42 U.S.C. § 16513 — Terms and conditions

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 16513 — Terms and conditions

**(a) In general** Except for division C of Public Law 108–324 [[15 U.S.C. 720](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section720&num=0&edition=prelim) et seq.], the Secretary shall make guarantees under this or any other Act for projects, including projects receiving financial support or credit enhancements from a State energy financing institution, on such terms and conditions as the Secretary determines, after consultation with the Secretary of the Treasury, only in accordance with this section. **(b) Specific appropriation or contribution** (1) **In general** — Except as provided in paragraph (2), the cost of a guarantee shall be paid by the Secretary using an appropriation made for the cost of the guarantee, subject to the availability of such an appropriation. (2) **Insufficient appropriations** — If sufficient appropriated funds to pay the cost of a guarantee are not available, then the guarantee shall not be made unless— (A) the Secretary has received from the borrower a payment in full for the cost of the guarantee and deposited the payment into the Treasury; or (B) a combination of one or more appropriations and one or more payments from the borrower under this subsection has been made that is sufficient to cover the cost of the guarantee. (3) **Source of payments** — The source of a payment received from a borrower under subparagraph (A) or (B) of paragraph (2) may not be a loan or other debt obligation that is made or guaranteed by the Federal Government. **(c) Amount** Unless otherwise provided by law, a guarantee by the Secretary shall not exceed an amount equal to 80 percent of the project cost of the facility that is the subject of the guarantee, as estimated at the time at which the guarantee is issued. **(d) Re

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 16513

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 2e3edd6aedc3a26a4e0dae8992991d3350a6211c7f811d9c812695fa9ab1e360. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_9c9f5d065c8a434d4b91782e
Source file: Laws/federal/codes/united-states-code/title-42/section-16513-terms-and-conditions--d64f6c1535.md
Pages: Not recorded – Not recorded
Passage SHA-256: ab97d741238d058d6578f1e2cc47221df8a8eb24df507fdfb6c3ab43111374dd

Source location: Title 42, Chapter 149, § 16513; chapter-149-national-energy-policy-and-programs.md

