Browse Arkansas Code titles and sections
43 U.S.C. § 1511a — Cooperation and participation by Sec-
Federal law — U.S. Code and appendices · legal_authorities
Page 399
TITLE 43—PUBLIC LANDS
§ 1511a
‘‘(a) IN GENERAL.—Except as provided in subsection
(b), if the Secretary [of the Interior] does not publish a
statement of findings under section 207(c) [118 Stat.
3519] by December 31, 2007 [published Dec. 14, 2007, see
72 F.R. 71143]—
‘‘(1) this title [see Short Title of 2004 Amendment
note below] is repealed effective January 1, 2008, and
any action taken by the Secretary and any contract
entered under any provision of this title shall be void;
and
‘‘(2) any amounts appropriated under section 110
[118 Stat. 3498] that remain unexpended shall imme-
diately revert to the general fund of the Treasury.
‘‘(b) EXCEPTION.—No subcontract amendment exe-
cuted by the Secretary under the notice of June 18, 2003
(67 Fed. Reg. 36578), shall be considered to be a contract
entered into by the Secretary for purposes of sub-
section (a)(1).’’
Pub. L. 108–451, title II, § 215, Dec. 10, 2004, 118 Stat.
3535, provided that: ‘‘If the Secretary [of the Interior]
does not publish a statement of findings under section
207(c) [118 Stat. 3519] by December 31, 2007 [published
Dec. 14, 2007, see 72 F.R. 71143]—
‘‘(1) except for section 213(i) [118 Stat. 3532], this
title [see Short Title of 2004 Amendment note below]
is repealed effective January 1, 2008, and any action
taken by the Secretary and any contract entered
under any provision of this title shall be void;
‘‘(2) any amounts appropriated under paragraphs (1)
through (7) of section 214(a) [118 Stat. 3534, 3535], to-
gether with any interest on those amounts, shall im-
mediately revert to the general fund of the Treasury;
‘‘(3) any amounts made available under section
214(b) [118 Stat. 3535] that remain unexpended shall
immediately revert to the general fund of the Treas-
u
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1511a
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 86aea02eeb4eb844283a7591033ab9e0dce5ecc47a4b35f1906d474dcfd46789. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-0b53a77eb6922243c2f88b5f
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-1511a-cooperation-and-participation-by-sec--044f91b0c7.md
Pages: Not recorded – Not recorded
Passage SHA-256: ca71f89e752d62b40355cfaec21d152ab6c9867375bd35b44b8467331023e0ca
Source location: USCODE-2024-title43-chap32-subchapII-sec1511a.pdf
Stored source content
Page 399
TITLE 43—PUBLIC LANDS
§ 1511a
‘‘(a) IN GENERAL.—Except as provided in subsection
(b), if the Secretary [of the Interior] does not publish a
statement of findings under section 207(c) [118 Stat.
3519] by December 31, 2007 [published Dec. 14, 2007, see
72 F.R. 71143]—
‘‘(1) this title [see Short Title of 2004 Amendment
note below] is repealed effective January 1, 2008, and
any action taken by the Secretary and any contract
entered under any provision of this title shall be void;
and
‘‘(2) any amounts appropriated under section 110
[118 Stat. 3498] that remain unexpended shall imme-
diately revert to the general fund of the Treasury.
‘‘(b) EXCEPTION.—No subcontract amendment exe-
cuted by the Secretary under the notice of June 18, 2003
(67 Fed. Reg. 36578), shall be considered to be a contract
entered into by the Secretary for purposes of sub-
section (a)(1).’’
Pub. L. 108–451, title II, § 215, Dec. 10, 2004, 118 Stat.
3535, provided that: ‘‘If the Secretary [of the Interior]
does not publish a statement of findings under section
207(c) [118 Stat. 3519] by December 31, 2007 [published
Dec. 14, 2007, see 72 F.R. 71143]—
‘‘(1) except for section 213(i) [118 Stat. 3532], this
title [see Short Title of 2004 Amendment note below]
is repealed effective January 1, 2008, and any action
taken by the Secretary and any contract entered
under any provision of this title shall be void;
‘‘(2) any amounts appropriated under paragraphs (1)
through (7) of section 214(a) [118 Stat. 3534, 3535], to-
gether with any interest on those amounts, shall im-
mediately revert to the general fund of the Treasury;
‘‘(3) any amounts made available under section
214(b) [118 Stat. 3535] that remain unexpended shall
immediately revert to the general fund of the Treas-
ury; and
‘‘(4) any amounts paid by the Salt River Project in
accordance with the Gila River agreement shall im-
mediately be returned to the Salt River Project.’’
