42 U.S.C. § 18715b — Grants to facilitate the siting of interstate electricity transmission lines
Federal law — U.S. Code and appendices · legal_authorities
**(a) Appropriation** In addition to amounts otherwise available, there is appropriated to the Secretary for fiscal year 2022, out of any money in the Treasury not otherwise appropriated, $760,000,000, to remain available through September 30, 2029, for making grants in accordance with this section and for administrative expenses associated with carrying out this section.
**(b) Use of funds**
(1) **In general** — The Secretary may make a grant under this section to a siting authority for, with respect to a covered transmission project, any of the following activities:
(A) Studies and analyses of the impacts of the covered transmission project.
(B) Examination of up to 3 alternate siting corridors within which the covered transmission project feasibly could be sited.
(C) Participation by the siting authority in regulatory proceedings or negotiations in another jurisdiction, or under the auspices of a Transmission Organization (as defined in [section 796 of title 16](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section796&num=0&edition=prelim)) that is also considering the siting or permitting of the covered transmission project.
(D) Participation by the siting authority in regulatory proceedings at the Federal Energy Regulatory Commission or a State regulatory commission for determining applicable rates and cost allocation for the covered transmission project.
(E) Other measures and actions that may improve the chances of, and shorten the time required for, approval by the siting authority of the application relating to the siting or permitting of the covered transmission project, as the Secretary determines appropriate.
(2) **Economic development** — The Secretary may make a grant under this section to a siting authority, or oth
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 18715b
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 2561cbb3ce298b683e17061afe2bf517e98805eed9e2917fe7397545cf0f9310. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_b1ea4a7951eb91377e0ec9b2
Source file: Laws/federal/codes/united-states-code/title-42/section-18715b-grants-to-facilitate-the-siting-of-interstate-electricity-transmission-l--9db72784e5.md
Pages: Not recorded – Not recorded
Passage SHA-256: 06ace3f20b2810b1aeb9f1a7412496244d36bf50c56d9f8b562cac5aa5f21de8
Source location: Title 42, Chapter 162, § 18715b; chapter-162-energy-infrastructure.md
Stored source content
**(a) Appropriation** In addition to amounts otherwise available, there is appropriated to the Secretary for fiscal year 2022, out of any money in the Treasury not otherwise appropriated, $760,000,000, to remain available through September 30, 2029, for making grants in accordance with this section and for administrative expenses associated with carrying out this section.
**(b) Use of funds**
(1) **In general** — The Secretary may make a grant under this section to a siting authority for, with respect to a covered transmission project, any of the following activities:
(A) Studies and analyses of the impacts of the covered transmission project.
(B) Examination of up to 3 alternate siting corridors within which the covered transmission project feasibly could be sited.
(C) Participation by the siting authority in regulatory proceedings or negotiations in another jurisdiction, or under the auspices of a Transmission Organization (as defined in [section 796 of title 16](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section796&num=0&edition=prelim)) that is also considering the siting or permitting of the covered transmission project.
(D) Participation by the siting authority in regulatory proceedings at the Federal Energy Regulatory Commission or a State regulatory commission for determining applicable rates and cost allocation for the covered transmission project.
(E) Other measures and actions that may improve the chances of, and shorten the time required for, approval by the siting authority of the application relating to the siting or permitting of the covered transmission project, as the Secretary determines appropriate.
(2) **Economic development** — The Secretary may make a grant under this section to a siting authority, or other State, local, or Tribal governmental entity, for economic development activities for communities that may be affected by the construction and operation of a covered transmission project, provided that the Secretary shall not enter into any grant agreement pursuant to this section that could result in any outlays after September 30, 2031.
**(c) Conditions**
(1) **Final decision on application** — In order to receive a grant for an activity described in subsection (b)(1), the Secretary shall require a siting authority to agree, in writing, to reach a final decision on the application relating to the siting or permitting of the applicable covered transmission project not later than 2 years after the date on which such grant is provided, unless the Secretary authorizes an extension for good cause.
(2) **Federal share** — The Federal share of the cost of an activity described in subparagraph (C) or (D) of subsection (b)(1) shall not exceed 50 percent.
(3) **Economic development** — The Secretary may only disburse grant funds for economic development activities under subsection (b)(2)—
(A) to a siting authority upon approval by the siting authority of the applicable covered transmission project; and
(B) to any other State, local, or Tribal governmental entity upon commencement of construction of the applicable covered transmission project in the area under the jurisdiction of the entity.
**(d) Returning funds** If a siting authority that receives a grant for an activity described in subsection (b)(1) fails to use all grant funds within 2 years of receipt, the siting authority shall return to the Secretary any such unused funds.
