Arkansas Legal Resource Navigator

49 U.S.C. § 26101 — High-speed rail corridor planning

Federal law — U.S. Code and appendices · legal_authorities

49 U.S.C. § 26101 — High-speed rail corridor planning

**(a) Corridor Planning Assistance.—** (1) The Secretary may provide under this section financial assistance to a public agency or group of public agencies for corridor planning for up to 50 percent of the publicly financed costs associated with eligible activities. (2) No less than 20 percent of the publicly financed costs associated with eligible activities shall come from State and local sources, which State and local sources may not include funds from any Federal program. **(b) Eligible Activities.—** (1) A corridor planning activity is eligible for financial assistance under subsection (a) if the Secretary determines that it is necessary to establish appropriate engineering, operational, financial, environmental, or socioeconomic projections for the establishment of high-speed rail service in the corridor and that it leads toward development of a prudent financial and institutional plan for implementation of specific high-speed rail improvements, or if it is an activity described in subparagraph (M). Eligible corridor planning activities include— (A) environmental assessments; (B) feasibility studies emphasizing commercial technology improvements or applications; (C) economic analyses, including ridership, revenue, and operating expense forecasting; (D) assessing the impact on rail employment of developing high-speed rail corridors; (E) assessing community economic impacts; (F) coordination with State and metropolitan area transportation planning and corridor planning with other States; (G) operational planning; (H) route selection analyses and purchase of rights-of-way for proposed high-speed rail service; (I) preliminary engineering and design; (J) identification of specific improvements to a corridor, including electrification,

Source: Supplied U.S. Code snapshot — release unconfirmed · 49 U.S.C. § 26101

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 36cd598cd4123ab61a9fb2478fb86be37f09277f2f35ef48ec52990f049a35fb. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_a3ce749d54ab608bb897fcba
Source file: Laws/federal/codes/united-states-code/title-49/section-26101-high-speed-rail-corridor-planning--29793830c8.md
Pages: Not recorded – Not recorded
Passage SHA-256: 5f71e4202fc029701be96c21bbd41b02dddbcf504475d8bac55068623eafc8fa

Source location: Title 49, Chapter 261, § 26101; chapter-261-high-speed-rail-assistance.md

Stored source content

**(a) Corridor Planning Assistance.—** (1) The Secretary may provide under this section financial assistance to a public agency or group of public agencies for corridor planning for up to 50 percent of the publicly financed costs associated with eligible activities. (2) No less than 20 percent of the publicly financed costs associated with eligible activities shall come from State and local sources, which State and local sources may not include funds from any Federal program. **(b) Eligible Activities.—** (1) A corridor planning activity is eligible for financial assistance under subsection (a) if the Secretary determines that it is necessary to establish appropriate engineering, operational, financial, environmental, or socioeconomic projections for the establishment of high-speed rail service in the corridor and that it leads toward development of a prudent financial and institutional plan for implementation of specific high-speed rail improvements, or if it is an activity described in subparagraph (M). Eligible corridor planning activities include— (A) environmental assessments; (B) feasibility studies emphasizing commercial technology improvements or applications; (C) economic analyses, including ridership, revenue, and operating expense forecasting; (D) assessing the impact on rail employment of developing high-speed rail corridors; (E) assessing community economic impacts; (F) coordination with State and metropolitan area transportation planning and corridor planning with other States; (G) operational planning; (H) route selection analyses and purchase of rights-of-way for proposed high-speed rail service; (I) preliminary engineering and design; (J) identification of specific improvements to a corridor, including electrification, line straightening and other right-of-way improvements, bridge rehabilitation and replacement, use of advanced locomotives and rolling stock, ticketing, coordination with other modes of transportation, parking and other means of passenger access, track, signal, station, and other capital work, and use of intermodal terminals; (K) preparation of financing plans and prospectuses; (L) creation of public/private partnerships; and (M) the acquisition of locomotives, rolling stock, track, and signal equipment. (2) No financial assistance shall be provided under this section for corridor planning with respect to the main line of the Northeast Corridor, between Washington, District of Columbia, and Boston, Massachusetts. **(c) Criteria for Determining Financial Assistance.—** Selection by the Secretary of recipients of financial assistance under this section shall be based on such criteria as the Secretary considers appropriate, including— (1) the relationship of the corridor to the Secretary’s national high-speed ground transportation policy; (2) the extent to which the proposed planning focuses on systems which will achieve sustained speeds of 125 mph or greater; (3) the integration of the corridor into metropolitan area and statewide transportation planning; (4) the potential interconnection of the corridor with other parts of the Nation’s transportation system, including the interconnection with other countries; (5) the anticipated effect of the corridor on the congestion of other modes of transportation; (6) whether the work to be funded will aid the efforts of State and local governments to comply with the Clean Air Act ([42 U.S.C. 7401](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7401&num=0&edition=prelim) et seq.); (7) the past and proposed financial commitments and other support of State and local governments and the private sector to the proposed high-speed rail program, including the acquisition of rolling stock; (8) the estimated level of ridership; (9) the estimated capital cost of corridor improvements, including the cost of closing, improving, or separating highway-rail grade crossings; (10) rail transportation employment impacts; (11) community economic impacts; (12) the extent to which the projected revenues of the proposed high-speed rail service, along with any financial commitments of State or local governments and the private sector, are expected to cover capital costs and operating and maintenance expenses; (13) whether a specific route has been selected, specific improvements identified, and capacity studies completed; and (14) whether the corridor has been designated as a high-speed rail corridor by the Secretary.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