SHORT TITLE OF 2004 AMENDMENT
Pub. L. 108–451, § 1(a), Dec. 10, 2004, 118 Stat. 3478, pro-
vided that: ‘‘This Act [amending sections 1524 and 1543
of this title and enacting and repealing provisions set
out as notes under this section and section 1543 of this
title] may be cited as the ‘Arizona Water Settlements
Act’.’’
Pub. L. 108–451, title I, § 101, Dec. 10, 2004, 118 Stat.
3486, provided that: ‘‘This title [amending section 1543
of this title and enacting and repealing provisions set
out as notes under this section and section 1543 of this
title] may be cited as the ‘Central Arizona Project Set-
tlement Act of 2004’.’’
Pub. L. 108–451, title II, § 201, Dec. 10, 2004, 118 Stat.
3499, provided that: ‘‘This title [amending section 1524
of this title and enacting and repealing provisions set
out as notes under this section] may be cited as the
‘Gila River Indian Community Water Rights Settle-
ment Act of 2004’.’’
SHORT TITLE
Pub. L. 90–537, title I, § 101, Sept. 30, 1968, 82 Stat. 885,
provided: ‘‘That this Act [enacting this chapter and
sections 616aa–1, 620a–1, 620a–2, 620c–1, and 620d–1 of this
title, amending sections 616hh, 620, and 620a of this
title, and enacting provisions set out as notes under
sections 620, 620k, and 1501 of this title] may be cited as
the ‘Colorado River Basin Project Act’.’’
SUBCHAPTER II—INVESTIGATIONS AND
PLANNING
§ 1511. Reconnaissance investigations by Sec-
retary of the Interior; reports; 10-year mora-
torium on water importation studies
Pursuant to the authority set out in the Rec-
lamation Act of June 17, 1902, 32 Stat. 388, and
Acts amendatory thereof or supplementary
thereto, and the provisions of the Water Re-
sources Planning Act of July 22, 1965, 79 Stat.
244, as amended [42 U.S.C. 1962 et seq.], with re-
spect to the coordination of studies, investiga-
tions and assessments, the Secretary of the Inte-
rior shall conduct full and complete reconnais-
sance investigations for the purpose of devel-
oping a general plan to meet the future water
needs of the Western United States. Such inves-
tigations shall include the long-range water sup-
ply available and the long-range water require-
ments in each water resource region of the
Western United States. Progress reports in con-
nection with these investigations shall be sub-
mitted to the President, the National Water
Commission (while it is in existence), the Water
Resources Council, and to the Congress every
two years. The first of such reports shall be sub-
mitted on or before June 30, 1971, and a final re-
connaissance report shall be submitted not later
than June 30, 1977: Provided, That for a period of
ten years from November 2, 1978, any Federal of-
ficial shall not undertake reconnaissance stud-
ies of any plan for the importation of water into
the Colorado River Basin from any other natural
river drainage basin lying outside the States of
Arizona, California, Colorado, New Mexico, and
those portions of Nevada, Utah, and Wyoming
which are in the natural drainage basin of the
Colorado River.
(Pub. L. 90–537, title II, § 201, Sept. 30, 1968, 82
Stat. 886; Pub. L. 95–578, § 10, Nov. 2, 1978, 92 Stat.
2472; Pub. L. 96–375, § 10, Oct. 3, 1980, 94 Stat.
1507.)
Editorial Notes
REFERENCES IN TEXT
The Reclamation Act of June 17, 1902, 32 Stat. 388, re-
ferred to in text, is classified generally to chapter 12
(§ 371 et seq.) of this title. For complete classification of
this Act to the Code, see Short Title note set out under
section 371 of this title and Tables.
The Water Resources Planning Act, referred to in
text, is Pub. L. 89–80, July 22, 1965, 79 Stat. 244, as
amended, which is classified generally to chapter 19B
(§ 1962 et seq.) of Title 42, The Public Health and Wel-
fare. For complete classification of this Act to the
Code, see Short Title note set out under section 1962 of
Title 42 and Tables.
