Arkansas Legal Resource Navigator

16 U.S.C. § 824a–3 — Cogeneration and small power production

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824a–3 — Cogeneration and small power production

**(a) Cogeneration and small power production rules** Not later than 1 year after November 9, 1978, the Commission shall prescribe, and from time to time thereafter revise, such rules as it determines necessary to encourage cogeneration and small power production, and to encourage geothermal small power production facilities of not more than 80 megawatts capacity, which rules require electric utilities to offer to— (1) sell electric energy to qualifying cogeneration facilities and qualifying small power production facilities 11 So in original. Probably should be followed by a comma. and (2) purchase electric energy from such facilities. Such rules shall be prescribed, after consultation with representatives of Federal and State regulatory agencies having ratemaking authority for electric utilities, and after public notice and a reasonable opportunity for interested persons (including State and Federal agencies) to submit oral as well as written data, views, and arguments. Such rules shall include provisions respecting minimum reliability of qualifying cogeneration facilities and qualifying small power production facilities (including reliability of such facilities during emergencies) and rules respecting reliability of electric energy service to be available to such facilities from electric utilities during emergencies. Such rules may not authorize a qualifying cogeneration facility or qualifying small power production facility to make any sale for purposes other than resale. **(b) Rates for purchases by electric utilities** The rules prescribed under subsection (a) shall insure that, in requiring any electric utility to offer to purchase electric energy from any qualifying cogeneration facility or qualifying small power production facility, the rates for such purcha

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824a–3

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: da5179c9ec7e6d50658df1529243cd20cf55952a4b72a603217270928baf71ad. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Record provenance

Stable record: federal_law:legal_authorities:record_usc_f57d45a19f8815ef4c5e90c9
Source file: Laws/federal/codes/united-states-code/title-16/section-824a3-cogeneration-and-small-power-production--082ba93b9d.md
Pages: Not recorded – Not recorded
Passage SHA-256: 681501ad73d01f1c8f85fbaae66de3354d25f74a06ab0cd1673336ccb57dfc81

Source location: Title 16, Chapter 12, § 824a–3; chapter-012-federal-regulation-and-development-of-power.md