49 U.S.C. § 28101 — Rail police officers

**(a) In General.—** Under regulations prescribed by the Secretary of Transportation, a rail police officer who is directly employed by or contracted by a rail carrier and certified or commissioned as a police officer under the laws of a State may enforce the laws of any jurisdiction in which the rail carrier owns property, to the extent of the authority of a police officer certified or commissioned under the laws of that jurisdiction, to protect— (1) employees, passengers, or patrons of the rail carrier; (2) property, equipment, and facilities owned, leased, operated, or maintained by the rail carrier; (3) property moving in interstate or foreign commerce in the possession of the rail carrier; and (4) personnel, equipment, and material moving by rail that are vital to the national defense. **(b) Assignment.—** A railroad police officer directly employed by or contracted by a railroad carrier and certified or commissioned as a police officer under the laws of a State may be temporarily assigned to assist a second railroad carrier in carrying out law enforcement duties upon the request of the second railroad carrier, at which time the police officer shall be considered to be an employee or agent, as applicable, of the second railroad carrier and shall have authority to enforce the laws of any jurisdiction in which the second railroad carrier owns property to the same extent as provided in subsection (a). **(c) Transfers.—** (1) **In general.—** — If a railroad police officer directly employed by or contracted by a rail carrier and certified or commissioned as a police officer under the laws of a State transfers primary employment or residence from the certifying or commissioning State to another State or jurisdiction, the railroad police officer, not later than 1

Source: Supplied U.S. Code snapshot — release unconfirmed · 49 U.S.C. § 28101

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

49 U.S.C. § 20101 — Purpose

The purpose of this chapter is to promote safety in every area of railroad operations and reduce railroad-related accidents and incidents.

Source: Supplied U.S. Code snapshot — release unconfirmed · 49 U.S.C. § 20101

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7401 — Congressional findings and declaration of purpose

**(a) Findings** The Congress finds— (1) that the predominant part of the Nation’s population is located in its rapidly expanding metropolitan and other urban areas, which generally cross the boundary lines of local jurisdictions and often extend into two or more States; (2) that the growth in the amount and complexity of air pollution brought about by urbanization, industrial development, and the increasing use of motor vehicles, has resulted in mounting dangers to the public health and welfare, including injury to agricultural crops and livestock, damage to and the deterioration of property, and hazards to air and ground transportation; (3) that air pollution prevention (that is, the reduction or elimination, through any measures, of the amount of pollutants produced or created at the source) and air pollution control at its source is the primary responsibility of States and local governments; and (4) that Federal financial assistance and leadership is essential for the development of cooperative Federal, State, regional, and local programs to prevent and control air pollution. **(b) Declaration** The purposes of this subchapter are— (1) to protect and enhance the quality of the Nation’s air resources so as to promote the public health and welfare and the productive capacity of its population; (2) to initiate and accelerate a national research and development program to achieve the prevention and control of air pollution; (3) to provide technical and financial assistance to State and local governments in connection with the development and execution of their air pollution prevention and control programs; and (4) to encourage and assist the development and operation of regional air pollution prevention and control programs. **(c) Pollution prevention** A prim

