Arkansas Legal Resource Navigator

10 U.S.C. § 4271 — Program cost, fielding, and performance goals in planning major defense acquisition programs

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 4271 — Program cost, fielding, and performance goals in planning major defense acquisition programs

**(a) Program Cost and Fielding Targets.—** (1) Before funds are obligated for technology development, systems development, or production of a major defense acquisition program, the designated milestone decision authority for the program shall ensure, by establishing the goals described in paragraph (2), that the program will— (A) be affordable; (B) incorporate program planning that anticipates the evolution of capabilities to meet changing threats, technology insertion, and interoperability; and (C) be fielded when needed. (2) The goals described in this paragraph are goals for— (A) the procurement unit cost and sustainment cost (referred to in this section as the “program cost targets”); (B) the date for initial operational capability (referred to in this section as the “fielding target”); and (C) technology maturation, prototyping, and a modular open system approach to evolve system capabilities and improve interoperability. **(b) Definitions.—** In this section: (1) The term “procurement unit cost” has the meaning provided in [section 4351(a)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4351/a/2&num=0&edition=prelim). (2) The term “initial capabilities document” has the meaning provided in [section 4251(d)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4251/d/1&num=0&edition=prelim).

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 4271

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 91f9595acbf20c5047a32cccfd933a8468236349318722dc7c417d6f354eccba. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_e6ccbb2d6556a5ff8393cf6d
Source file: Laws/federal/codes/united-states-code/title-10/section-4271-program-cost-fielding-and-performance-goals-in-planning-major-defense-ac--439aa7b5cf.md
Pages: Not recorded – Not recorded
Passage SHA-256: e88ea25bdb1f489ca79fafc44941e6a27924adf96029cf405c7fd3a371a43306

Source location: Title 10, Chapter 322, § 4271; chapter-322-major-systems-and-major-defense-acquisition-programs-generally.md

Stored source content

**(a) Program Cost and Fielding Targets.—** (1) Before funds are obligated for technology development, systems development, or production of a major defense acquisition program, the designated milestone decision authority for the program shall ensure, by establishing the goals described in paragraph (2), that the program will— (A) be affordable; (B) incorporate program planning that anticipates the evolution of capabilities to meet changing threats, technology insertion, and interoperability; and (C) be fielded when needed. (2) The goals described in this paragraph are goals for— (A) the procurement unit cost and sustainment cost (referred to in this section as the “program cost targets”); (B) the date for initial operational capability (referred to in this section as the “fielding target”); and (C) technology maturation, prototyping, and a modular open system approach to evolve system capabilities and improve interoperability. **(b) Definitions.—** In this section: (1) The term “procurement unit cost” has the meaning provided in [section 4351(a)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4351/a/2&num=0&edition=prelim). (2) The term “initial capabilities document” has the meaning provided in [section 4251(d)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4251/d/1&num=0&edition=prelim).

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2448a — Renumbered § 4271]

<a id="section-2448b"></a>

Source: U.S. Code supplied Markdown snapshot · 10 U.S.C. § 2448a

Stored review status: release_metadata_unconfirmed; partially_verified. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 3001 — Defense acquisition system; element of the defense acquisition system

**(a) Defense Acquisition System.—** In this part, the term “defense acquisition system” means— (1) the workforce engaged in carrying out the acquisition of property and services for the Department of Defense; (2) the management structure responsible for directing and overseeing the acquisition of property and services for the Department of Defense; and (3) the statutory, regulatory, and policy framework that guides the acquisition of property and services for the Department of Defense. **(b) Element of the Defense Acquisition System.—** In this part, the term “element of the defense acquisition system” means an organization that— (1) employs members of the acquisition workforce; (2) carries out acquisition functions; and (3) focuses primarily on acquisition. **(c) Acquisition.—** In this part, the term “acquisition” has the meaning provided in [section 131 of title 41](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section131&num=0&edition=prelim).

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 3001

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 4272 — Independent technical risk assessments

**(a) In General.—** With respect to a major defense acquisition program, the Secretary of Defense shall conduct or approve independent technical risk assessments before any decision to grant Milestone B approval for the program pursuant to [section 4252 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4252&num=0&edition=prelim), any decision to enter into low-rate initial production or full-rate production, or at any other time considered appropriate by the Secretary, that includes the identification of any critical technologies or manufacturing processes that have not been successfully demonstrated in a relevant environment. **(b) Guidance.—** The Secretary shall issue guidance and a framework for the conduct, execution, and approval of independent technical risk assessments.

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 4272

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 4271 — Program cost, fielding, and performance

Page 2725 TITLE 10—ARMED FORCES § 4271 Sec. 4272. Independent technical risk assessments. 4273. Performance assessments and root cause analyses. 4274. [Reserved]. 4275. [Reserved]. 4276. [Reserved]. Editorial Notes AMENDMENTS 2021—Pub. L. 117–81, div. A, title XVII, § 1701(r)(1)(A), Dec. 27, 2021, 135 Stat. 2149, amended Pub. L. 116–283, div. A, title XVIII. § 1847(a), Jan. 1, 2021, 134 Stat. 4253, which added this analysis, by substituting ‘‘[Reserved]’’ for ‘‘Acquisition-related functions of chiefs: adherence to requirements in major defense acquisition pro- grams’’ in item 4274. § 4271. Program cost, fielding, and performance goals in planning major defense acquisition programs (a) PROGRAM COST AND FIELDING TARGETS.—(1) Before funds are obligated for technology devel- opment, systems development, or production of a major defense acquisition program, the des- ignated milestone decision authority for the program shall ensure, by establishing the goals described in paragraph (2), that the program will— (A) be affordable; (B) incorporate program planning that an- ticipates the evolution of capabilities to meet changing threats, technology insertion, and interoperability; and (C) be fielded when needed. (2) The goals described in this paragraph are goals for— (A) the procurement unit cost and sustainment cost (referred to in this section as the ‘‘program cost targets’’); (B) the date for initial operational capa- bility (referred to in this section as the ‘‘field- ing target’’); and (C) technology maturation, prototyping, and a modular open system approach to evolve system capabilities and improve interoper- ability. (b) DEFINITIONS.—In this section: (1) The term ‘‘procurement unit cost’’ has the meaning provided in section 435

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 4271

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.