AMENDMENTS
1980—Pub. L. 96–375 substituted ‘‘any Federal offi-
cial’’ for ‘‘the Secretary’’ in proviso.
1978—Pub. L. 95–578 substituted ‘‘November 2, 1978’’
for ‘‘September 30, 1968’’.
Statutory Notes and Related Subsidiaries
TERMINATION OF NATIONAL WATER COMMISSION
National Water Commission, established by Pub. L.
90–515, Sept. 26, 1968, 82 Stat. 868, terminated Sept. 26,
1973.
§ 1511a. Cooperation and participation by Sec-
retary of the Army with Federal, State, and
local agencies
The Secretary of the Army, acting through
the Chief of Engineers, is authorized to cooper-
ate and participate with concerned Federal,
State, and local agencies in preparing the gen-
eral plan for the development of the water re-
Page 400
TITLE 43—PUBLIC LANDS
§ 1512
sources of the western United States authorized
by the Colorado River Basin Project Act [43
U.S.C. 1501 et seq.].
(Pub. L. 91–611, title II, § 203, Dec. 31, 1970, 84
Stat. 1828.)
Editorial Notes
REFERENCES IN TEXT
The Colorado River Basin Project Act, referred to in
text, is Pub. L. 90–537, Sept. 30, 1968, 82 Stat. 885, which
is classified principally to this chapter. For complete
classification of this Act to the Code, see Short Title
note set out under section 1501 of this title and Tables.
CODIFICATION
Section was not enacted as part of the Colorado River
Basin Project Act which comprises this chapter.
§ 1512. Mexican Water Treaty
The Congress declares that the satisfaction of
the requirements of the Mexican Water Treaty
from the Colorado River constitutes a national
obligation which shall be the first obligation of
any water augmentation project planned pursu-
ant to section 1511 of this title and authorized
by the Congress. Accordingly, the States of the
Upper Division (Colorado, New Mexico, Utah,
and Wyoming) and the States of the Lower Divi-
sion (Arizona, California, and Nevada) shall be
relieved from all obligations which may have
been imposed upon them by article III(c) of the
Colorado River Compact so long as the Sec-
retary shall determine and proclaim that means
are available and in operation which augment
the water supply of the Colorado River system
in such quantity as to satisfy the requirements
of the Mexican Water Treaty together with any
losses of water associated with the performance
of that treaty: Provided, That the satisfaction of
the requirements of the Mexican Water Treaty
(Treaty Series 994, 59 Stat. 1219), shall be from
the waters of the Colorado River pursuant to the
treaties, laws, and compacts presently relating
thereto, until such time as a feasibility plan
showing the most economical means of aug-
menting the water supply available in the Colo-
rado River below Lee Ferry by two and one-half
million acre-feet shall be authorized by the Con-
gress and is in operation as provided in this
chapter.
(Pub. L. 90–537, title II, § 202, Sept. 30, 1968, 82
Stat. 887.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in text, was in the original
‘‘this Act’’, meaning Pub. L. 90–537, Sept. 30, 1968, 82
Stat. 885, known as the Colorado River Basin Project
Act, which enacted this chapter and sections 616aa–1,
620a–1, 620a–2, 620c–1, and 620d–1 of this title, amended
sections 616hh, 620, and 620a of this title, and enacted
provisions set out as notes under sections 620, 620k, and
1501 of this title. For complete classification of this Act
to the Code, see Short Title note set out under section
1501 of this title and Tables.
§ 1513. Importation of water; protection of ex-
porting areas
(a) In the event that the Secretary shall, pur-
suant to section 1511 of this title, plan works to
import water into the Colorado River system
from sources outside the natural drainage areas
of the system, he shall make provision for ade-
quate and equitable protection of the interests
of the States and areas of origin, including as-
sistance from funds specified in this chapter, to
the end that water supplies may be available for
use in such States and areas of origin adequate
to satisfy their ultimate requirements at prices
to users not adversely affected by the expor-
tation of water to the Colorado River system.
(b) All requirements, present or future, for
water within any State lying wholly or in part
within the drainage area of any river basin from
which water is exported by works planned pursu-
ant to this chapter shall have a priority of right
in perpetuity to the use of the waters of that
river basin, for all purposes, as against the uses
of the water delivered by means of such expor-
tation works, unless otherwise provided by
interstate agreement.
