Browse Arkansas Code titles and sections
10 U.S.C. § 6115 — Major warhead refurbishment program
Federal law — U.S. Code and appendices · legal_authorities
In fiscal year 2015 and subsequent fiscal years, the Secretary of Energy shall submit to the congressional defense committees a report, on each major warhead refurbishment program that reaches the Phase 6.3 milestone, that provides an analysis of alternatives. Such report shall include—
(1) a full description of alternatives considered prior to the award of Phase 6.3;
(2) a comparison of the costs and benefits of each of those alternatives, to include an analysis of trade-offs among cost, schedule, and performance objectives against each alternative considered;
(3) identification of the cost and risk of critical technology elements associated with each alternative, including technology maturity, integration risk, manufacturing feasibility, and demonstration needs;
(4) identification of the cost and risk of additional capital asset and infrastructure capabilities required to support production and certification of each alternative;
(5) a comparative analysis of the risks, costs, and scheduling needs for any military requirement intended to enhance warhead safety, security, or maintainability, including any requirement to consolidate and/or integrate warhead systems or mods as compared to at least one other feasible refurbishment alternative the Nuclear Weapons Council considers appropriate; and
(6) a life-cycle cost estimate for the alternative selected that details the overall cost, scope, and schedule planning assumptions.
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 6115
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: f17ab8fe26225be17af4688e01a41facc4e8bb8b1c48d87815ddb4a7242bf1ab. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_2f7e09a26d66d0d23f290d09
Source file: Laws/federal/codes/united-states-code/title-10/section-6115-major-warhead-refurbishment-program--183420f263.md
Pages: Not recorded – Not recorded
Passage SHA-256: fbad3849466a0c36db66aaff77ceed6aaff08d6c4dd6fb223f1c222989c59101
Source location: Title 10, Chapter 602, § 6115; chapter-602-nuclear-weapons-stockpile-matters.md
Stored source content
In fiscal year 2015 and subsequent fiscal years, the Secretary of Energy shall submit to the congressional defense committees a report, on each major warhead refurbishment program that reaches the Phase 6.3 milestone, that provides an analysis of alternatives. Such report shall include—
(1) a full description of alternatives considered prior to the award of Phase 6.3;
(2) a comparison of the costs and benefits of each of those alternatives, to include an analysis of trade-offs among cost, schedule, and performance objectives against each alternative considered;
(3) identification of the cost and risk of critical technology elements associated with each alternative, including technology maturity, integration risk, manufacturing feasibility, and demonstration needs;
(4) identification of the cost and risk of additional capital asset and infrastructure capabilities required to support production and certification of each alternative;
(5) a comparative analysis of the risks, costs, and scheduling needs for any military requirement intended to enhance warhead safety, security, or maintainability, including any requirement to consolidate and/or integrate warhead systems or mods as compared to at least one other feasible refurbishment alternative the Nuclear Weapons Council considers appropriate; and
(6) a life-cycle cost estimate for the alternative selected that details the overall cost, scope, and schedule planning assumptions.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
#### Codification
Section, Pub. L. 112–81, div. A, title X, § 1045, Dec. 31, 2011, 125 Stat. 1577; Pub. L. 112–239, div. A, title X, § 1076(a)(19), Jan. 2, 2013, 126 Stat. 1949, which related to nuclear force reductions, was transferred to [section 494 of Title 10](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section494&num=0&edition=prelim), Armed Forces, by Pub. L. 112–239, div. A, title X, § 1033(b)(1)(A)–(C), Jan. 2, 2013, 126 Stat. 1920.
Source: Supplied U.S. Code snapshot — release unconfirmed · 50 U.S.C. § 2523c
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
Section, Pub. L. 113–235, div. D, title III, § 308, Dec. 16, 2014, 128 Stat. 2324, required annual reports analyzing alternatives to each major warhead refurbishment program that reached the Phase 6.3 milestone. See [section 6115 of Title 10](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section6115&num=0&edition=prelim), Armed Forces.
Source: Supplied U.S. Code snapshot — release unconfirmed · 50 U.S.C. § 2524
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.