Arkansas Legal Resource Navigator

42 U.S.C. § 1962 — Study of depletion of natural resources of regions of Colorado, Kansas, New Mexico, Oklahoma, Texas, and Nebraska utilizing Ogallala aquifer; plans; reports to Congress; authorization of appropriation

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 1962 — Study of depletion of natural resources of regions of Colorado, Kansas, New Mexico, Oklahoma, Texas, and Nebraska utilizing Ogallala aquifer; plans; reports to Congress; authorization of appropriation

In order to assure an adequate supply of food to the Nation and to promote the economic vitality of the High Plains Region, the Secretary of Commerce (hereinafter referred to in this section as the “Secretary”), acting through the Economic Development Administration, in cooperation with the Secretary of the Army, acting through the Chief of Engineers, and appropriate Federal, State, and local agencies, and the private sector, is authorized and directed to study the depletion of the natural resources of those regions of the States of Colorado, Kansas, New Mexico, Oklahoma, Texas, and Nebraska presently utilizing the declining water resources of the Ogallala acquifer,11 So in original. Probably should be “aquifer,”. and to develop plans to increase water supplies in the area and report thereon to Congress, together with any recommendations for further congressional action. In formulating these plans, the Secretary is directed to consider all past and ongoing studies, plans, and work on depleted water resources in the region, and to examine the feasibility of various alternatives to provide adequate water supplies in the area including, but not limited to, the transfer of water from adjacent areas, such portion to be conducted by the Chief of Engineers to assure the continued economic growth and vitality of the region. The Secretary shall report on the costs of reasonably available options, the benefits of various options, and the costs of inaction. If water transfer is found to be a part of a reasonable solution, the Secretary, as part of his study, shall include a recommended plan for allocating and distributing water in an equitable fashion, taking into account existing water rights and the needs for future growth of all affected areas. An interim report, with recommend

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 1962

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 18fe801656d2da4efdc625eab480417749aa37ec73abf7618641cdb702ed8af1. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_add62adac9a80ea5e08e1ef2
Source file: Laws/federal/codes/united-states-code/title-42/section-1962-study-of-depletion-of-natural-resources-of-regions-of-colorado-kansas-ne--2b7ed13ce7.md
Pages: Not recorded – Not recorded
Passage SHA-256: f14d412b559e98db59273f2dd9660464afebc68641325ba074cbda3880510bce

Source location: Title 42, Chapter 19B, § 1962; chapter-19b-water-resources-planning.md

Stored source content

In order to assure an adequate supply of food to the Nation and to promote the economic vitality of the High Plains Region, the Secretary of Commerce (hereinafter referred to in this section as the “Secretary”), acting through the Economic Development Administration, in cooperation with the Secretary of the Army, acting through the Chief of Engineers, and appropriate Federal, State, and local agencies, and the private sector, is authorized and directed to study the depletion of the natural resources of those regions of the States of Colorado, Kansas, New Mexico, Oklahoma, Texas, and Nebraska presently utilizing the declining water resources of the Ogallala acquifer,11 So in original. Probably should be “aquifer,”. and to develop plans to increase water supplies in the area and report thereon to Congress, together with any recommendations for further congressional action. In formulating these plans, the Secretary is directed to consider all past and ongoing studies, plans, and work on depleted water resources in the region, and to examine the feasibility of various alternatives to provide adequate water supplies in the area including, but not limited to, the transfer of water from adjacent areas, such portion to be conducted by the Chief of Engineers to assure the continued economic growth and vitality of the region. The Secretary shall report on the costs of reasonably available options, the benefits of various options, and the costs of inaction. If water transfer is found to be a part of a reasonable solution, the Secretary, as part of his study, shall include a recommended plan for allocating and distributing water in an equitable fashion, taking into account existing water rights and the needs for future growth of all affected areas. An interim report, with recommendations, shall be transmitted to the Congress no later than October 1, 1978, and a final report, with recommendations, shall be transmitted to Congress not later than July 1, 1980. A sum of $6,000,000 is authorized to be appropriated for the purposes of carrying out this section.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 1001 — Declaration of policy

