16 U.S.C. § 823e — Promoting hydropower development at existing nonpowered dams
Federal law — U.S. Code and appendices · legal_authorities
**(a) Expedited licensing process for non-Federal hydropower projects at existing nonpowered dams**
(1) **In general** — As provided in this section, the Commission may issue and amend licenses, as appropriate, for any facility the Commission determines is a qualifying facility.
(2) **Rule** — Not later than 180 days after October 23, 2018, the Commission shall issue a rule establishing an expedited process for issuing and amending licenses for qualifying facilities under this section.
(3) **Interagency task force**
(A) In establishing the expedited process under this section, the Commission shall convene an interagency task force, with appropriate Federal and State agencies and Indian tribes represented, to coordinate the regulatory processes associated with the authorizations required to construct and operate a qualifying facility.
(B) The task force shall develop procedures that are consistent with subsection (e)(1)(E) to seek to ensure that, for projects licensed pursuant to this section, the Commission and appropriate Federal and State agencies and Indian tribes shall exercise their authorities in a manner that, to the extent practicable, will not result in any material change to the storage, release, or flow operations of the associated nonpowered dam existing at the time an applicant files its license application.
(4) **Length of process** — The Commission shall seek to ensure that the expedited process under this section will result in a final decision on an application for a license by not later than 2 years after receipt of a completed application for the license.
**(b) Dam safety**
(1) **Assessment** — Before issuing any license for a qualifying facility, the Commission shall assess the safety of existing non-Federal dams and other non-Federal str
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 823e
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 37d7f2b973a803aa95e4df8d11f9d58fb73325dd18bc1fcf756928bbdd956c7d. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_f0a2a266461a161f4835ae9e
Source file: Laws/federal/codes/united-states-code/title-16/section-823e-promoting-hydropower-development-at-existing-nonpowered-dams--057f32c3a8.md
Pages: Not recorded – Not recorded
Passage SHA-256: 6aadce28304054d2d7c51914bcee14087ea03d2ea6c88dc0b22290051309edb6
Source location: Title 16, Chapter 12, § 823e; chapter-012-federal-regulation-and-development-of-power.md
Stored source content
**(a) Expedited licensing process for non-Federal hydropower projects at existing nonpowered dams**
(1) **In general** — As provided in this section, the Commission may issue and amend licenses, as appropriate, for any facility the Commission determines is a qualifying facility.
(2) **Rule** — Not later than 180 days after October 23, 2018, the Commission shall issue a rule establishing an expedited process for issuing and amending licenses for qualifying facilities under this section.
(3) **Interagency task force**
(A) In establishing the expedited process under this section, the Commission shall convene an interagency task force, with appropriate Federal and State agencies and Indian tribes represented, to coordinate the regulatory processes associated with the authorizations required to construct and operate a qualifying facility.
(B) The task force shall develop procedures that are consistent with subsection (e)(1)(E) to seek to ensure that, for projects licensed pursuant to this section, the Commission and appropriate Federal and State agencies and Indian tribes shall exercise their authorities in a manner that, to the extent practicable, will not result in any material change to the storage, release, or flow operations of the associated nonpowered dam existing at the time an applicant files its license application.
(4) **Length of process** — The Commission shall seek to ensure that the expedited process under this section will result in a final decision on an application for a license by not later than 2 years after receipt of a completed application for the license.
**(b) Dam safety**
(1) **Assessment** — Before issuing any license for a qualifying facility, the Commission shall assess the safety of existing non-Federal dams and other non-Federal structures related to the qualifying facility (including possible consequences associated with failure of such structures).
(2) **Requirements** — In issuing any license for a qualifying facility at a non-Federal dam, the Commission shall ensure that the Commission’s dam safety requirements apply to such qualifying facility, and the associated qualifying nonpowered dam, over the term of such license.
