Arkansas Legal Resource Navigator

42 U.S.C. § 6805 — Grants for State consumer protection of-

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 6805 — Grants for State consumer protection of-

Page 6890 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 6802 § 6802. Definitions As used in this subchapter: (1) The term ‘‘Secretary’’ means the Sec- retary of Energy. (2) The term ‘‘electric utility’’ means any person, State agency, or Federal agency which sells electric energy. (3) The term ‘‘Federal agency’’ means any agency or instrumentality of the United States. (4) The term ‘‘State agency’’ means a State, political subdivision thereof, or any agency or instrumentality of either. (5) The term ‘‘State utility regulatory com- mission’’ means (A) any utility regulatory commission which is a State agency or (B) the Tennessee Valley Authority. (6) The term ‘‘State’’ means any State, the District of Columbia, Puerto Rico, and any territory or possession of the United States. (7) The term ‘‘utility regulatory commis- sion’’ means any State agency or Federal agency which has authority to fix, modify, ap- prove, or disapprove rates for the sale of elec- tric energy by any electric utility (other than by such agency). (Pub. L. 94–385, title II, § 202, Aug. 14, 1976, 90 Stat. 1142; Pub. L. 95–617, title I, § 143, Nov. 9, 1978, 92 Stat. 3134; Pub. L. 105–388, § 5(b)(2), Nov. 13, 1998, 112 Stat. 3479.) Editorial Notes AMENDMENTS 1998—Par. (1). Pub. L. 105–388 made technical amend- ment by striking heading and designation which had been inserted by Pub. L. 95–617. 1978—Par. (1). Pub. L. 95–617 substituted ‘‘The term ‘Secretary’ means the Secretary of Energy’’ for ‘‘The term ‘Administrator’ means the Administrator of the Federal Energy Administration; except that after such Administration ceases to exist, such term means any officer of the United States designated by the President for purposes of this subchapter’’. § 6803. Development of electric u

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 6805

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: b29b45bfe325419c4845b12642d37c841044ad6fdfa266fa3163301107692f52. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-0af86b7ee1eb5e4998c0cfdb
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-6805-grants-for-state-consumer-protection-of--374091f9db.md
Pages: Not recorded – Not recorded
Passage SHA-256: 81e708fb111f210d8788da429f536547b51101f8f35b3b23ca14536f677a34e8

