Arkansas Legal Resource Navigator

33 U.S.C. § 2327a — Rehabilitation of Corps of Engineers

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2327a — Rehabilitation of Corps of Engineers

Page 828 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2327a (E)(i) which is initially funded before Octo- ber 1, 1994, and will require at least $5,000,000 in capital outlays; or (ii) which is initially funded on or after such date and will require at least $20,000,000 in capital outlays; and (2) structural modification of a major project component (not exhibiting reliability problems)— (A) which will enhance the operational ef- ficiency of such component or any other major component of the project by increas- ing benefits beyond the original project de- sign; and (B) which will require at least $1,000,000 in capital outlays. Such term does not include routine or deferred maintenance. The dollar amounts referred to in paragraphs (1) and (2) shall be adjusted annually according to the economic assumption published each year as guidance in the Annual Program and Budget Request for Civil Works Activities of the Corps of Engineers. (Pub. L. 102–580, title II, § 205, Oct. 31, 1992, 106 Stat. 4827; Pub. L. 113–121, title II, § 2006(a)(4), June 10, 2014, 128 Stat. 1268.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resources Development Act of 1992, and not as part of the Water Resources Development Act of 1986 which comprises this chapter. AMENDMENTS 2014—Par. (1)(E)(ii). Pub. L. 113–121 substituted ‘‘$20,000,000’’ for ‘‘$8,000,000’’. § 2327a. Rehabilitation of Corps of Engineers constructed pump stations (a) Definitions In this section: (1) Eligible pump station The term ‘‘eligible pump station’’ means a pump station— (A) that is a feature of— (i) a federally authorized flood or coastal storm risk management project; or (ii) an integrated flood risk reduction system that includes a federally author- ized flood or co

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2327a

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 58ecacfb6933d8e24d994d94a076335fdcd39116353992bbf9deb73d0d341b65. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-24d70ca9e5d98562aadc281b
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2327a-rehabilitation-of-corps-of-engineers--8b86f0edff.md
Pages: Not recorded – Not recorded
Passage SHA-256: c5fad8322c639180338ca19514d94fe404beeb635bc588ac0dedbbbc246cec4c

