Browse Arkansas Code titles and sections
42 U.S.C. § 9605 — National contingency plan
Federal law — U.S. Code and appendices · legal_authorities
**(a) Revision and republication** Within one hundred and eighty days after December 11, 1980, the President shall, after notice and opportunity for public comments, revise and republish the national contingency plan for the removal of oil and hazardous substances, originally prepared and published pursuant to [section 1321 of title 33](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1321&num=0&edition=prelim), to reflect and effectuate the responsibilities and powers created by this chapter, in addition to those matters specified in section 1321(c)(2) 11 See References in Text note below. of title 33. Such revision shall include a section of the plan to be known as the national hazardous substance response plan which shall establish procedures and standards for responding to releases of hazardous substances, pollutants, and contaminants, which shall include at a minimum:
(1) methods for discovering and investigating facilities at which hazardous substances have been disposed of or otherwise come to be located;
(2) methods for evaluating, including analyses of relative cost, and remedying any releases or threats of releases from facilities which pose substantial danger to the public health or the environment;
(3) methods and criteria for determining the appropriate extent of removal, remedy, and other measures authorized by this chapter;
(4) appropriate roles and responsibilities for the Federal, State, and local governments and for interstate and nongovernmental entities in effectuating the plan;
(5) provision for identification, procurement, maintenance, and storage of response equipment and supplies;
(6) a method for and assignment of responsibility for reporting the existence of such facilities which may be located on federally owne
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 9605
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 254d3f79fee29fe8851e7b349082228e817b31ff9fd78ffb79009cbcba03a09a. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_a4d809a5638d3bec8930c26f
Source file: Laws/federal/codes/united-states-code/title-42/section-9605-national-contingency-plan--a15fe6d87e.md
Pages: Not recorded – Not recorded
Passage SHA-256: b733cbc67014320c00a482ac800022a25e0d968b2f6f903e596531a54deadfa4
Source location: Title 42, Chapter 103, § 9605; chapter-103-comprehensive-environmental-response-compensation-and-liability.md
Stored source content
**(a) Revision and republication** Within one hundred and eighty days after December 11, 1980, the President shall, after notice and opportunity for public comments, revise and republish the national contingency plan for the removal of oil and hazardous substances, originally prepared and published pursuant to [section 1321 of title 33](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1321&num=0&edition=prelim), to reflect and effectuate the responsibilities and powers created by this chapter, in addition to those matters specified in section 1321(c)(2) 11 See References in Text note below. of title 33. Such revision shall include a section of the plan to be known as the national hazardous substance response plan which shall establish procedures and standards for responding to releases of hazardous substances, pollutants, and contaminants, which shall include at a minimum:
(1) methods for discovering and investigating facilities at which hazardous substances have been disposed of or otherwise come to be located;
(2) methods for evaluating, including analyses of relative cost, and remedying any releases or threats of releases from facilities which pose substantial danger to the public health or the environment;
(3) methods and criteria for determining the appropriate extent of removal, remedy, and other measures authorized by this chapter;
(4) appropriate roles and responsibilities for the Federal, State, and local governments and for interstate and nongovernmental entities in effectuating the plan;
(5) provision for identification, procurement, maintenance, and storage of response equipment and supplies;
(6) a method for and assignment of responsibility for reporting the existence of such facilities which may be located on federally owned or controlled properties and any releases of hazardous substances from such facilities;
(7) means of assuring that remedial action measures are cost-effective over the period of potential exposure to the hazardous substances or contaminated materials;
(8)
(A) criteria for determining priorities among releases or threatened releases throughout the United States for the purpose of taking remedial action and, to the extent practicable taking into account the potential urgency of such action, for the purpose of taking removal action. Criteria and priorities under this paragraph shall be based upon relative risk or danger to public health or welfare or the environment, in the judgment of the President, taking into account to the extent possible the population at risk, the hazard potential of the hazardous substances at such facilities, the potential for contamination of drinking water supplies, the potential for direct human contact, the potential for destruction of sensitive ecosystems, the damage to natural resources which may affect the human food chain and which is associated with any release or threatened release, the contamination or potential contamination of the ambient air which is associated with the release or threatened release, State preparedness to assume State costs and responsibilities, and other appropriate factors;
(B) based upon the criteria set forth in subparagraph (A) of this paragraph, the President shall list as part of the plan national priorities among the known releases or threatened releases throughout the United States and shall revise the list no less often than annually. Within one year after December 11, 1980, and annually thereafter, each State shall establish and submit for consideration by the President priorities for remedial action among known releases and potential releases in that State based upon the criteria set forth in subparagraph (A) of this paragraph. In assembling or revising the national list, the President shall consider any priorities established by the States. To the extent practicable, the highest priority facilities shall be designated individually and shall be referred to as the “top priority among known response targets”, and, to the extent practicable, shall include among the one hundred highest priority facilities one such facility from each State which shall be the facility designated by the State as presenting the greatest danger to public health or welfare or the environment among the known facilities in such State. A State shall be allowed to designate its highest priority facility only once. Other priority facilities or incidents may be listed singly or grouped for response priority purposes;
(9) specified roles for private organizations and entities in preparation for response and in responding to releases of hazardous substances, including identification of appropriate qualifications and capacity therefor and including consideration of minority firms in accordance with subsection (f); and
(10) standards and testing procedures by which alternative or innovative treatment technologies can be determined to be appropriate for utilization in response actions authorized by this chapter.
