-
thority that the technological system of contin-
uous emission reduction which is to be used at
such source will enable it to comply with the
standards of performance which are to apply to
such source and that the construction or modi-
fication and operation of such source will be in
compliance with all other requirements of this
chapter.
(k) Environmental Protection Agency action on
plan submissions
(1) Completeness of plan submissions
(A) Completeness criteria
Within 9 months after November 15, 1990,
the Administrator shall promulgate min-
imum criteria that any plan submission
must meet before the Administrator is re-
quired to act on such submission under this
subsection. The criteria shall be limited to
the information necessary to enable the Ad-
ministrator to determine whether the plan
submission complies with the provisions of
this chapter.
(B) Completeness finding
Within 60 days of the Administrator’s re-
ceipt of a plan or plan revision, but no later
than 6 months after the date, if any, by
which a State is required to submit the plan
or revision, the Administrator shall deter-
mine whether the minimum criteria estab-
lished pursuant to subparagraph (A) have
been met. Any plan or plan revision that a
State submits to the Administrator, and
that has not been determined by the Admin-
istrator (by the date 6 months after receipt
of the submission) to have failed to meet the
minimum criteria established pursuant to
subparagraph (A), shall on that date be
deemed by operation of law to meet such
minimum criteria.
(C) Effect of finding of incompleteness
Where the Administrator determines that
a plan submission (or part thereof) does not
meet the minimum criteria established pur-
suant to subparagraph (A), the State shall be
treated as not having made the submission
(or, in the Administrator’s discretion, part
thereof).
(2) Deadline for action
Within 12 months of a determination by the
Administrator (or a determination deemed by
operation of law) under paragraph (1) that a
State has submitted a plan or plan revision
(or, in the Administrator’s discretion, part
thereof) that meets the minimum criteria es-
tablished pursuant to paragraph (1), if applica-
ble (or, if those criteria are not applicable,
within 12 months of submission of the plan or
revision), the Administrator shall act on the
submission in accordance with paragraph (3).
(3) Full and partial approval and disapproval
In the case of any submittal on which the
Administrator is required to act under para-
graph (2), the Administrator shall approve
such submittal as a whole if it meets all of the
applicable requirements of this chapter. If a
portion of the plan revision meets all the ap-
plicable requirements of this chapter, the Ad-
ministrator may approve the plan revision in
part and disapprove the plan revision in part.
The plan revision shall not be treated as meet-
ing the requirements of this chapter until the
Administrator approves the entire plan revi-
sion as complying with the applicable require-
ments of this chapter.
(4) Conditional approval
The Administrator may approve a plan revi-
sion based on a commitment of the State to
adopt specific enforceable measures by a date
certain, but not later than 1 year after the
date of approval of the plan revision. Any such
conditional approval shall be treated as a dis-
approval if the State fails to comply with such
commitment.
(5) Calls for plan revisions
Whenever the Administrator finds that the
applicable implementation plan for any area is
substantially inadequate to attain or main-
tain the relevant national ambient air quality
standard, to mitigate adequately the inter-
state pollutant transport described in section
7506a of this title or section 7511c of this title,
or to otherwise comply with any requirement
of this chapter, the Administrator shall re-
quire the State to revise the plan as necessary
to correct such inadequacies. The Adminis-
trator shall notify the State of the inadequa-
cies, and may establish reasonable deadlines
(not to exceed 18 months after the date of such
notice) for the submission of such plan revi-
sions. Such findings and notice shall be public.
Any finding under this paragraph shall, to the
extent the Administrator deems appropriate,
subject the State to the requirements of this
chapter to which the State was subject when
it developed and submitted the plan for which
such finding was made, except that the Ad-
ministrator may adjust any dates applicable
under such requirements as appropriate (ex-
cept that the Administrator may not adjust
any attainment date prescribed under part D,
unless such date has elapsed).
(6) Corrections
Whenever
the
Administrator
determines
that the Administrator’s action approving,
disapproving, or promulgating any plan or
Page 7192
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7410
2 So in original. Probably should be followed by a comma.
plan revision (or part thereof), area designa-
tion, redesignation, classification, or reclassi-
fication was in error, the Administrator may
in the same manner as the approval, dis-
approval, or promulgation revise such action
as appropriate without requiring any further
submission from the State. Such determina-
tion and the basis thereof shall be provided to
the State and public.
(l) Plan revisions
Each revision to an implementation plan sub-
mitted by a State under this chapter shall be
adopted by such State after reasonable notice
and public hearing. The Administrator shall not
approve a revision of a plan if the revision would
interfere with any applicable requirement con-
cerning attainment and reasonable further
progress (as defined in section 7501 of this title),
or any other applicable requirement of this
chapter.
