Browse Arkansas Code titles and sections
33 U.S.C. § 2327a — Rehabilitation of Corps of Engineers
Federal law — U.S. Code and appendices · legal_authorities
Page 828
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2327a
(E)(i) which is initially funded before Octo-
ber 1, 1994, and will require at least $5,000,000
in capital outlays; or
(ii) which is initially funded on or after
such date and will require at least $20,000,000
in capital outlays; and
(2) structural modification of a major
project component (not exhibiting reliability
problems)—
(A) which will enhance the operational ef-
ficiency of such component or any other
major component of the project by increas-
ing benefits beyond the original project de-
sign; and
(B) which will require at least $1,000,000 in
capital outlays.
Such term does not include routine or deferred
maintenance. The dollar amounts referred to in
paragraphs (1) and (2) shall be adjusted annually
according to the economic assumption published
each year as guidance in the Annual Program
and Budget Request for Civil Works Activities of
the Corps of Engineers.
(Pub. L. 102–580, title II, § 205, Oct. 31, 1992, 106
Stat. 4827; Pub. L. 113–121, title II, § 2006(a)(4),
June 10, 2014, 128 Stat. 1268.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 1992, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2014—Par. (1)(E)(ii). Pub. L. 113–121 substituted
‘‘$20,000,000’’ for ‘‘$8,000,000’’.
§ 2327a. Rehabilitation of Corps of Engineers
constructed pump stations
(a) Definitions
In this section:
(1) Eligible pump station
The term ‘‘eligible pump station’’ means a
pump station—
(A) that is a feature of—
(i) a federally authorized flood or coastal
storm risk management project; or
(ii) an integrated flood risk reduction
system that includes a federally author-
ized flood or co
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2327a
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 58ecacfb6933d8e24d994d94a076335fdcd39116353992bbf9deb73d0d341b65. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-24d70ca9e5d98562aadc281b
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2327a-rehabilitation-of-corps-of-engineers--8b86f0edff.md
Pages: Not recorded – Not recorded
Passage SHA-256: c5fad8322c639180338ca19514d94fe404beeb635bc588ac0dedbbbc246cec4c
Source location: USCODE-2024-title33-chap36-subchapV-sec2327a.pdf
Stored source content
Page 828
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2327a
(E)(i) which is initially funded before Octo-
ber 1, 1994, and will require at least $5,000,000
in capital outlays; or
(ii) which is initially funded on or after
such date and will require at least $20,000,000
in capital outlays; and
(2) structural modification of a major
project component (not exhibiting reliability
problems)—
(A) which will enhance the operational ef-
ficiency of such component or any other
major component of the project by increas-
ing benefits beyond the original project de-
sign; and
(B) which will require at least $1,000,000 in
capital outlays.
Such term does not include routine or deferred
maintenance. The dollar amounts referred to in
paragraphs (1) and (2) shall be adjusted annually
according to the economic assumption published
each year as guidance in the Annual Program
and Budget Request for Civil Works Activities of
the Corps of Engineers.
(Pub. L. 102–580, title II, § 205, Oct. 31, 1992, 106
Stat. 4827; Pub. L. 113–121, title II, § 2006(a)(4),
June 10, 2014, 128 Stat. 1268.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 1992, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2014—Par. (1)(E)(ii). Pub. L. 113–121 substituted
‘‘$20,000,000’’ for ‘‘$8,000,000’’.
§ 2327a. Rehabilitation of Corps of Engineers
constructed pump stations
(a) Definitions
In this section:
(1) Eligible pump station
The term ‘‘eligible pump station’’ means a
pump station—
(A) that is a feature of—
(i) a federally authorized flood or coastal
storm risk management project; or
(ii) an integrated flood risk reduction
system that includes a federally author-
ized flood or coastal storm risk manage-
ment project; and
(B) the failure of which the Secretary has
determined would demonstrably impact the
function of the federally authorized flood or
coastal storm risk management project.
(2) Rehabilitation
(A) In general
The term ‘‘rehabilitation’’, with respect to
an eligible pump station, means to address a
major deficiency of the eligible pump sta-
tion caused by long-term degradation of the
foundation, construction materials, or engi-
neering systems or components of the eligi-
ble pump station.
(B) Inclusions
The term ‘‘rehabilitation’’, with respect to
an eligible pump station, includes—
(i) the incorporation into the eligible
pump station of—
(I) current design standards;
(II) efficiency improvements; and
(III) associated drainage; and
(ii) increasing the capacity of the eligi-
ble pump station, subject to the condition
that the increase shall—
(I) significantly decrease the risk of
loss of life and property damage; or
(II) decrease total lifecycle rehabilita-
tion costs for the eligible pump station.
