Browse Arkansas Code titles and sections
16 U.S.C. § 823e — Promoting hydropower development at
Federal law — U.S. Code and appendices · legal_authorities
Page 1395
TITLE 16—CONSERVATION
§ 823e
(2) Notwithstanding section 811 of this title,
the Secretary of the Interior or the Secretary of
Commerce, as appropriate, shall accept and pre-
scribe, and the Commission shall require, the
proposed alternative referred to in paragraph
(1), if the Secretary of the appropriate depart-
ment determines, based on substantial evidence
provided by the license applicant, any other
party to the proceeding, or otherwise available
to the Secretary, that such alternative—
(A) will be no less protective than the
fishway initially prescribed by the Secretary;
and
(B) will either, as compared to the fishway
initially prescribed by the Secretary—
(i) cost significantly less to implement; or
(ii) result in improved operation of the
project works for electricity production.
(3) In making a determination under para-
graph (2), the Secretary shall consider evidence
provided for the record by any party to a licens-
ing proceeding, or otherwise available to the
Secretary, including any evidence provided by
the Commission, on the implementation costs or
operational impacts for electricity production of
a proposed alternative.
(4) The Secretary concerned shall submit into
the public record of the Commission proceeding
with any prescription under section 811 of this
title or alternative prescription it accepts under
this section, a written statement explaining the
basis for such prescription, and reason for not
accepting any alternative prescription under
this section. The written statement must dem-
onstrate that the Secretary gave equal consider-
ation to the effects of the prescription adopted
and alternatives not accepted on energy supply,
distribution, cost, and use; flood control; navi-
gation; water supply; and air qua
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 823e
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 5b9dd1393b6148e5868316131b8cda5a8c031baa38fd3f91a36666a6a6951979. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-24bd69166519f76018c3987e
Source file: Laws/federal/codes/united-states-code-2024/title-16/section-823e-promoting-hydropower-development-at--799f61a57b.md
Pages: Not recorded – Not recorded
Passage SHA-256: 07ced72bcbdd90fdf138568c1c863d48feb982f282e17fd0303efa7adddc6075
Source location: USCODE-2024-title16-chap12-subchapI-sec823e.pdf
Stored source content
Page 1395
TITLE 16—CONSERVATION
§ 823e
(2) Notwithstanding section 811 of this title,
the Secretary of the Interior or the Secretary of
Commerce, as appropriate, shall accept and pre-
scribe, and the Commission shall require, the
proposed alternative referred to in paragraph
(1), if the Secretary of the appropriate depart-
ment determines, based on substantial evidence
provided by the license applicant, any other
party to the proceeding, or otherwise available
to the Secretary, that such alternative—
(A) will be no less protective than the
fishway initially prescribed by the Secretary;
and
(B) will either, as compared to the fishway
initially prescribed by the Secretary—
(i) cost significantly less to implement; or
(ii) result in improved operation of the
project works for electricity production.
(3) In making a determination under para-
graph (2), the Secretary shall consider evidence
provided for the record by any party to a licens-
ing proceeding, or otherwise available to the
Secretary, including any evidence provided by
the Commission, on the implementation costs or
operational impacts for electricity production of
a proposed alternative.
(4) The Secretary concerned shall submit into
the public record of the Commission proceeding
with any prescription under section 811 of this
title or alternative prescription it accepts under
this section, a written statement explaining the
basis for such prescription, and reason for not
accepting any alternative prescription under
this section. The written statement must dem-
onstrate that the Secretary gave equal consider-
ation to the effects of the prescription adopted
and alternatives not accepted on energy supply,
distribution, cost, and use; flood control; navi-
gation; water supply; and air quality (in addi-
tion to the preservation of other aspects of envi-
ronmental quality); based on such information
as may be available to the Secretary, including
information voluntarily provided in a timely
manner by the applicant and others. The Sec-
retary shall also submit, together with the
aforementioned written statement, all studies,
data, and other factual information available to
the Secretary and relevant to the Secretary’s
decision.
(5) If the Commission finds that the Sec-
retary’s final prescription would be inconsistent
with the purposes of this subchapter, or other
applicable law, the Commission may refer the
dispute to the Commission’s Dispute Resolution
Service. The Dispute Resolution Service shall
consult with the Secretary and the Commission
and issue a non-binding advisory within 90 days.
The Secretary may accept the Dispute Resolu-
tion Service advisory unless the Secretary finds
that the recommendation will not adequately
protect the fish resources. The Secretary shall
submit the advisory and the Secretary’s final
written determination into the record of the
Commission’s proceeding.
(June 10, 1920, ch. 285, pt. I, § 33, as added Pub. L.
109–58, title II, § 241(c), Aug. 8, 2005, 119 Stat. 675.)
§ 823e. Promoting hydropower development at
existing nonpowered dams
(a) Expedited licensing process for non-Federal
hydropower projects at existing nonpowered
dams
(1) In general
As provided in this section, the Commission
may issue and amend licenses, as appropriate,
for any facility the Commission determines is
a qualifying facility.