The plan shall specify procedures, techniques, materials, equipment, and methods to be employed in identifying, removing, or remedying releases of hazardous substances comparable to those required under section 1321(c)(2)(F) and (G) and (j)(1) of title 33. Following publication of the revised national contingency plan, the response to and actions to minimize damage from hazardous substances releases shall, to the greatest extent possible, be in accordance with the provisions of the plan. The President may, from time to time, revise and republish the national contingency plan.
**(b) Revision of plan** Not later than 18 months after the enactment of the Superfund Amendments and Reauthorization Act of 1986 [October 17, 1986], the President shall revise the National Contingency Plan to reflect the requirements of such amendments. The portion of such Plan known as “the National Hazardous Substance Response Plan” shall be revised to provide procedures and standards for remedial actions undertaken pursuant to this chapter which are consistent with amendments made by the Superfund Amendments and Reauthorization Act of 1986 relating to the selection of remedial action.
**(c) Hazard ranking system**
(1) **Revision** — Not later than 18 months after October 17, 1986, and after publication of notice and opportunity for submission of comments in accordance with [section 553 of title 5](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section553&num=0&edition=prelim), the President shall by rule promulgate amendments to the hazard ranking system in effect on September 1, 1984. Such amendments shall assure, to the maximum extent feasible, that the hazard ranking system accurately assesses the relative degree of risk to human health and the environment posed by sites and facilities subject to review. The President shall establish an effective date for the amended hazard ranking system which is not later than 24 months after October 17, 1986. Such amended hazard ranking system shall be applied to any site or facility to be newly listed on the National Priorities List after the effective date established by the President. Until such effective date of the regulations, the hazard ranking system in effect on September 1, 1984, shall continue in full force and effect.
(2) **Health assessment of water contamination risks** — In carrying out this subsection, the President shall ensure that the human health risks associated with the contamination or potential contamination (either directly or as a result of the runoff of any hazardous substance or pollutant or contaminant from sites or facilities) of surface water are appropriately assessed where such surface water is, or can be, used for recreation or potable water consumption. In making the assessment required pursuant to the preceding sentence, the President shall take into account the potential migration of any hazardous substance or pollutant or contaminant through such surface water to downstream sources of drinking water.
(3) **Reevaluation not required** — The President shall not be required to reevaluate, after October 17, 1986, the hazard ranking of any facility which was evaluated in accordance with the criteria under this section before the effective date of the amendments to the hazard ranking system under this subsection and which was assigned a national priority under the National Contingency Plan.
(4) **New information** — Nothing in paragraph (3) shall preclude the President from taking new information into account in undertaking response actions under this chapter.
**(d) Petition for assessment of release** Any person who is, or may be, affected by a release or threatened release of a hazardous substance or pollutant or contaminant, may petition the President to conduct a preliminary assessment of the hazards to public health and the environment which are associated with such release or threatened release. If the President has not previously conducted a preliminary assessment of such release, the President shall, within 12 months after the receipt of any such petition, complete such assessment or provide an explanation of why the assessment is not appropriate. If the preliminary assessment indicates that the release or threatened release concerned may pose a threat to human health or the environment, the President shall promptly evaluate such release or threatened release in accordance with the hazard ranking system referred to in paragraph (8)(A) of subsection (a) to determine the national priority of such release or threatened release.
