Browse Arkansas Code titles and sections
33 U.S.C. § 2231 — Study of water resources development
Federal law — U.S. Code and appendices · legal_authorities
Page 717
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2231
interest has entered into a memorandum of un-
derstanding with the Federal agency that in-
cludes such terms and conditions as the Sec-
retary determines to be necessary.
(c) Applicability
Nothing in this section alters any non-Federal
cost-sharing requirements for the project.
(Pub. L. 113–121, title I, § 1025, June 10, 2014, 128
Stat. 1229.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Reform and Development Act of 2014, and not as part of
the Water Resources Development Act of 1986 which
comprises this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 113–121, set out as a note under section
2201 of this title.
§ 2227. Clarification of impacts to other Federal
facilities
In any case where the modification or con-
struction of a water resources development
project carried out by the Secretary adversely
impacts other Federal facilities, the Secretary
may accept from other Federal agencies such
funds as may be necessary to address the ad-
verse impact, including by removing, relocating,
or reconstructing those facilities.
(Pub. L. 113–121, title I, § 1026, June 10, 2014, 128
Stat. 1229.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Reform and Development Act of 2014, and not as part of
the Water Resources Development Act of 1986 which
comprises this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 113–121, set out as a note under section
2201 of this title.
SUBCHAPTER II—HARBOR DEVELOPMENT
§ 2231. Study of water resources developmen
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2231
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 5b8274dbe7899aea12f0016fd26fc8ce8c9a919dd9be7b49668de73b7413d51d. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-44df086596ad083c2f926b84
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2231-study-of-water-resources-development--2a9b9c0726.md
Pages: Not recorded – Not recorded
Passage SHA-256: f9275449f589d24352191af7d635c8ff4669ce06457fce722181b51fb1841af5
Source location: USCODE-2024-title33-chap36-subchapII-sec2231.pdf
Stored source content
Page 717
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2231
interest has entered into a memorandum of un-
derstanding with the Federal agency that in-
cludes such terms and conditions as the Sec-
retary determines to be necessary.
(c) Applicability
Nothing in this section alters any non-Federal
cost-sharing requirements for the project.
(Pub. L. 113–121, title I, § 1025, June 10, 2014, 128
Stat. 1229.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Reform and Development Act of 2014, and not as part of
the Water Resources Development Act of 1986 which
comprises this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 113–121, set out as a note under section
2201 of this title.
§ 2227. Clarification of impacts to other Federal
facilities
In any case where the modification or con-
struction of a water resources development
project carried out by the Secretary adversely
impacts other Federal facilities, the Secretary
may accept from other Federal agencies such
funds as may be necessary to address the ad-
verse impact, including by removing, relocating,
or reconstructing those facilities.
(Pub. L. 113–121, title I, § 1026, June 10, 2014, 128
Stat. 1229.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Reform and Development Act of 2014, and not as part of
the Water Resources Development Act of 1986 which
comprises this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 113–121, set out as a note under section
2201 of this title.
SUBCHAPTER II—HARBOR DEVELOPMENT
§ 2231. Study of water resources development
projects by non-Federal interests
(a) Submission to Secretary
(1) In general
A non-Federal interest may undertake and
submit to the Secretary—
(A) a federally authorized feasibility study
of a proposed water resources development
project; or
(B) upon the determination of the Sec-
retary that the modifications are consistent
with the authorized purposes of the project,
a feasibility study on modifications to a
water resources development project con-
structed by the Corps of Engineers or con-
structed by a non-Federal interest pursuant
to section 2232 of this title.
(2) Guidelines
To assist non-Federal interests, the Sec-
retary shall issue guidelines for the formula-
tion of feasibility studies of water resources
development projects undertaken by non-Fed-
eral interests that—
(A) provide clear, concise, and transparent
guidance for the non-Federal interest to use
in developing a feasibility study that com-
plies with requirements that would apply to
a feasibility study undertaken by the Sec-
retary;
(B) provide sufficient information for the
formulation of the studies, including proc-
esses and procedures related to reviews and
assistance under subsection (e);
(C) provide guidance to a non-Federal in-
terest on obtaining support from the Sec-
retary to complete elements of a feasibility
study that may be considered inherently
governmental and required to be done by a
Federal agency; and
(D) provide contacts for employees of the
Corps of Engineers that a non-Federal inter-
est may use to initiate coordination with
the Secretary and identify at what stages
coordination may be beneficial.