Source location: USCODE-2024-title42-chap81-subchapI-sec6805.pdf

Stored source content

Page 6890 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 6802 § 6802. Definitions As used in this subchapter: (1) The term ‘‘Secretary’’ means the Sec- retary of Energy. (2) The term ‘‘electric utility’’ means any person, State agency, or Federal agency which sells electric energy. (3) The term ‘‘Federal agency’’ means any agency or instrumentality of the United States. (4) The term ‘‘State agency’’ means a State, political subdivision thereof, or any agency or instrumentality of either. (5) The term ‘‘State utility regulatory com- mission’’ means (A) any utility regulatory commission which is a State agency or (B) the Tennessee Valley Authority. (6) The term ‘‘State’’ means any State, the District of Columbia, Puerto Rico, and any territory or possession of the United States. (7) The term ‘‘utility regulatory commis- sion’’ means any State agency or Federal agency which has authority to fix, modify, ap- prove, or disapprove rates for the sale of elec- tric energy by any electric utility (other than by such agency). (Pub. L. 94–385, title II, § 202, Aug. 14, 1976, 90 Stat. 1142; Pub. L. 95–617, title I, § 143, Nov. 9, 1978, 92 Stat. 3134; Pub. L. 105–388, § 5(b)(2), Nov. 13, 1998, 112 Stat. 3479.) Editorial Notes AMENDMENTS 1998—Par. (1). Pub. L. 105–388 made technical amend- ment by striking heading and designation which had been inserted by Pub. L. 95–617. 1978—Par. (1). Pub. L. 95–617 substituted ‘‘The term ‘Secretary’ means the Secretary of Energy’’ for ‘‘The term ‘Administrator’ means the Administrator of the Federal Energy Administration; except that after such Administration ceases to exist, such term means any officer of the United States designated by the President for purposes of this subchapter’’. § 6803. Development of electric utility rate design proposals by Secretary; contents; submission to Congress; supporting analysis (a) The Secretary shall develop proposals to improve electric utility rate design. Such pro- posals shall be designed to encourage energy conservation, minimize the need for new elec- trical generating capacity, and minimize costs of electric energy to consumers, and shall in- clude (but not be limited to) proposals which provide for the development and implementa- tion of— (1) load management techniques which are cost effective; (2) rates which reflect marginal cost of serv- ice, or time of use of service, or both; (3) ratemaking policies which discourage in- efficient use of fuel and encourage economical purchases of fuel; and (4) rates (or other regulatory policies) which encourage electric utility system reliability and reliability of major items of electric util- ity equipment. (b) The proposals prepared under subsection (a) shall be transmitted to each House of Con- gress not later than 6 months after August 14, 1976, for review and for such further action as the Congress may direct by law. Such proposals shall be accompanied by an analysis of— (1) the projected savings (if any) in consump- tion of petroleum products, natural gas, elec- tric energy, and other energy resources, (2) the reduction (if any) in the need for new electrical generating capacity, and of the de- mand for capital by the electric utility indus- try, and (3) changes (if any) in the cost of electric en- ergy to consumers, which are likely to result from the implementa- tion nationally of each of the proposals trans- mitted under this subsection. (Pub. L. 94–385, title II, § 203, Aug. 14, 1976, 90 Stat. 1143; Pub. L. 95–617, title I, § 143, Nov. 9, 1978, 92 Stat. 3134.) Editorial Notes AMENDMENTS 1978—Subsec. (a). Pub. L. 95–617 substituted ‘‘Sec- retary’’ for ‘‘Administrator’’, meaning Administrator of the Federal Energy Administration. § 6804. Funding, administrative, and judicial au- thorities of Secretary The Secretary may— (1) fund (A) demonstration projects to im- prove electric utility load management proce- dures and (B) regulatory rate reform initia- tives, (2) on request of a State, a utility regulatory commission, or of any participant in any pro- ceeding before a State utility regulatory com- mission which relates to electric utility rates or rate design, intervene and participate in such proceeding, and (3) on request of any State, utility regu- latory commission, or party to any action to obtain judicial review of an administrative proceeding in which the Secretary intervened or participated under paragraph (2), intervene and participate in such action. (Pub. L. 94–385, title II, § 204, Aug. 14, 1976, 90 Stat. 1143; Pub. L. 95–617, title I, § 143, Nov. 9, 1978, 92 Stat. 3134.) Editorial Notes AMENDMENTS 1978—Pub. L. 95–617 substituted ‘‘Secretary’’ for ‘‘Ad- ministrator’’, meaning Administrator of the Federal Energy Administration in two places. § 6805. Grants for State consumer protection of- fices by Secretary (a) Establishment, operation, and purpose; quali- fications for funds The Secretary may make grants to States, or otherwise as provided in subsection (c), under this section to provide for the establishment and operation of offices of consumer services to as- sist consumers in their presentations before utility regulatory commissions. Any assistance provided under this section shall be provided only for an office of consumer services which is Page 6891 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 