Erosion, floodwater, and sediment damages in the watersheds of the rivers and streams of the United States, causing loss of life and damage to property, constitute a menace to the national welfare; and it is the sense of Congress that the Federal Government should cooperate with States and their political subdivisions, soil or water conservation districts, flood prevention or control districts, and other local public agencies for the purpose of preventing such damages, of furthering the conservation, development, utilization, and disposal of water, and the conservation and utilization of land and thereby of preserving, protecting, and improving the Nation’s land and water resources and the quality of the environment.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 1001

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 1275 — Additions to national wild and scenic rivers system

**(a) Reports by Secretaries of the Interior and Agriculture; recommendations to Congress; contents of reports** The Secretary of the Interior or, where national forest lands are involved, the Secretary of Agriculture or, in appropriate cases, the two Secretaries jointly shall study and submit to the President reports on the suitability or nonsuitability for addition to the national wild and scenic rivers system of rivers which are designated herein or hereafter by the Congress as potential additions to such system. The President shall report to the Congress his recommendations and proposals with respect to the designation of each such river or section thereof under this chapter. Such studies shall be completed and such reports shall be made to the Congress with respect to all rivers named in section 1276(a) (1) through (27) of this title no later than October 2, 1978. In conducting these studies the Secretary of the Interior and the Secretary of Agriculture shall give priority to those rivers (i) with respect to which there is the greatest likelihood of developments which, if undertaken, would render the rivers unsuitable for inclusion in the national wild and scenic rivers system, and (ii) which possess the greatest proportion of private lands within their areas. Every such study and plan shall be coordinated with any water resources planning involving the same river which is being conducted pursuant to the Water Resources Planning Act [[42 U.S.C. 1962](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1962&num=0&edition=prelim) et seq.]. Each report, including maps and illustrations, shall show among other things the area included within the report; the characteristics which do or do not make the area a worthy addition to the system; the cur

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 1275

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

22 U.S.C. § 2361 — Completion of plans and cost estimates

**(a) Restriction on agreements or grants** No agreement or grant which constitutes an obligation of the United States Government in excess of $500,000 under [section 1501 of title 31](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section1501&num=0&edition=prelim) shall be made for any assistance authorized under part I of subchapter I of this chapter, subpart II of part II of subchapter I of this chapter, or part IV of subchapter II of this chapter— (1) if such agreement or grant requires substantive technical or financial planning, until engineering, financial, and other plans necessary to carry out such assistance, and a reasonably firm estimate of the cost to the United States Government of providing such assistance, have been completed; and (2) if such agreement or grant requires legislative action within the recipient country, unless such legislative action may reasonably be anticipated to be completed in time to permit the orderly accomplishment of the purposes of such agreement or grant. **(b) Plans for water or related land resource construction projects; computation of benefits and costs** Plans required under subsection (a) of this section for any water or related land resource construction project or program shall include a computation of benefits and costs made insofar as practicable in accordance with the principles, standards, and procedures established pursuant to the Water Resources Planning Act ([42 U.S.C. 1962](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1962&num=0&edition=prelim), et seq.) or acts amendatory or supplementary thereto. **(c) Contracts for construction outside United States; competitive basis** To the maximum extent practicable, all contracts for construction outside the United

Source: Supplied U.S. Code snapshot — release unconfirmed · 22 U.S.C. § 2361

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 1289 — Basin planning

**(a) Preparation of Level B plans** The President, acting through the Water Resources Council, shall, as soon as practicable, prepare a Level B plan under the Water Resources Planning Act [[42 U.S.C. 1962](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1962&num=0&edition=prelim) et seq.] for all basins in the United States. All such plans shall be completed not later than January 1, 1980, except that priority in the preparation of such plans shall be given to those basins and portions thereof which are within those areas designated under paragraphs (2), (3), and (4) of subsection (a) of [section 1288 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1288&num=0&edition=prelim). **(b) Reporting requirements** The President, acting through the Water Resources Council, shall report annually to Congress on progress being made in carrying out this section. The first such report shall be submitted not later than January 31, 1973. **(c) Authorization of appropriations** There is authorized to be appropriated to carry out this section not to exceed $200,000,000.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1289

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 1962b–5 — Creation of commissions; powers and duties