**(e) Definitions** In this section:
(1) **Covered transmission project** — The term “covered transmission project” means a high-voltage interstate or offshore electricity transmission line—
(A) that is proposed to be constructed and to operate—
(i) at a minimum of 275 kilovolts of either alternating-current or direct-current electric energy by an entity; or
(ii) offshore and at a minimum of 200 kilovolts of either alternating-current or direct-current electric energy by an entity; and
(B) for which such entity has applied, or informed a siting authority of such entity’s intent to apply, for regulatory approval.
(2) **Siting authority** — The term “siting authority” means a State, local, or Tribal governmental entity with authority to make a final determination regarding the siting, permitting, or regulatory status of a covered transmission project that is proposed to be located in an area under the jurisdiction of the entity.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definition of Administrator** In this section, the term “Administrator” means the Administrator of General Services.
**(b) Establishment**
(1) **In general** — The Administrator shall establish a program to accelerate the use of more cost-effective technologies and practices at GSA facilities.
(2) **Requirements** — The program established under this subsection shall—
(A) ensure centralized responsibility for the coordination of cost reduction-related recommendations, practices, and activities of all relevant Federal agencies;
(B) provide technical assistance and operational guidance to applicable tenants to achieve the goal identified in subsection (c)(2)(B)(ii);
(C) establish methods to track the success of Federal departments and agencies with respect to that goal; and
(D) be fully coordinated with and no less stringent nor less energy-conserving or water-conserving than required by other provisions of this Act and other applicable law, including sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 and amendments made by those sections.
**(c) Accelerated use of technologies**
(1) **Review**
(A) *In general* — As part of the program under this section, not later than 90 days after December 19, 2007, the Administrator shall conduct a review of—
(i) current use of cost-effective lighting technologies and geothermal heat pumps in GSA facilities; and
(ii) the availability to managers of GSA facilities of cost-effective lighting technologies and geothermal heat pumps.
(B) *Requirements* — The review under subparagraph (A) shall—
(i) examine the use of cost-effective lighting technologies, geothermal heat pumps, and other cost-effective technologies and practices by Federal agencies in GSA facilitie
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 17113b
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
The words defined in this section shall have the following meanings for purposes of this chapter, to wit:
(1) “public lands” means such lands and interest in lands owned by the United States as are subject to private appropriation and disposal under public land laws. It shall not include “reservations”, as hereinafter defined;
(2) “reservations” means national forests, tribal lands embraced within Indian reservations, military reservations, and other lands and interests in lands owned by the United States, and withdrawn, reserved, or withheld from private appropriation and disposal under the public land laws; also lands and interests in lands acquired and held for any public purposes; but shall not include national monuments or national parks;
(3) “corporation” means any corporation, joint-stock company, partnership, association, business trust, organized group of persons, whether incorporated or not, or a receiver or receivers, trustee or trustees of any of the foregoing. It shall not include “municipalities” as hereinafter defined;
(4) “person” means an individual or a corporation;
(5) “licensee” means any person, State, or municipality licensed under the provisions of [section 797 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section797&num=0&edition=prelim), and any assignee or successor in interest thereof;
(6) “State” means a State admitted to the Union, the District of Columbia, and any organized Territory of the United States;
(7) “municipality” means a city, county, irrigation district, drainage district, or other political subdivision or agency of a State competent under the laws thereof to carry on the business of developing, transmitting, utilizing, or distributing power;
(8) “navigable waters” means those parts
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 796
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 9207
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 18721
Editorial Notes
CODIFICATION
Section was enacted as part of Pub. L. 117–169, and
not as part of div. D of Pub. L. 117–58, which enacted
this chapter.
Statutory Notes and Related Subsidiaries
DEFINITIONS
For definitions of ‘‘Secretary’’ and ‘‘State’’ as used in
this section, see section 50111 of Pub. L. 117–169, set out
as a note under section 17113b of this title.
§ 18715b. Interregional and offshore wind elec-
tricity transmission planning, modeling, and
analysis
(a) Appropriation
In addition to amounts otherwise available,
there is appropriated to the Secretary for fiscal
year 2022, out of any money in the Treasury not
otherwise appropriated, $100,000,000, to remain
available through September 30, 2031, to carry
out this section.
(b) Use of funds
The Secretary shall use amounts made avail-
able under subsection (a)—
(1) to pay expenses associated with con-
vening relevant stakeholders to address the
development of interregional electricity trans-
mission and transmission of electricity that is
generated by offshore wind; and
(2) to conduct planning, modeling, and anal-
ysis regarding interregional electricity trans-
mission and transmission of electricity that is
generated by offshore wind, taking into ac-
count the local, regional, and national eco-
nomic, reliability, resilience, security, public
policy, and environmental benefits of inter-
regional electricity transmission and trans-
mission of electricity that is generated by off-
shore wind, including planning, modeling, and
analysis, as the Secretary determines appro-
priate, pertaining to—
(A) clean energy integration into the elec-
tric grid, including the identification of re-
newable energy zones;
(B) the effects of changes in
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 18715b
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.