**(c) Interagency communications** Interagency cooperation in the preparation of environmental documents under the National Environmental Policy Act of 1969 ([42 U.S.C. 4321](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section4321&num=0&edition=prelim) et seq.) with respect to an application for a license for a qualifying facility under this section, and interagency communications relating to licensing process coordination pursuant to this section, shall not—
(1) be considered to be ex parte communications under Commission rules; or
(2) preclude an agency from participating in a licensing proceeding under this subchapter, providing that any agency participating as a party in a licensing proceeding under this subchapter shall, to the extent practicable, demonstrate a separation of staff cooperating with the Commission under the National Environmental Policy Act 11 So in original. Probably should be followed by “of 1969”. ([42 U.S.C. 4321](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section4321&num=0&edition=prelim) et seq.) and staff participating in the applicable proceeding under this subchapter.
**(d) Identification of nonpowered dams for hydropower development**
(1) **In general** — Not later than 12 months after October 23, 2018, the Commission, with the Secretary of the Army, the Secretary of the Interior, and the Secretary of Agriculture, shall jointly develop a list of existing nonpowered Federal dams that the Commission and the Secretaries agree have the greatest potential for non-Federal hydropower development.
(2) **Considerations** — In developing the list under paragraph (1), the Commission and the Secretaries may consider the following:
(A) The compatibility of hydropower generation with existing purposes of the dam.
(B) The proximity of the dam to existing transmission resources.
(C) The existence of studies to characterize environmental, cultural, and historic resources relating to the dam.
(D) The effects of hydropower development on release or flow operations of the dam.
(3) **Availability** — The Commission shall—
(A) provide the list developed under paragraph (1) to—
(i) the Committee on Energy and Commerce, the Committee on Transportation and Infrastructure, and the Committee on Natural Resources, of the House of Representatives; and
(ii) the Committee on Environment and Public Works, and the Committee on Energy and Natural Resources, of the Senate; and
(B) make such list available to the public.
**(e) Definitions** For purposes of this section:
(1) **Qualifying criteria** — The term “qualifying criteria” means, with respect to a facility—
(A) as of October 23, 2018, the facility is not licensed under, or exempted from the license requirements contained in, this subchapter;
(B) the facility will be associated with a qualifying nonpowered dam;
(C) the facility will be constructed, operated, and maintained for the generation of electric power;
(D) the facility will use for such generation any withdrawals, diversions, releases, or flows from the associated qualifying nonpowered dam, including its associated impoundment or other infrastructure; and
(E) the operation of the facility will not result in any material change to the storage, release, or flow operations of the associated qualifying nonpowered dam.
(2) **Qualifying facility** — The term “qualifying facility” means a facility that is determined under this section to meet the qualifying criteria.
(3) **Qualifying nonpowered dam** — The term “qualifying nonpowered dam” means any dam, dike, embankment, or other barrier—
(A) the construction of which was completed on or before October 23, 2018;
(B) that is or was operated for the control, release, or distribution of water for agricultural, municipal, navigational, industrial, commercial, environmental, recreational, aesthetic, drinking water, or flood control purposes; and
(C) that, as of October 23, 2018, is not generating electricity with hydropower generating works that are licensed under, or exempted from the license requirements contained in, this subchapter.
**(f) Savings clause** Nothing in this section affects—
(1) any authority of the Commission to license a facility at a nonpowered dam under this subchapter; and
(2) any authority of the Commission to issue an exemption to a small hydroelectric power project under the Public Utility Regulatory Policies Act of 1978.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Information required to be gathered** Each electric utility shall periodically gather information under such rules (promulgated by the Commission) as the Commission determines necessary to allow determination of the costs associated with providing electric service. For purposes of this section, and for purposes of any consideration and determination respecting the standard established by [section 2621(d)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2621/d/2&num=0&edition=prelim), such costs shall be separated, to the maximum extent practicable, into the following components: customer cost component, demand cost component, and energy cost component. Rules under this subsection shall include requirements for the gathering of the following information with respect to each electric utility—
(1) the costs of serving each electric consumer class, including costs of serving different consumption patterns within such class, based on voltage level, time of use, and other appropriate factors;
(2) daily kilowatt demand load curves for all electric consumer classes combined representative of daily and seasonal differences in demand, and daily kilowatt demand load curves for each electric consumer class for which there is a separate rate, representative of daily and seasonal differences in demand;
(3) annual capital, operating, and maintenance costs—
(A) for transmission and distribution services, and
(B) for each type of generating unit; and
(4) costs of purchased power, including representative daily and seasonal differences in the amount of such costs.
