Arkansas Legal Resource Navigator

43 U.S.C. § 1592 — Authorization to construct, operate, and maintain salinity control units and salinity control programs

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1592 — Authorization to construct, operate, and maintain salinity control units and salinity control programs

**(a) Authority of Secretary** The Secretary is authorized to construct, operate, and maintain the following salinity control units and salinity control programs as the initial stage of the Colorado River Basin salinity control program: (1) The Paradox Valley unit, Montrose County, Colorado, consisting of facilities for collection and disposition of saline ground water of Paradox Valley, including wells, pumps, pipelines, solar evaporation ponds, and all necessary appurtenant and associated works such as roads, fences, dikes, power transmission facilities, and permanent operating facilities, and consisting of measures to replace incidental fish and wildlife values foregone. (2) The Grand Valley unit, Colorado, consisting of measures and all necessary appurtenant and associated works to reduce the seepage of irrigation water from the irrigated lands of Grand Valley into the ground water and thence into the Colorado River. Measures shall include lining of canals and laterals, replacing canals and laterals with pipe, and the combining of existing canals and laterals into fewer and more efficient facilities implementing other measures to reduce salt contributions from the Grand Valley to the Colorado River, and implementing measures to replace incidental fish and wildlife values foregone..11 So in original. Prior to initiation of construction of the Grand Valley unit, or portion thereof, the Secretary shall enter into contracts through which the non-Federal entities owning, operating, and maintaining the water distribution systems, or portions thereof, in Grand Valley, singly or in concert, will assume the obligations specified in subsection (b)(2) relating to the continued operation and maintenance of the unit’s facilities to the end that the maximum reduction of salinit

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1592

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 6b49cafc0e7f66502c4f3c2ae2ae235496c1a3363a3fd149796d04891d5bf9a1. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_ba74e3f44070fa2e1da9f553
Source file: Laws/federal/codes/united-states-code/title-43/section-1592-authorization-to-construct-operate-and-maintain-salinity-control-units-a--8d85fca4a3.md
Pages: Not recorded – Not recorded
Passage SHA-256: c5ce91985e92e0a4994975f9a307b80b470f086c139e7db6a984ff8f873c382b

Source location: Title 43, Chapter 32A, § 1592; chapter-32a-colorado-river-basin-salinity-control.md