Stored source content

**(a) In general** Except for division C of Public Law 108–324 [[15 U.S.C. 720](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section720&num=0&edition=prelim) et seq.], the Secretary shall make guarantees under this or any other Act for projects, including projects receiving financial support or credit enhancements from a State energy financing institution, on such terms and conditions as the Secretary determines, after consultation with the Secretary of the Treasury, only in accordance with this section. **(b) Specific appropriation or contribution** (1) **In general** — Except as provided in paragraph (2), the cost of a guarantee shall be paid by the Secretary using an appropriation made for the cost of the guarantee, subject to the availability of such an appropriation. (2) **Insufficient appropriations** — If sufficient appropriated funds to pay the cost of a guarantee are not available, then the guarantee shall not be made unless— (A) the Secretary has received from the borrower a payment in full for the cost of the guarantee and deposited the payment into the Treasury; or (B) a combination of one or more appropriations and one or more payments from the borrower under this subsection has been made that is sufficient to cover the cost of the guarantee. (3) **Source of payments** — The source of a payment received from a borrower under subparagraph (A) or (B) of paragraph (2) may not be a loan or other debt obligation that is made or guaranteed by the Federal Government. **(c) Amount** Unless otherwise provided by law, a guarantee by the Secretary shall not exceed an amount equal to 80 percent of the project cost of the facility that is the subject of the guarantee, as estimated at the time at which the guarantee is issued. **(d) Repayment** (1) **Requirement** (A) *In general* — No guarantee, including a guarantee for a project receiving financial support or credit enhancements from a State energy financing institution, shall be made unless the Secretary determines that there is reasonable prospect of repayment of the principal and interest on the obligation by the borrower. (B) *Reasonable prospect of repayment* — The Secretary shall base a determination of whether there is reasonable prospect of repayment under subparagraph (A) on a comprehensive evaluation of whether the borrower has a reasonable prospect of repaying the guaranteed obligation for the eligible project, including, as applicable, an evaluation of— (i) the strength of the contractual terms of the eligible project (if commercially reasonably available); (ii) the forecast of noncontractual cash flows supported by market projections from reputable sources, as determined by the Secretary; (iii) cash sweeps and other structure enhancements; (iv) the projected financial strength of the borrower— (I) at the time of loan close; and (II) throughout the loan term after the project is completed; (v) the financial strength of the investors and strategic partners of the borrower, if applicable; and (vi) other financial metrics and analyses that are relied on by the private lending community and nationally recognized credit rating agencies, as determined appropriate by the Secretary. (2) **Amount** — No guarantee shall be made unless the Secretary determines that the amount of the obligation (when combined with amounts available to the borrower from other sources) will be sufficient to carry out the project. (3) **Subordination** — The obligation shall be subject to the condition that the obligation, including any reorganization, restructuring, or termination thereof, shall not at any time be subordinate to other financing. **(e) Interest rate** An obligation shall bear interest at a rate that does not exceed a level that the Secretary determines appropriate, taking into account the prevailing rate of interest in the private sector for similar loans and risks. **(f) Term** The term of an obligation shall require full repayment over a period not to exceed the lesser of— (1) 30 years; or (2) 90 percent of the projected useful life of the physical asset to be financed by the obligation (as determined by the Secretary). **(g) Defaults** (1) **Payment by Secretary** (A) *In general* — If a borrower defaults on the obligation (as defined in regulations promulgated by the Secretary and specified in the guarantee contract), the holder of the guarantee shall have the right to demand payment of the unpaid amount from the Secretary. (B) *Payment required* — Within such period as may be specified in the guarantee or related agreements, the Secretary shall pay to the holder of the guarantee the unpaid interest on, and unpaid principal of the obligation as to which the borrower has defaulted, unless the Secretary finds that there was no default by the borrower in the payment of interest or principal or that the default has been remedied. (C) *Forbearance* — Nothing in this subsection precludes any forbearance by the holder of the obligation for the benefit of the borrower which may be agreed upon by the parties to the obligation and approved by the Secretary. (2) **Subrogation** (A) *In general* — If the Secretary makes a payment under paragraph (1), the Secretary shall be subrogated to the rights of the recipient of the payment as specified in the guarantee or related agreements including, where appropriate, the authority (notwithstanding any other provision of law) to— (i) complete, maintain, operate, lease, or otherwise dispose of any property acquired pursuant to such guarantee or related agreements; or (ii) permit the borrower, pursuant to an agreement with the Secretary, to continue to pursue the purposes of the project if the Secretary determines this to be in the public interest. (B) *Superiority of rights* — The rights of the Secretary, with respect to any property acquired pursuant to a guarantee or related agreements, shall be superior to the rights of any other person with respect to the property. (C) *Terms and conditions* — A guarantee agreement shall include such detailed terms and conditions as the Secretary determines appropriate to— (i) protect the interests of the United States in the case of default; and (ii) have available all the patents and technology necessary for any person selected, including the Secretary, to complete and operate the project. (3) **Payment of principal and interest by Secretary** — With respect to any obligation guaranteed under this section, the Secretary may enter into a contract to pay, and pay, holders of the obligation, for and on behalf of the borrower, from funds appropriated for that purpose, the principal and interest payments which become due and payable on the unpaid balance of the obligation if the Secretary finds that— (A) (i) the borrower is unable to meet the payments and is not in default; (ii) it is in the public interest to permit the borrower to continue to pursue the purposes of the project; and (iii) the probable net benefit to the Federal Government in paying the principal and interest will be greater than that which would result in the event of a default; (B) the amount of the payment that the Secretary is authorized to pay shall be no greater than the amount of principal and interest that the borrower is obligated to pay under the agreement being guaranteed; and (C) the borrower agrees to reimburse the Secretary for the payment (including interest) on terms and conditions that are satisfactory to the Secretary. (4) **Action by Attorney General** (A) *Notification* — If the borrower defaults on an obligation, the Secretary shall notify the Attorney General of the default. (B) *Recovery* — On notification, the Attorney General shall take such action as is appropriate to recover the unpaid principal and interest due from— (i) such assets of the defaulting borrower as are associated with the obligation; or (ii) any other security pledged to secure the obligation. **(h) Fees** (1) **In general** — The Secretary shall charge, and collect on or after the date of the financial close of an obligation, a fee for a guarantee in an amount that the Secretary determines is sufficient to cover applicable administrative expenses (including any costs associated with third-party consultants engaged by the Secretary). (2) **Availability** — Fees collected under this subsection shall— (A) be deposited by the Secretary into the Treasury; and (B) remain available until expended, subject to such other conditions as are contained in annual appropriations Acts. (3) **Reduction in fee amount** — Notwithstanding paragraph (1) and subject to the availability of appropriations, the Secretary may reduce the amount of a fee for a guarantee under this subsection. **(i) Records; audits** (1) **In general** — A recipient of a guarantee shall keep such records and other pertinent documents as the Secretary shall prescribe by regulation, including such records as the Secretary may require to facilitate an effective audit. (2) **Access** — The Secretary and the Comptroller General of the United States, or their duly authorized representatives, shall have access, for the purpose of audit, to the records and other pertinent documents. **(j) Full faith and credit** The full faith and credit of the United States is pledged to the payment of all guarantees issued under this section with respect to principal and interest. **(k) Wage rate requirements** All laborers and mechanics employed by contractors and subcontractors in the performance of construction work financed in whole or in part by a loan guaranteed under this subchapter shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40. With respect to the labor standards in this subsection, the Secretary of Labor shall have the authority and functions set forth in Reorganization Plan Numbered 14 of 1950 (64 Stat. 1267; 5 U.S.C. App.) and [section 3145 of title 40](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title40-section3145&num=0&edition=prelim). **(l) Restructuring of loan guarantees** The Secretary shall consult with the Secretary of the Treasury regarding any restructuring of the terms or conditions of a guarantee issued pursuant to this subchapter, including with respect to any deviations from the financial terms of the guarantee. **(m) Written analysis** (1) **Requirement** — The Secretary may not make a guarantee under this subchapter until the Secretary of the Treasury has transmitted to the Secretary, and the Secretary has taken into consideration, a written analysis of the financial terms and conditions of the proposed guarantee. (2) **Transmission** — Not later than 30 days after receiving information on a proposed guarantee from the Secretary, the Secretary of the Treasury shall transmit the written analysis of the financial terms and conditions of the proposed guarantee required under paragraph (1) to the Secretary. (3) **Explanation** — If the Secretary makes a guarantee the financial terms and conditions of which are not consistent with the written analysis required under this subsection, not later than 30 days after making such guarantee, the Secretary shall submit to the Committee on Energy and Commerce and the Committee on Science, Space, and Technology of the House of Representatives, and the Committee on Energy and Natural Resources of the Senate, a written explanation of any material inconsistencies. **(n) Application status** (1) **Request** — If the Secretary does not make a final decision on an application for a guarantee under this subchapter by the date that is 180 days after receipt of the application by the Secretary, the applicant may request, on or after that date and not more than once every 60 days thereafter until a final decision is made, that the Secretary provide to the applicant a response described in paragraph (2). (2) **Response** — Not later than 10 days after receiving a request from an applicant under paragraph (1), the Secretary shall provide to the applicant a response that includes— (A) a description of the current status of review of the application; (B) a summary of any factors that are delaying a final decision on the application, a list of what items are required in order to reach a final decision, citations to authorities stating the reasons why such items are required, and a list of actions the applicant can take to expedite the process; and (C) an estimate of when a final decision on the application will be made. **(o) Outreach** In carrying out this subchapter, the Secretary shall— (1) provide assistance with the completion of applications for a guarantee under this subchapter; (2) conduct outreach, including through conferences and online programs, to disseminate information to potential applicants; (3) conduct outreach to encourage participation of supporting finance institutions and private lenders in eligible projects and projects described in [section 16517(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section16517/a&num=0&edition=prelim). **(p) Coordination** In carrying out this subchapter, the Secretary shall coordinate activities under this subchapter with activities of other relevant offices with the Department. **(q) Report** Not later than 2 years after December 27, 2020, and every 3 years thereafter, the Secretary shall submit to Congress a report on the status of applications for, and projects receiving, guarantees under this title, including— (1) a list of such projects, including the guarantee amount, construction status, and financing partners of each such project; (2) the status of each such project’s loan repayment, including interest paid and future repayment projections; (3) an estimate of the air pollutant or greenhouse gas emissions avoided or reduced from each such project; (4) data regarding the number of direct and indirect jobs retained, restored, or created by such projects; (5) identification of— (A) technologies deployed by projects that have received guarantees that have subsequently been deployed commercially without guarantees; and (B) novel technologies that have been deployed by such projects and deployed in the commercial energy market; (6) the number of new projects projected to receive a guarantee under this subchapter during the next 2 years and the aggregate guarantee amount; (7) the number of outreach engagements conducted with potential applicants; (8) the number of applications received and currently pending for each open solicitation; and (9) any other metrics the Secretary finds appropriate. **(r) 11 So in original. Two subsecs. (r) have been enacted. Conflicts of interest** For each project selected for a guarantee under this subchapter, the Secretary shall certify that political influence did not impact the selection of the project. **(r) 1 State energy financing institutions** (1) **Eligibility** — To be eligible for a guarantee under this subchapter, a project receiving financial support or credit enhancements from a State energy financing institution— (A) shall meet the requirements of [section 16513(a)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section16513/a/1&num=0&edition=prelim); and (B) shall not be required to meet the requirements of [section 16513(a)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section16513/a/2&num=0&edition=prelim). (2) **Partnerships authorized** — In carrying out a project receiving a loan guarantee under this subchapter, State energy financing institutions may enter into partnerships with private entities, Tribal entities, and Alaska Native corporations.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 18851 — Model guidance for combined heat and power systems and waste heat to power systems