(m) Sanctions
The Administrator may apply any of the sanc-
tions listed in section 7509(b) of this title at any
time (or at any time after) the Administrator
makes a finding, disapproval, or determination
under paragraphs (1) through (4), respectively, of
section 7509(a) of this title in relation to any
plan or plan item (as that term is defined by the
Administrator) required under this chapter,
with respect to any portion of the State the Ad-
ministrator determines reasonable and appro-
priate, for the purpose of ensuring that the re-
quirements of this chapter relating to such plan
or plan item are met. The Administrator shall,
by rule, establish criteria for exercising his au-
thority under the previous sentence with respect
to any deficiency referred to in section 7509(a) of
this title to ensure that, during the 24-month pe-
riod following the finding, disapproval, or deter-
mination referred to in section 7509(a) of this
title, such sanctions are not applied on a state-
wide basis where one or more political subdivi-
sions covered by the applicable implementation
plan are principally responsible for such defi-
ciency.
(n) Savings clauses
(1) Existing plan provisions
Any provision of any applicable implementa-
tion plan that was approved or promulgated by
the Administrator pursuant to this section as
in effect before November 15, 1990, shall re-
main in effect as part of such applicable im-
plementation plan, except to the extent that a
revision to such provision is approved or pro-
mulgated by the Administrator pursuant to
this chapter.
(2) Attainment dates
For any area not designated nonattainment,
any plan or plan revision submitted or re-
quired to be submitted by a State—
(A) in response to the promulgation or re-
vision of a national primary ambient air
quality standard in effect on November 15,
1990, or
(B) in response to a finding of substantial
inadequacy under subsection (a)(2) (as in ef-
fect immediately before November 15, 1990),
shall provide for attainment of the national
primary ambient air quality standards within
3 years of November 15, 1990, or within 5 years
of issuance of such finding of substantial inad-
equacy, whichever is later.
(3) Retention of construction moratorium in
certain areas
In the case of an area to which, immediately
before November 15, 1990, the prohibition on
construction or modification of major sta-
tionary
sources
prescribed
in
subsection
(a)(2)(I) (as in effect immediately before No-
vember 15, 1990) applied by virtue of a finding
of the Administrator that the State con-
taining such area had not submitted an imple-
mentation plan meeting the requirements of
section 7502(b)(6) of this title (relating to es-
tablishment of a permit program) (as in effect
immediately before November 15, 1990) or
7502(a)(1) of this title (to the extent such re-
quirements relate to provision for attainment
of the primary national ambient air quality
standard for sulfur oxides by December 31,
1982) as in effect immediately before November
15, 1990, no major stationary source of the rel-
evant air pollutant or pollutants shall be con-
structed or modified in such area until the Ad-
ministrator finds that the plan for such area
meets the applicable requirements of section
7502(c)(5) of this title (relating to permit pro-
grams) or subpart 5 of part D (relating to at-
tainment of the primary national ambient air
quality standard for sulfur dioxide), respec-
tively.
(o) Indian tribes
If an Indian tribe submits an implementation
plan to the Administrator pursuant to section
7601(d) of this title, the plan shall be reviewed in
accordance with the provisions for review set
forth in this section for State plans, except as
otherwise provided by regulation promulgated
pursuant to section 7601(d)(2) of this title. When
such plan becomes effective in accordance with
the
regulations
promulgated
under
section
7601(d) of this title, the plan shall become appli-
cable to all areas (except as expressly provided
otherwise in the plan) located within the exte-
rior boundaries of the reservation, notwith-
standing the issuance of any patent and includ-
ing rights-of-way running through the reserva-
tion.
(p) Reports
Any State shall submit, according to such
schedule as the Administrator may prescribe,
such reports as the Administrator may require
relating to emission reductions, vehicle miles
traveled, congestion levels, and any other infor-
mation the Administrator may deem necessary
to assess the development 2 effectiveness, need
for revision, or implementation of any plan or
plan revision required under this chapter.
(July 14, 1955, ch. 360, title I, § 110, as added Pub.
L. 91–604, § 4(a), Dec. 31, 1970, 84 Stat. 1680;
amended Pub. L. 93–319, § 4, June 22, 1974, 88 Stat.
256; Pub. L. 95–95, title I, §§ 107, 108, Aug. 7, 1977,
91 Stat. 691, 693; Pub. L. 95–190, § 14(a)(1)–(6), Nov.
16, 1977, 91 Stat. 1399; Pub. L. 97–23, § 3, July 17,
1981, 95 Stat. 142; Pub. L. 101–549, title I,
Page 7193
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7410
§§ 101(b)–(d), 102(h), 107(c), 108(d), title IV, § 412,
Nov. 15, 1990, 104 Stat. 2404–2408, 2422, 2464, 2466,
2634.)
Editorial Notes
REFERENCES IN TEXT
The Energy Supply and Environmental Coordination
Act of 1974, referred to in subsec. (a)(3)(B), is Pub. L.
