Browse Arkansas Code titles and sections
43 U.S.C. § 3204 — Critical maintenance and repair
Federal law — U.S. Code and appendices · legal_authorities
**(a) Critical failure at a reserved or transferred work**
(1) **In general** — A reserved or transferred work shall only be eligible for funding under [section 3201(2)(A) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section3201/2/A&num=0&edition=prelim) if—
(A) construction of the reserved or transferred work began on or before January 1, 1915; and
(B) a unit of the reserved or transferred work suffered a critical failure in Bureau of Reclamation infrastructure during the 2-year period ending on November 15, 2021, that resulted in the failure to deliver water to project beneficiaries.
(2) **Use of funds** — Rehabilitation, repair, and replacement activities for a transferred or reserved work using amounts made available under [section 3201(2)(A) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section3201/2/A&num=0&edition=prelim) may be used for the entire transferred or reserved work, regardless of whether the critical failure was limited to a single project of the overall work.
(3) **Nonreimbursable funds** — Notwithstanding [section 510b(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section510b/b&num=0&edition=prelim), amounts made available to a reserved or transferred work under [section 3201(2)(A) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section3201/2/A&num=0&edition=prelim) shall be nonreimbursable to the United States.
**(b) Carey Act projects** The Secretary shall use amounts made available under [section 3201(2)(B) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section3201/2/B&num=0&edition=prelim) to fund the rehabilitation, reconstruction, or replacement
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 3204
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: ba5fcd68133e735ced6bce2fede125cb9363295cd967ac2f41efbd974bc01d9d. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_17d3d72532cd58425d9e9040
Source file: Laws/federal/codes/united-states-code/title-43/section-3204-critical-maintenance-and-repair--d029f96094.md
Pages: Not recorded – Not recorded
Passage SHA-256: c2264ac1999808fc627361856937097f30a0b791d15729a716086bbe628c26ab
Source location: Title 43, Chapter 50, § 3204; chapter-050-western-water-infrastructure.md
Stored source content
**(a) Critical failure at a reserved or transferred work**
(1) **In general** — A reserved or transferred work shall only be eligible for funding under [section 3201(2)(A) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section3201/2/A&num=0&edition=prelim) if—
(A) construction of the reserved or transferred work began on or before January 1, 1915; and
(B) a unit of the reserved or transferred work suffered a critical failure in Bureau of Reclamation infrastructure during the 2-year period ending on November 15, 2021, that resulted in the failure to deliver water to project beneficiaries.
(2) **Use of funds** — Rehabilitation, repair, and replacement activities for a transferred or reserved work using amounts made available under [section 3201(2)(A) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section3201/2/A&num=0&edition=prelim) may be used for the entire transferred or reserved work, regardless of whether the critical failure was limited to a single project of the overall work.
(3) **Nonreimbursable funds** — Notwithstanding [section 510b(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section510b/b&num=0&edition=prelim), amounts made available to a reserved or transferred work under [section 3201(2)(A) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section3201/2/A&num=0&edition=prelim) shall be nonreimbursable to the United States.
**(b) Carey Act projects** The Secretary shall use amounts made available under [section 3201(2)(B) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section3201/2/B&num=0&edition=prelim) to fund the rehabilitation, reconstruction, or replacement of a dam—
(1) the construction of which began on or after January 1, 1905;
(2) that was developed pursuant to section 4 of the Act of August 18, 1894 (commonly known as the “Carey Act”) ([43 U.S.C. 641](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section641&num=0&edition=prelim); 28 Stat. 422, chapter 301);
(3) that the Governor of the State in which the dam is located has—
(A) determined the dam has reached its useful life;
(B) determined the dam poses significant health and safety concerns; and
(C) requested Federal support; and
(4) for which the estimated rehabilitation, reconstruction, or replacement, engineering, and permitting costs would exceed $50,000,000.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definitions** In this section:
(1) **Additional services** — The term “additional services” means the provision of supplementary power, backup or standby power, maintenance power, or interruptible power to an electric consumer by an electric utility.
(2) **Waste heat to power system** — The term “waste heat to power system” means a system that generates electricity through the recovery of waste energy.
(3) **Other terms**
(A) *Purpa* — The terms “electric consumer”, “electric utility”, “interconnection service”, “nonregulated electric utility”, and “State regulatory authority” have the meanings given those terms in the Public Utility Regulatory Policies Act of 1978 ([16 U.S.C. 2601](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2601&num=0&edition=prelim) et seq.), within the meaning of title I of that Act ([16 U.S.C. 2611](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2611&num=0&edition=prelim) et seq.).
(B) *EPCA* — The terms “combined heat and power system” and “waste energy” have the meanings given those terms in [section 6341 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6341&num=0&edition=prelim).