6807a operated independently of any such utility regu- latory commission and which is empowered to— (1) make general factual assessments of the impact of proposed rate changes and other proposed regulatory actions upon all affected consumers; (2) assist consumers in the presentation of their positions before utility regulatory com- missions; and (3) advocate, on its own behalf, a position which it determines represents the position most advantageous to consumers, taking into account developments in rate design reform. (b) Grants subject to State assurances on funds Grants pursuant to subsection (a) of this sec- tion shall be made only to States which furnish such assurances as the Secretary may require that funds made available under such section will be in addition to, and not in substitution for, funds made available to offices of consumer services from other sources. (c) Offices established by Tennessee Valley Au- thority Assistance may be provided under this section to an office of consumer services established by the Tennessee Valley Authority, if such office is operated independently of the Tennessee Valley Authority. (Pub. L. 94–385, title II, § 205, Aug. 14, 1976, 90 Stat. 1144; Pub. L. 95–617, title I, § 143, Nov. 9, 1978, 92 Stat. 3134.) Editorial Notes AMENDMENTS 1978—Subsecs. (a), (b). Pub. L. 95–617 substituted ‘‘Secretary’’ for ‘‘Administrator’’, meaning Adminis- trator of the Federal Energy Administration. § 6806. Statement in annual report The Secretary shall include in each annual re- port submitted under section 7267 of this title a statement with respect to activities conducted under this subchapter and recommendations as to the need for and types of further Federal leg- islation. (Pub. L. 94–385, title II, § 206, Aug. 14, 1976, 90 Stat. 1144; Pub. L. 95–617, title I, § 143, Nov. 9, 1978, 92 Stat. 3134; Pub. L. 96–470, title II, § 203(g), Oct. 19, 1980, 94 Stat. 2243.) Editorial Notes AMENDMENTS 1980—Pub. L. 96–470 substituted ‘‘The Secretary shall include in each annual report submitted under section 7267 of this title a statement’’ for ‘‘Not later than the last day in December in each year, the Secretary shall transmit to the Congress a report’’. 1978—Pub. L. 95–617 substituted ‘‘Secretary’’ for ‘‘Ad- ministrator’’, meaning Administrator of the Federal Energy Administration. § 6807. State utility regulatory assistance (a) Grants to State utility regulatory commis- sions and nonregulated electric utilities The Secretary may make grants to State util- ity regulatory commissions and nonregulated electric utilities (as defined in the Public Util- ity Regulatory Policies Act of 1978 [16 U.S.C. 2602]) to carry out duties and responsibilities under titles I [16 U.S.C. 2601 et seq.] and III [15 U.S.C. 3201 et seq.], and section 210 [16 U.S.C. 824a–3], of the Public Utility Regulatory Policies Act of 1978. No grant may be made under this section to any Federal agency. (b) Unnecessary requirements prohibited Any requirements established by the Sec- retary with respect to grants under this section may be only such requirements as are necessary to assure that such grants are expended solely to carry out duties and responsibilities referred to in subsection (a) or such as are otherwise re- quired by law. (c) Application for grant No grant may be made under this section un- less an application for such grant is submitted to the Secretary in such form and manner as the Secretary may require. The Secretary may not approve an application of a State utility regu- latory commission or nonregulated electric util- ity unless such commission or nonregulated electric utility assures the Secretary that funds made available under this section will be in ad- dition to, and not in substitution for, funds made available to such commission or nonregu- lated electric utility from other governmental sources. (d) Apportionment of funds The funds appropriated for purposes of this section shall be apportioned among the States in such manner that grants made under this sec- tion in each State shall not exceed the lesser of— (1) the amount determined by dividing equally among all States the total amount available under this section for such grants, or (2) the amount which the Secretary is au- thorized to provide pursuant to subsections (b) and (c) of this section for such State. (Pub. L. 94–385, title II, § 207, Aug. 14, 1976, 90 Stat. 1144; Pub. L. 95–617, title I, § 141, Nov. 9, 1978, 92 Stat. 3133.) Editorial Notes REFERENCES IN TEXT The Public Utility Regulatory Policies Act of 1978, referred to in subsec. (a), is Pub. L. 95–617, Nov. 9, 1978, 92 Stat. 3117. Title I of such Act is classified principally to chapter 46 (§ 2601 et seq.) of Title 16, Conservation, and title III of such Act is classified generally to chap- ter 59 (§ 3201 et seq.) of Title 15, Commerce and Trade. For complete classification of this Act to the Code, see Short Title note set out under section 2601 of Title 16 and Tables. AMENDMENTS 1978—Pub. L. 95–617 substituted provisions relating to grants to State utility regulatory commissions and nonregulated electric utilities for provisions author- izing appropriations to carry out this subchapter. § 6807a. Energy efficiency grants to State regu- latory authorities (a) Energy efficiency grants The Secretary is authorized in accordance with the provisions of this section to provide