**(e) Releases from earlier sites** Whenever there has been, after January 1, 1985, a significant release of hazardous substances or pollutants or contaminants from a site which is listed by the President as a “Site Cleaned Up To Date” on the National Priorities List (revised edition, December 1984) the site shall be restored to the National Priorities List, without application of the hazard ranking system.
**(f) Minority contractors** In awarding contracts under this chapter, the President shall consider the availability of qualified minority firms. The President shall describe, as part of any annual report submitted to the Congress under this chapter, the participation of minority firms in contracts carried out under this chapter. Such report shall contain a brief description of the contracts which have been awarded to minority firms under this chapter and of the efforts made by the President to encourage the participation of such firms in programs carried out under this chapter.
**(g) Special study wastes**
(1) **Application** — This subsection applies to facilities—
(A) which as of October 17, 1986, were not included on, or proposed for inclusion on, the National Priorities List; and
(B) at which special study wastes described in paragraph (2), (3)(A)(ii) or (3)(A)(iii) of [section 6921(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6921/b&num=0&edition=prelim) are present in significant quantities, including any such facility from which there has been a release of a special study waste.
(2) **Considerations in adding facilities to NPL** — Pending revision of the hazard ranking system under subsection (c), the President shall consider each of the following factors in adding facilities covered by this section to the National Priorities List:
(A) The extent to which hazard ranking system score for the facility is affected by the presence of any special study waste at, or any release from, such facility.
(B) Available information as to the quantity, toxicity, and concentration of hazardous substances that are constituents of any special study waste at, or released from such facility, the extent of or potential for release of such hazardous constituents, the exposure or potential exposure to human population and the environment, and the degree of hazard to human health or the environment posed by the release of such hazardous constituents at such facility. This subparagraph refers only to available information on actual concentrations of hazardous substances and not on the total quantity of special study waste at such facility.
(3) **Savings provisions** — Nothing in this subsection shall be construed to limit the authority of the President to remove any facility which as of October 17, 1986, is included on the National Priorities List from such List, or not to list any facility which as of such date is proposed for inclusion on such list.
(4) **Information gathering and analysis** — Nothing in this chapter shall be construed to preclude the expenditure of monies from the Fund for gathering and analysis of information which will enable the President to consider the specific factors required by paragraph (2).
**(h) NPL deferral**
(1) **Deferral to State voluntary cleanups** — At the request of a State and subject to paragraphs (2) and (3), the President generally shall defer final listing of an eligible response site on the National Priorities List if the President determines that—
(A) the State, or another party under an agreement with or order from the State, is conducting a response action at the eligible response site—
(i) in compliance with a State program that specifically governs response actions for the protection of public health and the environment; and
(ii) that will provide long-term protection of human health and the environment; or
(B) the State is actively pursuing an agreement to perform a response action described in subparagraph (A) at the site with a person that the State has reason to believe is capable of conducting a response action that meets the requirements of subparagraph (A).
(2) **Progress toward cleanup** — If, after the last day of the 1-year period beginning on the date on which the President proposes to list an eligible response site on the National Priorities List, the President determines that the State or other party is not making reasonable progress toward completing a response action at the eligible response site, the President may list the eligible response site on the National Priorities List.
(3) **Cleanup agreements** — With respect to an eligible response site under paragraph (1)(B), if, after the last day of the 1-year period beginning on the date on which the President proposes to list the eligible response site on the National Priorities List, an agreement described in paragraph (1)(B) has not been reached, the President may defer the listing of the eligible response site on the National Priorities List for an additional period of not to exceed 180 days if the President determines deferring the listing would be appropriate based on—
(A) the complexity of the site;
(B) substantial progress made in negotiations; and
(C) other appropriate factors, as determined by the President.