Stored source content

**(a) Authority of Secretary** The Secretary is authorized to construct, operate, and maintain the following salinity control units and salinity control programs as the initial stage of the Colorado River Basin salinity control program: (1) The Paradox Valley unit, Montrose County, Colorado, consisting of facilities for collection and disposition of saline ground water of Paradox Valley, including wells, pumps, pipelines, solar evaporation ponds, and all necessary appurtenant and associated works such as roads, fences, dikes, power transmission facilities, and permanent operating facilities, and consisting of measures to replace incidental fish and wildlife values foregone. (2) The Grand Valley unit, Colorado, consisting of measures and all necessary appurtenant and associated works to reduce the seepage of irrigation water from the irrigated lands of Grand Valley into the ground water and thence into the Colorado River. Measures shall include lining of canals and laterals, replacing canals and laterals with pipe, and the combining of existing canals and laterals into fewer and more efficient facilities implementing other measures to reduce salt contributions from the Grand Valley to the Colorado River, and implementing measures to replace incidental fish and wildlife values foregone..11 So in original. Prior to initiation of construction of the Grand Valley unit, or portion thereof, the Secretary shall enter into contracts through which the non-Federal entities owning, operating, and maintaining the water distribution systems, or portions thereof, in Grand Valley, singly or in concert, will assume the obligations specified in subsection (b)(2) relating to the continued operation and maintenance of the unit’s facilities to the end that the maximum reduction of salinity inflow to the Colorado River will be achieved. (3) The Las Vegas Wash unit, Nevada, consisting of facilities for collection and disposition of saline ground water of Las Vegas Wash, including infiltration galleries, pumps, desalter, pipelines, solar evaporation facilities, and all appurtenant works including but not limited to roads, fences, power transmission facilities, and operating facilities, and consisting of measures to replace incidental fish and wildlife values foregone. (4) Stage I of the Lower Gunnison Basin unit, Colorado, consisting of measures and all necessary appurtenant and associated works to reduce seepage from canals and laterals in the Uncompahgre Valley, and consisting of measures to replace incidental fish and wildlife values foregone, essentially as described in the feasibility report and final environmental statement dated February 10, 1984. Prior to initiation of construction of stage I of the Lower Gunnison Basin unit, or of a portion of stage I, the Secretary shall enter into contracts through which the non-Federal entities owning, operating, and maintaining the water distribution systems, or portions thereof, in the Uncompahgre Valley, singly or in concert, will assume the obligations specified in subsection (b)(2) relating to the continued operation and maintenance of the unit’s facilities. (5) Portions of the McElmo Creek unit, Colorado, as components of the Dolores participating project, Colorado River Storage project, authorized by Public Law 90–537 [[43 U.S.C. 1501](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1501&num=0&edition=prelim) et seq.] and Public Law 84–485 [[43 U.S.C. 620](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620&num=0&edition=prelim) et seq.], consisting of all measures and all necessary appurtenant and associated works to reduce seepage only from the Towaoc-Highline combined canal, Rocky Ford laterals, Lone Pine lateral, and Upper Hermana lateral, and consisting of measures to replace incidental fish and wildlife values foregone. The Dolores participating project shall have salinity control as a project purpose insofar as these specific facilities are concerned: Provided, That the costs of construction and replacement of these specific facilities shall be allocated by the Secretary to salinity control and irrigation only after consultation with the State of Colorado, the Montezuma Valley Irrigation District, Colorado, and the Dolores Water Conservancy District, Colorado: And provided further, That such allocation of costs to salinity control will include only the separable and specific costs of these specific facilities and will not include any joint costs of any other facilities of the Dolores participating project. Repayment of costs allocated to salinity control shall be subject to this chapter. Repayment of costs allocated to irrigation shall be subject to the Acts which authorized the Dolores participating project, the Reclamation Act of 1902, and Acts amendatory and supplementary thereto. Prior to initiation of construction of these specific facilities, or a portion thereof, the Secretary shall enter into contracts through which the non-Federal entities owning, operating, and maintaining the water distribution systems, or portions thereof, in the Montezuma Valley, singly or in concert, will assume the obligations specified in subsection (b)(2) relating to the continued operation and maintenance of the unit’s facilities. (6) A basinwide salinity control program that the Secretary, acting through the Bureau of Reclamation, shall implement. The Secretary may carry out the purposes of this paragraph directly, or may make grants, commitments for grants, or advances of funds to non-Federal entities under such terms and conditions as the Secretary may require. Such program shall consist of cost-effective measures and associated works to reduce salinity from saline springs, leaking wells, irrigation sources, industrial sources, erosion of public and private land, or other sources that the Secretary considers appropriate. Such program shall provide for the mitigation of incidental fish and wildlife values that are lost as a result of the measures and associated works. The Secretary shall submit a planning report concerning the program established under this paragraph to the appropriate committees of Congress. The Secretary may not expend funds for any implementation measure under the program established under this paragraph before the expiration of a 30-day period beginning on the date on which the Secretary submits such report. (7) **Basin states program.