33 U.S.C. § 2346 — Independent peer review

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2346 — Independent peer review

**(a) Project studies subject to independent peer review** (1) **In general** — Project studies shall be subject to a peer review by an independent panel of experts as determined under this section. (2) **Scope** — The peer review may include a review of the economic and environmental assumptions and projections, project evaluation data, economic analyses, environmental analyses, engineering analyses, formulation of alternative plans, methods for integrating risk and uncertainty, models used in evaluation of economic or environmental impacts of proposed projects, and any biological opinions of the project study. (3) **Project studies subject to peer review** (A) *Mandatory* — A project study shall be subject to peer review under paragraph (1) if— (i) the project has an estimated total cost of more than $200,000,000, including mitigation costs, and is not determined by the Chief of Engineers to be exempt from peer review under paragraph (6); (ii) the Governor of an affected State requests a peer review by an independent panel of experts; or (iii) the Chief of Engineers determines that the project study is controversial considering the factors set forth in paragraph (4). (B) *Discretionary* (i) *Agency request* — A project study shall be considered by the Chief of Engineers for peer review under this section if the head of a Federal or State agency charged with reviewing the project study determines that the project is likely to have a significant adverse impact on environmental, cultural, or other resources under the jurisdiction of the agency after implementation of proposed mitigation plans and requests a peer review by an independent panel of experts. (ii) *Deadline for decision* — A decision of the Chief of Engineers under this subpa

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2346

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: a7a39462d9f9ea4929ea0cd4c042e1ee464ce8cbf546941fce8b2bdb98fd0ef2. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_a28fac2a1fa90ba1b6f3e722
Source file: Laws/federal/codes/united-states-code/title-33/section-2346-independent-peer-review--c60041cfb1.md
Pages: Not recorded – Not recorded
Passage SHA-256: f898a8494be82bfa76f7b02cb991ca774e466c7656b2cf92fe5cd75e46fa5606

Source location: Title 33, Chapter 36, § 2346; chapter-036-water-resources-development.md

