42 U.S.C. § 17113b — Cost-effective technology acceleration program

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 17113b — Cost-effective technology acceleration program

**(a) Definition of Administrator** In this section, the term “Administrator” means the Administrator of General Services. **(b) Establishment** (1) **In general** — The Administrator shall establish a program to accelerate the use of more cost-effective technologies and practices at GSA facilities. (2) **Requirements** — The program established under this subsection shall— (A) ensure centralized responsibility for the coordination of cost reduction-related recommendations, practices, and activities of all relevant Federal agencies; (B) provide technical assistance and operational guidance to applicable tenants to achieve the goal identified in subsection (c)(2)(B)(ii); (C) establish methods to track the success of Federal departments and agencies with respect to that goal; and (D) be fully coordinated with and no less stringent nor less energy-conserving or water-conserving than required by other provisions of this Act and other applicable law, including sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 and amendments made by those sections. **(c) Accelerated use of technologies** (1) **Review** (A) *In general* — As part of the program under this section, not later than 90 days after December 19, 2007, the Administrator shall conduct a review of— (i) current use of cost-effective lighting technologies and geothermal heat pumps in GSA facilities; and (ii) the availability to managers of GSA facilities of cost-effective lighting technologies and geothermal heat pumps. (B) *Requirements* — The review under subparagraph (A) shall— (i) examine the use of cost-effective lighting technologies, geothermal heat pumps, and other cost-effective technologies and practices by Federal agencies in GSA facilitie

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 17113b

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 645127b209a231ec39edba117a680376f5bf57c65484083b669df18bef845a10. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_15b8d7e738a38ebeeeb16158
Source file: Laws/federal/codes/united-states-code/title-42/section-17113b-cost-effective-technology-acceleration-program--1786585563.md
Pages: Not recorded – Not recorded
Passage SHA-256: f4b20a16088f886c1bae4c3c5f7d7806e40c801ff100fd599b3685bd9b5e3d53

Source location: Title 42, Chapter 152, § 17113b; chapter-152-energy-independence-and-security.md