(Pub. L. 90–537, title II, § 203, Sept. 30, 1968, 82
Stat. 887.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in text, was in the original
‘‘this Act’’, meaning Pub. L. 90–537, Sept. 30, 1968, 82
Stat. 885, known as the Colorado River Basin Project
Act, which enacted this chapter and sections 616aa–1,
620a–1, 620a–2, 620c–1, and 620d–1 of this title, amended
sections 616hh, 620, and 620a of this title, and enacted
provisions set out as notes under sections 620, 620k, and
1501 of this title. For complete classification of this Act
to the Code, see Short Title note set out below and Ta-
bles.
§ 1514. Authorization of appropriations
There are authorized to be appropriated such
sums as are required to carry out the purposes
of this subchapter.
(Pub. L. 90–537, title II, § 204, Sept. 30, 1968, 82
Stat. 887.)
SUBCHAPTER III—AUTHORIZED UNITS;
PROTECTION OF EXISTING USES
§ 1521. Central Arizona Project
(a) Construction and operation; Hayden-Rhodes
Aqueduct and pumping plants; Orme Dam
and Reservoir; Buttes Dam and Reservoir;
Hooker Dam and Reservoir; Charleston Dam
and Reservoir; Tucson aqueducts and pump-
ing plants; Fannin-McFarland Aqueduct; re-
lated and appurtenant works
For the purposes of furnishing irrigation water
and municipal water supplies to the water-defi-
cient areas of Arizona and western New Mexico
through direct diversion or exchange of water,
control of floods, conservation and development
of fish and wildlife resources, enhancement of
recreation opportunities, and for other purposes,
the Secretary shall construct, operate, and
maintain the Central Arizona Project, con-
sisting of the following principal works: (1) a
system of main conduits and canals, including a
main canal and pumping plants (Hayden-Rhodes
Aqueduct and pumping plants), for diverting and
carrying water from Lake Havasu to Orme Dam
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
In order to assure an adequate supply of food to the Nation and to promote the economic vitality of the High Plains Region, the Secretary of Commerce (hereinafter referred to in this section as the “Secretary”), acting through the Economic Development Administration, in cooperation with the Secretary of the Army, acting through the Chief of Engineers, and appropriate Federal, State, and local agencies, and the private sector, is authorized and directed to study the depletion of the natural resources of those regions of the States of Colorado, Kansas, New Mexico, Oklahoma, Texas, and Nebraska presently utilizing the declining water resources of the Ogallala acquifer,11 So in original. Probably should be “aquifer,”. and to develop plans to increase water supplies in the area and report thereon to Congress, together with any recommendations for further congressional action. In formulating these plans, the Secretary is directed to consider all past and ongoing studies, plans, and work on depleted water resources in the region, and to examine the feasibility of various alternatives to provide adequate water supplies in the area including, but not limited to, the transfer of water from adjacent areas, such portion to be conducted by the Chief of Engineers to assure the continued economic growth and vitality of the region. The Secretary shall report on the costs of reasonably available options, the benefits of various options, and the costs of inaction. If water transfer is found to be a part of a reasonable solution, the Secretary, as part of his study, shall include a recommended plan for allocating and distributing water in an equitable fashion, taking into account existing water rights and the needs for future growth of all affected areas. An interim report, with recommend
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 1962
Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 1962. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 5184
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 1962
Sec.
1962d–5a.
Reimbursement to States.
1962d–5b.
Written
agreement
requirement
for
water resources projects.
1962d–5c.
Non-Federal public bodies, installment
construction payments.
1962d–5d.
Authorization of Secretary of the Army
to contract with States and political
subdivisions for increased law enforce-
ment services during peak visitation
periods; authorization of appropria-
tions.
1962d–5e.
Wetland areas.
1962d–5f.
Beach nourishment.
1962d–5g.
Hydroelectric power resources.
1962d–6.
Feasibility
studies;
acceleration;
ad-
vancement of costs by non-Federal
sources.
1962d–7.
Delmarva Peninsula hydrologic study;
duties of Secretary of the Interior.
1962d–8.
Reports on Delmarva Peninsula hydro-
logic study.
1962d–9.
Information from Federal agencies for
Delmarva Peninsula study.