**(a)** The President is authorized to declare the establishment of a river basin water and related land resources commission upon request therefor by the Council, or request addressed to the Council by a State within which all or part of the basin or basins concerned are located if the request by the Council or by a State (1) defines the area, river basin, or group of related river basins for which a commission is requested, (2) is made in writing by the Governor or in such manner as State law may provide, or by the Council, and (3) is concurred in by the Council and by not less than one-half of the States within which portions of the basin or basins concerned are located and, in the event the Upper Colorado River Basin is involved, by at least three of the four States of Colorado, New Mexico, Utah, and Wyoming or, in the event the Columbia River Basin is involved, by at least three of the four States of Idaho, Montana, Oregon, and Washington. Such concurrences shall be in writing. **(b)** Each such commission for an area, river basin, or group of river basins shall, to the extent consistent with [section 1962–1 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1962-1&num=0&edition=prelim)— (1) serve as the principal agency for the coordination of Federal, State, interstate, local and nongovernmental plans for the development of water and related land resources in its area, river basin, or group of river basins; (2) prepare and keep up to date, to the extent practicable, a comprehensive, coordinated, joint plan for Federal, State, interstate, local and nongovernmental development of water and related resources: Provided, That the plan shall include an evaluation of all reasonable alternative means of achieving optimum develop

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 1962b–5

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 1962c–1 — Duties of commissions

Each river basin commission shall— (1) engage in such activities and make such studies and investigations as are necessary and desirable in carrying out the policy set forth in [section 1962 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1962&num=0&edition=prelim) and in accomplishing the purposes set forth in [section 1962b(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1962b/b&num=0&edition=prelim); (2) submit to the Council and the Governor of each participating State a report on its work at least once each year. Such report shall be transmitted through the President to the Congress. After such transmission, copies of any such report shall be sent to the heads of such Federal, State, interstate, and international agencies as the President or the Governors of the participating States may direct; (3) submit to the Council for transmission to the President and by him to the Congress, and the Governors and the legislatures of the participating States a comprehensive, coordinated, joint plan, or any major portion thereof or necessary revisions thereof, for water and related land resources development in the area, river basin, or group of river basins for which such commission was established. Before the commission submits such a plan or major portion thereof or revision thereof to the Council, it shall transmit the proposed plan or revision to the head of each Federal department or agency, the Governor of each State, and each interstate agency, from which a member of the commission has been appointed, and to the head of the United States section of any international commission if the plan, portion or revision deals with a boundary water or a river crossing a boundary, or any trib

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 1962c–1

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 1962d–22 — Regional or river basin plans and Federal water and related land resources projects; preparation, formulation, and evaluation

**(a) Interest rate formula for discounting future benefits and cost computations; repeal of conflicting provisions and administrative actions** The interest rate formula to be used in plan formulation and evaluation for discounting future benefits and computing costs by Federal officers, employees, departments, agencies, and instrumentalities in the preparation of comprehensive regional or river basin plans and the formulation and evaluation of Federal water and related land resources projects shall be the formula set forth in the “Policies, Standards, and Procedures in the Formulation, Evaluation, and Review of Plans for Use and Development of Water and Related Land Resources” approved by the President on May 15, 1962, and published as Senate Document 97 of the Eighty-seventh Congress on May 29, 1962, as amended by the regulation issued by the Water Resources Council and published in the Federal Register on December 24, 1968 (33 F.R. 19170; 18 C.F.R. 704.39), until otherwise provided by a statute enacted after March 7, 1974. Every provision of law and every administrative action in conflict with this section is hereby repealed to the extent of such conflict. **(b) Interest rate for prior authorized projects assured of non-Federal share of project costs; continuation of rate** In the case of any project authorized before January 3, 1969, if the appropriate non-Federal interests have, prior to December 31, 1969, given satisfactory assurances to pay the required non-Federal share of project costs, the discount rate to be used in the computation of benefits and costs for such project shall be the rate in effect immediately prior to December 24, 1968, and that rate shall continue to be used for such project until construction has been completed, unless otherwise provided

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 1962d–22

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 1962d–5d — Northeastern United States water supply