(3) Determination
If a non-Federal interest requests to under-
take a feasibility study on a modification to a
constructed
water
resources
development
project under paragraph (1)(B), the Secretary
shall expeditiously provide to the non-Federal
interest the determination required under
such paragraph with respect to whether con-
ceptual modifications, as presented by the
non-Federal interest, are consistent with the
authorized purposes of the project.
(b) Review by Secretary
(1) In general
The Secretary shall review each feasibility
study received under subsection (a)(1) for the
purpose of determining whether or not the
study, and the process under which the study
was developed, each comply with Federal laws
and regulations applicable to feasibility stud-
ies of water resources development projects.
(2) Timing
The Secretary may not submit to Congress
an assessment of a feasibility study under this
section until such time as the Secretary—
(A) determines that the feasibility study
complies with all of the requirements that
would apply to a feasibility study under-
taken by the Secretary; and
(B) completes all of the Federal analyses,
reviews, and compliance processes under the
National Environmental Policy Act of 1969
(42 U.S.C. 4321 et seq.), that would be re-
quired with respect to the proposed project
if the Secretary had undertaken the feasi-
bility study.
(3) Initiation of review
(A) Request
(i) Submission
The non-Federal interest may submit to
the Secretary a request that the Secretary
Page 718
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2231
initiate the analyses, reviews, and compli-
ance processes described in paragraph
(2)(B) with respect to the proposed project
prior to the non-Federal interest’s submis-
sion of a feasibility study under subsection
(a)(1).
(ii) Effect
Receipt by the Secretary of a request
submitted under clause (i) shall be consid-
ered the receipt of a proposal or applica-
tion that will lead to a major Federal ac-
tion that is subject to the requirements of
section 102(2)(C) of the National Environ-
mental Policy Act of 1969 (42 U.S.C.
4332(2)(C)) that would be required if the
Secretary were to undertake the feasi-
bility study.
(B) Deadline
Not later than 10 days after the Secretary
receives a study submission under sub-
section (a) or receives a request under sub-
paragraph (A), the Secretary shall begin the
required analyses, reviews, and compliance
processes.
(C) Additional information required
The Secretary shall notify a non-Federal
interest if, upon initial review of a submis-
sion received under subsection (a) or a re-
ceipt of a request under subparagraph (A),
the Secretary requires additional informa-
tion to perform the required analyses, re-
views, and compliance processes and include
in such notification a detailed description of
the required information.
(4) Notification
Upon receipt of a study submission under
subsection (a) or receipt of a request under
paragraph (3)(A), the Secretary shall notify
the Committee on Transportation and Infra-
structure of the House of Representatives and
the Committee on Environment and Public
Works of the Senate of the submission or re-
quest and a timeline for completion of the re-
quired analyses, reviews, and compliance proc-
esses and shall notify the non-Federal interest
of such timeline.
(5) Status updates
Not later than 30 days after receiving a
study submission under subsection (a) or a re-
quest under paragraph (3)(A), and every 30
days thereafter until the Secretary submits an
assessment under subsection (c) for the appli-
cable feasibility study, the Secretary shall no-
tify the Committee on Transportation and In-
frastructure of the House of Representatives,
the Committee on Environment and Public
Works of the Senate, and the non-Federal in-
terest of the status of the Secretary’s required
analyses, reviews, and compliance processes.
(c) Submission to Congress
(1) Review and submission of studies to Con-
gress
Not later than 180 days after the completion
of review of a feasibility study under sub-
section (b), the Secretary shall submit to the
Committee on Environment and Public Works
of the Senate and the Committee on Transpor-
tation and Infrastructure of the House of Rep-
resentatives an assessment that describes—
(A) the results of the Secretary’s review of
the study under subsection (b), including a
determination of whether the project is fea-
sible;
(B) any recommendations the Secretary
may have concerning the plan or design of
the project; and
(C) any conditions the Secretary may re-
quire for construction of the project.
