30 U.S.C. § 1263 — Public notice and public hearings
Federal law — U.S. Code and appendices · legal_authorities
**(a) Submittal of advertisement to regulatory authority; notification of local governmental bodies** At the time of submission of an application for a surface coal mining and reclamation permit, or revision of an existing permit, pursuant to the provisions of this chapter or an approved State program, the applicant shall submit to the regulatory authority a copy of his advertisement of the ownership, precise location, and boundaries of the land to be affected. At the time of submission such advertisement shall be placed by the applicant in a local newspaper of general circulation in the locality of the proposed surface mine at least once a week for four consecutive weeks. The regulatory authority shall notify various local governmental bodies, planning agencies, and sewage and water treatment authorities, of 11 So in original. Probably should be “or”. water companies in the locality in which the proposed surface mining will take place, notifying them of the operator’s intention to surface mine a particularly described tract of land and indicating the application’s permit number and where a copy of the proposed mining and reclamation plan may be inspected. These local bodies, agencies, authorities, or companies may submit written comments within a reasonable period established by the regulatory authority on the mining applications with respect to the effect of the proposed operation on the environment which are within their area of responsibility. Such comments shall immediately be transmitted to the applicant by the regulatory authority and shall be made available to the public at the same locations as are the mining applications.
**(b) Objections to permit applications; informal conference; record** Any person having an interest which is or may be adversely affected
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1263
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 7c8623466b7d44446af16bb42b387dacf1bd2b3d97824bdd09c5f2596b24eaa3. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_985b5db30e4efc9388098338
Source file: Laws/federal/codes/united-states-code/title-30/section-1263-public-notice-and-public-hearings--72f0b980f5.md
Pages: Not recorded – Not recorded
Passage SHA-256: c837916859c10cc004cd4f0d907a7f4afd4e2e4896b100a0257e97422109015d
Source location: Title 30, Chapter 25, § 1263; chapter-025-surface-mining-control-and-reclamation.md
Stored source content
**(a) Submittal of advertisement to regulatory authority; notification of local governmental bodies** At the time of submission of an application for a surface coal mining and reclamation permit, or revision of an existing permit, pursuant to the provisions of this chapter or an approved State program, the applicant shall submit to the regulatory authority a copy of his advertisement of the ownership, precise location, and boundaries of the land to be affected. At the time of submission such advertisement shall be placed by the applicant in a local newspaper of general circulation in the locality of the proposed surface mine at least once a week for four consecutive weeks. The regulatory authority shall notify various local governmental bodies, planning agencies, and sewage and water treatment authorities, of 11 So in original. Probably should be “or”. water companies in the locality in which the proposed surface mining will take place, notifying them of the operator’s intention to surface mine a particularly described tract of land and indicating the application’s permit number and where a copy of the proposed mining and reclamation plan may be inspected. These local bodies, agencies, authorities, or companies may submit written comments within a reasonable period established by the regulatory authority on the mining applications with respect to the effect of the proposed operation on the environment which are within their area of responsibility. Such comments shall immediately be transmitted to the applicant by the regulatory authority and shall be made available to the public at the same locations as are the mining applications.
**(b) Objections to permit applications; informal conference; record** Any person having an interest which is or may be adversely affected or the officer or head of any Federal, State, or local governmental agency or authority shall have the right to file written objections to the proposed initial or revised application for a permit for surface coal mining and reclamation operation with the regulatory authority within thirty days after the last publication of the above notice. Such objections shall immediately be transmitted to the applicant by the regulatory authority and shall be made available to the public. If written objections are filed and an informal conference requested, the regulatory authority shall then hold an informal conference in the locality of the proposed mining, if requested within a reasonable time of the receipt of such objections or request. The date, time and location of such informal conference shall be advertised by the regulatory authority in a newspaper of general circulation in the locality at least two weeks prior to the scheduled conference date. The regulatory authority may arrange with the applicant upon request by any party to the administrative proceeding access to the proposed mining area for the purpose of gathering information relevant to the proceeding. An electronic or stenographic record shall be made of the conference proceeding, unless waived by all parties. Such record shall be maintained and shall be accessible to the parties until final release of the applicant’s performance bond. In the event all parties requesting the informal conference stipulate agreement prior to the requested informal conference and withdraw their request, such informal conference need not be held.
**(c) Prior Federal coal lease hearing as evidence** Where the lands included in an application for a permit are the subject of a Federal coal lease in connection with which hearings were held and determinations were made under section 201(a)(3)(A), (B) and (C) of this title, such hearings shall be deemed as to the matters covered to satisfy the requirements of this section and [section 1264 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1264&num=0&edition=prelim) and such determinations shall be deemed to be a part of the record and conclusive for purposes of sections 1260, 1264 of this title and this section.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Issuance of findings within 60 days after informal conference** If an informal conference has been held pursuant to [section 1263(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1263/b&num=0&edition=prelim), the regulatory authority shall issue and furnish the applicant for a permit and persons who are parties to the administrative proceedings with the written finding of the regulatory authority, granting or denying the permit in whole or in part and stating the reasons therefor, within the sixty days of said hearings.