**(b) Review**
(1) **In general** — Not later than 180 days after November 15, 2021, the Secretary, in consultation with the Federal Energy Regulatory Commission and other appropriate entities, shall review existing rules and procedures relating to interconnection service and additional services throughout the United States for electric generation with nameplate capacity up to 150 megawatts connecting at either distribution or transmission voltage levels to identify barriers to the deployment of combined heat and power systems and waste heat to power s
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 18851
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
To aid the public-land States in the reclamation of the desert lands therein, and the settlement, cultivation and sale thereof in small tracts to actual settlers, the Secretary of the Interior with the approval of the President is, as of August 18, 1894, authorized and empowered, upon proper application of the State to contract and agree, from time to time, with each of the States in which there may be situated desert lands as defined by the Act approved March 3, 1877, and the Act amendatory thereof, approved March 3, 1891, binding the United States to donate, grant, and patent to the State free of cost for survey or price such desert lands, not exceeding one million acres in each State, as the State may cause to be irrigated, reclaimed, occupied, and not less than twenty acres of each one hundred and sixty acre tract cultivated by actual settlers, as thoroughly as is required of citizens who may enter under the desert-land law within ten years from the date of approval by the Secretary of the Interior of the State’s application for the segregation of such lands; and if actual construction of reclamation works is not begun within three years after the segregation of the lands or within such further period not exceeding three years, as shall be allowed by the Secretary of the Interior, the said Secretary of the Interior, in his discretion, may restore such lands to the public domain; and if the State fails, within ten years from the date of such segregation, to cause the whole or any part of the lands so segregated to be so irrigated and reclaimed, the Secretary of the Interior may, in his discretion, continue said segregation for a period not exceeding five years, or may, in his discretion, restore such lands not irrigated and reclaimed to the public domain upon the exp
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 641
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 672
TITLE 43—PUBLIC LANDS
§ 3204
(4) Eligibility for funding
(A) In general
The non-Federal project sponsor of any
project determined by the Secretary to be
feasible under paragraph (3)(A) shall be eligi-
ble to apply to the Secretary for a grant to
cover the Federal share of the costs of plan-
ning, designing, and constructing the project
pursuant to subsection (c).
(B) Required determination
Prior to awarding grants to a small stor-
age project, the Secretary shall determine
whether there is sufficient non-Federal fund-
ing available to complete the project.
(5) Priority
In awarding grants to projects under this
section, the Secretary shall give priority to
projects that meet 1 or more of the following
criteria:
(A) Projects that are likely to provide a
more reliable water supply for States, Indian
Tribes, and local governments, including
subdivisions of those entities.
(B) Projects that are likely to increase
water management flexibility and reduce
impacts on environmental resources from
projects operated by Federal and State agen-
cies.
(C) Projects that are regional in nature.
(D) Projects with multiple stakeholders.
(E) Projects that provide multiple bene-
fits, including water supply reliability, eco-
system benefits, groundwater management
and enhancements, and water quality im-
provements.
(c) Ceiling on Federal share
The Federal share of the costs of each of the
individual projects selected under this section
shall not exceed the lesser of—
(1) 25 percent of the total project cost; or
(2) $30,000,000.
(d) Environmental laws
In providing funding for a grant for a project
under this section, the Secretary shall comply
with all applicable environmental laws, includ-
ing the National Environmental Policy Act of
1969 (42 U.S
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 3204
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 243
TITLE 43—PUBLIC LANDS
§ 641
tain exceptions, to Secretary of the Interior, with
power to delegate, see Reorg. Plan No. 3 of 1950, §§ 1, 2,
eff. May 24, 1950, 15 F.R. 3174, 64 Stat. 1262, set out under
section 1451 of this title.
‘‘Officer designated by the Secretary of the Interior’’
substituted for ‘‘register’’ on authority of section 403 of
Reorg. Plan No. 3 of 1946, which abolished all registers
of district land offices and transferred functions of reg-
ister of district land office to Secretary of the Interior.
See section 403 of Reorg. Plan No. 3 of 1946, set out as
a note under section 1 of this title. Previously, ref-
erence to ‘‘receiver’’ was changed to ‘‘register’’ by acts
Oct. 28, 1921 and Mar. 3, 1925.
§ 630. Disposition by Government of proceeds of
land sold
All moneys derived by the United States from
the sale of public lands referred to in this chap-
ter shall be paid into such funds and applied as
provided by law for the disposal of the proceeds
from the sale of public lands.
(Aug. 11, 1916, ch. 319, § 8, 39 Stat. 509.)
CHAPTER 14—GRANTS OF DESERT LANDS
TO STATES FOR RECLAMATION
Sec.
641.
Grant of desert land to States authorized.
641a.
Issuance of quitclaim deeds; patents for seg-
regated lands.
641b.
Filing of application for quitclaim deeds.
641c.
Requirements of application for quitclaim
deed.
641d.
Effective date of quitclaim; administration of
lands relinquished by States.
642.
Liens for expenses of reclamation.
643.
Repealed.
644.
Preference right to entryman under State
laws.
645.
Additional arid lands available to Colorado,
Idaho, Nevada, and Wyoming for reclama-
tion.
646.
Grant extended to New Mexico and Arizona.
647.
Grant extended to desert lands within part of
former Ute Indian Reservat
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 641
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 641. This identifies an authority to review, not proof of applicability.