(4) **Exceptions** — The President may decline to defer, or elect to discontinue a deferral of, a listing of an eligible response site on the National Priorities List if the President determines that—
(A) deferral would not be appropriate because the State, as an owner or operator or a significant contributor of hazardous substances to the facility, is a potentially responsible party;
(B) the criteria under the National Contingency Plan for issuance of a health advisory have been met; or
(C) the conditions in paragraphs (1) through (3), as applicable, are no longer being met.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definitions** For the purpose of this section, the term—
(1) “oil” means oil of any kind or in any form, including, but not limited to, petroleum, fuel oil, sludge, oil refuse, and oil mixed with wastes other than dredged spoil;
(2) “discharge” includes, but is not limited to, any spilling, leaking, pumping, pouring, emitting, emptying or dumping, but excludes (A) discharges in compliance with a permit under [section 1342 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1342&num=0&edition=prelim), (B) discharges resulting from circumstances identified and reviewed and made a part of the public record with respect to a permit issued or modified under [section 1342 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1342&num=0&edition=prelim), and subject to a condition in such permit,,11 So in original. (C) continuous or anticipated intermittent discharges from a point source, identified in a permit or permit application under [section 1342 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1342&num=0&edition=prelim), which are caused by events occurring within the scope of relevant operating or treatment systems, and (D) discharges incidental to mechanical removal authorized by the President under subsection (c) of this section;
(3) “vessel” means every description of watercraft or other artificial contrivance used, or capable of being used, as a means of transportation on water other than a public vessel;
(4) “public vessel” means a vessel owned or bareboat-chartered and operated by the United States, or by a State or political subdivision thereof, or by a foreign nation, except when such vessel is engaged in commerce;
(5) “United States”
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1321
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
For purpose of this subchapter—
(1) The term “act of God” means an unanticipated grave natural disaster or other natural phenomenon of an exceptional, inevitable, and irresistible character, the effects of which could not have been prevented or avoided by the exercise of due care or foresight.
(2) The term “Administrator” means the Administrator of the United States Environmental Protection Agency.
(3) The term “barrel” means forty-two United States gallons at sixty degrees Fahrenheit.
(4) The term “claim” means a demand in writing for a sum certain.
(5) The term “claimant” means any person who presents a claim for compensation under this chapter.
(6) The term “damages” means damages for injury or loss of natural resources as set forth in section 9607(a) or 9611(b) of this title.
(7) The term “drinking water supply” means any raw or finished water source that is or may be used by a public water system (as defined in the Safe Drinking Water Act [[42 U.S.C. 300f](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section300f&num=0&edition=prelim) et seq.]) or as drinking water by one or more individuals.
(8) The term “environment” means (A) the navigable waters, the waters of the contiguous zone, and the ocean waters of which the natural resources are under the exclusive management authority of the United States under the Magnuson-Stevens Fishery Conservation and Management Act [[16 U.S.C. 1801](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section1801&num=0&edition=prelim) et seq.], and (B) any other surface water, ground water, drinking water supply, land surface or subsurface strata, or ambient air within the United States or under the jurisdiction of the United States.
(9) The term “facility” means (A) any building, st
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 9601
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** This section applies, according to the provisions thereof, except to the extent that there is involved—
(1) a military or foreign affairs function of the United States; or
(2) a matter relating to agency management or personnel or to public property, loans, grants, benefits, or contracts.
**(b)** General notice of proposed rule making shall be published in the Federal Register, unless persons subject thereto are named and either personally served or otherwise have actual notice thereof in accordance with law. The notice shall include—
(1) a statement of the time, place, and nature of public rule making proceedings;
(2) reference to the legal authority under which the rule is proposed;
(3) either the terms or substance of the proposed rule or a description of the subjects and issues involved; and
(4) the Internet address of a summary of not more than 100 words in length of the proposed rule, in plain language, that shall be posted on the Internet website under section 206(d) of the E-Government Act of 2002 ([44 U.S.C. 3501](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title44-section3501&num=0&edition=prelim) note) (commonly known as regulations.gov).
Except when notice or hearing is required by statute, this subsection does not apply—
(A) to interpretative rules, general statements of policy, or rules of agency organization, procedure, or practice; or
(B) when the agency for good cause finds (and incorporates the finding and a brief statement of reasons therefor in the rules issued) that notice and public procedure thereon are impracticable, unnecessary, or contrary to the public interest.
**(c)** After notice required by this section, the agency shall give interested persons an opportunity to participate in the rule making through subm
Source: Supplied U.S. Code snapshot — release unconfirmed · 5 U.S.C. § 553
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Establishment of reserves for reclamation and closing costs**
(1) **Allowance of deduction** — If a taxpayer elects the application of this section with respect to any mining or solid waste disposal property, the amount of any deduction for qualified reclamation or closing costs for any taxable year to which such election applies shall be equal to the current reclamation or closing costs allocable to—
(A) in the case of qualified reclamation costs, the portion of the reserve property which was disturbed during such taxable year, and
(B) in the case of qualified closing costs, the production from the reserve property during such taxable year.