—** (A) *In general.—* — A Basin States Program that the Secretary, acting through the Bureau of Reclamation, shall implement to carry out salinity control activities in the Colorado River Basin using funds made available under [section 1595(f) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1595/f&num=0&edition=prelim). (B) *Assistance.—* — The Secretary, in consultation with the Colorado River Basin Salinity Control Advisory Council, shall carry out this paragraph using funds described in subparagraph (A) directly or by providing grants, grant commitments, or advance funds to Federal or non-Federal entities under such terms and conditions as the Secretary may require. (C) *Activities.—* — Funds described in subparagraph (A) shall be used to carry out, as determined by the Secretary— (i) cost-effective measures and associated works to reduce salinity from saline springs, leaking wells, irrigation sources, industrial sources, erosion of public and private land, or other sources; (ii) operation and maintenance of salinity control features constructed under the Colorado River Basin salinity control program; and (iii) studies, planning, and administration of salinity control activities. (D) *Report.—* (i) *In general.—* — Not later than 30 days before implementing the program established under this paragraph, the Secretary shall submit to the appropriate committees of Congress a planning report that describes the proposed implementation of the program. (ii) *Implementation.—* — The Secretary may not expend funds to implement the program established under this paragraph before the expiration of the 30-day period beginning on the date on which the Secretary submits the report, or any revision to the report, under clause (i). **(b) Implementation of authorized units** In implementing the units authorized to be constructed pursuant to subsection (a), the Secretary shall carry out the following directions: (1) As reports are completed describing final implementation plans for the unit, or any portion thereof, authorized by paragraph (5) of subsection (a), and prior to expenditure of funds for related construction activities, the Secretary shall submit such reports to the appropriate committees of the Congress and to the governors of the Colorado River Basin States. (2) Non-Federal entities shall be required by the Secretary to contract for the long-term operation and maintenance of canal and lateral systems constructed pursuant to activities provided for in subsection (a): Provided, That the Secretary shall reimburse such non-Federal entities for the costs of such operation and maintenance to the extent the costs exceed the expenses that would have been incurred by them in the thorough and timely operation and maintenance of their canal and lateral systems absent the construction of a unit, said expenses to be determined by the Secretary after consultation with the involved non-Federal entities. The operation and maintenance for which non-Federal entities shall be responsible shall include such repairing and replacing of a unit’s facilities as are associated with normal annual maintenance activities in order to keep such facilities in a condition which will assure maximum reduction of salinity inflow to the Colorado River. These non-Federal entities shall not be responsible, nor incur any costs, for the replacement of a unit’s facilities, including measures to replace incidental fish and wildlife values foregone. The term replacement shall be defined for the purposes of this subchapter as a major modification or reconstruction of a completed unit, or portion thereof, which is necessitated, through no fault of the non-Federal entity or entities operating and maintaining a unit, by design or construction inadequacies or by normal limits on the useful life of a facility. The Secretary is authorized to provide continuing technical assistance to non-Federal entities to assure the effective and efficient operation and maintenance of a unit’s facilities. (3) The Secretary may, under authority of this subchapter, and limited to the purposes of this chapter, fund through a grant or contract, for any fiscal year only to such extent or in such amounts as are provided in appropriation Acts, a non-Federal entity to organize private canal and lateral owners into formal organizations with which the Secretary may enter into a grant or contract to construct, operate, and maintain a unit’s facilities. (4) In implementing the units authorized to be constructed or the programs pursuant to paragraphs (1), (2), (3), (4), (5), (6), and (7) of subsection (a), the Secretary shall comply with procedural and substantive State water laws. (5) The Secretary may, under authority of this subchapter and limited to the purposes of this chapter, fund through a grant or contract, for any fiscal year only to such extent or in such amounts as are provided in appropriation Acts, a non-Federal entity to operate and maintain measures to replace incidental fish and wildlife values foregone. (6) In implementing the units authorized to be constructed pursuant to subsection (a), the Secretary shall implement measures to replace incidental fish and wildlife values foregone concurrently with the implementation of a unit’s, or a portion of a unit’s, related features. **(c) Salinity control measures** The Secretary of Agriculture shall carry out salinity control measures (including watershed enhancement and cost-share measures with livestock and crop producers) in the Colorado River Basin as part of the environmental quality incentives program established under subchapter A of chapter 4 of subtitle D of title XII of the Food Security Act of 1985 [[16 U.S.C. 3839aa](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section3839aa&num=0&edition=prelim) et seq.].