Stored source content

**(a) Cogeneration and small power production rules** Not later than 1 year after November 9, 1978, the Commission shall prescribe, and from time to time thereafter revise, such rules as it determines necessary to encourage cogeneration and small power production, and to encourage geothermal small power production facilities of not more than 80 megawatts capacity, which rules require electric utilities to offer to— (1) sell electric energy to qualifying cogeneration facilities and qualifying small power production facilities 11 So in original. Probably should be followed by a comma. and (2) purchase electric energy from such facilities. Such rules shall be prescribed, after consultation with representatives of Federal and State regulatory agencies having ratemaking authority for electric utilities, and after public notice and a reasonable opportunity for interested persons (including State and Federal agencies) to submit oral as well as written data, views, and arguments. Such rules shall include provisions respecting minimum reliability of qualifying cogeneration facilities and qualifying small power production facilities (including reliability of such facilities during emergencies) and rules respecting reliability of electric energy service to be available to such facilities from electric utilities during emergencies. Such rules may not authorize a qualifying cogeneration facility or qualifying small power production facility to make any sale for purposes other than resale. **(b) Rates for purchases by electric utilities** The rules prescribed under subsection (a) shall insure that, in requiring any electric utility to offer to purchase electric energy from any qualifying cogeneration facility or qualifying small power production facility, the rates for such purchase— (1) shall be just and reasonable to the electric consumers of the electric utility and in the public interest, and (2) shall not discriminate against qualifying cogenerators or qualifying small power producers. No such rule prescribed under subsection (a) shall provide for a rate which exceeds the incremental cost to the electric utility of alternative electric energy. **(c) Rates for sales by utilities** The rules prescribed under subsection (a) shall insure that, in requiring any electric utility to offer to sell electric energy to any qualifying cogeneration facility or qualifying small power production facility, the rates for such sale— (1) shall be just and reasonable and in the public interest, and (2) shall not discriminate against the qualifying cogenerators or qualifying small power producers. **(d) “Incremental cost of alternative electric energy” defined** For purposes of this section, the term “incremental cost of alternative electric energy” means, with respect to electric energy purchased from a qualifying cogenerator or qualifying small power producer, the cost to the electric utility of the electric energy which, but for the purchase from such cogenerator or small power producer, such utility would generate or purchase from another source. **(e) Exemptions** (1) Not later than 1 year after November 9, 1978, and from time to time thereafter, the Commission shall, after consultation with representatives of State regulatory authorities, electric utilities, owners of cogeneration facilities and owners of small power production facilities, and after public notice and a reasonable opportunity for interested persons (including State and Federal agencies) to submit oral as well as written data, views, and arguments, prescribe rules under which geothermal small power production facilities of not more than 80 megawatts capacity, qualifying cogeneration facilities, and qualifying small power production facilities are exempted in whole or part from the Federal Power Act [[16 U.S.C. 791a](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section791a&num=0&edition=prelim) et seq.], from the Public Utility Holding Company Act,22 See References in Text note below. from State laws and regulations respecting the rates, or respecting the financial or organizational regulation, of electric utilities, or from any combination of the foregoing, if the Commission determines such exemption is necessary to encourage cogeneration and small power production. (2) No qualifying small power production facility (other than a qualifying small power production facility which is an eligible solar, wind, waste, or geothermal facility as defined in section 3(17)(E) of the Federal Power Act [[16 U.S.C. 796(17)(E)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section796/17/E&num=0&edition=prelim)]) which has a power production capacity which, together with any other facilities located at the same site (as determined by the Commission), exceeds 30 megawatts, or 80 megawatts for a qualifying small power production facility using geothermal energy as the primary energy source, may be exempted under rules under paragraph (1) from any provision of law or regulation referred to in paragraph (1), except that any qualifying small power production facility which produces electric energy solely by the use of biomass as a primary energy source, may be exempted by the Commission under such rules from the Public Utility Holding Company Act 2 and from State laws and regulations referred to in such paragraph (1). (3) No qualifying small power production facility or qualifying cogeneration facility may be exempted under this subsection from— (A) any State law or regulation in effect in a State pursuant to subsection (f), (B) the provisions of section 210, 211, or 212 of the Federal Power Act [[16 U.S.C. 824i](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section824i&num=0&edition=prelim), 824j, or 824k] or the necessary authorities for enforcement of any such provision under the Federal Power Act [[16 U.S.C. 791a](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section791a&num=0&edition=prelim) et seq.], or (C) any license or permit requirement under part I of the Federal Power Act [[16 U.S.C. 791a](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section791a&num=0&edition=prelim) et seq.] any provision under such Act related to such a license or permit requirement, or the necessary authorities for enforcement of any such requirement. **(f) Implementation of rules for qualifying cogeneration and qualifying small power production facilities** (1) Beginning on or before the date one year after any rule is prescribed by the Commission under subsection (a) or revised under such subsection, each State regulatory authority shall, after notice and opportunity for public hearing, implement such rule (or revised rule) for each electric utility for which it has ratemaking authority. (2) Beginning on or before the date one year after any rule is prescribed by the Commission under subsection (a) or revised under such subsection, each nonregulated electric utility shall, after notice and opportunity for public hearing, implement such rule (or revised rule). **(g) Judicial review and enforcement** (1) Judicial review may be obtained respecting any proceeding conducted by a State regulatory authority or nonregulated electric utility for purposes of implementing any requirement of a rule under subsection (a) in the same manner, and under the same requirements, as judicial review may be obtained under [section 2633 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2633&num=0&edition=prelim) in the case of a proceeding to which [section 2633 