**(a) Definitions** In this section: (1) **Additional services** — The term “additional services” means the provision of supplementary power, backup or standby power, maintenance power, or interruptible power to an electric consumer by an electric utility. (2) **Waste heat to power system** — The term “waste heat to power system” means a system that generates electricity through the recovery of waste energy. (3) **Other terms** (A) *Purpa* — The terms “electric consumer”, “electric utility”, “interconnection service”, “nonregulated electric utility”, and “State regulatory authority” have the meanings given those terms in the Public Utility Regulatory Policies Act of 1978 ([16 U.S.C. 2601](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2601&num=0&edition=prelim) et seq.), within the meaning of title I of that Act ([16 U.S.C. 2611](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2611&num=0&edition=prelim) et seq.). (B) *EPCA* — The terms “combined heat and power system” and “waste energy” have the meanings given those terms in [section 6341 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6341&num=0&edition=prelim). **(b) Review** (1) **In general** — Not later than 180 days after November 15, 2021, the Secretary, in consultation with the Federal Energy Regulatory Commission and other appropriate entities, shall review existing rules and procedures relating to interconnection service and additional services throughout the United States for electric generation with nameplate capacity up to 150 megawatts connecting at either distribution or transmission voltage levels to identify barriers to the deployment of combined heat and power systems and waste heat to power s