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1501 — Congressional declaration of purpose and policy

**(a)** It is the object of this chapter to provide a program for the further comprehensive development of the water resources of the Colorado River Basin and for the provision of additional and adequate water supplies for use in the upper as well as in the lower Colorado River Basin. This program is declared to be for the purposes, among others, of regulating the flow of the Colorado River; controlling floods; improving navigation; providing for the storage and delivery of the waters of the Colorado River for reclamation of lands, including supplemental water supplies, and for municipal, industrial, and other beneficial purposes; improving water quality; providing for basic public outdoor recreation facilities; improving conditions for fish and wildlife, and the generation and sale of electrical power as an incident of the foregoing purposes. **(b)** It is the policy of the Congress that the Secretary of the Interior (hereinafter referred to the “Secretary”) shall continue to develop, after consultation with affected States and appropriate Federal agencies, a regional water plan, consistent with the provisions of this chapter and with future authorizations, to serve as the framework under which projects in the Colorado River Basin may be coordinated and constructed with proper timing to the end that an adequate supply of water may be made available for such projects, whether heretofore, herein, or hereafter authorized.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1501

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 3839aa — Purposes

The purposes of the environmental quality incentives program established by this subpart are to promote agricultural production, forest management, and environmental quality as compatible goals, and to optimize environmental benefits, by— (1) assisting producers in complying with local, State, and national regulatory requirements concerning— (A) soil, water, and air quality; (B) wildlife habitat; and (C) surface and ground water conservation; (2) avoiding, to the maximum extent practicable, the need for resource and regulatory programs by assisting producers in protecting soil, water, air, and related natural resources and meeting environmental quality criteria established by Federal, State, tribal, and local agencies; (3) providing flexible assistance to producers to install and maintain conservation practices that sustain food and fiber production while— (A) enhancing soil, water, and related natural resources, including grazing land, forestland, wetland, and wildlife; (B) developing and improving wildlife habitat; and (C) conserving energy; and (4) assisting producers to make beneficial, cost-effective changes to production systems, including addressing identified, new, or expected resource concerns related to organic production, grazing management, fuels management, forest management, nutrient management associated with crops and livestock, pest management, irrigation management, adapting to, and mitigating against, increasing weather volatility, drought resiliency measures, or other practices on agricultural and forested land.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 3839aa

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1591 — Salinity control policy

**(a) Implementation by Secretary of the Interior** The Secretary of the Interior shall implement the salinity control policy adopted for the Colorado River in the “Conclusions and Recommendations” published in the Proceedings of the Reconvened Seventh Session of the Conference in the Matter of Pollution of the Interstate Waters of the Colorado River and Its Tributaries in the States of California, Colorado, Utah, Arizona, Nevada, New Mexico, and Wyoming, held in Denver, Colorado, on April 26–27, 1972, under the authority of section 10 of the Federal Water Pollution Control Act ([33 U.S.C. 1160](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1160&num=0&edition=prelim)), and approved by the Administrator of the Environmental Protection Agency on June 9, 1972. **(b) Expeditious investigation, planning, and implementation of salinity control program** The Secretary is hereby directed to expedite the investigation, planning, and implementation of the salinity control program generally as described in chapter VI of the Secretary’s report entitled, “Colorado River Water Quality Improvement Program, February 1972”. In determining the relative priority of implementing additional units or new self-contained portions of units authorized by [section 1592 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592&num=0&edition=prelim), the Secretary or the Secretary of Agriculture, as the case may be, shall give preference to those additional units or new self-contained portions of units which reduce salinity of the Colorado River at the least cost per unit of salinity reduction. **(c) Cooperation with other Federal agencies** In conformity with subsection (a) and the authority of the Environmental Protection Agenc

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1591

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 371 — Definitions

When used in sections 371, 376, 377, 412, 417, 433, 462, 466, 478, 493, 494, 500, 501, and 526 of this title— **(a)** The word “Secretary” means the Secretary of the Interior. **(b)** The words “reclamation law” mean the Act of June 17, 1902 (32 Stat. 388), and all Acts amendatory thereof or supplementary thereto. **(c)** The words “reclamation fund” mean the fund provided by the reclamation law. **(d)** The word “project” means a Federal irrigation project authorized by the reclamation law. **(e)** The words “division of a project” mean a substantial irrigable area of a project designated as a division by order of the Secretary.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 371

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 620 — Upper Colorado River Basin; purpose of development of water resources; initial units; construction of Wayne N. Aspinall unit contingent upon certification; participating projects; Rainbow Bridge National Monument

In order to initiate the comprehensive development of the water resources of the Upper Colorado River Basin, for the purposes, among others, of regulating the flow of the Colorado River, storing water for beneficial consumptive use, making it possible for the States of the Upper Basin to utilize, consistently with the provisions of the Colorado River Compact, the apportionments made to and among them in the Colorado River Compact and the Upper Colorado River Basin Compact, respectively, providing for the reclamation of arid and semiarid land, for the control of floods, and for the generation of hydroelectric power, as an incident of the foregoing purposes, the Secretary of the Interior is authorized (1) to construct, operate, and maintain the following initial units of the Colorado River storage project, consisting of dams, reservoirs, powerplants, transmission facilities and appurtenant works: Wayne N. Aspinall, Flaming Gorge, Navajo (dam and reservoir only), and Glen Canyon: Provided, That the Wayne N. Aspinall Dam shall be constructed to a height which will impound not less than nine hundred and forty thousand acre-feet of water or will create a reservoir of such greater capacity as can be obtained by a high waterline located at seven thousand five hundred and twenty feet above mean sea level, and that construction thereof shall not be undertaken until the Secretary has, on the basis of further engineering and economic investigations, reexamined the economic justification of such unit and, accompanied by appropriate documentation in the form of a supplemental report, has certified to the Congress and to the President that, in his judgment, the benefits of such unit will exceed its costs; and (2) to construct, operate, and maintain the following additional reclamation