Stored source content

**(a) Definition of Administrator** In this section, the term “Administrator” means the Administrator of General Services. **(b) Establishment** (1) **In general** — The Administrator shall establish a program to accelerate the use of more cost-effective technologies and practices at GSA facilities. (2) **Requirements** — The program established under this subsection shall— (A) ensure centralized responsibility for the coordination of cost reduction-related recommendations, practices, and activities of all relevant Federal agencies; (B) provide technical assistance and operational guidance to applicable tenants to achieve the goal identified in subsection (c)(2)(B)(ii); (C) establish methods to track the success of Federal departments and agencies with respect to that goal; and (D) be fully coordinated with and no less stringent nor less energy-conserving or water-conserving than required by other provisions of this Act and other applicable law, including sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 and amendments made by those sections. **(c) Accelerated use of technologies** (1) **Review** (A) *In general* — As part of the program under this section, not later than 90 days after December 19, 2007, the Administrator shall conduct a review of— (i) current use of cost-effective lighting technologies and geothermal heat pumps in GSA facilities; and (ii) the availability to managers of GSA facilities of cost-effective lighting technologies and geothermal heat pumps. (B) *Requirements* — The review under subparagraph (A) shall— (i) examine the use of cost-effective lighting technologies, geothermal heat pumps, and other cost-effective technologies and practices by Federal agencies in GSA facilities; and (ii) as prepared in consultation with the Administrator of the Environmental Protection Agency, identify cost-effective lighting technology and geothermal heat pump technology standards that could be used for all types of GSA facilities. (2) **Replacement** (A) *In general* — As part of the program under this section, not later than 180 days after December 19, 2007, the Administrator shall establish, using available appropriations and programs implementing sections 432 and 525 11 See References in Text note below. (and amendments made by those sections), a cost-effective lighting technology and geothermal heat pump technology acceleration program to achieve maximum feasible replacement of existing lighting, heating, cooling 22 So in original. Probably should be “and cooling”. technologies with cost-effective lighting technologies and geothermal heat pump technologies in each GSA facility. Such program shall fully comply with the requirements of sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 1 and amendments made by those sections and any other provisions of law, which shall be applicable to the extent that they are more stringent or would achieve greater energy savings than required by this section. (B) *Acceleration plan timetable* (i) *In general* — To implement the program established under subparagraph (A), not later than 1 year after December 19, 2007, the Administrator shall establish a timetable of actions to comply with the requirements of this section and sections 431 through 435, whichever achieves greater energy savings most expeditiously, including milestones for specific activities needed to replace existing lighting, heating, cooling 2 technologies with cost-effective lighting technologies and geothermal heat pump technologies, to the maximum extent feasible (including at the maximum rate feasible), at each GSA facility. (ii) *Goal* — The goal of the timetable under clause (i) shall be to complete, using available appropriations and programs implementing sections 431 through 435 1 (and amendments made by those sections), maximum feasible replacement of existing lighting, heating, and cooling technologies with cost-effective lighting technologies and geothermal heat pump technologies consistent with the requirements of this section and sections 431 through 435,1 whichever achieves greater energy savings most expeditiously. Notwithstanding any provision of this section, such program shall fully comply with the requirements of the Act 33 So in original. Probably should be “this Act”. including sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 and amendments made by those sections and other provisions of law, which shall be applicable to the extent that they are more stringent or would achieve greater energy or water savings than required by this section. **(d) GSA facility technologies and practices** (1) **In general** — Not later than 180 days after December 19, 2007, and annually thereafter, the Administrator shall— (A) ensure that a manager responsible for implementing section 432 1 and for accelerating the use of cost-effective technologies and practices is designated for each GSA facility; and (B) submit to Congress a plan to comply with section 432,1 this section, and other applicable provisions of this Act and applicable law with respect to energy and water conservation at GSA facilities. (2) **Measures** — The plan shall implement measures required by such other provisions of law in accordance with those provisions, and shall implement the measures required by this section to the maximum extent feasible (including at the maximum rate feasible) using available appropriations and programs implementing sections 431 through 435 and 525 1 (and amendments made by those sections), by not later than the date that is 5 years after December 19, 2007. (3) **Contents of plan** — The plan shall— (A) with respect to cost-effective technologies and practices— (i) identify the specific activities needed to comply with sections 431 through 435; 1 (ii) identify the specific activities needed to achieve at least a 20-percent reduction in operational costs through the application of cost-effective technologies and practices from 2003 levels at GSA facilities by not later than 5 years after December 19, 2007; (iii) describe activities required and carried out to estimate the funds necessary to achieve the reduction described in clauses (i) and (ii); (B) include an estimate of the funds necessary to carry out this section; (C) describe the status of the implementation of cost-effective technologies and practices at GSA facilities, including— (i) the extent to which programs, including the program established under subsection (b), are being carried out in accordance with this part; and (ii) the status of funding requests and appropriations for those programs; (D) identify within the planning, budgeting, and construction processes, all types of GSA facility-related procedures that inhibit new and existing GSA facilities from implementing cost-effective technologies; (E) recommend language for uniform standards for use by Federal agencies in implementing cost-effective technologies and practices; (F) in coordination with the Office of Management and Budget, review the budget process for capital programs with respect to alternatives for— (i) implementing measures that will assure that Federal agencies retain all identified savings accrued as a result of the use of cost-effective technologies, consistent with [section 8253(a)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8253/a/1&num=0&edition=prelim), and other applicable law; and (ii) identifying short- and long-term cost savings that accrue from the use of cost-effective technologies and practices; (G) with respect to cost-effective technologies and practices, achieve substantial operational cost savings through the application of the technologies; and (H) include recommendations to address each of the matters, and a plan for implementation of each recommendation, described in subparagraphs (A) through (G). (4) **Administration** — Notwithstanding any provision of this section, the program required under this section shall fully comply with the requirements of sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 1 and amendments made by those sections, which shall be applicable to the extent that they are more stringent or would achieve greater energy or water savings than required by this section. **(e) Authorization of appropriations** There are authorized to be appropriated such sums as are necessary to carry out this section, to remain available until expended.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 17001 — Voluntary state, regional, and local electricity distribution planning