(b) Authorization
The Secretary may carry out rehabilitation of
an eligible pump station, if the Secretary deter-
mines that—
(1) the eligible pump station has a major de-
ficiency; and
(2) the rehabilitation is feasible.
(c) Cost sharing
The non-Federal interest for the eligible pump
station shall—
(1) provide 35 percent of the cost of rehabili-
tation of an eligible pump station carried out
under this section; and
(2) provide all land, easements, rights-of-
way, and necessary relocations associated
with the rehabilitation described in subpara-
graph (A), at no cost to the Federal Govern-
ment.
(d) Agreement required
The rehabilitation of an eligible pump station
pursuant to this section shall be initiated only
after a non-Federal interest has entered into a
binding agreement with the Secretary—
(1) to pay the non-Federal share of the costs
of rehabilitation under subsection (c); and
(2) to pay 100 percent of the operation and
maintenance costs of the rehabilitated eligible
pump station, in accordance with regulations
promulgated by the Secretary.
(e) Treatment
The rehabilitation of an eligible pump station
pursuant to this section shall not be considered
to be a separable element of the associated flood
risk management project constructed by the
Corps of Engineers.
(f) Authorization of appropriations
There is authorized to be appropriated to
carry out this section $60,000,000, to remain
available until expended.
(g) Prioritization
To the maximum extent practicable, the Sec-
retary shall prioritize the rehabilitation of eligi-
ble pump stations under this section that ben-
efit economically disadvantaged communities,
as defined by the Secretary under section 160 of
the Water Resources Development Act of 2020 (33
U.S.C. 2201 note), including economically dis-
advantaged communities located in urban and
rural areas.
(Pub. L. 116–260, div. AA, title I, § 133, Dec. 27,
2020, 134 Stat. 2647; Pub. L. 117–263, div. H, title
LXXXI, § 8152, Dec. 23, 2022, 136 Stat. 3733.)
Page 829
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2328
Editorial Notes
REFERENCES IN TEXT
Section 160 of the Water Resources Development Act
of 2020, referred to in subsec. (g), is section 160 of div.
AA of Pub. L. 116–260, which is set out as a note under
section 2201 of this title.
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2022—Subsec. (a)(1). Pub. L. 117–263, § 8152(1), added
par. (1) and struck out former par. (1) which defined eli-
gible pump station.
Subsec. (b). Pub. L. 117–263, § 8152(2), added subsec. (b)
and struck out former subsec. (b). Prior to amendment,
text read as follows: ‘‘The Secretary may carry out re-
habilitation of an eligible pump station, if the Sec-
retary determines that the rehabilitation is feasible.’’
Subsec. (g). Pub. L. 117–263, § 8152(3), added subsec. (g).
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of div. AA of Pub. L. 116–260, set out as a note
under section 2201 of this title.
§ 2328. Challenge cost-sharing program for man-
agement of recreation facilities
(a) In general
The Secretary is authorized to develop and im-
plement a program to share the cost of man-
aging recreation facilities and natural resources
at water resource development projects under
the Secretary’s jurisdiction.
(b) Cooperative agreements
(1) In general
To implement the program under this sec-
tion, the Secretary is authorized to enter into
cooperative agreements with non-Federal pub-
lic entities and private nonprofit entities to
provide for operation and management of
recreation facilities and natural resources at
civil works projects under the Secretary’s ju-
risdiction where such facilities and resources
are being maintained at complete Federal ex-
pense.
(2) Requirements
Before entering into an agreement under
paragraph (1), the Secretary shall ensure that
the non-Federal public entity or private non-
profit entity has the authority and capa-
bility—
(A) to carry out the terms of the agree-
ment; and
(B) to pay damages, if necessary, in the
event of a failure to perform.
(c) User fees
(1) Collection of fees
(A) In general
The Secretary may allow a non-Federal
public entity or private nonprofit entity
that has entered into an agreement pursuant
to subsection (b) to collect user fees for the
use of developed recreation sites and facili-
ties, whether developed or constructed by
the non-Federal public entity or private
nonprofit entity or the Department of the
Army.
(B) Use of visitor reservation services
(i) In general
A non-Federal public entity or a private
nonprofit entity described in subparagraph
(A) may use, to manage fee collections and
reservations under this section, any visitor
reservation service that the Secretary has
provided for by contract or interagency
agreement, subject to such terms and con-
ditions as the Secretary determines to be
appropriate.
(ii) Transfer
The Secretary may transfer, or cause to
be transferred by another Federal agency,
to a non-Federal public entity or a private
nonprofit entity described in subparagraph
(A) user fees received by the Secretary or
other Federal agency under a visitor res-
ervation service described in clause (i) for
recreation facilities and natural resources
managed by the non-Federal public entity
or private nonprofit entity pursuant to a
cooperative agreement entered into under
subsection (b).