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 3201 — Purposes; coverage

**(a) Purposes** The purposes of this chapter are to encourage— (1) conservation of energy supplied by gas utilities; (2) the optimization of the efficiency of use of facilities and resources by gas utility systems; and (3) equitable rates to gas consumers of natural gas. **(b) Volume of total retail sales** This chapter applies to each gas utility in any calendar year, and to each proceeding relating to each gas utility in such year, if the total sales of natural gas by such utility for purposes other than resale exceeded 10 billion cubic feet during any calendar year beginning after December 31, 1975, and before the immediately preceding calendar year. **(c) Exclusion of wholesale sales** The requirements of this chapter do not apply to the operations of a gas utility, or to proceedings respecting such operations, to the extent that such operations or proceedings relate to sales of natural gas for purposes of resale. **(d) List of covered utilities** Before the beginning of each calendar year, the Secretary shall publish a list identifying each gas utility to which this chapter applies during such calendar year. Promptly after publication of such list, each State regulatory authority shall notify the Secretary of each gas utility on the list for which such State regulatory authority has ratemaking authority.

Source: Supplied U.S. Code snapshot — release unconfirmed · 15 U.S.C. § 3201

Stored review status: release_metadata_unconfirmed. The source passage cites 15 U.S.C. § 3201. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 3201 — Purposes; coverage

Page 1994 TITLE 15—COMMERCE AND TRADE § 3201 1 So in original. The comma probably should not appear. 2 So in original. A comma probably should appear. § 3201. Purposes; coverage (a) Purposes The purposes of this chapter are to encour- age— (1) conservation of energy supplied by gas utilities; (2) the optimization of the efficiency of use of facilities and resources by gas utility sys- tems; and (3) equitable rates to gas consumers of nat- ural gas. (b) Volume of total retail sales This chapter applies to each gas utility in any calendar year, and to each proceeding relating to each gas utility in such year, if the total sales of natural gas by such utility for purposes other than resale exceeded 10 billion cubic feet during any calendar year beginning after De- cember 31, 1975, and before the immediately pre- ceding calendar year. (c) Exclusion of wholesale sales The requirements of this chapter do not apply to the operations of a gas utility, or to pro- ceedings respecting such operations, to the ex- tent that such operations or proceedings relate to sales of natural gas for purposes of resale. (d) List of covered utilities Before the beginning of each calendar year, the Secretary shall publish a list identifying each gas utility to which this chapter applies during such calendar year. Promptly after publi- cation of such list, each State regulatory au- thority shall notify the Secretary of each gas utility on the list for which such State regu- latory authority has ratemaking authority. (Pub. L. 95–617, title III, § 301, Nov. 9, 1978, 92 Stat. 3149.) Statutory Notes and Related Subsidiaries DEFINITIONS The definition of Secretary in section 2602 of Title 16, Conservation, applies to this section. § 3202. Definitions For purposes of this

Source: Supplied 2024 U.S. Code historical extraction · 15 U.S.C. § 3201

Stored review status: historical_2024_not_currentness_verified. The source passage cites 15 U.S.C. § 3201. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 2601 — Gathering information on costs of service

**(a) Information required to be gathered** Each electric utility shall periodically gather information under such rules (promulgated by the Commission) as the Commission determines necessary to allow determination of the costs associated with providing electric service. For purposes of this section, and for purposes of any consideration and determination respecting the standard established by [section 2621(d)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2621/d/2&num=0&edition=prelim), such costs shall be separated, to the maximum extent practicable, into the following components: customer cost component, demand cost component, and energy cost component. Rules under this subsection shall include requirements for the gathering of the following information with respect to each electric utility— (1) the costs of serving each electric consumer class, including costs of serving different consumption patterns within such class, based on voltage level, time of use, and other appropriate factors; (2) daily kilowatt demand load curves for all electric consumer classes combined representative of daily and seasonal differences in demand, and daily kilowatt demand load curves for each electric consumer class for which there is a separate rate, representative of daily and seasonal differences in demand; (3) annual capital, operating, and maintenance costs— (A) for transmission and distribution services, and (B) for each type of generating unit; and (4) costs of purchased power, including representative daily and seasonal differences in the amount of such costs. Such rules shall provide that information required to be gathered under this section shall be presented in such categories and such detail as may be necessary to carr

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 2601

Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 2601. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 2601 — Findings