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 18851

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 720 — Definitions

In this chapter: (1) **Alaska natural gas** — The term “Alaska natural gas” means natural gas derived from the area of the State of Alaska lying north of 64 degrees north latitude. (2) **Alaska natural gas transportation project** — The term “Alaska natural gas transportation project” means any natural gas pipeline system that carries Alaska natural gas to the border between Alaska and Canada (including related facilities subject to the jurisdiction of the Commission) that is authorized under— (A) the Alaska Natural Gas Transportation Act of 1976 ([15 U.S.C. 719](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section719&num=0&edition=prelim) et seq.); or (B) [section 720a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section720a&num=0&edition=prelim). (3) **Alaska natural gas transportation system** — The term “Alaska natural gas transportation system” means the Alaska natural gas transportation project authorized under the Alaska Natural Gas Transportation Act of 1976 ([15 U.S.C. 719](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section719&num=0&edition=prelim) et seq.) and designated and described in section 2 of the President’s decision. (4) **Commission** — The term “Commission” means the Federal Energy Regulatory Commission. (5) **Federal Coordinator** — The term “Federal Coordinator” means the head of the Office of the Federal Coordinator for Alaska Natural Gas Transportation Projects established by [section 720d(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section720d/a&num=0&edition=prelim). (6) **President’s decision** — The term “President’s decision” means the decision and report to Congress on the Alaska natural gas transp

Source: Supplied U.S. Code snapshot — release unconfirmed · 15 U.S.C. § 720

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

40 U.S.C. § 3145 — Regulations governing contractors and subcontractors

**(a) In General.—** The Secretary of Labor shall prescribe reasonable regulations for contractors and subcontractors engaged in constructing, carrying out, completing, or repairing public buildings, public works, or buildings or works that at least partly are financed by a loan or grant from the Federal Government. The regulations shall include a provision that each contractor and subcontractor each week must furnish a statement on the wages paid each employee during the prior week. **(b) Application.—** [Section 1001 of title 18](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title18-section1001&num=0&edition=prelim) applies to the statements.