**(a) Plans for Federal construction, operation, and maintenance of reservoir system within certain river basins and conveyance and purification facilities through cooperation of Secretary of the Army and government agencies; financial participation of States** Congress hereby recognizes that assuring adequate supplies of water for the great metropolitan centers of the United States has become a problem of such magnitude that the welfare and prosperity of this country require the Federal Government to assist in the solution of water supply problems. Therefore, the Secretary of the Army, acting through the Chief of Engineers, is authorized to cooperate with Federal, State, and local agencies in preparing plans in accordance with the Water Resources Planning Act [[42 U.S.C. 1962](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1962&num=0&edition=prelim) et seq.] to meet the long-range water needs of the northeastern United States. This plan may provide for the construction, operation, and maintenance by the United States of (1) a system of major reservoirs to be located within those river basins of the northeastern United States which drain into the Chesapeake Bay, those that drain into the Atlantic Ocean north of the Chesapeake Bay, those that drain into Lake Ontario, and those that drain into the Saint Lawrence River, (2) major conveyance facilities by which water may be exchanged between these river basins to the extent found desirable in the national interest, and (3) major purification facilities. Such plans shall provide for appropriate financial participation by the States, political subdivisions thereof, and other local interests. **(b) Construction, operation, and maintenance of reservoirs and conveyance and purification facilities**

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 1962d–5d

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1511 — Reconnaissance investigations by Secretary of the Interior; reports; 10-year moratorium on water importation studies

Pursuant to the authority set out in the Reclamation Act of June 17, 1902, 32 Stat. 388, and Acts amendatory thereof or supplementary thereto, and the provisions of the Water Resources Planning Act of July 22, 1965, 79 Stat. 244, as amended [[42 U.S.C. 1962](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1962&num=0&edition=prelim) et seq.], with respect to the coordination of studies, investigations and assessments, the Secretary of the Interior shall conduct full and complete reconnaissance investigations for the purpose of developing a general plan to meet the future water needs of the Western United States. Such investigations shall include the long-range water supply available and the long-range water requirements in each water resource region of the Western United States. Progress reports in connection with these investigations shall be submitted to the President, the National Water Commission (while it is in existence), the Water Resources Council, and to the Congress every two years. The first of such reports shall be submitted on or before June 30, 1971, and a final reconnaissance report shall be submitted not later than June 30, 1977: Provided, That for a period of ten years from November 2, 1978, any Federal official shall not undertake reconnaissance studies of any plan for the importation of water into the Colorado River Basin from any other natural river drainage basin lying outside the States of Arizona, California, Colorado, New Mexico, and those portions of Nevada, Utah, and Wyoming which are in the natural drainage basin of the Colorado River.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1511

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 1962 — Congressional statement of policy

Page 5184 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 1962 Sec. 1962d–5a. Reimbursement to States. 1962d–5b. Written agreement requirement for water resources projects. 1962d–5c. Non-Federal public bodies, installment construction payments. 1962d–5d. Authorization of Secretary of the Army to contract with States and political subdivisions for increased law enforce- ment services during peak visitation periods; authorization of appropria- tions. 1962d–5e. Wetland areas. 1962d–5f. Beach nourishment. 1962d–5g. Hydroelectric power resources. 1962d–6. Feasibility studies; acceleration; ad- vancement of costs by non-Federal sources. 1962d–7. Delmarva Peninsula hydrologic study; duties of Secretary of the Interior. 1962d–8. Reports on Delmarva Peninsula hydro- logic study. 1962d–9. Information from Federal agencies for Delmarva Peninsula study. 1962d–10. Cooperation with agencies on Delmarva Peninsula study. 1962d–11. Authorization of appropriation for Del- marva Peninsula study. 1962d–11a. Potomac River water diversion struc- ture. 1962d–11b. Dalecarlia Reservoir; delivery of water to metropolitan Maryland; expenses; payments; purchase of water from State or local authorities in Maryland or Virginia. 1962d–12 to 1962d–14. Repealed. 1962d–14a. Alaska hydroelectric power develop- ment. 1962d–15. Protection of United States from liabil- ity for damages; exception of damages due to fault or negligence of United States. 1962d–16. Comprehensive plans for development, utilization, and conservation of water and related resources. 1962d–17. Regional or river basin plans and Fed- eral water and related land resources projects; preparation, formulation, and evaluation. 1962d–18. Study of depletion of natural resources of

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 1962

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.