16 U.S.C. § 839c — Sale of power

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 839c — Sale of power

**(a) Preferences and priorities** All power sales under this chapter shall be subject at all times to the preference and priority provisions of the Bonneville Project Act of 1937 ([16 U.S.C. 832](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section832&num=0&edition=prelim) and following) and, in particular, sections 4 and 5 thereof [[16 U.S.C. 832c](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section832c&num=0&edition=prelim) and 832d]. Such sales shall be at rates established pursuant to [section 839e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839e&num=0&edition=prelim). **(b) Sales to public bodies, cooperatives, and Federal agency customers** (1) Whenever requested, the Administrator shall offer to sell to each requesting public body and cooperative entitled to preference and priority under the Bonneville Project Act of 1937 [[16 U.S.C. 832](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section832&num=0&edition=prelim) et seq.] and to each requesting investor-owned utility electric power to meet the firm power load of such public body, cooperative or investor-owned utility in the Region to the extent that such firm power load exceeds— (A) the capability of such entity’s firm peaking and energy resources used in the year prior to December 5, 1980, to serve its firm load in the region, and (B) such other resources as such entity determines, pursuant to contracts under this chapter, will be used to serve its firm load in the region. In determining the resources which are used to serve a firm load, for purposes of subparagraphs (A) and (B), any resources used to serve a firm load under such subparagraphs shall be treated as continuing to be s

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 839c

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 8a5c3c91d3cab5ba83855d094fd5599ae43d8d5185a9784cdb43ec7547e831ea. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_b492e15104f1aed036a2f010
Source file: Laws/federal/codes/united-states-code/title-16/section-839c-sale-of-power--db4b30d002.md
Pages: Not recorded – Not recorded
Passage SHA-256: 8947e358978763fd729f77e56acf0bc0a96154d2ebf114e598456c82511772aa

Source location: Title 16, Chapter 12H, § 839c; chapter-12h-pacific-northwest-electric-power-planning-and-conservation.md