93–319, June 22, 1974, 88 Stat. 246, which is classified
principally to chapter 16C (§ 791 et seq.) of Title 15,
Commerce and Trade. For complete classification of
this Act to the Code, see Short Title note set out under
section 791 of Title 15 and Tables.
Section 7413 of this title, referred to in subsecs.
(a)(3)(C), (6), (f)(5), (g)(3), and (i), was amended gen-
erally by Pub. L. 101–549, title VII, § 701, Nov. 15, 1990,
104 Stat. 2672, and, as so amended, subsecs. (d) and (e)
of section 7413 no longer relates to final compliance or-
ders and steel industry compliance extension, respec-
tively.
Section 1857c–10 of this title, as in effect before Au-
gust 7, 1977, referred to in subsecs. (f)(5) and (g)(3), was
in the original ‘‘section 119, as in effect before the date
of the enactment of this paragraph’’, meaning section
119 of act July 14, 1955, ch. 360, title I, as added June 22,
1974, Pub. L. 93–319, § 3, 88 Stat. 248, (which was classi-
fied to section 1857c–10 of this title) as in effect prior to
the enactment of subsecs. (f)(5) and (g)(3) of this section
by Pub. L. 95–95, § 107, Aug. 7, 1977, 91 Stat. 691, effective
Aug. 7, 1977. Section 112(b)(1) of Pub. L. 95–95 repealed
section 119 of act July 14, 1955, ch. 360, title I, as added
by Pub. L. 93–319, and provided that all references to
such section 119 in any subsequent enactment which su-
persedes Pub. L. 93–319 shall be construed to refer to
section 113(d) of the Clean Air Act and to paragraph (5)
thereof in particular which is classified to section
7413(d)(5) of this title. Section 7413 of this title was sub-
sequently amended generally by Pub. L. 101–549, title
VII, § 701, Nov. 15, 1990, 104 Stat. 2672, see note above.
Section 117(b) of Pub. L. 95–95 added a new section 119
of act July 14, 1955, which is classified to section 7419 of
this title.
CODIFICATION
Section was formerly classified to section 1857c–5 of
this title.
PRIOR PROVISIONS
A prior section 110 of act July 14, 1955, was renum-
bered section 117 by Pub. L. 91–604 and is classified to
section 7417 of this title.
AMENDMENTS
1990—Subsec. (a)(1). Pub. L. 101–549, § 101(d)(8), sub-
stituted ‘‘3 years (or such shorter period as the Admin-
istrator may prescribe)’’ for ‘‘nine months’’ in two
places.
Subsec. (a)(2). Pub. L. 101–549, § 101(b), amended par.
(2) generally, substituting present provisions for provi-
sions setting the time within which the Administrator
was to approve or disapprove a plan or portion thereof
and listing the conditions under which the plan or por-
tion thereof was to be approved after reasonable notice
and hearing.
Subsec. (a)(3)(A). Pub. L. 101–549, § 101(d)(1), struck
out subpar. (A) which directed Administrator to ap-
prove any revision of an implementation plan if it met
certain requirements and had been adopted by the
State after reasonable notice and public hearings.
Subsec. (a)(3)(D). Pub. L. 101–549, § 101(d)(1), struck
out subpar. (D) which directed that certain implemen-
tation plans be revised to include comprehensive meas-
ures and requirements.
Subsec. (a)(4). Pub. L. 101–549, § 101(d)(2), struck out
par. (4) which set forth requirements for review proce-
dure.
Subsec. (c)(1). Pub. L. 101–549, § 102(h), amended par.
(1) generally, substituting present provisions for provi-
sions relating to preparation and publication of regula-
tions setting forth an implementation plan, after op-
portunity for a hearing, upon failure of a State to make
required submission or revision.
Subsec. (c)(2)(A). Pub. L. 101–549, § 101(d)(3)(A), struck
out subpar. (A) which required a study and report on
necessity of parking surcharge, management of parking
supply, and preferential bus/carpool lane regulations to
achieve and maintain national primary ambient air
quality standards.
Subsec. (c)(2)(C). Pub. L. 101–549, § 101(d)(3)(B), struck
out subpar. (C) which authorized suspension of certain
regulations and requirements relating to management
of parking supply.
Subsec. (c)(4). Pub. L. 101–549, § 101(d)(3)(C), struck out
par. (4) which permitted Governors to temporarily sus-
pend measures in implementation plans relating to ret-
rofits, gas rationing, and reduction of on-street park-
ing.
Subsec. (c)(5)(B). Pub. L. 101–549, § 101(d)(3)(D), struck
out ‘‘(including the written evidence required by part
D),’’ after ‘‘include comprehensive measures’’.