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2633&num=0&edition=prelim) applies. (2) Any person (including the Secretary) may bring an action against any electric utility, qualifying small power producer, or qualifying cogenerator to enforce any requirement established by a State regulatory authority or nonregulated electric utility pursuant to subsection (f). Any such action shall be brought only in the manner, and under the requirements, as provided under [section 2633 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2633&num=0&edition=prelim) with respect to an action to which [section 2633 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2633&num=0&edition=prelim) applies. **(h) Commission enforcement** (1) For purposes of enforcement of any rule prescribed by the Commission under subsection (a) with respect to any operations of an electric utility, a qualifying cogeneration facility or a qualifying small power production facility which are subject to the jurisdiction of the Commission under part II of the Federal Power Act [[16 U.S.C. 824](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section824&num=0&edition=prelim) et seq.], such rule shall be treated as a rule under the Federal Power Act [[16 U.S.C. 791a](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section791a&num=0&edition=prelim) et seq.]. Nothing in subsection (g) shall apply to so much of the operations of an electric utility, a qualifying cogeneration facility or a qualifying small power production facility as are subject to the jurisdiction of the Commission under part II of the Federal Power Act. (2) (A) The Commission may enforce the requirements of subsection (f) against any State regulatory authority or nonregulated electric utility. For purposes of any such enforcement, the requirements of subsection (f)(1) shall be treated as a rule enforceable under the Federal Power Act [[16 U.S.C. 791a](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section791a&num=0&edition=prelim) et seq.]. For purposes of any such action, a State regulatory authority or nonregulated electric utility shall be treated as a person within the meaning of the Federal Power Act. No enforcement action may be brought by the Commission under this section other than— (i) an action against the State regulatory authority or nonregulated electric utility for failure to comply with the requirements of subsection (f) 1 or (ii) an action under paragraph (1). (B) Any electric utility, qualifying cogenerator, or qualifying small power producer may petition the Commission to enforce the requirements of subsection (f) as provided in subparagraph (A) of this paragraph. If the Commission does not initiate an enforcement action under subparagraph (A) against a State regulatory authority or nonregulated electric utility within 60 days following the date on which a petition is filed under this subparagraph with respect to such authority, the petitioner may bring an action in the appropriate United States district court to require such State regulatory authority or nonregulated electric utility to comply with such requirements, and such court may issue such injunctive or other relief as may be appropriate. The Commission may intervene as a matter of right in any such action. **(i) Federal contracts** No contract between a Federal agency and any electric utility for the sale of electric energy by such Federal agency for resale which is entered into after November 9, 1978, may contain any provision which will have the effect of preventing the implementation of any rule under this section with respect to such utility. Any provision in any such contract which has such effect shall be null and void. **(j) New dams and diversions** Except for a hydroelectric project located at a Government dam (as defined in section 3(10) of the Federal Power Act [[16 U.S.C. 796(10)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section796/10&num=0&edition=prelim)]) at which non-Federal hydroelectric development is permissible, this section shall not apply to any hydroelectric project which impounds or diverts the water of a natural watercourse by means of a new dam or diversion unless the project meets each of the following requirements: (1) **No substantial adverse effects** — At the time of issuance of the license or exemption for the project, the Commission finds that the project will not have substantial adverse effects on the environment, including recreation and water quality. Such finding shall be made by the Commission after taking into consideration terms and conditions imposed under either paragraph (3) of this subsection or section 10 of the Federal Power Act [[16 U.S.C. 803](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section803&num=0&edition=prelim)] (whichever is appropriate as required by that Act [[16 U.S.C. 791a](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section791a&num=0&edition=prelim) et seq.] or the Electric Consumers Protection Act of 1986) and compliance with other environmental requirements applicable to the project. (2) **Protected rivers** — At the time the application for a license or exemption for the project is accepted by the Commission (in accordance with the Commission’s regulations and procedures in effect on January 1, 1986, including those relating to environmental consultation), such project is not located on either of the following: (A) Any segment of a natural watercourse which is included in (or designated for potential inclusion in) a State or national wild and scenic river system. (B) Any segment of a natural watercourse which the State has determined, in accordance with applicable State law, to possess unique natural, recreational, cultural, or scenic attributes which would be adversely affected by hydroelectric development. (3) **Fish and wildlife terms and conditions** — The project meets the terms and conditions set by fish and wildlife agencies under the same procedures as provided for under section 30(c) of the Federal Power Act [[16 U.S.C. 823a(c)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section823a/c&num=0&edition=prelim)]. **(k) “New dam or diversion” defined** For purposes of this section, the term “new dam or diversion” means a dam or diversion which requires, for purposes of installing any hydroelectric power project, any construction, or enlargement of any impoundment or diversion structure (other than repairs or reconstruction or the addition of flashboards or similar adjustable devices) 33 So in original. Probably should be followed by a period. **(l) Definitions** For purposes of this section, the terms “small power production facility”, “qualifying small power production facility”, “qualifying small power producer”, “primary energy source”, “cogeneration facility”, “qualifying cogeneration facility”, and “qualifying cogenerator” have the respective meanings provided for such terms under section 3(17) and (18) of the Federal Power Act [[16 U.S.C. 796(17)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section796/17&num=0&edition=prelim), (18)]. **(m) Termination of mandatory purchase and sale requirements** (1) **Obligation to purchase** — After August 8, 2005, no electric utility shall be required to enter into a new contract or obligation to purchase electric energy from a qualifying cogeneration facility or a qualifying small power production facility under this section if the Commission finds that the qualifying cogeneration facility or qualifying small power production facility has nondiscriminatory access to— (A) (i) independently administered, auction-based