(2) Use of fees
(A) In general
A non-Federal public entity or private
nonprofit entity that collects a user fee
under paragraph (1)—
(i) may retain up to 100 percent of the
fees collected, as determined by the Sec-
retary; and
(ii) notwithstanding section 460d–3(b)(4)
of title 16, shall use any retained amounts
for operation, maintenance, and manage-
ment activities relating to recreation and
natural resources at recreation site at
which the fee is collected.
(B) Requirements
The use by a non-Federal public entity or
private nonprofit entity of user fees col-
lected under paragraph (1)—
(i) shall remain subject to the direction
and oversight of the Secretary; and
(ii) shall not affect any existing third-
party property interest, lease, or agree-
ment with the Secretary.
(3) Terms and conditions
The authority of a non-Federal public entity
or private nonprofit entity under this sub-
section shall be subject to such terms and con-
ditions as the Secretary determines to be nec-
essary to protect the interests of the United
States.
(d) Contributions
(1) In general
For purposes of carrying out this section the
Secretary may accept contributions of funds,
materials, and services from non-Federal pub-
lic entities, private nonprofit entities, and
other private entities.
(2) Deposit of funds
Any funds received by the Secretary under
this subsection shall be deposited into the ac-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
In any case in which a project under the jurisdiction of the Secretary is budgeted under a different business line than the business line under which the project was originally authorized, the Secretary shall ensure that the project is carried out in accordance with any requirements that apply to the business line under which the project was originally authorized.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2201
Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2201. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 688
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
Sec.
2326e.
Non-Federal interest dredging authority.
2326f.
Maintenance dredging data.
2326g.
Beneficial use of dredged material; dredged
material management plans.
2326h.
Five-year regional dredged material manage-
ment plans.
2326i.
Beneficial use of dredged material.
2326j.
Transfer of suitable dredged material.
2327.
Definition of rehabilitation for inland water-
way projects.
2327a.
Rehabilitation of Corps of Engineers con-
structed pump stations.
2328.
Challenge cost-sharing program for manage-
ment of recreation facilities.
2328a.
Special use permits.
2329.
International outreach program.
2330.
Aquatic ecosystem restoration.
2330a.
Monitoring ecosystem restoration.
2330b.
Fish hatcheries.
2330c.
Aquatic ecosystem restoration.
2330d.
Public recreational amenities in ecosystem
restoration projects.
2331.
Use of continuing contracts for construction
of certain projects.
2331a.
Initiating work on separable elements.
2332.
Shoreline and riverine protection and res-
toration.
2333.
Irrigation diversion protection and fisheries
enhancement assistance.
2334.
Innovative technologies for watershed res-
toration.
2335.
Coastal aquatic habitat management.
2336.
Abandoned and inactive noncoal mine res-
toration.
2337.
Property protection program.
2338.
Reburial and conveyance authority.
2339.
Assistance programs.
2339a.
Cooperative agreements with Indian tribes.
2340.
Revision of project partnership agreement;
cost sharing.
2341.
Expedited actions for emergency flood dam-
age reduction.
2341a.
Prioritization.
2341b.
Prioritization of certain projects.
2341c.
Criteria for funding environmental infra-
structure projects.
2342.
Access to water resource
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2201
Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 2201. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** The Secretary is authorized to carry out projects for the beneficial use of dredged material, including projects for the purposes of—
(1) promoting resiliency and reducing the risk to property and infrastructure of flooding and storm damage;
(2) promoting public safety;
(3) protecting, restoring, and creating aquatic ecosystem habitats;
(4) stabilizing stream systems and enhancing shorelines;
(5) promoting recreation;
(6) supporting risk management adaptation strategies;
(7) reducing the costs of dredging and dredged material placement or disposal, such as projects that use dredged material for—
(A) construction or fill material;
(B) civic improvement objectives; and
(C) other innovative uses and placement alternatives that produce public economic or environmental benefits; and
(8) recovering lost storage capacity in reservoirs due to sediment accumulation, if the project also has a purpose described in any of paragraphs (1) through (7).
**(b) Project selection** In carrying out this section, the Secretary shall—
(1) identify and carry out projects for the beneficial use of dredged material;
(2) consult with relevant State agencies in selecting projects; and
(3) select projects solely on the basis of—
(A) the environmental, economic, and social benefits of the projects, including monetary and nonmonetary benefits; and
(B) the need for a diversity of project types and geographical project locations.
**(c) Regional beneficial use teams**
(1) **In general** — The Secretary shall establish regional beneficial use teams to identify and assist in the implementation of projects under this section.
(2) **Composition**
(A) *Leadership* — For each regional beneficial use team established under paragraph (1), the Secretary shall
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2327a
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.