**(a) In general** On the request of a State, regional organization, or electric utility, the Secretary of Energy shall provide assistance to States, regional organizations, and electric utilities to facilitate the development of State, regional, and local electricity distribution plans by— (1) conducting a resource assessment and analysis of future demand and distribution requirements; and (2) developing open source tools for State, regional, and local planning and operations. **(b) Risk and security analysis** The assessment under subsection (a)(1) shall include— (1) the evaluation of the physical security, cybersecurity, and associated communications needs of an advanced distribution management system and the integration of distributed energy resources; and (2) advanced use of grid architecture to analyze risks in an all-hazards approach that includes communications infrastructure, control systems architecture, and power systems architecture. **(c) Designation** The information collected for the assessment and analysis under subsection (a)(1)— (1) shall be considered to be critical electric infrastructure information under section 824o–1 of title 16; and (2) shall only be released in compliance with regulations implementing that section. **(d) Technical assistance** For the purpose of assisting in the development of State and regional electricity distribution plans, the Secretary shall provide technical assistance to— (1) States; (2) regional reliability entities; and (3) other distribution asset owners and operators. **(e) Withdrawal** A State or any entity that has requested technical assistance under this section may withdraw the request for technical assistance at any time, and on such withdrawal, the Secretary shall terminate all assistance efforts.

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 17001

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

40 U.S.C. § 3313 — Procurement of life-cycle cost effective and energy efficient lighting systems

**(a) Definitions.—** In this section: (1) **Administrator.—** — The term “Administrator” means the Administrator of General Services. (2) **Lighting system.—** — The term “lighting system” means the elements required to maintain a desired light level, including lamps, light fixtures, fixture distribution, sensors and control technologies, interior design elements, and daylighting sources. **(b) Procurement.—** (1) **In general.—** — To the maximum extent practicable, the Administrator shall— (A) procure the most life-cycle cost effective and energy efficient lighting systems; and (B) ensure that procurements after the date of enactment of the BRIGHT Act of lighting systems or the individual components of lighting systems maximize life-cycle cost effectiveness and energy efficiency. (2) **Use.—** — Each public building constructed, altered, acquired, or leased by the Administrator shall be equipped, to the maximum extent practicable as determined by the Administrator, with the most life-cycle cost effective and energy efficient lighting systems for each application. **(c) Maintenance of Public Buildings.—** Each individual component of a lighting system, including a lamp or fixture, that is replaced by the Administrator in the normal course of maintenance of public buildings shall be replaced, to the maximum extent practicable, with the most life-cycle cost effective and energy efficient lighting system possible for the application. **(d) Considerations.—** (1) **Contracting options.—** — In carrying out this section, the Administrator shall consider appropriate contracting options for the procurement of the most life-cycle cost effective and energy efficient lighting systems. (2) **Procurement and use.—** — In making a determination under this section co

Source: Supplied U.S. Code snapshot — release unconfirmed · 40 U.S.C. § 3313

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

2 U.S.C. § 1824 — Energy and environmental measures in Capitol Complex Master Plan

**(a) In general** To the maximum extent practicable, the Architect of the Capitol shall include energy efficiency and conservation measures, greenhouse gas emission reduction measures, and other appropriate environmental measures in the Capitol Complex Master Plan. **(b) Report** Not later than 6 months after December 19, 2007, the Architect of the Capitol shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Rules and Administration of the Senate, a report on the energy efficiency and conservation measures, greenhouse gas emission reduction measures, and other appropriate environmental measures included in the Capitol Complex Master Plan pursuant to subsection (a).

Source: Supplied U.S. Code snapshot — release unconfirmed · 2 U.S.C. § 1824

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 8259b — Federal procurement of energy efficient products

**(a) Definitions** In this section: (1) **Agency** — The term “agency” has the meaning given that term in [section 7902(a) of title 5](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section7902/a&num=0&edition=prelim). (2) **Energy Star product** — The term “Energy Star product” means a product that is rated for energy efficiency under an Energy Star program. (3) **Energy Star program** — The term “Energy Star program” means the program established by [section 6294a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6294a&num=0&edition=prelim). (4) **FEMP designated product** — The term “FEMP designated product” means a product that is designated under the Federal Energy Management Program of the Department of Energy as being among the highest 25 percent of equivalent products for energy efficiency. (5) **Product** — The term “product” does not include any energy consuming product or system designed or procured for combat or combat-related missions. **(b) Procurement of energy efficient products** (1) **Requirement** — To meet the requirements of an agency for an energy consuming product in a product category covered by the Energy Star program or the Federal Energy Management Program for designated products, the head of the agency shall, except as provided in paragraph (2), procure— (A) an Energy Star product; or (B) a FEMP designated product. (2) **Exceptions** — The head of an agency is not required to procure an Energy Star product or FEMP designated product under paragraph (1) if the head of the agency finds in writing that— (A) an Energy Star product or FEMP designated product is not cost-effective over the life of the product taking energy cost savings into account; or (B) no Energy