day ahead and real time wholesale markets for the sale of electric energy; and (ii) wholesale markets for long-term sales of capacity and electric energy; or (B) (i) transmission and interconnection services that are provided by a Commission-approved regional transmission entity and administered pursuant to an open access transmission tariff that affords nondiscriminatory treatment to all customers; and (ii) competitive wholesale markets that provide a meaningful opportunity to sell capacity, including long-term and short-term sales, and electric energy, including long-term, short-term and real-time sales, to buyers other than the utility to which the qualifying facility is interconnected. In determining whether a meaningful opportunity to sell exists, the Commission shall consider, among other factors, evidence of transactions within the relevant market; or (C) wholesale markets for the sale of capacity and electric energy that are, at a minimum, of comparable competitive quality as markets described in subparagraphs (A) and (B). (2) **Revised purchase and sale obligation for new facilities** (A) After August 8, 2005, no electric utility shall be required pursuant to this section to enter into a new contract or obligation to purchase from or sell electric energy to a facility that is not an existing qualifying cogeneration facility unless the facility meets the criteria for qualifying cogeneration facilities established by the Commission pursuant to the rulemaking required by subsection (n). (B) For the purposes of this paragraph, the term “existing qualifying cogeneration facility” means a facility that— (i) was a qualifying cogeneration facility on August 8, 2005; or (ii) had filed with the Commission a notice of self-certification, self recertification or an application for Commission certification under 18 CFR 292.207 prior to the date on which the Commission issues the final rule required by subsection (n). (3) **Commission review** — Any electric utility may file an application with the Commission for relief from the mandatory purchase obligation pursuant to this subsection on a service territory-wide basis. Such application shall set forth the factual basis upon which relief is requested and describe why the conditions set forth in subparagraph (A), (B), or (C) of paragraph (1) of this subsection have been met. After notice, including sufficient notice to potentially affected qualifying cogeneration facilities and qualifying small power production facilities, and an opportunity for comment, the Commission shall make a final determination within 90 days of such application regarding whether the conditions set forth in subparagraph (A), (B), or (C) of paragraph (1) have been met. (4) **Reinstatement of obligation to purchase** — At any time after the Commission makes a finding under paragraph (3) relieving an electric utility of its obligation to purchase electric energy, a qualifying cogeneration facility, a qualifying small power production facility, a State agency, or any other affected person may apply to the Commission for an order reinstating the electric utility’s obligation to purchase electric energy under this section. Such application shall set forth the factual basis upon which the application is based and describe why the conditions set forth in subparagraph (A), (B), or (C) of paragraph (1) of this subsection are no longer met. After notice, including sufficient notice to potentially affected utilities, and opportunity for comment, the Commission shall issue an order within 90 days of such application reinstating the electric utility’s obligation to purchase electric energy under this section if the Commission finds that the conditions set forth in subparagraphs (A), (B) or (C) of paragraph (1) which relieved the obligation to purchase, are no longer met. (5) **Obligation to sell** — After August 8, 2005, no electric utility shall be required to enter into a new contract or obligation to sell electric energy to a qualifying cogeneration facility or a qualifying small power production facility under this section if the Commission finds that— (A) competing retail electric suppliers are willing and able to sell and deliver electric energy to the qualifying cogeneration facility or qualifying small power production facility; and (B) the electric utility is not required by State law to sell electric energy in its service territory. (6) **No effect on existing rights and remedies** — Nothing in this subsection affects the rights or remedies of any party under any contract or obligation, in effect or pending approval before the appropriate State regulatory authority or non-regulated electric utility on August 8, 2005, to purchase electric energy or capacity from or to sell electric energy or capacity to a qualifying cogeneration facility or qualifying small power production facility under this Act (including the right to recover costs of purchasing electric energy or capacity). (7) **Recovery of costs** (A) The Commission shall issue and enforce such regulations as are necessary to ensure that an electric utility that purchases electric energy or capacity from a qualifying cogeneration facility or qualifying small power production facility in accordance with any legally enforceable obligation entered into or imposed under this section recovers all prudently incurred costs associated with the purchase. (B) A regulation under subparagraph (A) shall be enforceable in accordance with the provisions of law applicable to enforcement of regulations under the Federal Power Act ([16 U.S.C. 791a](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section791a&num=0&edition=prelim) et seq.). **(n) Rulemaking for new qualifying facilities** (1) (A) Not later than 180 days after August 8, 2005, the Commission shall issue a rule revising the criteria in 18 CFR 292.205 for new qualifying cogeneration facilities seeking to sell electric energy pursuant to this section to ensure— (i) that the thermal energy output of a new qualifying cogeneration facility is used in a productive and beneficial manner; (ii) the electrical, thermal, and chemical output of the cogeneration facility is used fundamentally for industrial, commercial, or institutional purposes and is not intended fundamentally for sale to an electric utility, taking into account technological, efficiency, economic, and variable thermal energy requirements, as well as State laws applicable to sales of electric energy from a qualifying facility to its host facility; and (iii) continuing progress in the development of efficient electric energy generating technology. (B) The rule issued pursuant to paragraph (1)(A) of this subsection shall be applicable only to facilities that seek to sell electric energy pursuant to this section. For all other purposes, except as specifically provided in subsection (m)(2)(A), qualifying facility status shall be determined in accordance with the rules and regulations of this Act. (2) Notwithstanding rule revisions under paragraph (1), the Commission’s criteria for qualifying cogeneration facilities in effect prior to the date on which the Commission issues the final rule required by paragraph (1) shall continue to apply to any cogeneration facility that— (A) was a qualifying cogeneration facility on August 8, 2005, or (B) had filed with the Commission a notice of self-certification, self-recertification or an application for Commission certification under 18 CFR 292.207 prior to the date on which the Commission issues the final rule required by paragraph (1).