Source: Supplied U.S. Code snapshot — release unconfirmed · 40 U.S.C. § 3145

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 16071 — Domestic manufacturing conversion grant program

**(a) Program** (1) **In general** — The Secretary shall establish a program to encourage domestic production and sales of efficient hybrid and advanced diesel vehicles and components of those vehicles. (2) **Inclusions** — The program shall include grants and loan guarantees under [section 16513 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section16513&num=0&edition=prelim) to automobile manufacturers and suppliers and hybrid component manufacturers to encourage domestic production of efficient hybrid, plug-in electric hybrid, plug-in electric drive, and advanced diesel vehicles. (3) **Priority** — Priority shall be given to the refurbishment or retooling of manufacturing facilities that have recently ceased operation or will cease operation in the near future. **(b) Coordination with State and local programs** The Secretary may coordinate implementation of this section with State and local programs designed to accomplish similar goals, including the retention and retraining of skilled workers from the manufacturing facilities, including by establishing matching grant arrangements. **(c) Authorization of appropriations** There are authorized to be appropriated to the Secretary such sums as may be necessary to carry out this section.

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 16071

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 16512 — Definitions

In this subchapter: (1) **Commercial technology** (A) *In general* — The term “commercial technology” means a technology in general use in the commercial marketplace. (B) *Inclusions* — The term “commercial technology” does not include a technology solely by use of the technology in a demonstration project funded by the Department. (2) **Cost** — The term “cost” has the meaning given the term “cost of a loan guarantee” within the meaning of [section 661a(5)(C) of title 2](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title2-section661a/5/C&num=0&edition=prelim). (3) **Eligible project** — The term “eligible project” means a project described in [section 16513 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section16513&num=0&edition=prelim). (4) **Guarantee** (A) *In general* — The term “guarantee” has the meaning given the term “loan guarantee” in [section 661a of title 2](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title2-section661a&num=0&edition=prelim), except that a loan guarantee may guarantee any debt obligation of a non-Federal borrower to any Eligible Lender (as defined in section 609.2 of title 10, Code of Federal Regulations). (B) *Inclusion* — The term “guarantee” includes a loan guarantee commitment (as defined in [section 661a of title 2](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title2-section661a&num=0&edition=prelim)). (5) **Obligation** — The term “obligation” means the loan or other debt obligation that is guaranteed under this section. (6) **State** — The term “State” has the meaning given the term in [section 6802 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6802&num=0&edition=prelim). (7) **State e

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 16512

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 16521 — Energy infrastructure reinvestment financing

**(a) In general** Notwithstanding [section 16513 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section16513&num=0&edition=prelim), the Secretary may make guarantees, including refinancing, under this section only for projects that— (1) retool, repower, repurpose, or replace energy infrastructure that has ceased operations; (2) enable operating energy infrastructure to increase capacity or output; or (3) support or enable the provision of known or forecastable electric supply at time intervals necessary to maintain or enhance grid reliability or other system adequacy needs. **(b) Inclusion** A project under subsection (a) may include the remediation of environmental damage associated with energy infrastructure. **(c) Application** To apply for a guarantee under this section, an applicant shall submit to the Secretary an application at such time, in such manner, and containing such information as the Secretary may require, including— (1) a detailed plan describing the proposed project; and (2) in the case of an applicant that is an electric utility, an assurance that the electric utility shall pass on any financial benefit from the guarantee made under this section to the customers of, or associated communities served by, the electric utility. **(d) Term** Notwithstanding [section 16512(f) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section16512/f&num=0&edition=prelim), the term of an obligation shall require full repayment over a period not to exceed 30 years. **(e) Definition of energy infrastructure** In this section, the term “energy infrastructure” means a facility, and associated equipment, used for enabling the identification, leasing, development, production, processing, transp