Subsec. (d). Pub. L. 101–549, § 101(d)(4), struck out sub-
sec. (d) which defined an applicable implementation
plan for purposes of this chapter.
Subsec. (e). Pub. L. 101–549, § 101(d)(5), struck out sub-
sec. (e) which permitted an extension of time for at-
tainment of a national primary ambient air quality
standard.
Subsec. (f)(1). Pub. L. 101–549, § 412, inserted ‘‘or of any
requirement under section 7651j of this title (con-
cerning excess emissions penalties or offsets)’’ in sub-
par. (A) and in last sentence.
Subsec. (g)(1). Pub. L. 101–549, § 101(d)(6), substituted
‘‘12 months of submission of the proposed plan revi-
sion’’ for ‘‘the required four month period’’ in closing
provisions.
Subsec. (h)(1). Pub. L. 101–549, § 101(d)(7), substituted
‘‘5 years after November 15, 1990, and every three years
thereafter’’ for ‘‘one year after August 7, 1977, and an-
nually thereafter’’ and struck out at end ‘‘Each such
document shall be revised as frequently as practicable
but not less often than annually.’’
Subsecs. (k) to (n). Pub. L. 101–549, § 101(c), added sub-
secs. (k) to (n).
Subsec. (o). Pub. L. 101–549, § 107(c), added subsec. (o).
Subsec. (p). Pub. L. 101–549, § 108(d), added subsec. (p).
1981—Subsec. (a)(3)(C). Pub. L. 97–23 inserted ref-
erence to extensions of compliance in decrees entered
under section 7413(e) of this title (relating to iron- and
steel-producing operations).
1977—Subsec. (a)(2)(A). Pub. L. 95–95, § 108(a)(1), sub-
stituted ‘‘(A) except as may be provided in subpara-
graph (I)(i) in the case of a plan’’ for ‘‘(A)(i) in the case
of a plan’’.
Subsec. (a)(2)(B). Pub. L. 95–95, § 108(a)(2), substituted
‘‘transportation controls, air quality maintenance
plans, and preconstruction review of direct sources of
air pollution as provided in subparagraph (D)’’ for
‘‘land use and transportation controls’’.
Subsec. (a)(2)(D). Pub. L. 95–95, § 108(a)(3), substituted
‘‘it includes a program to provide for the enforcement
of emission limitations and regulation of the modifica-
tion, construction, and operation of any stationary
source, including a permit program as required in parts
C and D and a permit or equivalent program for any
major emitting facility, within such region as nec-
essary to assure (i) that national ambient air quality
standards are achieved and maintained, and (ii) a pro-
cedure’’ for ‘‘it includes a procedure’’.
Subsec. (a)(2)(E). Pub. L. 95–95, § 108(a)(4), substituted
‘‘it contains adequate provisions (i) prohibiting any
stationary source within the State from emitting any
air pollutant in amounts which will (I) prevent attain-
ment or maintenance by any other State of any such
national primary or secondary ambient air quality
standard, or (II) interfere with measures required to be
included in the applicable implementation plan for any
other State under part C to prevent significant deterio-
ration of air quality or to protect visibility, and (ii) in-
Page 7194
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7410
suring compliance with the requirements of section
7426 of this title, relating to interstate pollution abate-
ment’’ for ‘‘it contains adequate provisions for inter-
governmental cooperation, including measures nec-
essary to insure that emissions of air pollutants from
sources located in any air quality control region will
not interfere with the attainment or maintenance of
such primary or secondary standard in any portion of
such region outside of such State or in any other air
quality control region’’.
Subsec. (a)(2)(F). Pub. L. 95–95, § 108(a)(5), added cl.
(vi).
Subsec. (a)(2)(H). Pub. L. 95–190, § 14(a)(1), substituted
‘‘1977;’’ for ‘‘1977’’.
Pub. L. 95–95, § 108(a)(6), inserted ‘‘except as provided
in paragraph (3)(C),’’ after ‘‘or (ii)’’ and ‘‘or to other-
wise comply with any additional requirements estab-
lished under the Clean Air Act Amendments of 1977’’
after ‘‘to achieve the national ambient air quality pri-
mary or secondary standard which it implements’’.
Subsec. (a)(2)(I). Pub. L. 95–95, § 108(b), added subpar.
(I).
Subsec. (a)(2)(J). Pub. L. 95–190, § 14(a)(2), substituted
‘‘; and’’ for ‘‘, and’’.
Pub. L. 95–95, § 108(b), added subpar. (J).
Subsec. (a)(2)(K). Pub. L. 95–95, § 108(b) added subpar.
(K).
Subsec. (a)(3)(C). Pub. L. 95–95, § 108(c), added subpar.
(C).
Subsec. (a)(3)(D). Pub. L. 95–190, § 14(a)(4), added sub-
par. (D).
Subsec. (a)(5). Pub. L. 95–95, § 108(e), added par. (5).