Source location: USCODE-2024-title33-chap36-subchapV-sec2327a.pdf

Stored source content

Page 828 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2327a (E)(i) which is initially funded before Octo- ber 1, 1994, and will require at least $5,000,000 in capital outlays; or (ii) which is initially funded on or after such date and will require at least $20,000,000 in capital outlays; and (2) structural modification of a major project component (not exhibiting reliability problems)— (A) which will enhance the operational ef- ficiency of such component or any other major component of the project by increas- ing benefits beyond the original project de- sign; and (B) which will require at least $1,000,000 in capital outlays. Such term does not include routine or deferred maintenance. The dollar amounts referred to in paragraphs (1) and (2) shall be adjusted annually according to the economic assumption published each year as guidance in the Annual Program and Budget Request for Civil Works Activities of the Corps of Engineers. (Pub. L. 102–580, title II, § 205, Oct. 31, 1992, 106 Stat. 4827; Pub. L. 113–121, title II, § 2006(a)(4), June 10, 2014, 128 Stat. 1268.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resources Development Act of 1992, and not as part of the Water Resources Development Act of 1986 which comprises this chapter. AMENDMENTS 2014—Par. (1)(E)(ii). Pub. L. 113–121 substituted ‘‘$20,000,000’’ for ‘‘$8,000,000’’. § 2327a. Rehabilitation of Corps of Engineers constructed pump stations (a) Definitions In this section: (1) Eligible pump station The term ‘‘eligible pump station’’ means a pump station— (A) that is a feature of— (i) a federally authorized flood or coastal storm risk management project; or (ii) an integrated flood risk reduction system that includes a federally author- ized flood or coastal storm risk manage- ment project; and (B) the failure of which the Secretary has determined would demonstrably impact the function of the federally authorized flood or coastal storm risk management project. (2) Rehabilitation (A) In general The term ‘‘rehabilitation’’, with respect to an eligible pump station, means to address a major deficiency of the eligible pump sta- tion caused by long-term degradation of the foundation, construction materials, or engi- neering systems or components of the eligi- ble pump station. (B) Inclusions The term ‘‘rehabilitation’’, with respect to an eligible pump station, includes— (i) the incorporation into the eligible pump station of— (I) current design standards; (II) efficiency improvements; and (III) associated drainage; and (ii) increasing the capacity of the eligi- ble pump station, subject to the condition that the increase shall— (I) significantly decrease the risk of loss of life and property damage; or (II) decrease total lifecycle rehabilita- tion costs for the eligible pump station. (b) Authorization The Secretary may carry out rehabilitation of an eligible pump station, if the Secretary deter- mines that— (1) the eligible pump station has a major de- ficiency; and (2) the rehabilitation is feasible. (c) Cost sharing The non-Federal interest for the eligible pump station shall— (1) provide 35 percent of the cost of rehabili- tation of an eligible pump station carried out under this section; and (2) provide all land, easements, rights-of- way, and necessary relocations associated with the rehabilitation described in subpara- graph (A), at no cost to the Federal Govern- ment. (d) Agreement required The rehabilitation of an eligible pump station pursuant to this section shall be initiated only after a non-Federal interest has entered into a binding agreement with the Secretary— (1) to pay the non-Federal share of the costs of rehabilitation under subsection (c); and (2) to pay 100 percent of the operation and maintenance costs of the rehabilitated eligible pump station, in accordance with regulations promulgated by the Secretary. (e) Treatment The rehabilitation of an eligible pump station pursuant to this section shall not be considered to be a separable element of the associated flood risk management project constructed by the Corps of Engineers. (f) Authorization of appropriations There is authorized to be appropriated to carry out this section $60,000,000, to remain available until expended. (g) Prioritization To the maximum extent practicable, the Sec- retary shall prioritize the rehabilitation of eligi- ble pump stations under this section that ben- efit economically disadvantaged communities, as defined by the Secretary under section 160 of the Water Resources Development Act of 2020 (33 U.S.C. 2201 note), including economically dis- advantaged communities located in urban and rural areas. (Pub. L. 116–260, div. AA, title I, § 133, Dec. 27, 2020, 134 Stat. 2647; Pub. L. 117–263, div. H, title LXXXI, § 8152, Dec. 23, 2022, 136 Stat. 3733.) Page 829 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2328 Editorial Notes REFERENCES IN TEXT Section 160 of the Water Resources Development Act of 2020, referred to in subsec. (g), is section 160 of div. AA of Pub. L. 116–260, which is set out as a note under section 2201 of this title. CODIFICATION Section was enacted as part of the Water Resources Development Act of 2020, and not as part of the Water Resources Development Act of 1986 which comprises this chapter. AMENDMENTS 2022—Subsec. (a)(1). Pub. L. 117–263, § 8152(1), added par. (1) and struck out former par. (1) which defined eli- gible pump station. Subsec. (b). Pub. L. 117–263, § 8152(2), added subsec. (b) and struck out former subsec. (b). Prior to amendment, text read as follows: ‘‘The Secretary may carry out re- habilitation of an eligible pump station, if the Sec- retary determines that the rehabilitation is feasible.’’ Subsec. (g). Pub. L. 117–263, § 8152(3), added subsec. (g). Statutory Notes and Related Subsidiaries ‘‘SECRETARY’’ DEFINED Secretary means the Secretary of the Army, see sec- tion 2 of div. AA of Pub. L. 116–260, set out as a note under section 2201 of this title. § 2328. Challenge cost-sharing program for man- agement of recreation facilities (a) In general The Secretary is authorized to develop and im- plement a program to share the cost of man- aging recreation facilities and natural resources at water resource development projects under the Secretary’s jurisdiction. (b) Cooperative agreements (1) In general To implement the program under this sec- tion, the Secretary is authorized to enter into cooperative agreements with non-Federal pub- lic entities and private nonprofit entities to provide for operation and management of recreation facilities and natural resources at civil works projects under the Secretary’s ju- risdiction where such facilities and resources are being maintained at complete Federal ex- pense. (2) Requirements Before entering into an agreement under paragraph (1), the Secretary shall ensure that the non-Federal public entity or private non- profit entity has the authority and capa- bility— (A) to carry out the terms of the agree- ment; and (B) to pay damages, if necessary, in the event of a failure to perform. (c) User fees (1) Collection of fees (A) In general The Secretary may allow a non-Federal public entity or private nonprofit entity that has entered into an agreement pursuant to subsection (b) to collect user fees for the use of developed recreation sites and facili- ties, whether developed or constructed by the non-Federal public entity or private nonprofit entity or the Department of the Army. (B) Use of visitor reservation services (i) In general A non-Federal public entity or a private nonprofit entity described in subparagraph (A) may use, to manage fee collections and reservations under this section, any visitor reservation service that the Secretary has provided for by contract or interagency agreement, subject to such terms and con- ditions as the Secretary determines to be appropriate. (ii) Transfer The Secretary may transfer, or cause to be transferred by another Federal agency, to a non-Federal public entity or a private nonprofit entity described in subparagraph (A) user fees received by the Secretary or other Federal agency under a visitor res- ervation service described in clause (i) for recreation facilities and natural resources managed by the non-Federal public entity or private nonprofit entity pursuant to a cooperative agreement entered into under subsection (b). (2) Use of fees (A) In general A non-Federal public entity or private nonprofit entity that collects a user fee under paragraph (1)— (i) may retain up to 100 percent of the fees collected, as determined by the Sec- retary; and (ii) notwithstanding section 460d–3(b)(4) of title 16, shall use any retained amounts for operation, maintenance, and manage- ment activities relating to recreation and natural resources at recreation site at which the fee is collected. (B) Requirements The use by a non-Federal public entity or private nonprofit entity of user fees col- lected under paragraph (1)— (i) shall remain subject to the direction and oversight of the Secretary; and (ii) shall not affect any existing third- party property interest, lease, or agree- ment with the Secretary. (3) Terms and conditions The authority of a non-Federal public entity or private nonprofit entity under this sub- section shall be subject to such terms and con- ditions as the Secretary determines to be nec- essary to protect the interests of the United States. (d) Contributions (1) In general For purposes of carrying out this section the Secretary may accept contributions of funds, materials, and services from non-Federal pub- lic entities, private nonprofit entities, and other private entities. (2) Deposit of funds Any funds received by the Secretary under this subsection shall be deposited into the ac-

