Browse Arkansas Code titles and sections
42 U.S.C. § 11003 — Comprehensive emergency response plans
Federal law — U.S. Code and appendices · legal_authorities
**(a) Plan required** Each local emergency planning committee shall complete preparation of an emergency plan in accordance with this section not later than two years after October 17, 1986. The committee shall review such plan once a year, or more frequently as changed circumstances in the community or at any facility may require.
**(b) Resources** Each local emergency planning committee shall evaluate the need for resources necessary to develop, implement, and exercise the emergency plan, and shall make recommendations with respect to additional resources that may be required and the means for providing such additional resources.
**(c) Plan provisions** Each emergency plan shall include (but is not limited to) each of the following:
(1) Identification of facilities subject to the requirements of this subchapter that are within the emergency planning district, identification of routes likely to be used for the transportation of substances on the list of extremely hazardous substances referred to in [section 11002(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section11002/a&num=0&edition=prelim), and identification of additional facilities contributing or subjected to additional risk due to their proximity to facilities subject to the requirements of this subchapter, such as hospitals or natural gas facilities.
(2) Methods and procedures to be followed by facility owners and operators and local emergency and medical personnel to respond to any release of such substances.
(3) Designation of a community emergency coordinator and facility emergency coordinators, who shall make determinations necessary to implement the plan.
(4) Procedures providing reliable, effective, and timely notification by the facility emergency coordina
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 11003
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: e82e4fcd57c344a67cb1344b69104bb3257603b4f5e70239a7ba7e76f72d85b2. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_5eb6e75c2bf27863045dc1ac
Source file: Laws/federal/codes/united-states-code/title-42/section-11003-comprehensive-emergency-response-plans--e238f2c14a.md
Pages: Not recorded – Not recorded
Passage SHA-256: c258ced038fc3709d069a56c2d3ecf31177ce88158c159ba46d69bd75e7f2578
Source location: Title 42, Chapter 116, § 11003; chapter-116-emergency-planning-and-community-right-to-know.md
Stored source content
**(a) Plan required** Each local emergency planning committee shall complete preparation of an emergency plan in accordance with this section not later than two years after October 17, 1986. The committee shall review such plan once a year, or more frequently as changed circumstances in the community or at any facility may require.
**(b) Resources** Each local emergency planning committee shall evaluate the need for resources necessary to develop, implement, and exercise the emergency plan, and shall make recommendations with respect to additional resources that may be required and the means for providing such additional resources.
**(c) Plan provisions** Each emergency plan shall include (but is not limited to) each of the following:
(1) Identification of facilities subject to the requirements of this subchapter that are within the emergency planning district, identification of routes likely to be used for the transportation of substances on the list of extremely hazardous substances referred to in [section 11002(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section11002/a&num=0&edition=prelim), and identification of additional facilities contributing or subjected to additional risk due to their proximity to facilities subject to the requirements of this subchapter, such as hospitals or natural gas facilities.
(2) Methods and procedures to be followed by facility owners and operators and local emergency and medical personnel to respond to any release of such substances.
(3) Designation of a community emergency coordinator and facility emergency coordinators, who shall make determinations necessary to implement the plan.
(4) Procedures providing reliable, effective, and timely notification by the facility emergency coordinators and the community emergency coordinator to persons designated in the emergency plan, and to the public, that a release has occurred (consistent with the emergency notification requirements of [section 11004 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section11004&num=0&edition=prelim)).
(5) Methods for determining the occurrence of a release, and the area or population likely to be affected by such release.
(6) A description of emergency equipment and facilities in the community and at each facility in the community subject to the requirements of this subchapter, and an identification of the persons responsible for such equipment and facilities.
(7) Evacuation plans, including provisions for a precautionary evacuation and alternative traffic routes.
(8) Training programs, including schedules for training of local emergency response and medical personnel.
(9) Methods and schedules for exercising the emergency plan.
**(d) Providing of information** For each facility subject to the requirements of this subchapter:
(1) Within 30 days after establishment of a local emergency planning committee for the emergency planning district in which such facility is located, or within 11 months after October 17, 1986, whichever is earlier, the owner or operator of the facility shall notify the emergency planning committee (or the Governor if there is no committee) of a facility representative who will participate in the emergency planning process as a facility emergency coordinator.
(2) The owner or operator of the facility shall promptly inform the emergency planning committee of any relevant changes occurring at such facility as such changes occur or are expected to occur.
(3) Upon request from the emergency planning committee, the owner or operator of the facility shall promptly provide information to such committee necessary for developing and implementing the emergency plan.