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 16521

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 720 — Definitions

Page 1221 TITLE 15—COMMERCE AND TRADE § 720a with respect to pre-construction, construction, and ini- tial operation of transportation system for Canadian and Alaskan natural gas transferred to Federal Inspec- tor, Office of Federal Inspector for Alaska Natural Gas Transportation System, until first anniversary of date of initial operation of Alaska Natural Gas Transpor- tation System, see Reorg. Plan No. 1 of 1979, §§ 102(h)(1), 203(a), 44 F.R. 33663, 33666, 93 Stat. 1373, 1376, effective July 1, 1979, set out under section 719e of this title. Of- fice of Federal Inspector for the Alaska Natural Gas Transportation System abolished and functions and au- thority vested in Inspector transferred to Secretary of Energy by section 3012(b) of Pub. L. 102–486, set out as an Abolition of Office of Federal Inspector note under section 719e of this title. Functions and authority vest- ed in Secretary of Energy subsequently transferred to Federal Coordinator for Alaska Natural Gas Transpor- tation Projects by section 720d(f) of this title. CHAPTER 15D—ALASKA NATURAL GAS PIPELINE Sec. 720. Definitions. 720a. Issuance of certificate of public convenience and necessity. 720b. Environmental reviews. 720c. Pipeline expansion. 720d. Federal Coordinator. 720e. Judicial review. 720f. State jurisdiction over in-State delivery of natural gas. 720g. Study of alternative means of construction. 720h. Clarification of ANGTA status and authori- ties. 720i. Sense of Congress concerning use of steel manufactured in North America and nego- tiation of a project labor agreement. 720j. Sense of Congress concerning participation by small business concerns. 720k. Alaska pipeline construction training pro- gram. 720l. Sense of Congress concerning natural gas de-

Source: Supplied 2024 U.S. Code historical extraction · 15 U.S.C. § 720

Stored review status: historical_2024_not_currentness_verified. The source passage cites 15 U.S.C. § 720. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 16513 — Eligible projects

Page 8913 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 16513 financing institutions may enter into partner- ships with private entities, Tribal entities, and Alaska Native corporations. (Pub. L. 109–58, title XVII, § 1702, Aug. 8, 2005, 119 Stat. 1117; Pub. L. 111–85, title III, § 310, Oct. 28, 2009, 123 Stat. 2873; Pub. L. 112–74, div. B, title III, § 305(1), Dec. 23, 2011, 125 Stat. 877; Pub. L. 116–260, div. Z, title IX, § 9010(a), Dec. 27, 2020, 134 Stat. 2603; Pub. L. 117–58, div. D, title IV, § 40401(a)(1), (3), (c)(2), Nov. 15, 2021, 135 Stat. 1033, 1034, 1037; Pub. L. 117–169, title V, §§ 50141(f), 50144(d), Aug. 16, 2022, 136 Stat. 2044, 2045; Pub. L. 117–328, div. D, title III, § 308, Dec. 29, 2022, 136 Stat. 4645.) Editorial Notes REFERENCES IN TEXT Division C of Public Law 108–324, referred to in sub- sec. (a), is division C of Pub. L. 108–324, Oct. 13, 2004, 118 Stat. 1255, known as the Alaska Natural Gas Pipeline Act, which is classified principally to chapter 15D (§ 720 et seq.) of Title 15, Commerce and Trade. For complete classification of division C to the Code, see Short Title note set out under section 720 of Title 15 and Tables. Reorganization Plan Numbered 14 of 1950, referred to in subsec. (k), is set out in the Appendix to Title 5, Government Organization and Employees. AMENDMENTS 2022—Subsec. (b)(3). Pub. L. 117–169, § 50141(f), added par. (3). Subsec. (o)(3). Pub. L. 117–169, § 50144(d), inserted ‘‘and projects described in section 16517(a) of this title’’ be- fore period at end. Subsec. (r)(3). Pub. L. 117–328 struck out par. (3). Text read as follows: ‘‘Amounts appropriated to the Depart- ment of Energy before November 15, 2021, shall not be available to be used for the cost of loan guarantees for projects receiving

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 16513