Subsec. (a)(5)(D). Pub. L. 95–190, § 14(a)(3), struck out
‘‘preconstruction or premodification’’ before ‘‘review’’.
Subsec. (a)(6). Pub. L. 95–95, § 108(e), added par. (6).
Subsec. (c)(1). Pub. L. 95–95, § 108(d)(1), (2), substituted
‘‘plan which meets the requirements of this section’’
for ‘‘plan for any national ambient air quality primary
or secondary standard within the time prescribed’’ in
subpar. (A) and, in provisions following subpar. (C), di-
rected that any portion of a plan relating to any meas-
ure described in first sentence of 7421 of this title (re-
lating to consultation) or the consultation process re-
quired under such section 7421 of this title not be re-
quired to be promulgated before the date eight months
after such date required for submission.
Subsec. (c)(3) to (5). Pub. L. 95–95, § 108(d)(3), added
pars. (3) to (5).
Subsec. (d). Pub. L. 95–95, § 108(f), substituted ‘‘and
which implements the requirements of this section’’ for
‘‘and which implements a national primary or sec-
ondary ambient air quality standard in a State’’.
Subsec. (f). Pub. L. 95–95, § 107(a), substituted provi-
sions relating to the handling of national or regional
energy emergencies for provisions relating to the post-
ponement of compliance by stationary sources or class-
es of moving sources with any requirement of applica-
ble implementation plans.
Subsec. (g). Pub. L. 95–95, § 108(g), added subsec. (g) re-
lating to publication of comprehensive document.
Pub. L. 95–95, § 107(b), added subsec. (g) relating to
Governor’s authority to issue temporary emergency
suspensions.
Subsec. (h). Pub. L. 95–190, § 14(a)(5), redesignated sub-
sec. (g), added by Pub. L. 95–95, § 108(g), as (h). Former
subsec. (h) redesignated (i).
Subsec. (i). Pub. L. 95–190, § 14(a)(5), redesignated sub-
sec. (h), added by Pub. L. 95–95, § 108(g), as (i). Former
subsec. (i) redesignated (j) and amended.
Subsec. (j). Pub. L. 95–190 § 14(a)(5), (6), redesignated
subsec. (i), added by Pub. L. 95–95, § 108(g), as (j) and in
subsec. (j) as so redesignated, substituted ‘‘will enable
such source’’ for ‘‘at such source will enable it’’.
1974—Subsec. (a)(3). Pub. L. 93–319, § 4(a), designated
existing provisions as subpar. (A) and added subpar. (B).
Subsec. (c). Pub. L. 93–319, § 4(b), designated existing
provisions as par. (1) and existing pars. (1), (2), and (3)
as subpars. (A), (B), and (C), respectively, of such redes-
ignated par. (1), and added par. (2).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1977 AMENDMENT
Amendment by Pub. L. 95–95 effective Aug. 7, 1977, ex-
cept as otherwise expressly provided, see section 406(d)
of Pub. L. 95–95, set out as a note under section 7401 of
this title.
PENDING ACTIONS AND PROCEEDINGS
Suits, actions, and other proceedings lawfully com-
menced by or against the Administrator or any other
officer or employee of the United States in his official
capacity or in relation to the discharge of his official
duties under act July 14, 1955, the Clean Air Act, as in
effect immediately prior to the enactment of Pub. L.
95–95 [Aug. 7, 1977], not to abate by reason of the taking
effect of Pub. L. 95–95, see section 406(a) of Pub. L.
95–95, set out as an Effective Date of 1977 Amendment
note under section 7401 of this title.
MODIFICATION OR RESCISSION OF RULES, REGULATIONS,
ORDERS,
DETERMINATIONS,
CONTRACTS,
CERTIFI-
CATIONS, AUTHORIZATIONS, DELEGATIONS, AND OTHER
ACTIONS
All rules, regulations, orders, determinations, con-
tracts, certifications, authorizations, delegations, or
other actions duly issued, made, or taken by or pursu-
ant to act July 14, 1955, the Clean Air Act, as in effect
immediately prior to the date of enactment of Pub. L.
95–95 [Aug. 7, 1977] to continue in full force and effect
until modified or rescinded in accordance with act July
14, 1955, as amended by Pub. L. 95–95 [this chapter], see
section 406(b) of Pub. L. 95–95, set out as an Effective
Date of 1977 Amendment note under section 7401 of this
title.
MODIFICATION
OR
RESCISSION
OF
IMPLEMENTATION
PLANS APPROVED
AND IN EFFECT PRIOR
TO AUG. 7,
1977
Nothing in the Clean Air Act Amendments of 1977
[Pub. L. 95–95] to affect any requirement of an approved
implementation plan under this section or any other
provision in effect under this chapter before Aug. 7,
1977, until modified or rescinded in accordance with
this chapter as amended by the Clean Air Act Amend-
ments of 1977, see section 406(c) of Pub. L. 95–95, set out
as an Effective Date of 1977 Amendment note under sec-
tion 7401 of this title.