Stored source content

**(a) Preferences and priorities** All power sales under this chapter shall be subject at all times to the preference and priority provisions of the Bonneville Project Act of 1937 ([16 U.S.C. 832](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section832&num=0&edition=prelim) and following) and, in particular, sections 4 and 5 thereof [[16 U.S.C. 832c](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section832c&num=0&edition=prelim) and 832d]. Such sales shall be at rates established pursuant to [section 839e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839e&num=0&edition=prelim). **(b) Sales to public bodies, cooperatives, and Federal agency customers** (1) Whenever requested, the Administrator shall offer to sell to each requesting public body and cooperative entitled to preference and priority under the Bonneville Project Act of 1937 [[16 U.S.C. 832](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section832&num=0&edition=prelim) et seq.] and to each requesting investor-owned utility electric power to meet the firm power load of such public body, cooperative or investor-owned utility in the Region to the extent that such firm power load exceeds— (A) the capability of such entity’s firm peaking and energy resources used in the year prior to December 5, 1980, to serve its firm load in the region, and (B) such other resources as such entity determines, pursuant to contracts under this chapter, will be used to serve its firm load in the region. In determining the resources which are used to serve a firm load, for purposes of subparagraphs (A) and (B), any resources used to serve a firm load under such subparagraphs shall be treated as continuing to be so used, unless such use is discontinued with the consent of the Administrator, or unless such use is discontinued because of obsolescence, retirement, loss of resource, or loss of contract rights. (2) Contracts with investor-owned utilities shall provide that the Administrator may reduce his obligations under such contracts in accordance with section 5(a) of the Bonneville Project Act of 1937 [[16 U.S.C. 832d(a)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section832d/a&num=0&edition=prelim)]. (3) In addition to his authorities to sell electric power under paragraph (1), the Administrator is also authorized to sell electric power to Federal agencies in the region. (4) Sales under this subsection shall be made only if the public body, cooperative, Federal agency or investor-owned utility complies with the Administrator’s standards for service in effect on December 5, 1980, or as subsequently revised. (5) The Administrator shall include in contracts executed in accordance with this subsection provisions that enable the Administrator to restrict his contractual obligations to meet the loads referred to in this subsection in the future if the Administrator determines, after a reasonable period of experience under this chapter, that the Administrator cannot be assured on a planning basis of acquiring sufficient resources to meet such loads during a specified period of insufficiency. Any such contract with a public body, cooperative, or Federal agency shall specify a reasonable minimum period between a notice of restriction and the earliest date such restriction may be imposed. (6) Contracts executed in accordance with this subsection with public body, cooperative, and Federal agency customers shall— (A) provide that the restriction referred to in paragraph (5) shall not be applicable to any such customers until the operating year in which the total of such customers’ firm loads to be served by the Administrator equals or exceeds the firm capability of the Federal base system resources; (B) not permit restrictions which would reduce the total contractual entitlement of such customers to an amount less than the firm capability of the Federal base system resources; and (C) contain a formula for determining annually, on a uniform basis, each such customer’s contractual entitlement to firm power during such a period of restriction, which formula shall not consider customer resources other than those the customer has determined, as of December 5, 1980, to be used to serve its own firm loads. The formula referred to in subparagraph (C) shall obligate the Administrator to provide on an annual basis only firm power needed to serve the portion of such customer’s firm load in excess of the capability of such customer’s own firm resources determined by such customer under paragraph (1) of this subsection to be used to serve its firm load. (7) **Required sale.—** (A) *Definition of a joint operating entity.—* — In this section, the term “joint operating entity” means an entity that is lawfully organized under State law as a public body or cooperative prior to September 22, 2000, and is formed by and whose members or participants are two or more public bodies or cooperatives, each of which was a customer of the Bonneville Power Administration on or before January 1, 1999. (B) *Sale.—* — Pursuant to paragraph (1), the Administrator shall sell, at wholesale to a joint operating entity, electric power solely for the purpose of meeting the regional firm power consumer loads of regional public bodies and cooperatives that are members of or participants in the joint operating entity. (C) *No resale.—* — A public body or cooperative to which a joint operating entity sells electric power under subparagraph (B) shall not resell that power except to retail customers of the public body or cooperative or to another regional member or participant of the same joint operating entity, or except as otherwise permitted by law. **(c) Purchase and exchange sales** (1) Whenever a Pacific Northwest electric utility offers to sell electric power to the Administrator at the average system cost of that utility’s resources in each year, the Administrator shall acquire by purchase such power and shall offer, in exchange, to sell an equivalent amount of electric power to such utility for resale to that utility’s residential users within the region. (2) The purchase and exchange sale referred to in paragraph (1) of this subsection with any electric utility shall be limited to an amount not in excess of 50 per centum of such utility’s Regional residential load in the year beginning July 1, 1980, such 50 per centum limit increasing in equal annual increments to 100 per centum of such load in the year beginning July 1, 1985, and each year thereafter. (3) The cost benefits, as specified in contracts with the Administrator, of any purchase and exchange sale referred to in paragraph (1) of this subsection which are attributable to any electric utility’s residential load within a State shall be passed through directly to such utility’s residential loads within such State, except that a State which lies partially within and partially without the region may require that such cost benefits be distributed among all of the utility’s residential loads in that State. (4) An electric utility may terminate, upon reasonable terms and conditions agreed to by the Administrator and such utility prior to such termination, its purchase and sale under this subsection if the supplemental rate charge provided for in [section 839e(b)(3) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839e/b/3&num=0&edition=prelim) is applied and the cost of electric power sold to such utility under this subsection exceeds, after application of such rate charge, the average system cost of power sold by such utility to the Administrator under this subsection. (5) Subject to the provisions of sections 839b and 839d of this title, in lieu of purchasing any amount of electric power offered by a utility under paragraph (1) of this subsection, the Administrator may acquire an equivalent amount of electric power from other sources to replace power sold to such utility as part of an exchange sale if the cost of such acquisition is less than the cost of purchasing the electric power offered by such utility. (6) Exchange sales to a utility pursuant to this subsection shall not be restricted below the amounts of electric power acquired by the Administrator from, or on behalf of, such utility pursuant to this subsection. (7) The “average system cost” for electric power sold to the Administrator under this subsection shall be determined by the Administrator on the basis of a methodology developed for this purpose in consultation with the Council, the Administrator’s customers, and appropriate State regulatory bodies in the region. Such methodology shall be subject to review and approval by the Federal Energy Regulatory Commission. Such average system cost shall not include— (A) the cost of additional resources in an amount sufficient to serve any new large single load of the utility; (B) the cost of additional resources in an amount sufficient to meet any additional load outside the region occurring after December 5, 1980; and (C) any costs of any generating facility which is terminated prior to initial commercial operation. **(d) Sales to existing direct service industrial customers** (1) (A) The Administrator is authorized to sell in accordance with this subsection electric power to existing direct service industrial