(2) Limitation
The completion of the review by the Sec-
retary of a feasibility study that has been sub-
mitted under subsection (a)(1) may not be de-
layed as a result of consideration being given
to changes in policy or priority with respect to
project consideration.
(d) Credit
(1) In general
If a project for which a feasibility study has
been submitted under subsection (a)(1) is au-
thorized by a Federal law enacted after the
date of the submission to Congress under sub-
section (c), the Secretary shall credit toward
the non-Federal share of the cost of construc-
tion of the project or modification to the
project an amount equal to the portion of the
cost of developing the study that would have
been the responsibility of the United States if
the study had been developed by the Sec-
retary.
(2) Maximum amount
Any credit provided to a non-Federal inter-
est under this subsection may not exceed the
Federal share of the cost for a feasibility
study initiated by the Secretary under section
2282c(a) of this title.
(e) Review and technical assistance
(1) Review
The Secretary may accept and expend funds
provided by non-Federal interests to under-
take reviews, inspections, certifications, and
other activities that are the responsibility of
the Secretary in carrying out this section.
(2) Technical assistance
At the request of a non-Federal interest, the
Secretary shall provide to the non-Federal in-
terest technical assistance relating to any as-
pect of a feasibility study if the non-Federal
interest contracts with the Secretary to pay
all costs of providing such technical assist-
ance.
(3) Limitation
Funds provided by non-Federal interests
under this subsection shall not be eligible for
credit under subsection (d) or reimbursement.
(4) Impartial decisionmaking
In carrying out this section, the Secretary
shall ensure that the use of funds accepted
from a non-Federal interest will not affect the
impartial decisionmaking of the Secretary, ei-
ther substantively or procedurally.
(5) Savings provision
The provision of technical assistance by the
Secretary under paragraph (2)—
Page 719
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2231
(A) shall not be considered to be an ap-
proval or endorsement of the feasibility
study; and
(B) shall not affect the responsibilities of
the Secretary under subsections (b) and (c).
(f) Authorization of appropriations
There is authorized to be appropriated to the
Secretary $1,000,000 for each fiscal year to carry
out this section.
(Pub. L. 99–662, title II, § 203, Nov. 17, 1986, 100
Stat. 4098; Pub. L. 113–121, title I, § 1014(a), June
10, 2014, 128 Stat. 1219; Pub. L. 114–322, title I,
§ 1126, Dec. 16, 2016, 130 Stat. 1648; Pub. L. 115–270,
title I, § 1152, Oct. 23, 2018, 132 Stat. 3788; Pub. L.
116–260, div. AA, title I, § 161(a), Dec. 27, 2020, 134
Stat. 2665; Pub. L. 118–272, div. A, title I,
§ 1109(a), Jan. 4, 2025, 138 Stat. 3007.)
Editorial Notes
REFERENCES IN TEXT
The National Environmental Policy Act of 1969, re-
ferred to in subsec. (b)(2)(B), is Pub. L. 91–190, Jan. 1,
1970, 83 Stat. 852, which is classified generally to chap-
ter 55 (§ 4321 et seq.) of Title 42, The Public Health and
Welfare. For complete classification of this Act to the
Code, see Short Title note set out under section 4321 of
Title 42 and Tables.
AMENDMENTS
2025—Subsec.
(a)(1)(A).
Pub.
L.
118–272,
§ 1109(a)(1)(A)(i), substituted ‘‘may undertake and sub-
mit to the Secretary—
‘‘(A) a federally authorized feasibility study of a
proposed water resources development project; or’’
for ‘‘may undertake a federally authorized feasibility
study of a proposed water resources development
project, or,’’.
Subsec. (a)(1)(B). Pub. L. 118–272, § 1109(a)(1)(A)(ii),
(iii), substituted ‘‘(B) upon the determination’’ for
‘‘upon the written approval’’, struck out ‘‘undertake’’
before ‘‘a feasibility’’, and substituted ‘‘or constructed
by a non-Federal interest pursuant to section 2232 of
this title’’ for ‘‘, and submit the study to the Sec-
retary’’.