Such rules shall provide that information required to be gathered under this section shall be presented in such categories and such detail as may be necessary to carr
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 2601
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
Section, Pub. L. 114–94, div. D, title XLI, § 41013, Dec. 4, 2015, 129 Stat. 1761, provided that this subchapter shall terminate 7 years after Dec. 4, 2015.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 4321
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 1395
TITLE 16—CONSERVATION
§ 823e
(2) Notwithstanding section 811 of this title,
the Secretary of the Interior or the Secretary of
Commerce, as appropriate, shall accept and pre-
scribe, and the Commission shall require, the
proposed alternative referred to in paragraph
(1), if the Secretary of the appropriate depart-
ment determines, based on substantial evidence
provided by the license applicant, any other
party to the proceeding, or otherwise available
to the Secretary, that such alternative—
(A) will be no less protective than the
fishway initially prescribed by the Secretary;
and
(B) will either, as compared to the fishway
initially prescribed by the Secretary—
(i) cost significantly less to implement; or
(ii) result in improved operation of the
project works for electricity production.
(3) In making a determination under para-
graph (2), the Secretary shall consider evidence
provided for the record by any party to a licens-
ing proceeding, or otherwise available to the
Secretary, including any evidence provided by
the Commission, on the implementation costs or
operational impacts for electricity production of
a proposed alternative.
(4) The Secretary concerned shall submit into
the public record of the Commission proceeding
with any prescription under section 811 of this
title or alternative prescription it accepts under
this section, a written statement explaining the
basis for such prescription, and reason for not
accepting any alternative prescription under
this section. The written statement must dem-
onstrate that the Secretary gave equal consider-
ation to the effects of the prescription adopted
and alternatives not accepted on energy supply,
distribution, cost, and use; flood control; navi-
gation; water supply; and air qua
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 823e
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 6095
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 4321
Sec.
4368a.
Utilization of talents of older Americans in
projects of pollution prevention, abate-
ment, and control.
4368b.
General assistance program.
4369.
Miscellaneous reports.
4369a.
Reports on environmental research and devel-
opment activities of Agency.
4370.
Reimbursement for use of facilities.
4370a.
Assistant Administrators of Environmental
Protection Agency; appointment; duties.
4370b.
Availability of fees and charges to carry out
Agency programs.
4370c.
Environmental Protection Agency fees.
4370d.
Percentage of Federal funding for organiza-
tions owned by socially and economically
disadvantaged individuals.
4370e.
Working capital fund in Treasury.
4370f.
Availability of funds after expiration of pe-
riod for liquidating obligations.
4370g.
Availability of funds for uniforms and certain
services.
4370h.
Availability of funds for facilities.
4370i.
Regional liaisons for minority, tribal, and
low-income communities.
4370j.
Municipal Ombudsman.
SUBCHAPTER IV—FEDERAL PERMITTING
IMPROVEMENT
4370m.
Definitions.
4370m–1. Federal Permitting Improvement Steering
Council.
4370m–2. Permitting process improvement.
4370m–3. Interstate compacts.
4370m–4. Coordination of required reviews.
4370m–5. Delegated State permitting programs.
4370m–6. Litigation, judicial review, and savings provi-
sion.
4370m–7. Reports.
4370m–8. Funding for governance, oversight, and proc-
essing of environmental reviews and per-
mits.
4370m–9. Application.
4370m–10. GAO report.
4370m–11. Savings provision.
4370m–12. Repealed.
§ 4321. Congressional declaration of purpose
The purposes of this chapter are: To declare a
national policy which will encourage productive
and enjoyable harmony
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 4321
Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 4321. This identifies an authority to review, not proof of applicability.