customers. Such sales shall provide a portion of the Administrator’s reserves for firm power loads within the region. (B) After December 5, 1980, the Administrator shall offer in accordance with subsection (g) of this section to each existing direct service industrial customer an initial long term contract that provides such customer an amount of power equivalent to that to which such customer is entitled under its contract dated January or April 1975 providing for the sale of “industrial firm power.” (2) The Administrator shall not sell electric power, including reserves, directly to new direct service industrial customers. (3) The Administrator shall not sell amounts of electric power, including reserves, to existing direct service industrial customers in excess of the amount permitted under paragraph (1) unless the Administrator determines, after a plan has been adopted pursuant to [section 839b of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839b&num=0&edition=prelim), that such proposed sale is consistent with the plan and that— (A) additional power system reserves are required for the region’s firm loads, (B) the proposed sale would provide a cost-effective method of supplying such reserves, (C) such loads or loads of similar character cannot provide equivalent operating or planning benefits to the region if served by an electric utility under contractual arrangements providing reserves, and (D) the Administrator has or can acquire sufficient electric power to serve such loads, and unless the Council has determined such sale is consistent with the plan. After such determination by the Administrator and by the Council, the Administrator is authorized to offer to existing direct service industrial customers power in such amounts in excess of the amount permitted under paragraph (1) of this subsection as the Administrator determines to be necessary to provide additional power system reserves to meet the region’s firm loads. (4) (A) As used in this section, the term “existing direct service industrial customer” means any direct service industrial customer of the Administrator which has a contract for the purchase of electric power from the Administrator on December 5, 1980. (B) The term “new direct service industrial customer” means any industrial entity other than an existing direct service industrial customer. (C) (i) Where a new contract is offered in accordance with subsection (g) to any existing direct service industrial customer which has not received electric power prior to December 5, 1980, from the Administrator pursuant to a contract with the Administrator existing on December 5, 1980, electric power delivered under such new contract shall be conditioned on the Administrator reasonably acquiring, in accordance with this chapter and within such estimated period of time (as specified in the contract) as he deems reasonable, sufficient resources to meet, on a planning basis, the load requirement of such customer. Such contract shall also provide that the obligation of the Administrator to acquire such resources to meet such load requirement shall, except as provided in clause (ii) of this subparagraph, apply only to such customer and shall not be sold or exchanged by such customer to any other person. (ii) Rights under a contract described in clause (i) of this subparagraph may be transferred by an existing direct service industrial customer referred to in clause (i) to a successor in interest in connection with a reorganization or other transfer of all major assets of such customer. Following such a transfer, such successor in interest (or any other subsequent successor in interest) may also transfer rights under such a contract only in connection with a reorganization or other transfer of all assets of such successor in interest. (iii) The limitations of clause (i) of this subparagraph shall not apply to any customer referred to in clause (i) whenever the Administrator determines that such customer is receiving electric power pursuant to a contract referred to in such clause (ii). **(e) Contractual entitlements to firm power** (1) The contractual entitlement to firm power of any customer from whom, or on whose behalf, the Administrator has acquired electric power pursuant to [section 839d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839d&num=0&edition=prelim) may not be restricted below the amount of electric power so acquired from, or on behalf of, such customer. If in any year such customer’s requirements are less than such entitlement, any excess of such entitlement shall be first made available to increase the entitlement of other customers of the same class before being available for the entitlement of other customers. For purposes of this paragraph, the following entities shall each constitute a class: (A) public bodies and cooperatives; (B) Federal agencies; (C) direct service industrial; and (D) investor owned utilities. (2) Any contractual entitlement to firm power which is based on electric power acquired from, or on behalf of, a customer pursuant to [section 839d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839d&num=0&edition=prelim) shall be in addition to any other contractual entitlement to firm power not subject to restriction that such customer may have under this section. For the purposes of this subsection, references to amounts of power acquired by the Administrator pursuant to [section 839d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839d&num=0&edition=prelim) shall be deemed to mean the amounts specified in the resource acquisition contracts exclusive of any amounts recognized in such contracts as replacement for Federal base system resources. (3) The Administrator shall, consistent with the provisions of this chapter, insure that any restrictions upon any particular customer class made pursuant to this subsection and subsection (b) of this section are distributed equitably throughout the region. **(f) Surplus power** The Administrator is authorized to sell, or otherwise dispose of, electric power, including power acquired pursuant to this and other Acts, that is surplus to his obligations incurred pursuant to subsections (b), (c), and (d) of this section in accordance with this and other Acts applicable to the Administrator, including the Bonneville Project Act of 1937 ([16 U.S.C. 832](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section832&num=0&edition=prelim) and following), the Federal Columbia River Transmission System Act ([16 U.S.C. 838](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section838&num=0&edition=prelim) and following), and the Act of August 31, 1964 ([16 U.S.C. 837–837h](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section837–837h&num=0&edition=prelim)). **(g) Long-term contracts** (1) As soon as practicable within nine months after December 5, 1980, the Administrator shall commence necessary negotiations for, and offer, initial long-term contracts (within the limitations of the third sentence of section 5(a) of the Bonneville Project Act [[16 U.S.C. 832d(a)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section832d/a&num=0&edition=prelim)]) simultaneously to— (A) existing public body and cooperative customers and investor-owned utility customers under subsection (b) of this section; (B) Federal agency customers under subsection (b) of this section; (C) electric utility customers under subsection (c) of this section; and (D) direct service industrial customers under subsection (d)(1). (2) Each customer offered a contract pursuant to this subsection shall have one year from the date of such offer to accept such contract. Such contract shall be effective as provided in this subsection. (3) An initial contract with a public body, cooperative or investor-owned electric utility customer or a Federal agency customer pursuant to subsection (b) of this section shall be effective on the date executed by such customer, unless another effective date is otherwise agreed to by the Administrator and the customer. (4) An initial contract with an electric utility customer pursuant to subsection (c) of this section shall be effective on the date executed by such customer, but no earlier than the first day of the tenth month after December 5, 1980. (5) An initial contract with a direct service industrial customer pursuant to subsection (d)(1), shall be effective on the date agreed upon by the Administrator and such customer, but no later than the first day of the tenth month after December 5, 1980. When such contract is executed, it may for rate purposes be given retroactive effect to such first day. (6) Initial contracts offered public body, cooperative and Federal agency customers in accordance with this subsection shall provide that during a period of insufficiency declared in accordance with subsection (b) of this section each customer’s contractual entitlement shall, to the extent of its requirements on the Administrator, be no less than the amount of firm power received from the Administrator in the year immediately preceding the period of insufficiency. (7) The Administrator shall be deemed to have sufficient resources for the purpose of entering into the initial contracts specified in paragraph (1)(A) through (D).