Stored source content

**(a) Project studies subject to independent peer review** (1) **In general** — Project studies shall be subject to a peer review by an independent panel of experts as determined under this section. (2) **Scope** — The peer review may include a review of the economic and environmental assumptions and projections, project evaluation data, economic analyses, environmental analyses, engineering analyses, formulation of alternative plans, methods for integrating risk and uncertainty, models used in evaluation of economic or environmental impacts of proposed projects, and any biological opinions of the project study. (3) **Project studies subject to peer review** (A) *Mandatory* — A project study shall be subject to peer review under paragraph (1) if— (i) the project has an estimated total cost of more than $200,000,000, including mitigation costs, and is not determined by the Chief of Engineers to be exempt from peer review under paragraph (6); (ii) the Governor of an affected State requests a peer review by an independent panel of experts; or (iii) the Chief of Engineers determines that the project study is controversial considering the factors set forth in paragraph (4). (B) *Discretionary* (i) *Agency request* — A project study shall be considered by the Chief of Engineers for peer review under this section if the head of a Federal or State agency charged with reviewing the project study determines that the project is likely to have a significant adverse impact on environmental, cultural, or other resources under the jurisdiction of the agency after implementation of proposed mitigation plans and requests a peer review by an independent panel of experts. (ii) *Deadline for decision* — A decision of the Chief of Engineers under this subparagraph whether to conduct a peer review shall be made within 21 days of the date of receipt of the request by the head of the Federal or State agency under clause (i). (iii) *Reasons for not conducting peer review* — If the Chief of Engineers decides not to conduct a peer review following a request under clause (i), the Chief shall make publicly available, including on the Internet, the reasons for not conducting the peer review. (iv) *Appeal to Chairman of Council on Environmental Quality* — A decision by the Chief of Engineers not to conduct a peer review following a request under clause (i) shall be subject to appeal by a person referred to in clause (i) to the Chairman of the Council on Environmental Quality if such appeal is made within the 30-day period following the date of the decision being made available under clause (iii). A decision of the Chairman on an appeal under this clause shall be made within 30 days of the date of the appeal. (4) **Factors to consider** — In determining whether a project study is controversial under paragraph (3)(A)(iii), the Chief of Engineers shall consider if— (A) there is a significant public dispute as to the size, nature, or effects of the project; or (B) there is a significant public dispute as to the economic or environmental costs or benefits of the project. (5) **Project studies excluded from peer review** — The Chief of Engineers may exclude a project study from peer review under paragraph (1)— (A) if the project study does not include an environmental impact statement and is a project study subject to peer review under paragraph (3)(A)(i) that the Chief of Engineers determines— (i) is not controversial; (ii) has no more than negligible adverse impacts on scarce or unique cultural, historic, or tribal resources; (iii) has no substantial adverse impacts on fish and wildlife species and their habitat prior to the implementation of mitigation measures; and (iv) has, before implementation of mitigation measures, no more than a negligible adverse impact on a species listed as endangered or threatened species under the Endangered Species Act of 1973 ([16 U.S.C. 1531](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section1531&num=0&edition=prelim) et seq.) or the critical habitat of such species designated under such Act; (B) if the project study— (i) involves only the rehabilitation or replacement of existing hydropower turbines, lock structures, or flood control gates within the same footprint and for the same purpose as an existing water resources project; (ii) is for an activity for which there is ample experience within the Corps of Engineers and industry to treat the activity as being routine; and (iii) has minimal life safety risk; or (C) if the project study does not include an environmental impact statement and is a project study pursued under [section 701s of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701s&num=0&edition=prelim), [section 701g of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701g&num=0&edition=prelim), [section 701r of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701r&num=0&edition=prelim), [section 577(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section577/a&num=0&edition=prelim), [section 426g of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section426g&num=0&edition=prelim), [section 426i of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section426i&num=0&edition=prelim), [section 603a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section603a&num=0&edition=prelim), [section 2309a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2309a&num=0&edition=prelim), or [section 2330 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2330&num=0&edition=prelim). (6) **Determination of total cost** — For purposes of determining the estimated total cost of a project under paragraph (3)(A), the total cost shall be based upon the reasonable estimates of the Chief of Engineers at the completion of the reconnaissance study for the project. If the reasonable estimate of total costs is subsequently determined to be in excess of the amount in paragraph (3)(A), the Chief of Engineers shall make a determination whether a project study is required to be reviewed under this section. **(b) Timing of peer review** (1) **In general** — The Chief of Engineers shall determine the timing of a peer review of a project study under subsection (a). In all cases, the peer review shall occur during the period beginning on the date of the signing of the feasibility cost-sharing agreement for the study and ending on the date established under subsection (e)(1)(A) for the peer review and shall be accomplished concurrent with the conducting of the project study. (2) **Factors to consider** — In any case in which the Chief of Engineers has not initiated a peer review of a project study, the Chief of Engineers shall consider, at a minimum, whether to initiate a peer review at the time that— (A) the without-project conditions are identified; (B) the array of alternatives to be considered are identified; and (C) the preferred alternative is identified. (3) **Reasons for timing** — If the Chief of Engineers does not initiate a peer review for a project study at a time described in paragraph (2), the Chief shall— (A) not later than 7 days after the date on which the Chief of Engineers determines not to initiate a peer review— (i) notify the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives of that decision; and (ii) make publicly available, including on the Internet, the reasons for not conducting the review; and (B) include the reasons for not conducting the review in the decision document for the project study. (4) **Limitation on multiple peer review** — Nothing in this subsection shall be construed to require the Chief of Engineers to conduct multiple peer reviews for a project study. **(c) Establishment of panels** (1) **In general** — For each project study subject to peer review under subsection (a), as soon as practicable after the Chief of Engineers