Subsec. (a)(2). Pub. L. 118–272, § 1109(a)(1)(B)(i), in in-
troductory provisions, struck out ‘‘, as soon as prac-
ticable,’’ after ‘‘Secretary’’ and substituted ‘‘non-Fed-
eral interests that’’ for ‘‘non-Federal interests to’’.
Subsec. (a)(2)(A). Pub. L. 118–272, § 1109(a)(1)(B)(ii),
added subpar. (A) and struck out former subpar. (A)
which read as follows: ‘‘ensure that any feasibility
study with respect to which the Secretary submits an
assessment to Congress under subsection (c) complies
with all of the requirements that would apply to a fea-
sibility study undertaken by the Secretary; and’’.
Subsec.
(a)(2)(C),
(D).
Pub.
L.
118–272,
§ 1109(a)(1)(B)(iii), (iv), added subpars. (C) and (D).
Subsec. (a)(3). Pub. L. 118–272, § 1109(a)(1)(C), added
par. (3).
Subsec. (b)(3)(B). Pub. L. 118–272, § 1109(a)(2)(A)(i), sub-
stituted ‘‘receives a study submission under subsection
(a) or receives a request under subparagraph (A)’’ for
‘‘receives a request under this paragraph’’.
Subsec. (b)(3)(C). Pub. L. 118–272, § 1109(a)(2)(A)(ii),
added subpar. (C).
Subsec. (b)(4). Pub. L. 118–272, § 1109(a)(2)(B), added
par. (4) and struck out former par. (4). Prior to amend-
ment, text read as follows: ‘‘Upon receipt of a request
under paragraph (3), the Secretary shall notify the
Committee on Transportation and Infrastructure of the
House of Representatives and the Committee on Envi-
ronment and Public Works of the Senate of the request
and a timeline for completion of the required analyses,
reviews, and compliance processes.’’
Subsec. (b)(5). Pub. L. 118–272, § 1109(a)(2)(C), sub-
stituted ‘‘receiving a study submission under sub-
section (a) or a request under paragraph (3)(A)’’ for ‘‘re-
ceiving a request under paragraph (3)’’.
Subsec. (d). Pub. L. 118–272, § 1109(a)(3), designated ex-
isting provisions as par. (1), inserted heading, sub-
stituted ‘‘of the project or modification to the project’’
for ‘‘of the project’’, and added par. (2).
Subsec. (f). Pub. L. 118–272, § 1109(a)(4), added subsec.
(f).
2020—Subsec. (a)(1). Pub. L. 116–260, § 161(a)(1)(A), in-
serted ‘‘, or, upon the written approval of the Sec-
retary that the modifications are consistent with the
authorized purposes of the project, undertake a feasi-
bility study on modifications to a water resources de-
velopment project constructed by the Corps of Engi-
neers,’’ after ‘‘water resources development project’’.
Subsec. (a)(2). Pub. L. 116–260, § 161(a)(1)(B), sub-
stituted ‘‘for the formulation of feasibility studies of
water resources development projects undertaken by
non-Federal interests to—’’ for ‘‘for feasibility studies
of water resources development projects to provide suf-
ficient information for the formulation of the studies.’’
and added subpars. (A) and (B).
Subsec. (b). Pub. L. 116–260, § 161(a)(2), designated ex-
isting provisions as par. (1), inserted heading, and
added pars. (2) to (5).
Subsec. (c)(1). Pub. L. 116–260, § 161(a)(3), in introduc-
tory provisions, substituted ‘‘after the completion of
review of a feasibility study under subsection (b)’’ for
‘‘after the date of receipt of a feasibility study of a
project under subsection (a)(1)’’ and ‘‘an assessment’’
for ‘‘a report’’.
2018—Subsec. (a)(1). Pub. L. 115–270, § 1152(1), inserted
‘‘federally authorized’’ before ‘‘feasibility study’’.
Subsec. (c). Pub. L. 115–270, § 1152(2), amended subsec.