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 839b — Regional planning and participation

**(a) Pacific Northwest Electric Power and Conservation Planning Council; establishment and operation as regional agency** (1) The purposes of this section are to provide for the prompt establishment and effective operation of the Pacific Northwest Electric Power and Conservation Planning Council, to further the purposes of this chapter by the Council promptly preparing and adopting (A) a regional conservation and electric power plan and (B) a program to protect, mitigate, and enhance fish and wildlife, and to otherwise expeditiously and effectively carry out the Council’s responsibilities and functions under this chapter. (2) To achieve such purposes and facilitate cooperation among the States of Idaho, Montana, Oregon, and Washington, and with the Bonneville Power Administration, the consent of Congress is given for an agreement described in this paragraph and not in conflict with this chapter, pursuant to which— (A) there shall be established a regional agency known as the “Pacific Northwest Electric Power and Conservation Planning Council” which (i) shall have its offices in the Pacific Northwest, (ii) shall carry out its functions and responsibilities in accordance with the provisions of this chapter, (iii) shall continue in force and effect in accordance with the provisions of this chapter, and (iv) except as otherwise provided in this chapter, shall not be considered an agency or instrumentality of the United States for the purpose of any Federal law; and (B) two persons from each State may be appointed, subject to the applicable laws of each such State, to undertake the functions and duties of members of the Council. The State may fill any vacancy occurring prior to the expiration of the term of any member. The appointment of six initial members, subje