determines that a project study will be subject to peer review, the Chief of Engineers shall contract with the National Academy of Sciences or a similar independent scientific and technical advisory organization or an eligible organization to establish a panel of experts to conduct a peer review for the project study. (2) **Membership** — A panel of experts established for a project study under this section shall be composed of independent experts who represent a balance of areas of expertise suitable for the review being conducted. (3) **Limitation on appointments** — The National Academy of Sciences or any other organization the Chief of Engineers contracts with under paragraph (1) to establish a panel of experts shall apply the National Academy of Science’s policy for selecting committee members to ensure that members selected for the panel of experts have no conflict with the project being reviewed. (4) **Congressional and public notification** — Following the identification of a project study for peer review under this section, but prior to initiation of the review by the panel of experts, the Chief of Engineers shall, not later than 7 days after the date on which the Chief of Engineers determines to conduct a review— (A) notify the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives of the review conducted under this section; and (B) make publicly available, including on the Internet, information on— (i) the dates scheduled for beginning and ending the review; (ii) the entity that has the contract for the review; and (iii) the names and qualifications of the panel of experts. **(d) Duties of panels** A panel of experts established for a peer review for a project study under this section shall— (1) conduct the peer review for the project study; (2) assess the adequacy and acceptability of the economic, engineering, and environmental methods, models, and analyses used by the Chief of Engineers; (3) receive from the Chief of Engineers the public written and oral comments provided to the Chief of Engineers; (4) provide timely written and oral comments to the Chief of Engineers throughout the development of the project study, as requested; and (5) submit to the Chief of Engineers a final report containing the panel’s economic, engineering, and environmental analysis of the project study, including the panel’s assessment of the adequacy and acceptability of the economic, engineering, and environmental methods, models, and analyses used by the Chief of Engineers, to accompany the publication of the report of the Chief of Engineers for the project. **(e) Duration of project study peer reviews** (1) **Deadline** — A panel of experts established under this section shall— (A) complete its peer review under this section for a project study and submit a report to the Chief of Engineers under subsection (d)(5) not more than 60 days after the last day of the public comment period for the draft project study, or, if the Chief of Engineers determines that a longer period of time is necessary, such period of time determined necessary by the Chief of Engineers; and (B) terminate on the date of initiation of the State and agency review required by [section 701–1 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701-1&num=0&edition=prelim). (2) **Failure to meet deadline** — If a panel of experts does not complete its peer review of a project study under this section and submit a report to the Chief of Engineers under subsection (d)(5) on or before the deadline established by paragraph (1) for the peer review, the Chief of Engineers shall complete the project study without delay. **(f) Recommendations of panel** (1) **Consideration by the Chief of Engineers** — After receiving a report on a project study from a panel of experts under this section and before entering a final record of decision for the project, the Chief of Engineers shall consider any recommendations contained in the report and prepare a written response for any recommendations adopted or not adopted. (2) **Public availability and submission to Congress** — After receiving a report on a project study from a panel of experts under this section, the Chief of Engineers shall make available to the public, including on the Internet, and submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives— (A) a copy of the report not later than 7 days after the date on which the report is delivered to the Chief of Engineers; and (B) a copy of any written response of the Chief of Engineers on recommendations contained in the report not later than 3 days after the date on which the response is delivered to the Chief of Engineers. (3) **Inclusion in project study** — A report on a project study from a panel of experts under this section and the written response of the Chief of Engineers shall be included in the final decision document for the project study. **(g) Costs** (1) **In general** — The costs of a panel of experts established for a peer review under this section— (A) shall be a Federal expense; and (B) shall not exceed $500,000. (2) **Waiver** — The Chief of Engineers may waive the $500,000 limitation contained in paragraph (1)(B) in cases that the Chief of Engineers determines appropriate. **(h) Reports** (1) **Initial report** — Not later than 3 years after November 8, 2007, the Chief of Engineers shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report on the implementation of this section. (2) **Additional report** — Not later than 6 years after November 8, 2007, the Chief of Engineers shall update the report under paragraph (1) taking into account any further information on implementation of this section and submit such updated report to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives. **(i) Nonapplicability of chapter 10 of title 5** Chapter 10 of title 5 shall not apply to a peer review panel established under this section. **(j) Savings clause** Nothing in this section shall be construed to affect any authority of the Chief of Engineers to cause or conduct a peer review of a water resources project existing on November 8, 2007. **(k) Definitions** In this section, the following definitions apply: (1) **Project study** — The term “project study” means— (A) a feasibility study or reevaluation study for a water resources project, including the environmental impact statement prepared for the study; and (B) any other study associated with a modification of a water resources project that includes an environmental impact statement, including the environmental impact statement prepared for the study. (2) **Affected State** — The term “affected State”, as used with respect to a water resources project, means a State all or a portion of which is within the drainage basin in which the project is or would be located and would be economically or environmentally affected as a consequence of the project. (3) **Eligible organization** — The term “eligible organization” means an organization that— (A) is described in section 501(c)(3), and exempt from Federal tax under section 501(a), of title 26; (B) is independent; (C) is free from conflicts of interest; (D) does not carry out or advocate for or against Federal water resources projects; and (E) has experience in establishing and administering peer review panels. (4) **Total cost** — The term “total cost”, as used with respect to a water resources project, means the cost of construction (including planning and designing) of the project. In the case of a project for hurricane and storm damage reduction or flood damage reduction that includes periodic nourishment over the life of the project, the term includes the total cost of the nourishment.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 701r — Protection of highways, bridge approaches, lighthouses, public works, and nonprofit public services