1962d–10.
Cooperation with agencies on Delmarva
Peninsula study.
1962d–11.
Authorization of appropriation for Del-
marva Peninsula study.
1962d–11a.
Potomac River water diversion struc-
ture.
1962d–11b.
Dalecarlia Reservoir; delivery of water
to metropolitan Maryland; expenses;
payments; purchase of water from
State or local authorities in Maryland
or Virginia.
1962d–12 to 1962d–14. Repealed.
1962d–14a.
Alaska
hydroelectric
power
develop-
ment.
1962d–15.
Protection of United States from liabil-
ity for damages; exception of damages
due to fault or negligence of United
States.
1962d–16.
Comprehensive plans for development,
utilization, and conservation of water
and related resources.
1962d–17.
Regional or river basin plans and Fed-
eral water and related land resources
projects; preparation, formulation, and
evaluation.
1962d–18.
Study of depletion of natural resources
of
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 1962
Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 1962. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** It is the object of this chapter to provide a program for the further comprehensive development of the water resources of the Colorado River Basin and for the provision of additional and adequate water supplies for use in the upper as well as in the lower Colorado River Basin. This program is declared to be for the purposes, among others, of regulating the flow of the Colorado River; controlling floods; improving navigation; providing for the storage and delivery of the waters of the Colorado River for reclamation of lands, including supplemental water supplies, and for municipal, industrial, and other beneficial purposes; improving water quality; providing for basic public outdoor recreation facilities; improving conditions for fish and wildlife, and the generation and sale of electrical power as an incident of the foregoing purposes.
**(b)** It is the policy of the Congress that the Secretary of the Interior (hereinafter referred to the “Secretary”) shall continue to develop, after consultation with affected States and appropriate Federal agencies, a regional water plan, consistent with the provisions of this chapter and with future authorizations, to serve as the framework under which projects in the Colorado River Basin may be coordinated and constructed with proper timing to the end that an adequate supply of water may be made available for such projects, whether heretofore, herein, or hereafter authorized.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1501
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 1501. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 398
TITLE 43—PUBLIC LANDS
§ 1501
documents, handbooks, standard operating pro-
cedures, and statements of policy specific to the
scoping, contracting, and review of appraisals
performed for the Department by Federal or
non-Federal covered appraisers, shall be made
publicly available online and provided upon re-
quest.
(f) Definitions
In this section:
(1) Covered appraiser
The term ‘‘covered appraiser’’ means a
State-licensed or -certified real property ap-
praiser.
(2) Department
The term ‘‘Department’’ means the Depart-
ment of the Interior.
(3) Reporting period
The term ‘‘reporting period’’ means the 1-
year period before the date on which a report
is submitted under subsection (c).
(4) Secretary
The term ‘‘Secretary’’ means the Secretary
of the Interior.
(5) State
The term ‘‘State’’ means each of the several
States, the District of Columbia, and each ter-
ritory and possession of the United States.
(Pub. L. 118–230, § 2, Jan. 4, 2025, 138 Stat. 2826.)
CHAPTER 32—COLORADO RIVER BASIN
PROJECT
SUBCHAPTER I—OBJECTIVES
Sec.
1501.
Congressional declaration of purpose and pol-
icy.
SUBCHAPTER II—INVESTIGATIONS AND
PLANNING
1511.
Reconnaissance investigations by Secretary
of the Interior; reports; 10-year moratorium
on water importation studies.
1511a.
Cooperation and participation by Secretary
of the Army with Federal, State, and local
agencies.
1512.
Mexican Water Treaty.
1513.
Importation of water; protection of exporting
areas.
1514.
Authorization of appropriations.
SUBCHAPTER III—AUTHORIZED UNITS;
PROTECTION OF EXISTING USES
1521.
Central Arizona Project.
1522.
Orme Dam and Reservoir.
1523.
Power
requirements
of
Central
Arizona
Project and augmentation of Lower Colo-
rado River Basin Development Fund.
1524.
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1501
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 1501. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
The Secretary of the Army, acting through the Chief of Engineers, is authorized to cooperate and participate with concerned Federal, State, and local agencies in preparing the general plan for the development of the water resources of the western United States authorized by the Colorado River Basin Project Act [[43 U.S.C. 1501](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1501&num=0&edition=prelim) et seq.].
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1511a
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.