**(e) Review by State emergency response commission** After completion of an emergency plan under subsection (a) for an emergency planning district, the local emergency planning committee shall submit a copy of the plan to the State emergency response commission of each State in which such district is located. The commission shall review the plan and make recommendations to the committee on revisions of the plan that may be necessary to ensure coordination of such plan with emergency response plans of other emergency planning districts. To the maximum extent practicable, such review shall not delay implementation of such plan.
**(f) Guidance documents** The national response team, as established pursuant to the National Contingency Plan as established under [section 9605 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section9605&num=0&edition=prelim), shall publish guidance documents for preparation and implementation of emergency plans. Such documents shall be published not later than five months after October 17, 1986.
**(g) Review of plans by regional response teams** The regional response teams, as established pursuant to the National Contingency Plan as established under [section 9605 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section9605&num=0&edition=prelim), may review and comment upon an emergency plan or other issues related to preparation, implementation, or exercise of such a plan upon request of a local emergency planning committee. Such review shall not delay implementation of the plan.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Revision and republication** Within one hundred and eighty days after December 11, 1980, the President shall, after notice and opportunity for public comments, revise and republish the national contingency plan for the removal of oil and hazardous substances, originally prepared and published pursuant to [section 1321 of title 33](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1321&num=0&edition=prelim), to reflect and effectuate the responsibilities and powers created by this chapter, in addition to those matters specified in section 1321(c)(2) 11 See References in Text note below. of title 33. Such revision shall include a section of the plan to be known as the national hazardous substance response plan which shall establish procedures and standards for responding to releases of hazardous substances, pollutants, and contaminants, which shall include at a minimum:
(1) methods for discovering and investigating facilities at which hazardous substances have been disposed of or otherwise come to be located;
(2) methods for evaluating, including analyses of relative cost, and remedying any releases or threats of releases from facilities which pose substantial danger to the public health or the environment;
(3) methods and criteria for determining the appropriate extent of removal, remedy, and other measures authorized by this chapter;
(4) appropriate roles and responsibilities for the Federal, State, and local governments and for interstate and nongovernmental entities in effectuating the plan;
(5) provision for identification, procurement, maintenance, and storage of response equipment and supplies;
(6) a method for and assignment of responsibility for reporting the existence of such facilities which may be located on federally owne
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 9605
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Types of releases**
(1) **11002(a) substance which requires CERCLA notice** — If a release of an extremely hazardous substance referred to in [section 11002(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section11002/a&num=0&edition=prelim) occurs from a facility at which a hazardous chemical is produced, used, or stored, and such release requires a notification under section 103(a) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [[42 U.S.C. 9603(a)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section9603/a&num=0&edition=prelim)] (hereafter in this section referred to as “CERCLA”) ([42 U.S.C. 9601](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section9601&num=0&edition=prelim) et seq.), the owner or operator of the facility shall immediately provide notice as described in subsection (b).
(2) **Other 11002(a) substance** — If a release of an extremely hazardous substance referred to in [section 11002(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section11002/a&num=0&edition=prelim) occurs from a facility at which a hazardous chemical is produced, used, or stored, and such release is not subject to the notification requirements under section 103(a) of CERCLA [[42 U.S.C. 9603(a)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section9603/a&num=0&edition=prelim)], the owner or operator of the facility shall immediately provide notice as described in subsection (b), but only if the release—
(A) is not a federally permitted release as defined in section 101(10) of CERCLA [[42 U.S.C. 9601(10)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section9601/10&num=0
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 11004
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 8096
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 11003
(C) If the Administrator fails to publish an
interim final regulation establishing a thresh-
old planning quantity for a substance within
30 days after October 17, 1986, the threshold
planning quantity for the substance shall be 2
pounds until such time as the Administrator
publishes regulations establishing a threshold
for the substance.
(4) Revisions
The Administrator may revise the list and
thresholds under paragraphs (2) and (3) from
time to time. Any revisions to the list shall
take into account the toxicity, reactivity, vol-
atility,
dispersability,
combustability,
or
flammability of a substance. For purposes of
the preceding sentence, the term ‘‘toxicity’’
shall include any short- or long-term health
effect which may result from a short-term ex-
posure to the substance.
(b) Facilities covered
(1) Except as provided in section 11004 of this
title, a facility is subject to the requirements of
this subchapter if a substance on the list re-
ferred to in subsection (a) is present at the facil-
ity in an amount in excess of the threshold plan-
ning quantity established for such substance.
(2) For purposes of emergency planning, a Gov-
ernor or a State emergency response commis-
sion may designate additional facilities which
shall be subject to the requirements of this sub-
chapter, if such designation is made after public
notice and opportunity for comment. The Gov-
ernor or State emergency response commission
shall notify the facility concerned of any facil-
ity designation under this paragraph.
(c) Emergency planning notification
Not later than seven months after October 17,
1986, the owner or operator of each facility sub-
ject to the requirements of this subchapter by
reason of s
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 11003
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.