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

7 U.S.C. § 8701 — Geographically disadvantaged farmers and ranchers

**(a) Definitions** In this section: (1) **Agricultural commodity** — The term “agricultural commodity” has the meaning given the term in [section 5602 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section5602&num=0&edition=prelim). (2) **Geographically disadvantaged farmer or rancher** — The term “geographically disadvantaged farmer or rancher” has the meaning given the term in section 10906(a) of the Farm Security and Rural Investment Act of 2002 ([7 U.S.C. 2204](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section2204&num=0&edition=prelim) note; Public Law 107–171). **(b) Authorization** Subject to the availability of funds under subsection (d), the Secretary may provide geographically disadvantaged farmers or ranchers direct reimbursement payments for activities described in subsection (c). **(c) Transportation** (1) **In general** — Subject to paragraphs (2) and (3), the Secretary may provide direct reimbursement payments to a geographically disadvantaged farmer or rancher to transport an agricultural commodity, or inputs used to produce an agricultural commodity, during a fiscal year. (2) **Proof of eligibility** — To be eligible to receive assistance under paragraph (1), a geographically disadvantaged farmer or rancher shall demonstrate to the Secretary that transportation of the agricultural commodity or inputs occurred over a distance of more than 30 miles, as determined by the Secretary. (3) **Amount** (A) *In general* — Subject to paragraph (2), the amount of direct reimbursement payments made to a geographically disadvantaged farmer or rancher under this section for a fiscal year shall equal the product obtained by multiplying— (i) the amount of costs incurred by the geographically di

Source: Supplied U.S. Code snapshot — release unconfirmed · 7 U.S.C. § 8701

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

7 U.S.C. § 1281 — Administrative expenses; posting names and compensation of local employees

**(a)** The Secretary is authorized and directed to make such expenditures as he deems necessary to carry out the provisions of this chapter and sections 590g, 590h, 590i, and 590j to 590q of title 16, including personal services and rents in the District of Columbia and elsewhere; traveling expenses; supplies and equipment; lawbooks, books of reference, directories, periodicals, and newspapers; and the preparation and display of exhibits, including such displays at community, county, State, interstate, and international fairs within the United States. The Secretary of the Treasury is authorized and directed upon the request of the Secretary to establish one or more separate appropriation accounts into which there shall be transferred from the respective funds available for the purposes of this chapter and chapter 3B of title 16, in connection with which personnel or other facilities of the Agricultural Adjustment Administration are utilized, proportionate amounts estimated by the Secretary to be required by the Agricultural Adjustment Administration for administrative expenses in carrying out or cooperating in carrying out any of the provisions of this chapter and chapter 3B of title 16. **(b)** In the administration of this subchapter and sections 590g, 590h, 590i, and 590j to 590q of title 16, the aggregate amount expended in any fiscal year, beginning with the fiscal year ending June 30, 1942, for administrative expenses in the District of Columbia, including regional offices, and in the several States (not including the expenses of county and local committees) shall not exceed 3 per centum of the total amount available for such fiscal year for carrying out the purposes of this subchapter and chapter 3B of title 16, unless otherwise provided by appropriation or oth

Source: Supplied U.S. Code snapshot — release unconfirmed · 7 U.S.C. § 1281

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1598 — Achieving project objectives

**(a) Modification of projects** The Secretary is authorized to provide for modifications of the projects authorized by this subchapter as determined to be appropriate for purposes of meeting the objective of this subchapter. No funds for any such modification shall be expended until the expiration of sixty days after the proposed modification has been submitted to appropriate committees of the Congress, except that funds may be expended prior to the expiration of such sixty days in any case in which the Congress approves an earlier date by concurrent resolution. The Governors of the Colorado River Basin States shall be notified of these changes. **(b) Contract authority; authorization of appropriations** The Secretary is hereby authorized to enter into contracts that he deems necessary to carry out the provisions of this subchapter, in advance of the appropriation of funds therefor. There is hereby authorized to be appropriated the sum of $125,100,000 for the construction of the works and for other purposes authorized in section 1592(a) or (b) of this title, based on April 1973 prices, plus or minus such amounts as may be justified by reason of ordinary fluctuations in costs involved therein, and such sums as may be required to operate and maintain such works. The funds authorized to be appropriated by this section may be used for construction of any or all of the works or portions thereof and for other purposes authorized in subsection (a), including measures as provided for in subsection (b) of [section 1592 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592&num=0&edition=prelim). There is further authorized to be appropriated such sums as may be necessary to pay condemnation awards in excess of appraised values and to co