(2) Rule
Not later than 180 days after October 23, 2018,
the Commission shall issue a rule establishing
an expedited process for issuing and amending
licenses for qualifying facilities under this
section.
(3) Interagency task force
(A) In establishing the expedited process
under this section, the Commission shall
convene an interagency task force, with ap-
propriate Federal and State agencies and In-
dian tribes represented, to coordinate the
regulatory processes associated with the au-
thorizations required to construct and oper-
ate a qualifying facility.
(B) The task force shall develop procedures
that are consistent with subsection (e)(1)(E)
to seek to ensure that, for projects licensed
pursuant to this section, the Commission
and appropriate Federal and State agencies
and Indian tribes shall exercise their au-
thorities in a manner that, to the extent
practicable, will not result in any material
change to the storage, release, or flow oper-
ations of the associated nonpowered dam ex-
isting at the time an applicant files its li-
cense application.
(4) Length of process
The Commission shall seek to ensure that
the expedited process under this section will
result in a final decision on an application for
a license by not later than 2 years after re-
ceipt of a completed application for the li-
cense.
(b) Dam safety
(1) Assessment
Before issuing any license for a qualifying
facility, the Commission shall assess the safe-
ty of existing non-Federal dams and other
non-Federal structures related to the quali-
fying facility (including possible consequences
associated with failure of such structures).
(2) Requirements
In issuing any license for a qualifying facil-
ity at a non-Federal dam, the Commission
shall ensure that the Commission’s dam safety
requirements apply to such qualifying facility,
and the associated qualifying nonpowered
dam, over the term of such license.
(c) Interagency communications
Interagency cooperation in the preparation of
environmental documents under the National
Environmental Policy Act of 1969 (42 U.S.C. 4321
et seq.) with respect to an application for a li-
cense for a qualifying facility under this section,
Page 1396
TITLE 16—CONSERVATION
§ 823f
1 So in original. Probably should be followed by ‘‘of 1969’’.
and interagency communications relating to li-
censing process coordination pursuant to this
section, shall not—
(1) be considered to be ex parte communica-
tions under Commission rules; or
(2) preclude an agency from participating in
a licensing proceeding under this subchapter,
providing that any agency participating as a
party in a licensing proceeding under this sub-
chapter shall, to the extent practicable, dem-
onstrate a separation of staff cooperating with
the Commission under the National Environ-
mental Policy Act 1 (42 U.S.C. 4321 et seq.) and
staff participating in the applicable pro-
ceeding under this subchapter.
(d) Identification of nonpowered dams for hydro-
power development
(1) In general
Not later than 12 months after October 23,
2018, the Commission, with the Secretary of
the Army, the Secretary of the Interior, and
the Secretary of Agriculture, shall jointly de-
velop a list of existing nonpowered Federal
dams that the Commission and the Secretaries
agree have the greatest potential for non-Fed-
eral hydropower development.
(2) Considerations
In developing the list under paragraph (1),
the Commission and the Secretaries may con-
sider the following:
(A) The compatibility of hydropower gen-
eration with existing purposes of the dam.
(B) The proximity of the dam to existing
transmission resources.
(C) The existence of studies to characterize
environmental, cultural, and historic re-
sources relating to the dam.
(D) The effects of hydropower development
on release or flow operations of the dam.
(3) Availability
The Commission shall—
(A) provide the list developed under para-
graph (1) to—
(i) the Committee on Energy and Com-
merce, the Committee on Transportation
and Infrastructure, and the Committee on
Natural Resources, of the House of Rep-
resentatives; and
(ii) the Committee on Environment and
Public Works, and the Committee on En-
ergy and Natural Resources, of the Senate;
and
(B) make such list available to the public.
(e) Definitions
For purposes of this section:
(1) Qualifying criteria
The term ‘‘qualifying criteria’’ means, with
respect to a facility—
(A) as of October 23, 2018, the facility is not
licensed under, or exempted from the license
requirements contained in, this subchapter;
(B) the facility will be associated with a
qualifying nonpowered dam;
(C) the facility will be constructed, oper-
ated, and maintained for the generation of
electric power;
(D) the facility will use for such genera-
tion any withdrawals, diversions, releases,
or flows from the associated qualifying non-
powered dam, including its associated im-
poundment or other infrastructure; and
(E) the operation of the facility will not
result in any material change to the storage,
release, or flow operations of the associated
qualifying nonpowered dam.
(2) Qualifying facility
The term ‘‘qualifying facility’’ means a fa-
cility that is determined under this section to
meet the qualifying criteria.
(3) Qualifying nonpowered dam
The term ‘‘qualifying nonpowered dam’’
means any dam, dike, embankment, or other
barrier—
(A) the construction of which was com-
pleted on or before October 23, 2018;
(B) that is or was operated for the control,
release, or distribution of water for agricul-
tural, municipal, navigational, industrial,
commercial,
environmental,
recreational,
aesthetic, drinking water, or flood control
purposes; and
(C) that, as of October 23, 2018, is not gen-
erating electricity with hydropower gener-
ating works that are licensed under, or ex-
empted from the license requirements con-
tained in, this subchapter.