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 791a — Short title

This chapter may be cited as the “Federal Power Act”.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 791a

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 2601 — Gathering information on costs of service

**(a) Information required to be gathered** Each electric utility shall periodically gather information under such rules (promulgated by the Commission) as the Commission determines necessary to allow determination of the costs associated with providing electric service. For purposes of this section, and for purposes of any consideration and determination respecting the standard established by [section 2621(d)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2621/d/2&num=0&edition=prelim), such costs shall be separated, to the maximum extent practicable, into the following components: customer cost component, demand cost component, and energy cost component. Rules under this subsection shall include requirements for the gathering of the following information with respect to each electric utility— (1) the costs of serving each electric consumer class, including costs of serving different consumption patterns within such class, based on voltage level, time of use, and other appropriate factors; (2) daily kilowatt demand load curves for all electric consumer classes combined representative of daily and seasonal differences in demand, and daily kilowatt demand load curves for each electric consumer class for which there is a separate rate, representative of daily and seasonal differences in demand; (3) annual capital, operating, and maintenance costs— (A) for transmission and distribution services, and (B) for each type of generating unit; and (4) costs of purchased power, including representative daily and seasonal differences in the amount of such costs. Such rules shall provide that information required to be gathered under this section shall be presented in such categories and such detail as may be necessary to carr

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 2601

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824i — Interconnection authority

**(a) Powers of Commission; application by State regulatory authority** (1) Upon application of any electric utility, Federal power marketing agency, geothermal power producer (including a producer which is not an electric utility), qualifying cogenerator, or qualifying small power producer, the Commission may issue an order requiring— (A) the physical connection of any cogeneration facility, any small power production facility, or the transmission facilities of any electric utility, with the facilities of such applicant, (B) such action as may be necessary to make effective any physical connection described in subparagraph (A), which physical connection is ineffective for any reason, such as inadequate size, poor maintenance, or physical unreliability, (C) such sale or exchange of electric energy or other coordination, as may be necessary to carry out the purposes of any order under subparagraph (A) or (B), or (D) such increase in transmission capacity as may be necessary to carry out the purposes of any order under subparagraph (A) or (B). (2) Any State regulatory authority may apply to the Commission for an order for any action referred to in subparagraph (A), (B), (C), or (D) of paragraph (1). No such order may be issued by the Commission with respect to a Federal power marketing agency upon application of a State regulatory authority. **(b) Notice, hearing and determination by Commission** Upon receipt of an application under subsection (a), the Commission shall— (1) issue notice to each affected State regulatory authority, each affected electric utility, each affected Federal power marketing agency, each affected owner or operator of a cogeneration facility or of a small power production facility, and to the public.11 So in original. The period pro