(c) generally. Prior to amendment, text read as follows:
‘‘Not later than 180 days after the date of receipt of a
feasibility study of a project under subsection (a)(1),
the Secretary shall submit to the Committee on Envi-
ronment and Public Works of the Senate and the Com-
mittee on Transportation and Infrastructure of the
House of Representatives a report that describes—
‘‘(1) the results of the Secretary’s review of the
study under subsection (b), including a determination
of whether the project is feasible;
‘‘(2) any recommendations the Secretary may have
concerning the plan or design of the project; and
‘‘(3) any conditions the Secretary may require for
construction of the project.’’
Subsec. (e). Pub. L. 115–270, § 1152(3), amended subsec.
(e) generally. Prior to amendment, text read as follows
‘‘At the request of a non-Federal interest, the Sec-
retary may provide to the non-Federal interest tech-
nical assistance relating to any aspect of a feasibility
study if the non-Federal interest contracts with the
Secretary to pay all costs of providing such technical
assistance.’’.
2016—Subsec. (e). Pub. L. 114–322 added subsec. (e).
2014—Pub. L. 113–121 amended section generally. Prior
to amendment, section related to studies of projects by
non-Federal interests.
Statutory Notes and Related Subsidiaries
SHORT TITLE
For short title of title II of Pub. L. 99–662, enacting
this subchapter, as the Harbor Development and Navi-
gation Improvement Act of 1986, see section 215 of Pub.
L. 99–662, set out as a note under section 2201 of this
title.
GUIDANCE
Pub. L. 118–272, div. A, title I, § 1109(b), Jan. 4, 2025, 138
Stat. 3009, provided that: ‘‘Not later than 18 months
after the date of enactment of this Act [Jan. 4, 2025],
the Secretary [of the Army] shall update any guidance
as necessary to reflect the amendments made by this
section [amending this section].’’
IMPLEMENTATION
Pub. L. 118–272, div. A, title I, § 1109(c), Jan. 4, 2025, 138
Stat. 3009, provided that: ‘‘Any non-Federal interest
Page 720
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2232
1 See References in Text note below.
that has entered in a written agreement with the Sec-
retary [of the Army] related to carrying out a feasi-
bility study pursuant to section 203 of the Water Re-
sources Development Act of 1986 (33 U.S.C. 2231) before
the date of enactment of this Act [Jan. 4, 2025] may
submit to the Secretary a request to amend such agree-
ment to reflect the amendments made by this section
[amending this section].’’
DEADLINE
Pub. L. 116–260, div. AA, title I, § 161(b), Dec. 27, 2020,
134 Stat. 2667, provided that: ‘‘Not later than 90 days
after the date of enactment of this Act [Dec. 27, 2020],
the Secretary [of the Army] shall issue revised guide-
lines under section 203 of the Water Resources Develop-
ment Act of 1986 (33 U.S.C. 2231) to implement the
amendments made by this section [amending this sec-
tion].’’
HOLD HARMLESS
Pub. L. 116–260, div. AA, title I, § 161(c), Dec. 27, 2020,
134 Stat. 2667, provided that:
‘‘(1) ONE-YEAR
WINDOW.—The amendments made by
this section [amending this section] shall not apply to
any feasibility study submitted to the Secretary [of the
Army] under section 203 of the Water Resources Devel-
opment Act of 1986 (33 U.S.C. 2231) during the one-year
period prior to the date of enactment of this section
[Dec. 27, 2020].
‘‘(2) 2020 PROJECTS.—The amendments made by this
section shall not apply to any project authorized by
section 403 of this Act [section 403 of div. AA of Pub. L.
116–260, 134 Stat. 2743, which is not classified to the
Code].’’
§ 2232. Construction of water resources develop-
ment projects by non-Federal interests
(a) Water resources development project defined
In this section, the term ‘‘water resources de-
velopment
project’’
means
a
project
rec-
ommendation that results from—
(1) a feasibility report, as such term is de-
fined in section 2282d(f) 1 of this title;
(2) a completed feasibility study developed
under section 2231 of this title; or
(3) a final feasibility study for water re-
sources development and conservation and
other purposes that is specifically authorized
by Congress to be carried out by the Sec-
retary.