The Secretary of the Army is authorized to allot from any appropriations heretofore or hereafter made for flood control, not to exceed $50,000,000 per year, for the construction, repair, restoration, and modification of emergency streambank and shoreline protection works to prevent damage to highways, bridge approaches, lighthouses (including those lighthouses with historical value), and public works, churches, hospitals, schools, and other nonprofit public services, when in the opinion of the Chief of Engineers such work is advisable: Provided, That not more than $15,000,000 shall be allotted for this purpose at any single locality from the appropriations for any one fiscal year, and if such amount is not sufficient to cover the costs included in the Federal cost share for a project, as determined by the Secretary, the non-Federal interest shall be responsible for any such costs that exceed such amount.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 701r

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 1531 — Congressional findings and declaration of purposes and policy

**(a) Findings** The Congress finds and declares that— (1) various species of fish, wildlife, and plants in the United States have been rendered extinct as a consequence of economic growth and development untempered by adequate concern and conservation; (2) other species of fish, wildlife, and plants have been so depleted in numbers that they are in danger of or threatened with extinction; (3) these species of fish, wildlife, and plants are of esthetic, ecological, educational, historical, recreational, and scientific value to the Nation and its people; (4) the United States has pledged itself as a sovereign state in the international community to conserve to the extent practicable the various species of fish or wildlife and plants facing extinction, pursuant to— (A) migratory bird treaties with Canada and Mexico; (B) the Migratory and Endangered Bird Treaty with Japan; (C) the Convention on Nature Protection and Wildlife Preservation in the Western Hemisphere; (D) the International Convention for the Northwest Atlantic Fisheries; (E) the International Convention for the High Seas Fisheries of the North Pacific Ocean; (F) the Convention on International Trade in Endangered Species of Wild Fauna and Flora; and (G) other international agreements; and (5) encouraging the States and other interested parties, through Federal financial assistance and a system of incentives, to develop and maintain conservation programs which meet national and international standards is a key to meeting the Nation’s international commitments and to better safeguarding, for the benefit of all citizens, the Nation’s herit­age in fish, wildlife, and plants. **(b) Purposes** The purposes of this chapter are to provide a means whereby the ecosystems upon which endangered

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 1531

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 603a — Removal of snags and debris, and straightening, clearing, and protecting channels in navigable waters

The Secretary of the Army is authorized to allot not to exceed $5,000,000 from any appropriations made prior to or after March 2, 1945, for any one fiscal year for improvement of rivers and harbors, for removing accumulated snags, obstructions, and other debris located in or adjacent to a Federal channel, and for protecting, clearing, and straightening channels in navigable harbors and navigable streams and tributaries thereof, when in the opinion of the Chief of Engineers such work is advisable in the interest of navigation, flood control, ecosystem restoration, or recreation.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 603a

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 426g — Storm and hurricane restoration and impact minimization program