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7401

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

49 U.S.C. § 26106 — High-speed rail corridor development

**(a) In General.—** The Secretary of Transportation shall establish and implement a high-speed rail corridor development program. **(b) Definitions.—** In this section, the following definitions apply: (1) **Applicant.—** — The term “applicant” means a State, a group of States, an Interstate Compact, a public agency established by one or more States and having responsibility for providing high-speed rail service, or Amtrak. (2) **Corridor.—** — The term “corridor” means a corridor designated by the Secretary pursuant to section 104(d)(2) 11 See References in Text note below. of title 23. (3) **Capital project.—** — The term “capital project” means a project or program in a State rail plan developed under chapter 227 of this title for acquiring, constructing, improving, or inspecting equipment, track, and track structures, or a facility of use in or for the primary benefit of high-speed rail service, expenses incidental to the acquisition or construction (including designing, engineering, location surveying, mapping, environmental studies, and acquiring rights-of-way), payments for the capital portions of rail trackage rights agreements, highway-rail grade crossing improvements related to high-speed rail service, mitigating environmental impacts, communication and signalization improvements, relocation assistance, acquiring replacement housing sites, and acquiring, constructing, relocating, and rehabilitating replacement housing. (4) **High-speed rail.—** — The term “high-speed rail” means intercity passenger rail service that is reasonably expected to reach speeds of at least 110 miles per hour. (5) **Intercity passenger rail service.—** — The term “intercity passenger rail service” has the meaning given the term “intercity rail passenger transportation” in [sect

Source: Supplied U.S. Code snapshot — release unconfirmed · 49 U.S.C. § 26106

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7401 — Congressional findings and declaration of

Page 7160 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 7401 Sec. PART C—CLEAN FUEL VEHICLES 7581. Definitions. 7582. Requirements applicable to clean-fuel vehi- cles. 7583. Standards for light-duty clean-fuel vehicles. 7584. Administration and enforcement as per Cali- fornia standards. 7585. Standards for heavy-duty clean-fuel vehicles (GVWR above 8,500 up to 26,000 lbs.). 7586. Centrally fueled fleets. 7587. Vehicle conversions. 7588. Federal agency fleets. 7589. California pilot test program. 7590. General provisions. SUBCHAPTER III—GENERAL PROVISIONS 7601. Administration. 7602. Definitions. 7603. Emergency powers. 7604. Citizen suits. 7605. Representation in litigation. 7606. Federal procurement. 7607. Administrative proceedings and judicial re- view. 7608. Mandatory licensing. 7609. Policy review. 7610. Other authority. 7611. Records and audit. 7612. Economic impact analyses. 7613. Repealed. 7614. Labor standards. 7615. Separability. 7616. Sewage treatment grants. 7617. Economic impact assessment. 7618. Repealed. 7619. Air quality monitoring. 7620. Standardized air quality modeling. 7621. Employment effects. 7622. Employee protection. 7623. Repealed. 7624. Cost of vapor recovery equipment. 7625. Vapor recovery for small business marketers of petroleum products. 7625–1. Exemptions for certain territories. 7625a. Statutory construction. 7626. Authorization of appropriations. 7627. Air pollution from Outer Continental Shelf activities. 7628. Demonstration grant program for local gov- ernments. SUBCHAPTER IV—NOISE POLLUTION 7641. Noise abatement. 7642. Authorization of appropriations. SUBCHAPTER IV–A—ACID DEPOSITION CONTROL 7651. Findings and purposes. 7651a. Definitions. 7651b.

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7401

Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 7401. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

49 U.S.C. § 26101 — High-speed rail corridor planning

Page 735 TITLE 49—TRANSPORTATION § 26101 propriations of the Senate, and the Committee on Transportation and Infrastructure of the House of Representatives, and the Committee on Appropriations of the House of Representatives a project pipeline, in accordance with this sec- tion, that— (1) identifies intercity passenger rail cor- ridors selected for development under this sec- tion; (2) identifies capital projects for Federal in- vestment, project applicants, and proposed Federal funding levels, as applicable, con- sistent with the corridor project inventory; (3) specifies the order in which the Secretary would provide Federal financial assistance, subject to the availability of funds, to projects that have identified sponsors, including a method and plan for apportioning funds to project sponsors for a 5-year period, which may be altered by the Secretary, as necessary, if recipients are not carrying out projects on the anticipated schedule; (4) takes into consideration the appropriate sequence and phasing of projects described in the corridor project inventory; (5) takes into consideration the existing commitments and anticipated Federal, project applicant, sponsor, and other relevant funding levels for the next 5 fiscal years based on in- formation currently available to the Sec- retary; (6) is prioritized based on the level of readi- ness of the corridor; and (7) reflects consultation with Amtrak. (h) DEFINITION.—In this section, the term ‘‘intercity passenger rail corridor’’ means— (1) a new intercity passenger rail route of less than 750 miles; (2) the enhancement of an existing intercity passenger rail route of less than 750 miles; (3) the restoration of service over all or por- tions of an intercity passenger rail route for- merly oper

Source: Supplied 2024 U.S. Code historical extraction · 49 U.S.C. § 26101

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.