(2) **Opening balance and adjustments to reserve**
(A) *Opening balance* — The opening balance of any reserve for its first taxable year shall be zero.
(B) *Increase for interest* — A reserve shall be increased each taxable year by an amount equal to the amount of interest which would have been earned during such taxable year on the opening balance of such reserve for such taxable year if such interest were computed—
(i) at the Federal short-term rate or rates (determined under section 1274) in effect, and
(ii) by compounding semiannually.
(C) *Reserve to be charged for amounts paid* — Any amount paid by the taxpayer during any taxable year for qualified reclamation or closing costs allocable to portions of the reserve property for which the election under paragraph (1) was in effect shall be charged to the appropriate reserve as of the close of the taxable year.
(D) *Reserve increased by amount deducted* — A reserve shall be increased each taxable year by the amount allowable as a deduction under paragraph (1) for such taxable year which is allocable to such reserve.
(3) **Allowance of deduction
Source: Supplied U.S. Code snapshot — release unconfirmed · 26 U.S.C. § 468
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
For the purposes of this Act, the term—
(1) “act of God” means an unanticipated grave natural disaster or other natural phenomenon of an exceptional, inevitable, and irresistible character the effects of which could not have been prevented or avoided by the exercise of due care or foresight;
(2) “barrel” means 42 United States gallons at 60 degrees fahrenheit;
(3) “claim” means a request, made in writing for a sum certain, for compensation for damages or removal costs resulting from an incident;
(4) “claimant” means any person or government who presents a claim for compensation under this subchapter;
(5) “damages” means damages specified in [section 2702(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2702/b&num=0&edition=prelim), and includes the cost of assessing these damages;
(6) “deepwater port” is a facility licensed under the Deepwater Port Act of 1974 ([33 U.S.C. 1501–152](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1501–152&num=0&edition=prelim)4);
(7) “discharge” means any emission (other than natural seepage), intentional or unintentional, and includes, but is not limited to, spilling, leaking, pumping, pouring, emitting, emptying, or dumping;
(8) “exclusive economic zone” means the zone established by Presidential Proclamation Numbered 5030, dated March 10, 1983, including the ocean waters of the areas referred to as “eastern special areas” in Article 3(1) of the Agreement between the United States of America and the Union of Soviet Socialist Republics on the Maritime Boundary, signed June 1, 1990;
(9) “facility” means any structure, group of structures, equipment, or device (other than a vessel) which is used for one or more of the following purposes: exploring for, drill
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2701
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Plan required** Each local emergency planning committee shall complete preparation of an emergency plan in accordance with this section not later than two years after October 17, 1986. The committee shall review such plan once a year, or more frequently as changed circumstances in the community or at any facility may require.
**(b) Resources** Each local emergency planning committee shall evaluate the need for resources necessary to develop, implement, and exercise the emergency plan, and shall make recommendations with respect to additional resources that may be required and the means for providing such additional resources.
**(c) Plan provisions** Each emergency plan shall include (but is not limited to) each of the following:
(1) Identification of facilities subject to the requirements of this subchapter that are within the emergency planning district, identification of routes likely to be used for the transportation of substances on the list of extremely hazardous substances referred to in [section 11002(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section11002/a&num=0&edition=prelim), and identification of additional facilities contributing or subjected to additional risk due to their proximity to facilities subject to the requirements of this subchapter, such as hospitals or natural gas facilities.
(2) Methods and procedures to be followed by facility owners and operators and local emergency and medical personnel to respond to any release of such substances.
(3) Designation of a community emergency coordinator and facility emergency coordinators, who shall make determinations necessary to implement the plan.