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 839b

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 839d — Conservation and resource acquisition

**(a) Conservation measures; resources** (1) The Administrator shall acquire such resources through conservation, implement all such conservation measures, and acquire such renewable resources which are installed by a residential or small commercial consumer to reduce load, as the Administrator determines are consistent with the plan, or if no plan is in effect with the criteria of [section 839b(e)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839b/e/1&num=0&edition=prelim) and the considerations of [section 839b(e)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839b/e/2&num=0&edition=prelim) and, in the case of major resources, in accordance with subsection (c) of this section. Such conservation measures and such resources may include, but are not limited to— (A) loans and grants to consumers for insulation or weatherization, increased system efficiency, and waste energy recovery by direct application, (B) technical and financial assistance to, and other cooperation with, the Administrator’s customers and governmental authorities to encourage maximum cost-effective voluntary conservation and the attainment of any cost-effective conservation objectives adopted by individual States or subdivisions thereof, (C) aiding the Administrator’s customers and governmental authorities in implementing model conservation standards adopted pursuant to [section 839b(f) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839b/f&num=0&edition=prelim), and (D) conducting demonstration projects to determine the cost effectiveness of conservation measures and direct application of renewable energy resources. (2) In addition to acquiring electri

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 839d

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 832 — Completion and maintenance of project; generation of electricity

For the purpose of improving navigation on the Columbia River, and for other purposes incidental thereto, the dam, locks, power plant, and appurtenant works under construction on August 20, 1937, at Bonneville, Oregon and North Bonneville, Washington (called Bonneville project in this chapter), shall be completed, maintained, and operated under the direction of the Secretary of the Army and the supervision of the Chief of Engineers, subject to the provisions of this chapter relating to the powers and duties of the Bonneville power administrator provided for in [section 832a(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section832a/a&num=0&edition=prelim) (called the administrator in this chapter) respecting the transmission and sale of electric energy generated at said project. The Secretary of the Army shall provide, construct, operate, maintain, and improve at Bonneville project such machinery, equipment, and facilities for the generation of electric energy as the administrator may deem necessary to develop such electric energy as rapidly as markets may be found therefor. The electric energy thus generated and not required for the operation of the dam and locks at such project and the navigation facilities employed in connection therewith shall be delivered to the administrator, for disposition as provided in this chapter.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 832

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 839e — Rates

**(a) Establishment; periodic review and revision; confirmation and approval by Federal Energy Regulatory Commission** (1) The Administrator shall establish, and periodically review and revise, rates for the sale and disposition of electric energy and capacity and for the transmission of non-Federal power. Such rates shall be established and, as appropriate, revised to recover, in accordance with sound business principles, the costs associated with the acquisition, conservation, and transmission of electric power, including the amortization of the Federal investment in the Federal Columbia River Power System (including irrigation costs required to be repaid out of power revenues) over a reasonable period of years and the other costs and expenses incurred by the Administrator pursuant to this chapter and other provisions of law. Such rates shall be established in accordance with sections 9 and 10 of the Federal Columbia River Transmission System Act ([16 U.S.C. 838](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section838&num=0&edition=prelim)) [[16 U.S.C. 838g](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section838g&num=0&edition=prelim) and 838h], section 5 of the Flood Control Act of 1944 [[16 U.S.C. 825s](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section825s&num=0&edition=prelim)], and the provisions of this chapter. (2) Rates established under this section shall become effective only, except in the case of interim rules as provided in subsection (i)(6), upon confirmation and approval by the Federal Energy Regulatory Commission upon a finding by the Commission, that such rates— (A) are sufficient to assure repayment of the Federal investment in the Federal Columbia River Power System over