SAVINGS PROVISION
Pub. L. 91–604, § 16, Dec. 31, 1970, 84 Stat. 1713, provided
that:
‘‘(a)(1) Any implementation plan adopted by any
State and submitted to the Secretary of Health, Edu-
cation, and Welfare, or to the Administrator pursuant
to the Clean Air Act [this chapter] prior to enactment
of this Act [Dec. 31, 1970] may be approved under sec-
tion 110 of the Clean Air Act [this section] (as amended
by this Act) [Pub. L. 91–604] and shall remain in effect,
unless the Administrator determines that such imple-
mentation plan, or any portion thereof, is not con-
sistent with applicable requirements of the Clean Air
Act [this chapter] (as amended by this Act) and will not
provide for the attainment of national primary ambi-
ent air quality standards in the time required by such
Act. If the Administrator so determines, he shall, with-
in 90 days after promulgation of any national ambient
air quality standards pursuant to section 109(a) of the
Clean Air Act [section 7409(a) of this title], notify the
State and specify in what respects changes are needed
to meet the additional requirements of such Act, in-
cluding requirements to implement national secondary
ambient air quality standards. If such changes are not
adopted by the State after public hearings and within
six months after such notification, the Administrator
shall promulgate such changes pursuant to section
110(c) of such Act [subsec. (c) of this section].
‘‘(2) The amendments made by section 4(b) [amending
sections 7403 and 7415 of this title] shall not be con-
Page 7195
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7411
1 See References in Text note below.
strued as repealing or modifying the powers of the Ad-
ministrator with respect to any conference convened
under section 108(d) of the Clean Air Act [section 7415
of this title] before the date of enactment of this Act
[Dec. 31, 1970].
‘‘(b) Regulations or standards issued under this title
II of the Clean Air Act [subchapter II of this chapter]
prior to the enactment of this Act [Dec. 31, 1970] shall
continue in effect until revised by the Administrator
consistent with the purposes of such Act [this chap-
ter].’’
FEDERAL ENERGY ADMINISTRATOR
‘‘Federal Energy Administrator’’, for purposes of this
chapter, to mean Administrator of Federal Energy Ad-
ministration established by Pub. L. 93–275, May 7, 1974,
88 Stat. 97, which is classified to section 761 et seq. of
Title 15, Commerce and Trade, but with the term to
mean any officer of the United States designated as
such by the President until Federal Energy Adminis-
trator takes office and after Federal Energy Adminis-
tration ceases to exist, see section 798 of Title 15, Com-
merce and Trade.
Federal Energy Administration terminated and func-
tions vested by law in Administrator thereof trans-
ferred to Secretary of Energy (unless otherwise specifi-
cally provided) by sections 7151(a) and 7293 of this title.
§ 7411. Standards of performance for new sta-
tionary sources
(a) Definitions
For purposes of this section:
(1) The term ‘‘standard of performance’’
means a standard for emissions of air pollut-
ants which reflects the degree of emission lim-
itation achievable through the application of
the best system of emission reduction which
(taking into account the cost of achieving
such reduction and any nonair quality health
and environmental impact and energy require-
ments) the Administrator determines has been
adequately demonstrated.
(2) The term ‘‘new source’’ means any sta-
tionary source, the construction or modifica-
tion of which is commenced after the publica-
tion of regulations (or, if earlier, proposed reg-
ulations) prescribing a standard of perform-
ance under this section which will be applica-
ble to such source.
(3) The term ‘‘stationary source’’ means any
building, structure, facility, or installation
which emits or may emit any air pollutant.
Nothing in subchapter II of this chapter relat-
ing to nonroad engines shall be construed to
apply to stationary internal combustion en-
gines.
(4) The term ‘‘modification’’ means any
physical change in, or change in the method of
operation of, a stationary source which in-
creases the amount of any air pollutant emit-
ted by such source or which results in the
emission of any air pollutant not previously
emitted.
(5) The term ‘‘owner or operator’’ means any
person who owns, leases, operates, controls, or
supervises a stationary source.
(6) The term ‘‘existing source’’ means any
stationary source other than a new source.
(7) The term ‘‘technological system of con-
tinuous emission reduction’’ means—
(A) a technological process for production
or operation by any source which is inher-
ently low-polluting or nonpolluting, or
(B) a technological system for continuous
reduction of the pollution generated by a
source before such pollution is emitted into
the ambient air, including precombustion
cleaning or treatment of fuels.