**(a) Construction of small shore and beach restoration and protection projects** (1) **In general** — The Secretary may carry out a program for the construction of small shore and beach restoration and protection projects not specifically authorized by Congress that otherwise comply with [section 426e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section426e&num=0&edition=prelim) if the Secretary determines that such construction is advisable. (2) **Local cooperation** — The local cooperation requirement of [section 426e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section426e&num=0&edition=prelim) shall apply to a project under this section. (3) **Completeness** — A project under this subsection— (A) shall be complete; and (B) shall not commit the United States to any additional improvement to ensure the successful operation of the project; except for participation in periodic beach nourishment in accordance with— (i) [section 426e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section426e&num=0&edition=prelim); and (ii) the procedure for projects authorized after submission of a survey report. **(b) National shoreline erosion control development and demonstration program** (1) **In general** — The Secretary shall conduct under the program authorized by subsection (a) a national shoreline erosion control development and demonstration program (referred to in this section as the “demonstration program”). (2) **Requirements** (A) *In general* — The demonstration program shall include provisions for— (i) projects consisting of planning, design, construction, and monitoring of prototype engineered and native and naturalized vegetat

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 426g

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2309a — Control of ice

**(a) Program authority** The Secretary shall undertake a program of research for the control of ice, and to assist communities in breaking up ice, which otherwise is likely to cause or aggravate flood damage or severe streambank erosion. **(b) Assistance to units of local government** The Secretary is further authorized to provide technical assistance to units of local government to implement local plans to control or break up such ice. As part of such authority, the Secretary shall acquire necessary ice-control or ice-breaking equipment, which shall be loaned to units of local government together with operating assistance, where appropriate. **(c) Authorization of appropriations** There is authorized to be appropriated $5,000,000 per fiscal year for each of the fiscal years 1988, 1989, 1990, 1991, and 1992 for purposes of carrying out subsections (a) and (b) of this section, such sums to remain available until expended. **(d) Hardwick, Vermont, demonstration program** To implement further the purposes of this section, the Secretary, in consultation and cooperation with local officials, is authorized and directed to undertake a demonstration program for the control of ice at Hardwick, Vermont. The work authorized by this subsection shall be designed to minimize the danger of flooding due to ice problems in the vicinity of such community. In the design, construction, and location of ice-control structures for this project, full consideration will be given to the recreational, scenic, and environmental values of the reach of river affected by the project, in order to minimize project impacts on these values. Full opportunity shall be given to interested environmental and recreational organizations to participate in such planning. There is authorized to be appropriated

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2309a

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 701g — Removal of obstructions; clearing channels

The Secretary of the Army is authorized to allot not to exceed $15,000,000 from any appropriations heretofore or hereafter made for any one fiscal year for flood control, for removing accumulated snags and other debris, for preventing and mitigating flood damages associated with ice jams, and clearing and straightening the channel in navigable streams and tributaries thereof, when in the opinion of the Chief of Engineers such work is advisable in the interest of flood control: Provided, That not more than $1,000,000 shall be expended for this purpose for any single tributary from the appropriations for any one fiscal year.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 701g

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 426i — Shore damage prevention or mitigation

**(a) In general** The Secretary of the Army is authorized to investigate, study, plan, and implement structural and nonstructural measures for the prevention or mitigation of shore damages attributable to Federal navigation works and shore damage attributable to the Atlantic Intracoastal Waterway and the Gulf Intracoastal Waterway, if a non-Federal public body agrees to operate and maintain such measures, and, in the case of interests in real property acquired in conjunction with nonstructural measures, to operate and maintain the property for public purposes in accordance with regulations prescribed by the Secretary. **(b) Cost sharing** The costs of implementing measures, including a study, shall be cost-shared in the same proportion as the cost-sharing provisions applicable to construction of the project causing the shore damage. **(c) Requirement for specific authorization** No such project shall be initiated without specific authorization by Congress if the Federal first cost exceeds $15,000,000. **(d) Coordination** The Secretary shall— (1) coordinate the implementation of the measures under this section with other Federal and non-Federal shore protection projects in the same geographic area; and (2) to the extent practicable, combine mitigation projects with other shore protection projects in the same area into a comprehensive regional project. **(e) Reimbursement for feasibility studies** Beginning on December 16, 2016, in any case in which the Secretary implements a project under this section, the Secretary shall reimburse or credit the non-Federal interest for any amounts contributed for the study evaluating the damage in excess of the non-Federal share of the costs, as determined under subsection (b).