Page 2195 TITLE 16—CONSERVATION § 2602 § 2513. Repealed. Pub. L. 113–287, § 7, Dec. 19, 2014, 128 Stat. 3272 Section, Pub. L. 95–625, title X, § 1014, Nov. 10, 1978, 92 Stat. 3544, related to limitation of use of funds. See sec- tion 200511(e) of Title 54, National Park Service and Re- lated Programs. § 2514. Repealed. Pub. L. 113–287, § 7, Dec. 19, 2014, 128 Stat. 3272 Section, Pub. L. 95–625, title X, § 1015, Nov. 10, 1978, 92 Stat. 3544; Pub. L. 104–333, div. I, title VIII, § 814(d)(1)(M), Nov. 12, 1996, 110 Stat. 4196, related to sun- set and reporting provisions. CHAPTER 46—PUBLIC UTILITY REGULATORY POLICIES Sec. 2601. Findings. 2602. Definitions. 2603. Relationship to antitrust laws. SUBCHAPTER I—RETAIL REGULATORY POLICIES FOR ELECTRIC UTILITIES 2611. Purposes. 2612. Coverage. 2613. Federal contracts. SUBCHAPTER II—STANDARDS FOR ELECTRIC UTILITIES 2621. Consideration and determination respecting certain ratemaking standards. 2622. Obligations to consider and determine. 2623. Adoption of certain standards. 2624. Lifeline rates. 2625. Special rules for standards. 2626. Reports respecting standards. 2627. Relationship to State law. SUBCHAPTER III—INTERVENTION AND JUDICIAL REVIEW 2631. Intervention in proceedings. 2632. Consumer representation. 2633. Judicial review and enforcement. 2634. Prior and pending proceedings. SUBCHAPTER IV—ADMINISTRATIVE PROVISIONS 2641. Voluntary guidelines. 2642. Responsibilities of Secretary. 2643. Gathering information on costs of service. 2644. Relationship to other authority. 2645. Utility regulatory institute. § 2601. Findings The Congress finds that the protection of the public health, safety, and welfare, the preserva- tion of national security, and the proper ex

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 2601

Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 2601. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 2602 — Relationship to other authority

Nothing in this chapter shall be construed to limit or affect any authority of the Secretary or the Commission under any other provision of law.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 2602

Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 2602. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 2602 — Definitions

Page 2195 TITLE 16—CONSERVATION § 2602 § 2513. Repealed. Pub. L. 113–287, § 7, Dec. 19, 2014, 128 Stat. 3272 Section, Pub. L. 95–625, title X, § 1014, Nov. 10, 1978, 92 Stat. 3544, related to limitation of use of funds. See sec- tion 200511(e) of Title 54, National Park Service and Re- lated Programs. § 2514. Repealed. Pub. L. 113–287, § 7, Dec. 19, 2014, 128 Stat. 3272 Section, Pub. L. 95–625, title X, § 1015, Nov. 10, 1978, 92 Stat. 3544; Pub. L. 104–333, div. I, title VIII, § 814(d)(1)(M), Nov. 12, 1996, 110 Stat. 4196, related to sun- set and reporting provisions. CHAPTER 46—PUBLIC UTILITY REGULATORY POLICIES Sec. 2601. Findings. 2602. Definitions. 2603. Relationship to antitrust laws. SUBCHAPTER I—RETAIL REGULATORY POLICIES FOR ELECTRIC UTILITIES 2611. Purposes. 2612. Coverage. 2613. Federal contracts. SUBCHAPTER II—STANDARDS FOR ELECTRIC UTILITIES 2621. Consideration and determination respecting certain ratemaking standards. 2622. Obligations to consider and determine. 2623. Adoption of certain standards. 2624. Lifeline rates. 2625. Special rules for standards. 2626. Reports respecting standards. 2627. Relationship to State law. SUBCHAPTER III—INTERVENTION AND JUDICIAL REVIEW 2631. Intervention in proceedings. 2632. Consumer representation. 2633. Judicial review and enforcement. 2634. Prior and pending proceedings. SUBCHAPTER IV—ADMINISTRATIVE PROVISIONS 2641. Voluntary guidelines. 2642. Responsibilities of Secretary. 2643. Gathering information on costs of service. 2644. Relationship to other authority. 2645. Utility regulatory institute. § 2601. Findings The Congress finds that the protection of the public health, safety, and welfare, the preserva- tion of national security, and the proper ex

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 2602

Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 2602. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824a — Interconnection and coordination of facilities; emergencies; transmission to foreign countries