(8) A conversion to coal (A) by reason of an
order under section 2(a) of the Energy Supply
and Environmental Coordination Act of 1974
[15 U.S.C. 792(a)] or any amendment thereto,
or any subsequent enactment which super-
sedes such Act [15 U.S.C. 791 et seq.], or (B)
which qualifies under section 7413(d)(5)(A)(ii) 1
of this title, shall not be deemed to be a modi-
fication for purposes of paragraphs (2) and (4)
of this subsection.
(b) List of categories of stationary sources;
standards of performance; information on
pollution control techniques; sources owned
or operated by United States; particular sys-
tems; revised standards
(1)(A) The Administrator shall, within 90 days
after December 31, 1970, publish (and from time
to time thereafter shall revise) a list of cat-
egories of stationary sources. He shall include a
category of sources in such list if in his judg-
ment it causes, or contributes significantly to,
air pollution which may reasonably be antici-
pated to endanger public health or welfare.
(B) Within one year after the inclusion of a
category of stationary sources in a list under
subparagraph (A), the Administrator shall pub-
lish proposed regulations, establishing Federal
standards of performance for new sources within
such category. The Administrator shall afford
interested persons an opportunity for written
comment on such proposed regulations. After
considering such comments, he shall promul-
gate, within one year after such publication,
such standards with such modifications as he
deems appropriate. The Administrator shall, at
least every 8 years, review and, if appropriate,
revise such standards following the procedure
required by this subsection for promulgation of
such standards. Notwithstanding the require-
ments of the previous sentence, the Adminis-
trator need not review any such standard if the
Administrator determines that such review is
not appropriate in light of readily available in-
formation on the efficacy of such standard.
Standards of performance or revisions thereof
shall become effective upon promulgation. When
implementation and enforcement of any require-
ment of this chapter indicate that emission lim-
itations and percent reductions beyond those re-
quired by the standards promulgated under this
section are achieved in practice, the Adminis-
trator shall, when revising standards promul-
gated under this section, consider the emission
limitations and percent reductions achieved in
practice.
(2) The Administrator may distinguish among
classes, types, and sizes within categories of new
sources for the purpose of establishing such
standards.
(3) The Administrator shall, from time to
time, issue information on pollution control
techniques for categories of new sources and air
pollutants subject to the provisions of this sec-
tion.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
The purposes of this chapter are (1) to provide for a means to assist in meeting the essential needs of the United States for fuels, in a manner which is consistent, to the fullest extent practicable, with existing national commitments to protect and improve the environment, and (2) to provide requirements for reports respecting energy resources.
Source: Supplied U.S. Code snapshot — release unconfirmed · 15 U.S.C. § 791
Stored review status: release_metadata_unconfirmed. The source passage cites 15 U.S.C. § 791. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 1252
TITLE 15—COMMERCE AND TRADE
§ 791
1 See References in Text note below.
Sec.
793.
Protection of public health and environment.
794.
Energy conservation study.
795.
Report to Congress by January 31, 1975.
796.
Reporting of energy information.
797.
Enforcement.
798.
Definitions.
§ 791. Congressional declaration of purpose
The purposes of this chapter are (1) to provide
for a means to assist in meeting the essential
needs of the United States for fuels, in a manner
which is consistent, to the fullest extent prac-
ticable, with existing national commitments to
protect and improve the environment, and (2) to
provide requirements for reports respecting en-
ergy resources.
(Pub. L. 93–319, § 1(b), June 22, 1974, 88 Stat. 246.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in text, was in the original
‘‘this Act’’, meaning Pub. L. 93–319 which, in addition
to enacting this chapter and provision set out as a note
under this section, enacted sections 1857c–10 and
1857f–6f of Title 42, The Public Health and Welfare, and
amended sections 1857b–1, 1857c–5, 1857c–8, 1857c–9,
1857d–1, 1857f–1, 1857f–6e, 1857f–7, 1857h–5, and 1857l of
Title 42. For complete classification of this Act to the
Code, see Tables.
Statutory Notes and Related Subsidiaries
SHORT TITLE
Pub. L. 93–319, § 1(a), June 22, 1974, 88 Stat. 246, pro-
vided that Pub. L. 93–319 [enacting this chapter, enact-
ing sections 1857c–10 and 1857f–6f of Title 42, The Public
Health and Welfare, and amending sections 1857b–1,
1857c–5, 1857c–8, 1857c–9, 1857d–1, 1857f–1, 1857f–6e, 1857f–7,
1857h–5, and 1857l of Title 42] may be cited as the ‘‘En-
ergy Supply and Environmental Coordination Act of
1974’’.