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 426i

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 701s — Small flood control projects; appropriations; amount limitation for single locality; conditions

The Secretary of the Army is authorized to allot from any appropriations heretofore or hereafter made for flood control, not to exceed $90,000,000 for any one fiscal year, for the implementation of small structural and nonstructural projects, and projects that use natural features or nature-based features (as those terms are defined in [section 2289a(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2289a/a&num=0&edition=prelim)), for flood control and related purposes not specifically authorized by Congress, which come within the provisions of [section 701a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701a&num=0&edition=prelim), when in the opinion of the Chief of Engineers such work is advisable. The amount allotted for a project shall be sufficient to complete Federal participation in the project. Not more than $15,000,000 shall be allotted under this section for a project at any single locality. The provisions of local cooperation specified in [section 701c of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701c&num=0&edition=prelim) shall apply. The work shall be complete in itself and not commit the United States to any additional improvement to insure its successful operation, except as may result from the normal procedure applying to projects authorized after submission of preliminary examination and survey reports.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 701s

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2330 — Challenge cost-sharing program for management of recreation facilities

**(a) In general** The Secretary is authorized to develop and implement a program to share the cost of managing recreation facilities and natural resources at water resource development projects under the Secretary’s jurisdiction. **(b) Cooperative agreements** (1) **In general** — To implement the program under this section, the Secretary is authorized to enter into cooperative agreements with non-Federal public entities and private nonprofit entities to provide for operation and management of recreation facilities and natural resources at civil works projects under the Secretary’s jurisdiction where such facilities and resources are being maintained at complete Federal expense. (2) **Requirements** — Before entering into an agreement under paragraph (1), the Secretary shall ensure that the non-Federal public entity or private nonprofit entity has the authority and capability— (A) to carry out the terms of the agreement; and (B) to pay damages, if necessary, in the event of a failure to perform. **(c) User fees** (1) **Collection of fees** (A) *In general* — The Secretary may allow a non-Federal public entity or private nonprofit entity that has entered into an agreement pursuant to subsection (b) to collect user fees for the use of developed recreation sites and facilities, whether developed or constructed by the non-Federal public entity or private nonprofit entity or the Department of the Army. (B) *Use of visitor reservation services* (i) *In general* — A non-Federal public entity or a private nonprofit entity described in subparagraph (A) may use, to manage fee collections and reservations under this section, any visitor reservation service that the Secretary has provided for by contract or interagency agreement, subject to such terms and con

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2330

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 1531 — Congressional findings and declaration of

Page 1909 TITLE 16—CONSERVATION § 1531 maintenance of continuing and stable supply of agri- cultural commodities and forest products. Section 1502, Pub. L. 91–524, title X, § 1002, as added Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 242, required eligible landowners and operators to furnish plan of farming operations or land use to Secretary. Section 1503, Pub. L. 91–524, title X, § 1003, as added Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 242; amended Pub. L. 93–125, § 1(g)(i), Oct. 18, 1973, 87 Stat. 450, related to approved conservation plans as basis for contracts, duties under contracts, and termination or modifica- tion of contracts. Section 1504, Pub. L. 91–524, title X, § 1004, as added Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 243, author- ized furnishing of conservation materials to eligible owners and operators. Section 1505, Pub. L. 91–524, title X, § 1005, as added Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 243; amended Pub. L. 95–113, title XV, § 1509, Sept. 29, 1977, 91 Stat. 1022, authorized establishment of multiyear set-aside contracts. Section 1506, Pub. L. 91–524, title X, § 1006, as added Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 244, author- ized issuance of rules and regulations as well as limita- tions on total retired acreage. Section 1507, Pub. L. 91–524, title X, § 1007, as added Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 244; amended Pub. L. 93–125, § 1(g)(ii), Oct. 18, 1973, 87 Stat. 450, di- rected appointment of advisory boards to assist in de- velopment of programs under this chapter. Section 1508, Pub. L. 91–524, title X, § 1008, as added Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 244, directed coordination with and utilization of Federal, State, and local services and facili

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 1531

Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 1531. This identifies an authority to review, not proof of applicability.