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 8259b

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 17091 — Commercial high-performance green buildings

**(a) Director of Commercial High-Performance Green Buildings** Notwithstanding any other provision of law, the Secretary, acting through the Assistant Secretary of Energy Efficiency and Renewable Energy, shall appoint a Director of Commercial High-Performance Green Buildings to a position in the career-reserved Senior Executive service, with the principal responsibility to— (1) establish and manage the Office of Commercial High-Performance Green Buildings; and (2) carry out other duties as required under this part. **(b) Qualifications** The Commercial Director shall be an individual, who by reason of professional background and experience, is specifically qualified to carry out the duties required under this part. **(c) Duties** The Commercial Director shall, with respect to development of high-performance green buildings and zero-energy commercial buildings nationwide— (1) coordinate the activities of the Office of Commercial High-Performance Green Buildings with the activities of the Office of Federal High-Performance Green Buildings; (2) develop the legal predicates and agreements for, negotiate, and establish one or more public-private partnerships with the Consortium, members of the Consortium, and other capable parties meeting the qualifications of the Consortium, to further such development; (3) represent the public and the Department in negotiating and performing in accord with such public-private partnerships; (4) use appropriated funds in an effective manner to encourage the maximum investment of private funds to achieve such development; (5) promote research and development of high-performance green buildings, consistent with [section 17083 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section17083&num=0&editio

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 17091

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2913 — Energy savings contracts and activities

**(a) Shared Energy Savings Contracts.—** (1) The Secretary of Defense shall develop a simplified method of contracting for shared energy savings contract services that will accelerate the use of these contracts with respect to military installations and will reduce the administrative effort and cost on the part of the Department of Defense as well as the private sector. (2) In carrying out paragraph (1), the Secretary of Defense may— (A) request statements of qualifications (as prescribed by the Secretary of Defense), including financial and performance information, from firms engaged in providing shared energy savings contracting; (B) designate from the statements received, with an update at least annually, those firms that are presumptively qualified to provide shared energy savings services; (C) select at least three firms from the qualifying list to conduct discussions concerning a particular proposed project, including requesting a technical and price proposal from such selected firms for such project; and (D) select from such firms the most qualified firm to provide shared energy savings services pursuant to a contractual arrangement that the Secretary determines is fair and reasonable, taking into account the estimated value of the services to be rendered and the scope and nature of the project. (3) In carrying out paragraph (1), the Secretary may also provide for the direct negotiation, by departments, agencies, and instrumentalities of the Department of Defense, of contracts with shared energy savings contractors that have been selected competitively and approved by any gas or electric utility serving the department, agency, or instrumentality concerned. **(b) Participation in Gas or Electric Utility Programs.—** The Secretary of Defense shall

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2913

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 6834 — Federal building energy efficiency standards

**(a) In general** (1) Not later than 2 years after October 24, 1992, the Secretary, after consulting with appropriate Federal agencies, CABO, ASHRAE, the National Association of Home Builders, the Illuminating Engineering Society, the American Institute of Architects, the National Conference of the States on Building Codes and Standards, and other appropriate persons, shall establish, by rule, Federal building energy standards that require in new Federal buildings those energy efficiency measures that are technologically feasible and economically justified. Such standards shall become effective no later than 1 year after such rule is issued. (2) The standards established under paragraph (1) shall— (A) contain energy saving and renewable energy specifications that meet or exceed the energy saving and renewable energy specifications of the 2004 International Energy Conservation Code (in the case of residential buildings) or ASHRAE Standard 90.1–2004 (in the case of commercial buildings); (B) to the extent practicable, use the same format as the appropriate voluntary building energy code; and (C) consider, in consultation with the Environmental Protection Agency and other Federal agencies, and where appropriate contain, measures with regard to radon and other indoor air pollutants. (3) (A) Not later than 1 year after August 8, 2005, the Secretary shall establish, by rule, revised Federal building energy efficiency performance standards that require that— (i) if life-cycle cost-effective for new Federal buildings— (I) the buildings be designed to achieve energy consumption levels that are at least 30 percent below the levels established in the version of the ASHRAE Standard or the International Energy Conservation Code, as appropriate, that is in