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 839e

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 838 — Congressional findings; authority and duties of Secretary of Energy relating to Federal Columbia River Power System unaffected

**(a)** Congress finds that in order to enable the Secretary of Energy to carry out the policies of Public Law 88–552 [[16 U.S.C. 837](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section837&num=0&edition=prelim) et seq.] relating to the marketing of electric power from hydroelectric projects in the Pacific Northwest, Public Laws 89–448 and 89–561 relating to use of revenues of the Federal Columbia River Power System to provide financial assistance to reclamation projects in the Pacific Northwest, the treaty between the United States and Canada relating to the cooperative development of the resources of the Columbia River Basin, and other applicable law, it is desirable and appropriate that the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds be used to further the operation, maintenance, and further construction of the Federal transmission system in the Pacific Northwest. **(b)** Other than as specifically provided herein, the present authority and duties of the Secretary of Energy relating to the Federal Columbia River Power System shall not be affected by this chapter. The authority and duties of the Administrator referred to herein are subject to the supervision and direction of the Secretary.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 838

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 832c — Distribution of electricity; preference to public bodies and cooperatives

**(a) General provisions** In order to insure that the facilities for the generation of electric energy at the Bonneville project shall be operated for the benefit of the general public, and particularly of domestic and rural consumers, the administrator shall at all times, in disposing of electric energy generated at said project, give preference and priority to public bodies and cooperatives. **(b) Prior to January 1, 1942; subsequent thereto** To preserve and protect the preferential rights and priorities of public bodies and cooperatives as provided in section 11 So in original. Probably should be “subsection”. (a) and to effectuate the intent and purpose of this chapter that at all times up to January 1, 1942, there shall be available for sale to public bodies and cooperatives not less than 50 per centum of the electric energy produced at the Bonneville project, it shall be the duty of the administrator in making contracts for the sale of such energy to so arrange such contracts as to make such 50 per centum of such energy available to said public bodies and cooperatives until January 1, 1942: Provided, That the electric energy so reserved for but not actually purchased by and delivered to such public bodies and cooperatives prior to January 1, 1942, may be disposed of temporarily so long as such temporary disposition will not interfere with the purchase by and delivery to such public bodies and cooperatives at any time prior to January 1, 1942: Provided further, That nothing herein contained shall be construed to limit or impair the preferential and priority rights of such public bodies or cooperatives after January 1, 1942; and in the event that after such date there shall be conflicting or competing applications for an allocation of electric energy between any

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 832c

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 832m — Sale of excess Federal power; fish and wildlife conservation within Federal Columbia River Power System; residential exchange; personnel flexibility

**(a) Definitions** In this section: (1) **Administrator** — The term “Administrator” means the Administrator of the Bonneville Power Administration. (2) **Council** — The term “Council” means the Northwest Power and Conservation Planning Council. (3) **Excess Federal power** — The term “excess Federal power” means such electric power that has become surplus to the firm contractual obligations of the Administrator under [section 839c(f) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839c/f&num=0&edition=prelim) due to either— (A) any reduction in the quantity of electric power that the Administrator is contractually required to supply under subsections (b) and (d) of [section 839c of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839c&num=0&edition=prelim), due to the election by customers of the Bonneville Power Administration to purchase electric power from other suppliers, as compared to the quantity of electric power that the Administrator was contractually required to supply as of January 1, 1995; or (B) those operations of the Federal Columbia River Power System that are primarily for the benefit of fish and wildlife affected by the development, operation, or management of the System. **(b) Sale of excess Federal power** Notwithstanding [section 837a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section837a&num=0&edition=prelim), subsections (a), (b), and (c) of [section 837b of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section837b&num=0&edition=prelim), and [section 837f of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section837f&num=0&edition=prelim), and [s

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 832m

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 839f — Administrative provisions