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824i

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 2602 — Relationship to other authority

Nothing in this chapter shall be construed to limit or affect any authority of the Secretary or the Commission under any other provision of law.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 2602

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 2633 — Relationship to State law

**(a) Revenue and rate of return** Nothing in this chapter shall authorize or require the recovery by an electric utility of revenues, or of a rate of return, in excess of, or less than, the amount of revenues or the rate of return determined to be lawful under any other provision of law. **(b) State authority** Nothing in this chapter prohibits any State regulatory authority or nonregulated electric utility from adopting, pursuant to State law, any standard or rule affecting electric utilities which is different from any standard established by this subchapter. **(c) Federal agencies** With respect to any electric utility which is a Federal agency, and with respect to the Tennessee Valley Authority when it is treated as a State regulatory authority as provided in [section 2602(17) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2602/17&num=0&edition=prelim), any reference in section 2621 or 2623 of this title to State law shall be treated as a reference to Federal law.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 2633

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 803 — Conditions of license generally

All licenses issued under this subchapter shall be on the following conditions: **(a) Modification of plans; factors considered to secure adaptability of project; recommendations for proposed terms and conditions** (1) That the project adopted, including the maps, plans, and specifications, shall be such as in the judgment of the Commission will be best adapted to a comprehensive plan for improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, for the improvement and utilization of water-power development, for the adequate protection, mitigation, and enhancement of fish and wildlife (including related spawning grounds and habitat), and for other beneficial public uses, including irrigation, flood control, water supply, and recreational and other purposes referred to in [section 797(e) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section797/e&num=0&edition=prelim) 11 So in original. Probably should be followed by “; and”. if necessary in order to secure such plan the Commission shall have authority to require the modification of any project and of the plans and specifications of the project works before approval. (2) In order to ensure that the project adopted will be best adapted to the comprehensive plan described in paragraph (1), the Commission shall consider each of the following: (A) The extent to which the project is consistent with a comprehensive plan (where one exists) for improving, developing, or conserving a waterway or waterways affected by the project that is prepared by— (i) an agency established pursuant to Federal law that has the authority to prepare such a plan; or (ii) the State in which the facility is or will be located. (B) The recommendatio

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 803

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824 — Declaration of policy; application of subchapter

**(a) Federal regulation of transmission and sale of electric energy** It is declared that the business of transmitting and selling electric energy for ultimate distribution to the public is affected with a public interest, and that Federal regulation of matters relating to generation to the extent provided in this subchapter and subchapter III of this chapter and of that part of such business which consists of the transmission of electric energy in interstate commerce and the sale of such energy at wholesale in interstate commerce is necessary in the public interest, such Federal regulation, however, to extend only to those matters which are not subject to regulation by the States. **(b) Use or sale of electric energy in interstate commerce** (1) The provisions of this subchapter shall apply to the transmission of electric energy in interstate commerce and to the sale of electric energy at wholesale in interstate commerce, but except as provided in paragraph (2) shall not apply to any other sale of electric energy or deprive a State or State commission of its lawful authority now exercised over the exportation of hydroelectric energy which is transmitted across a State line. The Commission shall have jurisdiction over all facilities for such transmission or sale of electric energy, but shall not have jurisdiction, except as specifically provided in this subchapter and subchapter III of this chapter, over facilities used for the generation of electric energy or over facilities used in local distribution or only for the transmission of electric energy in intrastate commerce, or over facilities for the transmission of electric energy consumed wholly by the transmitter. (2) Notwithstanding subsection (f), the provisions of sections 824b(a)(2), 824e(e), 824i, 824j, 824j–