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 6834

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 8253 — Energy and water management requirements

**(a) Energy performance requirement for Federal buildings** (1) Subject to paragraph (2), each agency shall apply energy conservation measures to, and shall improve the design for the construction of, the Federal buildings of the agency (including each industrial or laboratory facility) so that the energy consumption per gross square foot of the Federal buildings of the agency in fiscal years 2006 through 2015 is reduced, as compared with the energy consumption per gross square foot of the Federal buildings of the agency in fiscal year 2003, by the percentage specified in the following table: Fiscal YearPercentage Reduction 20062 20074 20089 200912 201015 201118 201221 201324 201427 201530. (2) An agency may exclude from the requirements of paragraph (1) any building, and the associated energy consumption and gross square footage, in which energy intensive activities are carried out. Each agency shall identify and list in each report made under [section 8258(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8258/a&num=0&edition=prelim) the buildings designated by it for such exclusion. (3) Not later than December 31, 2014, the Secretary shall review the results of the implementation of the energy performance requirement established under paragraph (1) and submit to Congress recommendations concerning energy performance requirements for fiscal years 2016 through 2025. **(b) Energy and water management requirement for Federal agencies** (1) **In general.—** — Each agency shall— (A) not later than October 1, 2022, to the maximum extent practicable, begin installing in Federal buildings owned by the United States all energy and water conservation measures determined by the Secretary to be life cycle cost-effective (as def

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 8253

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 18715a — Transmission facility financing

**(a) Appropriation** In addition to amounts otherwise available, there is appropriated to the Secretary for fiscal year 2022, out of any money in the Treasury not otherwise appropriated, $2,000,000,000, to remain available through September 30, 2030, to carry out this section: Provided, That the Secretary shall not enter into any loan agreement pursuant to this section that could result in disbursements after September 30, 2031. **(b) Use of funds** The Secretary shall use the amounts made available by subsection (a) to carry out a program to pay the costs of direct loans to non-Federal borrowers, subject to the limitations that apply to loan guarantees under section 50141(d) and under such terms and conditions as the Secretary determines to be appropriate, for the construction or modification of electric transmission facilities designated by the Secretary to be necessary in the national interest under [section 824p(a) of title 16](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section824p/a&num=0&edition=prelim). **(c) Loans** A direct loan provided under this section— (1) shall have a term that does not exceed the lesser of— (A) 90 percent of the projected useful life, in years, of the eligible transmission facility; and (B) 30 years; (2) shall not exceed 80 percent of the project costs; and (3) shall, on first issuance, be subject to the condition that the direct loan is not subordinate to other financing. **(d) Interest rates** A direct loan provided under this section shall bear interest at a rate determined by the Secretary, taking into consideration market yields on outstanding marketable obligations of the United States of comparable maturities as of the date on which the direct loan is made. **(e) Definition of direct loan**

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 18715a

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 18715b — Grants to facilitate the siting of interstate electricity transmission lines

**(a) Appropriation** In addition to amounts otherwise available, there is appropriated to the Secretary for fiscal year 2022, out of any money in the Treasury not otherwise appropriated, $760,000,000, to remain available through September 30, 2029, for making grants in accordance with this section and for administrative expenses associated with carrying out this section. **(b) Use of funds** (1) **In general** — The Secretary may make a grant under this section to a siting authority for, with respect to a covered transmission project, any of the following activities: (A) Studies and analyses of the impacts of the covered transmission project. (B) Examination of up to 3 alternate siting corridors within which the covered transmission project feasibly could be sited. (C) Participation by the siting authority in regulatory proceedings or negotiations in another jurisdiction, or under the auspices of a Transmission Organization (as defined in [section 796 of title 16](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section796&num=0&edition=prelim)) that is also considering the siting or permitting of the covered transmission project. (D) Participation by the siting authority in regulatory proceedings at the Federal Energy Regulatory Commission or a State regulatory commission for determining applicable rates and cost allocation for the covered transmission project. (E) Other measures and actions that may improve the chances of, and shorten the time required for, approval by the siting authority of the application relating to the siting or permitting of the covered transmission project, as the Secretary determines appropriate. (2) **Economic development** — The Secretary may make a grant under this section to a siting authority, or oth

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 18715b

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.