(b) Authority
(1) In general
A non-Federal interest may carry out a fed-
erally authorized water resources development
project, or separable element thereof—
(A) in accordance with a plan approved by
the Secretary for the project or separable
element; and
(B) subject to any conditions that the Sec-
retary may require, including any condi-
tions specified under section 2231(c)(3) of this
title.
(2) Conditions
Before carrying out a water resources devel-
opment project, or separable element thereof,
under this section, a non-Federal interest
shall—
(A) obtain any permit or approval required
in connection with the project or separable
element under Federal or State law, except
as provided in paragraph (3); and
(B) ensure that a final environmental im-
pact statement or environmental assess-
ment, as appropriate, for the project or sepa-
rable element has been filed.
(3) Permit exception
(A) In general
For a project described in subsection (a)(1)
or subsection (a)(3), or a separable element
thereof, with respect to which a written
agreement described in subparagraph (B) has
been entered into, a non-Federal interest
that carries out a project under this section
shall not be required to obtain any Federal
permits or approvals that would not be re-
quired if the Secretary carried out the
project or separable element unless signifi-
cant new circumstances or information rel-
evant to environmental concerns or compli-
ance have arisen since development of the
project recommendation.
(B) Written agreement
For purposes of this paragraph, a written
agreement shall provide that the non-Fed-
eral interest shall comply with the same
legal and technical requirements that would
apply if the project or separable element
were carried out by the Secretary, including
all mitigation required to offset environ-
mental impacts of the project or separable
element as determined by the Secretary.
(C) Certifications
Notwithstanding subparagraph (A), if a
non-Federal interest carrying out a project
under this section would, in the absence of a
written agreement entered into under this
paragraph, be required to obtain a certifi-
cation from a State under Federal law to
carry out the project, such certification
shall still be required if a written agreement
is entered into with respect to the project
under this paragraph.
(4) Data sharing
(A) In general
If a non-Federal interest for a water re-
sources development project begins to carry
out
that
water
resources
development
project under this section, the non-Federal
interest may request that the Secretary
transfer to the non-Federal interest all rel-
evant data and documentation under the
control of the Secretary with respect to that
water resources development project.
(B) Deadline
Except as provided in subparagraph (C),
the Secretary shall transfer the data and
documentation requested by a non-Federal
interest under subparagraph (A) not later
than the date that is 90 days after the date
on which the non-Federal interest so re-
quests such data and documentation.
(C) Limitation
Nothing in this paragraph obligates the
Secretary to share any data or documenta-
tion that the Secretary considers to be pro-
prietary information.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Requests for credits** With respect to an authorized flood damage reduction project, or separable element thereof, that has been constructed by a non-Federal interest under section 701b–13 11 See References in Text note below. of this title, or an authorized coastal navigation project that has been constructed by the Corps of Engineers pursuant to [section 561 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section561&num=0&edition=prelim) before October 23, 2018, the Secretary may provide to the non-Federal interest, at the request of the non-Federal interest, a credit in an amount equal to the estimated Federal share of the cost of the project or separable element, in lieu of providing to the non-Federal interest a reimbursement in that amount or reimbursement of funds of an equivalent amount, subject to the availability of appropriations.
**(b) Application of credits** At the request of the non-Federal interest, the Secretary may apply all or a portion of such credit to the share of the cost of the non-Federal interest of carrying out other flood damage reduction and coastal navigation projects or studies.
**(c) Application of reimbursement** At the request of the non-Federal interest, the Secretary may apply such funds, subject to the availability of appropriations, equal to the share of the cost of the non-Federal interest of carrying out other flood damage reduction and coastal navigation projects or studies.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2231
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
Section, Pub. L. 114–94, div. D, title XLI, § 41013, Dec. 4, 2015, 129 Stat. 1761, provided that this subchapter shall terminate 7 years after Dec. 4, 2015.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 4321
Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 4321. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 6095
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 4321
Sec.
4368a.
Utilization of talents of older Americans in
projects of pollution prevention, abate-
ment, and control.
4368b.
General assistance program.
4369.
Miscellaneous reports.
4369a.
Reports on environmental research and devel-
opment activities of Agency.
4370.
Reimbursement for use of facilities.
4370a.
Assistant Administrators of Environmental
Protection Agency; appointment; duties.