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1598

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 3839aa — Purposes

Page 2382 TITLE 16—CONSERVATION § 3839aa Section 3839b, Pub. L. 99–198, title XII, § 1239B, as added Pub. L. 101–624, title XIV, § 1440, Nov. 28, 1990, 104 Stat. 3598, related to duties of Secretary. Section 3839c, Pub. L. 99–198, title XII, § 1239C, as added Pub. L. 101–624, title XIV, § 1440, Nov. 28, 1990, 104 Stat. 3599, related to payments. Section 3839d, Pub. L. 99–198, title XII, § 1239D, as added Pub. L. 101–624, title XIV, § 1440, Nov. 28, 1990, 104 Stat. 3600, related to changes in ownership; modifica- tion of easement. PART IV—ENVIRONMENTAL QUALITY INCENTIVES PROGRAM AND CONSERVATION STEWARDSHIP PROGRAM Editorial Notes CODIFICATION Pub. L. 115–334, title II, § 2301(a)(1), Dec. 20, 2018, 132 Stat. 4551, substituted ‘‘Environmental Quality Incen- tives Program and Conservation Stewardship Program’’ for ‘‘Environmental Quality Incentives Program’’ in part heading. Chapter 4 of subtitle D of title XII of the Food Secu- rity Act of 1985, comprising this part, was originally added to Pub. L. 99–198 by Pub. L. 104–127, title III, § 334, Apr. 4, 1996, 110 Stat. 996. Chapter 4 is shown herein, however, as having been added by Pub. L. 107–171, title II, § 2301, May 13, 2002, 116 Stat. 253, because of the ex- tensive revision of the chapter’s provisions by Pub. L. 107–171. Such revision did not contain a chapter head- ing, which was subsequently added by Pub. L. 110–234, title II, § 2501(b), May 22, 2008, 122 Stat. 1058, and Pub. L. 110–246, § 4(a), title II, § 2501(b), June 18, 2008, 122 Stat. 1664, 1786. Pub. L. 110–234 was repealed by section 4(a) of Pub. L. 110–246 effective May 22, 2008, the date of enact- ment of Pub. L. 110–234. SUBPART A—ENVIRONMENTAL QUALITY INCENTIVES PROGRAM § 3839aa. Purposes The purposes of the environmental qua

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 3839aa

Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 3839aa. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1501 — Congressional declaration of purpose and

Page 398 TITLE 43—PUBLIC LANDS § 1501 documents, handbooks, standard operating pro- cedures, and statements of policy specific to the scoping, contracting, and review of appraisals performed for the Department by Federal or non-Federal covered appraisers, shall be made publicly available online and provided upon re- quest. (f) Definitions In this section: (1) Covered appraiser The term ‘‘covered appraiser’’ means a State-licensed or -certified real property ap- praiser. (2) Department The term ‘‘Department’’ means the Depart- ment of the Interior. (3) Reporting period The term ‘‘reporting period’’ means the 1- year period before the date on which a report is submitted under subsection (c). (4) Secretary The term ‘‘Secretary’’ means the Secretary of the Interior. (5) State The term ‘‘State’’ means each of the several States, the District of Columbia, and each ter- ritory and possession of the United States. (Pub. L. 118–230, § 2, Jan. 4, 2025, 138 Stat. 2826.) CHAPTER 32—COLORADO RIVER BASIN PROJECT SUBCHAPTER I—OBJECTIVES Sec. 1501. Congressional declaration of purpose and pol- icy. SUBCHAPTER II—INVESTIGATIONS AND PLANNING 1511. Reconnaissance investigations by Secretary of the Interior; reports; 10-year moratorium on water importation studies. 1511a. Cooperation and participation by Secretary of the Army with Federal, State, and local agencies. 1512. Mexican Water Treaty. 1513. Importation of water; protection of exporting areas. 1514. Authorization of appropriations. SUBCHAPTER III—AUTHORIZED UNITS; PROTECTION OF EXISTING USES 1521. Central Arizona Project. 1522. Orme Dam and Reservoir. 1523. Power requirements of Central Arizona Project and augmentation of Lower Colo- rado River Basin Development Fund. 1524.

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1501

Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 1501. This identifies an authority to review, not proof of applicability.