**(a) Regional districts; establishment; notice to State commissions** For the purpose of assuring an abundant supply of electric energy throughout the United States with the greatest possible economy and with regard to the proper utilization and conservation of natural resources, the Commission is empowered and directed to divide the country into regional districts for the voluntary interconnection and coordination of facilities for the generation, transmission, and sale of electric energy, and it may at any time thereafter, upon its own motion or upon application, make such modifications thereof as in its judgment will promote the public interest. Each such district shall embrace an area which, in the judgment of the Commission, can economically be served by such interconnection and coordinated electric facilities. It shall be the duty of the Commission to promote and encourage such interconnection and coordination within each such district and between such districts. Before establishing any such district and fixing or modifying the boundaries thereof the Commission shall give notice to the State commission of each State situated wholly or in part within such district, and shall afford each such State commission reasonable opportunity to present its views and recommendations, and shall receive and consider such views and recommendations. **(b) Sale or exchange of energy; establishing physical connections** Whenever the Commission, upon application of any State commission or of any person engaged in the transmission or sale of electric energy, and after notice to each State commission and public utility affected and after opportunity for hearing, finds such action necessary or appropriate in the public interest it may by order direct a public utility (if the Commissio

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824a

Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 824a. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824a — Interconnection and coordination of fa-

Page 1400 TITLE 16—CONSERVATION § 824a AMENDMENTS 2015—Subsec. (b)(2). Pub. L. 114–94, § 61003(b)(1), in- serted ‘‘824o–1,’’ after ‘‘824o,’’ in two places. Subsec. (e). Pub. L. 114–94, § 61003(b)(2), inserted ‘‘824o–1,’’ after ‘‘824o,’’. 2005—Subsec. (b)(2). Pub. L. 109–58, § 1295(a)(1), sub- stituted ‘‘Notwithstanding subsection (f), the provi- sions of sections 824b(a)(2), 824e(e), 824i, 824j, 824j–1, 824k, 824o, 824p, 824q, 824r, 824s, 824t, 824u, and 824v of this title’’ for ‘‘The provisions of sections 824i, 824j, and 824k of this title’’ and ‘‘Compliance with any order or rule of the Commission under the provisions of section 824b(a)(2), 824e(e), 824i, 824j, 824j–1, 824k, 824o, 824p, 824q, 824r, 824s, 824t, 824u, or 824v of this title’’ for ‘‘Compli- ance with any order of the Commission under the provi- sions of section 824i or 824j of this title’’. Subsec. (e). Pub. L. 109–58, § 1295(a)(2), substituted ‘‘section 824e(e), 824e(f), 824i, 824j, 824j–1, 824k, 824o, 824p, 824q, 824r, 824s, 824t, 824u, or 824v of this title’’ for ‘‘sec- tion 824i, 824j, or 824k of this title’’. Subsec. (f). Pub. L. 109–58, § 1291(c), which directed amendment of subsec. (f) by substituting ‘‘political subdivision of a State, an electric cooperative that re- ceives financing under the Rural Electrification Act of 1936 (7 U.S.C. 901 et seq.) or that sells less than 4,000,000 megawatt hours of electricity per year,’’ for ‘‘political subdivision of a state,’’, was executed by making the substitution for ‘‘political subdivision of a State,’’ to reflect the probable intent of Congress. Subsec. (g)(5). Pub. L. 109–58, § 1277(b)(1), substituted ‘‘2005’’ for ‘‘1935’’. 1992—Subsec. (g). Pub. L. 102–486 added subsec. (g). 1978—Subsec. (b). Pub. L. 95–617, § 204(b)(1), de

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 824a

Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 824a. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 6805 — Grants for State consumer protection offices by Secretary

**(a) Establishment, operation, and purpose; qualifications for funds** The Secretary may make grants to States, or otherwise as provided in subsection (c), under this section to provide for the establishment and operation of offices of consumer services to assist consumers in their presentations before utility regulatory commissions. Any assistance provided under this section shall be provided only for an office of consumer services which is operated independently of any such utility regulatory commission and which is empowered to— (1) make general factual assessments of the impact of proposed rate changes and other proposed regulatory actions upon all affected consumers; (2) assist consumers in the presentation of their positions before utility regulatory commissions; and (3) advocate, on its own behalf, a position which it determines represents the position most advantageous to consumers, taking into account developments in rate design reform. **(b) Grants subject to State assurances on funds** Grants pursuant to subsection (a) of this section shall be made only to States which furnish such assurances as the Secretary may require that funds made available under such section will be in addition to, and not in substitution for, funds made available to offices of consumer services from other sources. **(c) Offices established by Tennessee Valley Authority** Assistance may be provided under this section to an office of consumer services established by the Tennessee Valley Authority, if such office is operated independently of the Tennessee Valley Authority.

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 6805

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.