**(b) Decision without informal conference; notification within a reasonable time** If there has been no informal conference held pursuant to [section 1263(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1263/b&num=0&edition=prelim), the regulatory authority shall notify the applicant for a permit within a reasonable time as determined by the regulatory authority and set forth in regulations, taking into account the time needed for proper investigation of the site, the complexity of the permit application, and whether or not written objection to the application has been filed, whether the application has been approved or disapproved in whole or part.
**(c) Request for rehearing on reasons for final determination; time; issuance of decision** If the application is approved, the permit shall be issued. If the application is disapproved, specific reasons therefor must be set forth in the notification. Within thirty days after the applicant is notified of the final decision of the regulatory authority on the permit application, the applicant or any person with an interest which is or may be adversely affected may request a hearing on the reasons for the final d
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1264
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Basis for decision; notification of applicant and local government officials; burden of proof** Upon the basis of a complete mining application and reclamation plan or a revision or renewal thereof, as required by this chapter and pursuant to an approved State program or Federal program under the provisions of this chapter, including public notification and an opportunity for a public hearing as required by [section 1263 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1263&num=0&edition=prelim), the regulatory authority shall grant, require modification of, or deny the application for a permit in a reasonable time set by the regulatory authority and notify the applicant in writing. The applicant for a permit, or revision of a permit, shall have the burden of establishing that his application is in compliance with all the requirements of the applicable State or Federal program. Within ten days after the granting of a permit, the regulatory authority shall notify the local governmental officials in the local political subdivision in which the area of land to be affected is located that a permit has been issued and shall describe the location of the land.
**(b) Requirements for approval** No permit or revision application shall be approved unless the application affirmatively demonstrates and the regulatory authority finds in writing on the basis of the information set forth in the application or from information otherwise available which will be documented in the approval, and made available to the applicant, that—
(1) the permit application is accurate and complete and that all the requirements of this chapter and the State or Federal program have been complied with;
(2) the applicant has demonstrated that reclamation a
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1260
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Filing of request; submittal of copy of advertisement; notification by letter of intent to seek release** The permittee may file a request with the regulatory authority for the release of all or part of a performance bond or deposit. Within thirty days after any application for bond or deposit release has been filed with the regulatory authority, the operator shall submit a copy of an advertisement placed at least once a week for four successive weeks in a newspaper of general circulation in the locality of the surface coal mining operation. Such advertisement shall be considered part of any bond release application and shall contain a notification of the precise location of the land affected, the number of acres, the permit and the date approved, the amount of the bond filed and the portion sought to be released, and the type and appropriate dates of reclamation work performed, and a description of the results achieved as they relate to the operator’s approved reclamation plan. In addition, as part of any bond release application, the applicant shall submit copies of letters which he has sent to adjoining property owners, local governmental bodies, planning agencies, and sewage and water treatment authorities, or water companies in the locality in which the surface coal mining and reclamation activities took place, notifying them of his intention to seek release from the bond.
**(b) Inspection and evaluation; notification of decision** Upon receipt of the notification and request, the regulatory authority shall within thirty days conduct an inspection and evaluation of the reclamation work involved. Such evaluation shall consider, among other things, the degree of difficulty to complete any remaining reclamation, whether pollution of surface and subsurface water
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1269
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 284
TITLE 30—MINERAL LANDS AND MINING
§ 1262
1 So in original. Probably should be ‘‘or’’.
authority shall establish guidelines for a deter-
mination of the scale or extent of a revision re-
quest for which all permit application informa-
tion requirements and procedures, including no-
tice and hearings, shall apply: Provided, That
any revisions which propose significant alter-
ations in the reclamation plan shall, at a min-
imum, be subject to notice and hearing require-
ments.
(3) Any extensions to the area covered by the
permit except incidental boundary revisions
must be made by application for another permit.
(b) Transfer, assignment, or sale of rights under
permit
No transfer, assignment, or sale of the rights
granted under any permit issued pursuant to
this chapter shall be made without the written
approval of the regulatory authority.
(c) Review of outstanding permits
The regulatory authority shall within a time
limit prescribed in regulations promulgated by
the regulatory authority, review outstanding
permits and may require reasonable revision or
modification of the permit provisions during the
term of such permit: Provided, That such revi-
sion or modification shall be based upon a writ-
ten finding and subject to notice and hearing re-
quirements established by the State or Federal
program.
(Pub. L. 95–87, title V, § 511, Aug. 3, 1977, 91 Stat.
483.)
§ 1262. Coal exploration permits
(a) Regulations; contents
Each State or Federal program shall include a
requirement that coal exploration operations
which substantially disturb the natural land
surface be conducted in accordance with explo-
ration regulations issued by the regulatory au-
thority. Such regulations shall include, at a
minimum (1) the requirement that prior to con-
Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 1263
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.