4370b.
Availability of fees and charges to carry out
Agency programs.
4370c.
Environmental Protection Agency fees.
4370d.
Percentage of Federal funding for organiza-
tions owned by socially and economically
disadvantaged individuals.
4370e.
Working capital fund in Treasury.
4370f.
Availability of funds after expiration of pe-
riod for liquidating obligations.
4370g.
Availability of funds for uniforms and certain
services.
4370h.
Availability of funds for facilities.
4370i.
Regional liaisons for minority, tribal, and
low-income communities.
4370j.
Municipal Ombudsman.
SUBCHAPTER IV—FEDERAL PERMITTING
IMPROVEMENT
4370m.
Definitions.
4370m–1. Federal Permitting Improvement Steering
Council.
4370m–2. Permitting process improvement.
4370m–3. Interstate compacts.
4370m–4. Coordination of required reviews.
4370m–5. Delegated State permitting programs.
4370m–6. Litigation, judicial review, and savings provi-
sion.
4370m–7. Reports.
4370m–8. Funding for governance, oversight, and proc-
essing of environmental reviews and per-
mits.
4370m–9. Application.
4370m–10. GAO report.
4370m–11. Savings provision.
4370m–12. Repealed.
§ 4321. Congressional declaration of purpose
The purposes of this chapter are: To declare a
national policy which will encourage productive
and enjoyable harmony
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 4321
Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 4321. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** The Congress, recognizing the profound impact of man’s activity on the interrelations of all components of the natural environment, particularly the profound influences of population growth, high-density urbanization, industrial expansion, resource exploitation, and new and expanding technological advances and recognizing further the critical importance of restoring and maintaining environmental quality to the overall welfare and development of man, declares that it is the continuing policy of the Federal Government, in cooperation with State and local governments, and other concerned public and private organizations, to use all practicable means and measures, including financial and technical assistance, in a manner calculated to foster and promote the general welfare, to create and maintain conditions under which man and nature can exist in productive harmony, and fulfill the social, economic, and other requirements of present and future generations of Americans.
**(b)** In order to carry out the policy set forth in this chapter, it is the continuing responsibility of the Federal Government to use all practicable means, consistent with other essential considerations of national policy, to improve and coordinate Federal plans, functions, programs, and resources to the end that the Nation may—
(1) fulfill the responsibilities of each generation as trustee of the environment for succeeding generations;
(2) assure for all Americans safe, healthful, productive, and esthetically and culturally pleasing surroundings;
(3) attain the widest range of beneficial uses of the environment without degradation, risk to health or safety, or other undesirable and unintended consequences;
(4) preserve important historic, cultural, and natural aspects of our national heritag
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 4332
Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 4332. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 6139
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 4332
(c) This order is not intended to, and does not, create
any right or benefit, substantive or procedural, enforce-
able at law or in equity by any party against the
United States, its departments, agencies, or entities,
its officers, employees, or agents, or any other person.
J.R. BIDEN, JR.
SUBCHAPTER I—POLICIES AND GOALS
§ 4331. Congressional declaration of national en-
vironmental policy
(a) The Congress, recognizing the profound im-
pact of man’s activity on the interrelations of
all components of the natural environment, par-
ticularly the profound influences of population
growth, high-density urbanization, industrial
expansion, resource exploitation, and new and
expanding technological advances and recog-
nizing further the critical importance of restor-
ing and maintaining environmental quality to
the overall welfare and development of man, de-
clares that it is the continuing policy of the
Federal Government, in cooperation with State
and local governments, and other concerned
public and private organizations, to use all prac-
ticable means and measures, including financial
and technical assistance, in a manner calculated
to foster and promote the general welfare, to
create and maintain conditions under which
man and nature can exist in productive har-
mony, and fulfill the social, economic, and other
requirements of present and future generations
of Americans.
(b) In order to carry out the policy set forth in
this chapter, it is the continuing responsibility
of the Federal Government to use all practicable
means, consistent with other essential consider-
ations of national policy, to improve and coordi-
nate Federal plans, functions, programs, and re-
sources to the end that the Nati
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 4332
Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 4332. This identifies an authority to review, not proof of applicability.