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 825 — Accounts and records

**(a) Duty to keep** Every licensee and public utility shall make, keep, and preserve for such periods, such accounts, records of cost-accounting procedures, correspondence, memoranda, papers, books, and other records as the Commission may by rules and regulations prescribe as necessary or appropriate for purposes of the administration of this chapter, including accounts, records, and memoranda of the generation, transmission, distribution, delivery, or sale of electric energy, the furnishing of services or facilities in connection therewith, and receipts and expenditures with respect to any of the foregoing: Provided, however, That nothing in this chapter shall relieve any public utility from keeping any accounts, memoranda, or records which such public utility may be required to keep by or under authority of the laws of any State. The Commission may prescribe a system of accounts to be kept by licensees and public utilities and may classify such licensees and public utilities and prescribe a system of accounts for each class. The Commission, after notice and opportunity for hearing, may determine by order the accounts in which particular outlays and receipts shall be entered, charged, or credited. The burden of proof to justify every accounting entry questioned by the Commission shall be on the person making, authorizing, or requiring such entry, and the Commission may suspend a charge or credit pending submission of satisfactory proof in support thereof. **(b) Access to and examination by the Commission** The Commission shall at all times have access to and the right to inspect and examine all accounts, records, and memoranda of licensees and public utilities, and it shall be the duty of such licensees and public utilities to furnish to the Commission, within such r

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 825

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 797 — General powers of Commission

The Commission is authorized and empowered— **(a) Investigations and data** To make investigations and to collect and record data concerning the utilization of the water resources of any region to be developed, the water-power industry and its relation to other industries and to interstate or foreign commerce, and concerning the location, capacity, development costs, and relation to markets of power sites, and whether the power from Government dams can be advantageously used by the United States for its public purposes, and what is a fair value of such power, to the extent the Commission may deem necessary or useful for the purposes of this chapter. **(b) Statements as to investment of licensees in projects; access to projects, maps, etc.** To determine the actual legitimate original cost of and the net investment in a licensed project, and to aid the Commission in such determinations, each licensee shall, upon oath, within a reasonable period of time to be fixed by the Commission, after the construction of the original project or any addition thereto or betterment thereof, file with the Commission in such detail as the Commission may require, a statement in duplicate showing the actual legitimate original cost of construction of such project addition, or betterment, and of the price paid for water rights, rights-of-way, lands, or interest in lands. The licensee shall grant to the Commission or to its duly authorized agent or agents, at all reasonable times, free access to such project, addition, or betterment, and to all maps, profiles, contracts, reports of engineers, accounts, books, records, and all other papers and documents relating thereto. The statement of actual legitimate original cost of said project, and revisions thereof as determined by the Commission, s

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 797

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

26 U.S.C. § 136 — Energy conservation subsidies provided by public utilities

**(a) Exclusion** Gross income shall not include the value of any subsidy provided (directly or indirectly) by a public utility to a customer for the purchase or installation of any energy conservation measure. **(b) Denial of double benefit** Notwithstanding any other provision of this subtitle, no deduction or credit shall be allowed for, or by reason of, any expenditure to the extent of the amount excluded under subsection (a) for any subsidy which was provided with respect to such expenditure. The adjusted basis of any property shall be reduced by the amount excluded under subsection (a) which was provided with respect to such property. **(c) Energy conservation measure** (1) **In general** — For purposes of this section, the term “energy conservation measure” means any installation or modification primarily designed to reduce consumption of electricity or natural gas or to improve the management of energy demand with respect to a dwelling unit. (2) **Other definitions** — For purposes of this subsection— (A) *Dwelling unit* — The term “dwelling unit” has the meaning given such term by section 280A(f)(1). (B) *Public utility* — The term “public utility” means a person engaged in the sale of electricity or natural gas to residential, commercial, or industrial customers for use by such customers. For purposes of the preceding sentence, the term “person” includes the Federal Government, a State or local government or any political subdivision thereof, or any instrumentality of any of the foregoing. **(d) Exception** This section shall not apply to any payment to or from a qualified cogeneration facility or qualifying small power production facility pursuant to section 210 of the Public Utility Regulatory Policy Act of 1978.

Source: Supplied U.S. Code snapshot — release unconfirmed · 26 U.S.C. § 136

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.