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2201 — Prior project authorization

In any case in which a project under the jurisdiction of the Secretary is budgeted under a different business line than the business line under which the project was originally authorized, the Secretary shall ensure that the project is carried out in accordance with any requirements that apply to the business line under which the project was originally authorized.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2201

Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2201. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2201 — ‘‘Secretary’’ defined

Page 688 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2201 Sec. 2326e. Non-Federal interest dredging authority. 2326f. Maintenance dredging data. 2326g. Beneficial use of dredged material; dredged material management plans. 2326h. Five-year regional dredged material manage- ment plans. 2326i. Beneficial use of dredged material. 2326j. Transfer of suitable dredged material. 2327. Definition of rehabilitation for inland water- way projects. 2327a. Rehabilitation of Corps of Engineers con- structed pump stations. 2328. Challenge cost-sharing program for manage- ment of recreation facilities. 2328a. Special use permits. 2329. International outreach program. 2330. Aquatic ecosystem restoration. 2330a. Monitoring ecosystem restoration. 2330b. Fish hatcheries. 2330c. Aquatic ecosystem restoration. 2330d. Public recreational amenities in ecosystem restoration projects. 2331. Use of continuing contracts for construction of certain projects. 2331a. Initiating work on separable elements. 2332. Shoreline and riverine protection and res- toration. 2333. Irrigation diversion protection and fisheries enhancement assistance. 2334. Innovative technologies for watershed res- toration. 2335. Coastal aquatic habitat management. 2336. Abandoned and inactive noncoal mine res- toration. 2337. Property protection program. 2338. Reburial and conveyance authority. 2339. Assistance programs. 2339a. Cooperative agreements with Indian tribes. 2340. Revision of project partnership agreement; cost sharing. 2341. Expedited actions for emergency flood dam- age reduction. 2341a. Prioritization. 2341b. Prioritization of certain projects. 2341c. Criteria for funding environmental infra- structure projects. 2342. Access to water resource

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2201

Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 2201. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2327a — Beneficial use of dredged material

**(a) In general** The Secretary is authorized to carry out projects for the beneficial use of dredged material, including projects for the purposes of— (1) promoting resiliency and reducing the risk to property and infrastructure of flooding and storm damage; (2) promoting public safety; (3) protecting, restoring, and creating aquatic ecosystem habitats; (4) stabilizing stream systems and enhancing shorelines; (5) promoting recreation; (6) supporting risk management adaptation strategies; (7) reducing the costs of dredging and dredged material placement or disposal, such as projects that use dredged material for— (A) construction or fill material; (B) civic improvement objectives; and (C) other innovative uses and placement alternatives that produce public economic or environmental benefits; and (8) recovering lost storage capacity in reservoirs due to sediment accumulation, if the project also has a purpose described in any of paragraphs (1) through (7). **(b) Project selection** In carrying out this section, the Secretary shall— (1) identify and carry out projects for the beneficial use of dredged material; (2) consult with relevant State agencies in selecting projects; and (3) select projects solely on the basis of— (A) the environmental, economic, and social benefits of the projects, including monetary and nonmonetary benefits; and (B) the need for a diversity of project types and geographical project locations. **(c) Regional beneficial use teams** (1) **In general** — The Secretary shall establish regional beneficial use teams to identify and assist in the implementation of projects under this section. (2) **Composition** (A) *Leadership* — For each regional beneficial use team established under paragraph (1), the Secretary shall

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2327a

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.