(f) Savings clause
Nothing in this section affects—
(1) any authority of the Commission to li-
cense a facility at a nonpowered dam under
this subchapter; and
(2) any authority of the Commission to issue
an exemption to a small hydroelectric power
project under the Public Utility Regulatory
Policies Act of 1978.
(June 10, 1920, ch. 285, pt. I, § 34, as added Pub. L.
115–270, title III, § 3003, Oct. 23, 2018, 132 Stat.
3863.)
Editorial Notes
REFERENCES IN TEXT
The National Environmental Policy Act of 1969, re-
ferred to in subsec. (c), is Pub. L. 91–190, Jan. 1, 1970, 83
Stat. 852, which is classified generally to chapter 55
(§ 4321 et seq.) of Title 42, The Public Health and Wel-
fare. For complete classification of this Act to the
Code, see Short Title note set out under section 4321 of
Title 42 and Tables.
The Public Utility Regulatory Policies Act of 1978,
referred to in subsec. (f)(2), is Pub. L. 95–617, Nov. 9,
1978, 92 Stat. 3117. For complete classification of this
Act to the Code, see Short Title note set out under sec-
tion 2601 of this title and Tables.
§ 823f. Closed-loop pumped storage projects
(a) Expedited licensing process for closed-loop
pumped storage projects
(1) In general
As provided in this section, the Commission
may issue and amend licenses, as appropriate,
for closed-loop pumped storage projects.
(2) Rule
Not later than 180 days after October 23, 2018,
the Commission shall issue a rule establishing
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Expedited licensing process for non-Federal hydropower projects at existing nonpowered dams**
(1) **In general** — As provided in this section, the Commission may issue and amend licenses, as appropriate, for any facility the Commission determines is a qualifying facility.
(2) **Rule** — Not later than 180 days after October 23, 2018, the Commission shall issue a rule establishing an expedited process for issuing and amending licenses for qualifying facilities under this section.
(3) **Interagency task force**
(A) In establishing the expedited process under this section, the Commission shall convene an interagency task force, with appropriate Federal and State agencies and Indian tribes represented, to coordinate the regulatory processes associated with the authorizations required to construct and operate a qualifying facility.
(B) The task force shall develop procedures that are consistent with subsection (e)(1)(E) to seek to ensure that, for projects licensed pursuant to this section, the Commission and appropriate Federal and State agencies and Indian tribes shall exercise their authorities in a manner that, to the extent practicable, will not result in any material change to the storage, release, or flow operations of the associated nonpowered dam existing at the time an applicant files its license application.
(4) **Length of process** — The Commission shall seek to ensure that the expedited process under this section will result in a final decision on an application for a license by not later than 2 years after receipt of a completed application for the license.
**(b) Dam safety**
(1) **Assessment** — Before issuing any license for a qualifying facility, the Commission shall assess the safety of existing non-Federal dams and other non-Federal str
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 823e
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
Section, Pub. L. 114–94, div. D, title XLI, § 41013, Dec. 4, 2015, 129 Stat. 1761, provided that this subchapter shall terminate 7 years after Dec. 4, 2015.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 4321
Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 4321. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 6095
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 4321
Sec.
4368a.
Utilization of talents of older Americans in
projects of pollution prevention, abate-
ment, and control.
4368b.
General assistance program.
4369.
Miscellaneous reports.
4369a.
Reports on environmental research and devel-
opment activities of Agency.
4370.
Reimbursement for use of facilities.
4370a.
Assistant Administrators of Environmental
Protection Agency; appointment; duties.
4370b.
Availability of fees and charges to carry out
Agency programs.
4370c.
Environmental Protection Agency fees.
4370d.
Percentage of Federal funding for organiza-
tions owned by socially and economically
disadvantaged individuals.
4370e.
Working capital fund in Treasury.
4370f.
Availability of funds after expiration of pe-
riod for liquidating obligations.
4370g.
Availability of funds for uniforms and certain
services.
4370h.
Availability of funds for facilities.
4370i.
Regional liaisons for minority, tribal, and
low-income communities.
4370j.
Municipal Ombudsman.
SUBCHAPTER IV—FEDERAL PERMITTING
IMPROVEMENT
4370m.
Definitions.
4370m–1. Federal Permitting Improvement Steering
Council.
4370m–2. Permitting process improvement.
4370m–3. Interstate compacts.
4370m–4. Coordination of required reviews.
4370m–5. Delegated State permitting programs.
4370m–6. Litigation, judicial review, and savings provi-
sion.
4370m–7. Reports.
4370m–8. Funding for governance, oversight, and proc-
essing of environmental reviews and per-
mits.
4370m–9. Application.
4370m–10. GAO report.
4370m–11. Savings provision.
4370m–12. Repealed.
§ 4321. Congressional declaration of purpose
The purposes of this chapter are: To declare a
national policy which will encourage productive
and enjoyable harmony
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 4321
Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 4321. This identifies an authority to review, not proof of applicability.