(4) Procedures providing reliable, effective, and timely notification by the facility emergency coordina
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 11003
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Removal and other remedial action by President; applicability of national contingency plan; response by potentially responsible parties; public health threats; limitations on response; exception**
(1) Whenever (A) any hazardous substance is released or there is a substantial threat of such a release into the environment, or (B) there is a release or substantial threat of release into the environment of any pollutant or contaminant which may present an imminent and substantial danger to the public health or welfare, the President is authorized to act, consistent with the national contingency plan, to remove or arrange for the removal of, and provide for remedial action relating to such hazardous substance, pollutant, or contaminant at any time (including its removal from any contaminated natural resource), or take any other response measure consistent with the national contingency plan which the President deems necessary to protect the public health or welfare or the environment. When the President determines that such action will be done properly and promptly by the owner or operator of the facility or vessel or by any other responsible party, the President may allow such person to carry out the action, conduct the remedial investigation, or conduct the feasibility study in accordance with [section 9622 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section9622&num=0&edition=prelim). No remedial investigation or feasibility study (RI/FS) shall be authorized except on a determination by the President that the party is qualified to conduct the RI/FS and only if the President contracts with or arranges for a qualified person to assist the President in overseeing and reviewing the conduct of such RI/FS and if the responsible party
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 9604
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Covered persons; scope; recoverable costs and damages; interest rate; “comparable maturity” date** Notwithstanding any other provision or rule of law, and subject only to the defenses set forth in subsection (b) of this section—
(1) the owner and operator of a vessel or a facility,
(2) any person who at the time of disposal of any hazardous substance owned or operated any facility at which such hazardous substances were disposed of,
(3) any person who by contract, agreement, or otherwise arranged for disposal or treatment, or arranged with a transporter for transport for disposal or treatment, of hazardous substances owned or possessed by such person, by any other party or entity, at any facility or incineration vessel owned or operated by another party or entity and containing such hazardous substances, and
(4) any person who accepts or accepted any hazardous substances for transport to disposal or treatment facilities, incineration vessels or sites selected by such person, from which there is a release, or a threatened release which causes the incurrence of response costs, of a hazardous substance, shall be liable for—
(A) all costs of removal or remedial action incurred by the United States Government or a State or an Indian tribe not inconsistent with the national contingency plan;
(B) any other necessary costs of response incurred by any other person consistent with the national contingency plan;
(C) damages for injury to, destruction of, or loss of natural resources, including the reasonable costs of assessing such injury, destruction, or loss resulting from such a release; and
(D) the costs of any health assessment or health effects study carried out under [section 9604(i) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 9607
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** For the purposes specified in this section there is authorized to be appropriated from the Hazardous Substance Superfund established under subchapter A of chapter 98 of title 26 not more than $8,500,000,000 for the 5-year period beginning on October 17, 1986, and not more than $5,100,000,000 for the period commencing October 1, 1991, and ending September 30, 1994, and such sums shall remain available until expended. The preceding sentence constitutes a specific authorization for the funds appropriated under title II of Public Law 99-160 (relating to payment to the Hazardous Substances Trust Fund). The President shall use the money in the Fund for the following purposes:
(1) Payment of governmental response costs incurred pursuant to [section 9604 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section9604&num=0&edition=prelim), including costs incurred pursuant to the Intervention on the High Seas Act [[33 U.S.C. 1471](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1471&num=0&edition=prelim) et seq.].
(2) Payment of any claim for necessary response costs incurred by any other person as a result of carrying out the national contingency plan established under section 1321(c) 11 See References in Text note below. of title 33 and amended by [section 9605 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section9605&num=0&edition=prelim): Provided, however, That such costs must be approved under said plan and certified by the responsible Federal official.
(3) Payment of any claim authorized by subsection (b) of this section and finally decided pursuant to [section 9612 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-sect
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 9611
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Assessment and listing of facilities** It shall be a goal of this chapter that, to the maximum extent practicable—
(1) not later than January 1, 1988, the President shall complete preliminary assessments of all facilities that are contained (as of October 17, 1986) on the Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) including in each assessment a statement as to whether a site inspection is necessary and by whom it should be carried out; and
(2) not later than January 1, 1989, the President shall assure the completion of site inspections at all facilities for which the President has stated a site inspection is necessary pursuant to paragraph (1).
**(b) Evaluation** Within 4 years after October 17, 1986, each facility listed (as of October 17, 1986) in the CERCLIS shall be evaluated if the President determines that such evaluation is warranted on the basis of a site inspection or preliminary assessment. The evaluation shall be in accordance with the criteria established in [section 9605 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section9605&num=0&edition=prelim) under the National Contingency Plan for determining priorities among release for inclusion on the National Priorities List. In the case of a facility listed in the CERCLIS after October 17, 1986, the facility shall be evaluated within 4 years after the date of such listing if the President determines that such evaluation is warranted on the basis of a site inspection or preliminary assessment.
**(c) Explanations** If any of the goals established by subsection (a) or (b) are not achieved, the President shall publish an explanation of why such action could not be completed by the specified date.
**(d) Commencement
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 9616
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.