**(a) Contract authority** Subject to the provisions of this chapter, the Administrator is authorized to contract in accordance with section 2(f) of the Bonneville Project Act of 1937 ([16 U.S.C. 832a(f)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section832a/f&num=0&edition=prelim)). Other provisions of law applicable to such contracts on December 5, 1980, shall continue to be applicable. **(b) Executive and administrative functions of Administrator of Bonneville Power Administration; sound and businesslike implementation of chapter** The Administrator shall discharge the executive and administrative functions of his office in accordance with the policy established by the Bonneville Project Act of 1937 ([16 U.S.C. 832](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section832&num=0&edition=prelim) and following), section 7152(a)(2) and (3) of title 42, and this chapter. The Secretary of Energy, the Council, and the Administrator shall take such steps as are necessary to assure the timely implementation of this chapter in a sound and businesslike manner. Nothing in this chapter shall be construed by the Secretary, the Administrator, or any other official of the Department of Energy to modify, alter, or otherwise affect the requirements and directives expressed by the Congress in section 7152(a)(2) and (3) of title 42 or the operations of such officials as they existed prior to December 5, 1980. **(c) Limitations and conditions on contracts for sale or exchange of electric power for use outside Pacific Northwest** Any contract of the Administrator for the sale or exchange of electric power for use outside the Pacific Northwest shall be subject to limitations and conditions corresponding to those provided in sections 2 and

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 839f

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 839g — Savings provisions

**(a) Rights of States and political subdivisions of States** Nothing in this chapter shall be construed to affect or modify any right of any State or political subdivision thereof or electric utility to— (1) determine retail electric rates, except as provided by [section 839c(c)(3) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839c/c/3&num=0&edition=prelim); (2) develop and implement plans and programs for the conservation, development, and use of resources; or (3) make energy facility siting decisions, including, but not limited to, determining the need for a particular facility, evaluating alternative sites, and considering alternative methods of meeting the determined need. **(b) Rights and obligations under existing contracts** Nothing in this chapter shall alter, diminish, or abridge the rights and obligations of the Administrator or any customer under any contract existing as of December 5, 1980. **(c) Statutory preferences and priorities of public bodies and cooperatives in sale of federally generated power** Nothing in this chapter shall alter, diminish, abridge, or otherwise affect the provisions of other Federal laws by which public bodies and cooperatives are entitled to preference and priority in the sale of federally generated electric power. **(d) Contractual rights under provisions later found to be unconstitutional** If any provision of this chapter is found to be unconstitutional, then any contract entered into by the Administrator, prior to such finding and in accordance with such provisions, to sell power, acquire or credit resources, or to reimburse investigation and preconstruction expenses pursuant to [section 839c of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 839g

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 832 — Completion and maintenance of project;

Page 1478 TITLE 16—CONSERVATION § 831dd (May 18, 1933, ch. 32, § 30, 48 Stat. 72; Aug. 31, 1935, ch. 836, § 15, 49 Stat. 1081.) Editorial Notes AMENDMENTS 1935—Act Aug. 31, 1935, reenacted provisions of this section without change. § 831dd. Liberal construction of chapter; sale of surplus lands This chapter shall be liberally construed to carry out the purposes of Congress to provide for the disposition of and make needful rules and regulations respecting Government properties entrusted to the Authority, provide for the na- tional defense, improve navigation, control de- structive floods, and promote interstate com- merce and the general welfare, but no real es- tate shall be held except what is necessary in the opinion of the Board to carry out plans and projects actually decided upon requiring the use of such land: Provided, That any land purchased by the Authority and not necessary to carry out plans and projects actually decided upon shall be sold by the Authority as agent of the United States, after due advertisement, at public auc- tion to the highest bidder. (May 18, 1933, ch. 32, § 31, as added Aug. 31, 1935, ch. 836, § 12, 49 Stat. 1080.) Editorial Notes CODIFICATION As originally enacted, the last sentence of this sec- tion contained, at the end thereof, the words ‘‘or at pri- vate sale as provided in section 3 of this amendatory Act.’’ Section 3 of the amendatory act of Aug. 31, 1935, added subsec. (k) to section 831c of this title. § 831ee. Essential stewardship activities For essential stewardship activities for which appropriations were provided to the Tennessee Valley Authority in Public Law 104–206, such sums as are necessary in fiscal year 1999 and thereafter, to be derived only from one or more of the following sources:

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 832

Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 832. This identifies an authority to review, not proof of applicability.