§ 792. Coal conversion and allocation
(a) Powerplant and fuel burni
Source: Supplied 2024 U.S. Code historical extraction · 15 U.S.C. § 791
Stored review status: historical_2024_not_currentness_verified. The source passage cites 15 U.S.C. § 791. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Powerplant and fuel burning installations** The Federal Energy Administrator—
(1) shall, by order, prohibit any powerplant, and
(2) may, by order, prohibit any major fuel burning installation, other than a powerplant,
from burning natural gas or petroleum products as its primary energy source, if the requirements of subsection (b) are met and if (A) the Federal Energy Administrator determines such powerplant or installation on June 22, 1974, had, or thereafter acquires or is designed with, the capability and necessary plant equipment to burn coal, or (B) such powerplant or installation is required to meet a design or construction requirement under subsection (c).
**(b) Prerequisites to issuance or effectiveness of orders prohibiting use of natural gas or petroleum products as primary energy source** The requirements referred to in subsection (a) are as follows:
(1) An order under subsection (a) may not be issued with respect to a powerplant or installation unless the Federal Energy Administrator finds (A) that the burning of coal by such plant or installation, in lieu of petroleum products or natural gas, is practicable and consistent with the purposes of this chapter, (B) that coal and coal transportation facilities will be available during the period the order is in effect, and (C) in the case of a powerplant, that the prohibition under subsection (a) will not impair the reliability of service in the area served by such plant. Such an order shall be rescinded or modified to the extent the Federal Energy Administrator determines that any requirement described in subparagraph (A), (B), or (C) of this paragraph is no longer met; and such an order may at any time be modified if the Federal Energy Administrator determines that such order, as modified, complies wi
Source: Supplied U.S. Code snapshot — release unconfirmed · 15 U.S.C. § 792
Stored review status: release_metadata_unconfirmed. The source passage cites 15 U.S.C. § 792. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 1252
TITLE 15—COMMERCE AND TRADE
§ 791
1 See References in Text note below.
Sec.
793.
Protection of public health and environment.
794.
Energy conservation study.
795.
Report to Congress by January 31, 1975.
796.
Reporting of energy information.
797.
Enforcement.
798.
Definitions.
§ 791. Congressional declaration of purpose
The purposes of this chapter are (1) to provide
for a means to assist in meeting the essential
needs of the United States for fuels, in a manner
which is consistent, to the fullest extent prac-
ticable, with existing national commitments to
protect and improve the environment, and (2) to
provide requirements for reports respecting en-
ergy resources.
(Pub. L. 93–319, § 1(b), June 22, 1974, 88 Stat. 246.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in text, was in the original
‘‘this Act’’, meaning Pub. L. 93–319 which, in addition
to enacting this chapter and provision set out as a note
under this section, enacted sections 1857c–10 and
1857f–6f of Title 42, The Public Health and Welfare, and
amended sections 1857b–1, 1857c–5, 1857c–8, 1857c–9,
1857d–1, 1857f–1, 1857f–6e, 1857f–7, 1857h–5, and 1857l of
Title 42. For complete classification of this Act to the
Code, see Tables.
Statutory Notes and Related Subsidiaries
SHORT TITLE
Pub. L. 93–319, § 1(a), June 22, 1974, 88 Stat. 246, pro-
vided that Pub. L. 93–319 [enacting this chapter, enact-
ing sections 1857c–10 and 1857f–6f of Title 42, The Public
Health and Welfare, and amending sections 1857b–1,
1857c–5, 1857c–8, 1857c–9, 1857d–1, 1857f–1, 1857f–6e, 1857f–7,
1857h–5, and 1857l of Title 42] may be cited as the ‘‘En-
ergy Supply and Environmental Coordination Act of
1974’’.
§ 792. Coal conversion and allocation
(a) Powerplant and fuel burni
Source: Supplied 2024 U.S. Code historical extraction · 15 U.S.C. § 792
Stored review status: historical_2024_not_currentness_verified. The source passage cites 15 U.S.C. § 792. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Adoption of plan by State; submission to Administrator; content of plan; revision; new sources; indirect source review program; supplemental or intermittent control systems**
(1) Each State shall, after reasonable notice and public hearings, adopt and submit to the Administrator, within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national primary ambient air quality standard (or any revision thereof) under [section 7409 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7409&num=0&edition=prelim) for any air pollutant, a plan which provides for implementation, maintenance, and enforcement of such primary standard in each air quality control region (or portion thereof) within such State. In addition, such State shall adopt and submit to the Administrator (either as a part of a plan submitted under the preceding sentence or separately) within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national ambient air quality secondary standard (or revision thereof), a plan which provides for implementation, maintenance, and enforcement of such secondary standard in each air quality control region (or portion thereof) within such State. Unless a separate public hearing is provided, each State shall consider its plan implementing such secondary standard at the hearing required by the first sentence of this paragraph.
(2) Each implementation plan submitted by a State under this chapter shall be adopted by the State after reasonable notice and public hearing. Each such plan shall—
(A) include enforceable emission limitations and other control measures, means, or techniques (including economic incentives such as fees, marketable permit
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7410
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.