Browse Arkansas Code titles and sections
33 U.S.C. § 2282c — Feasibility reports
Federal law — U.S. Code and appendices · legal_authorities
**(a) Preparation of reports**
(1) **In general** — In the case of any water resources project-related study authorized to be undertaken by the Secretary that results in recommendations concerning a project or the operation of a project and that requires specific authorization by Congress in law or otherwise, the Secretary shall prepare a feasibility report, subject to [section 2215 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2215&num=0&edition=prelim).
(2) **Contents of feasibility reports** — A feasibility report shall describe, with reasonable certainty, the economic, environmental, and social benefits and detriments of the recommended plan and alternative plans considered by the Secretary and the engineering features (including hydrologic and geologic information), the public acceptability, and the purposes, scope, and scale of the recommended plan. A feasibility report shall also include the views of other Federal agencies and non-Federal agencies with regard to the recommended plan, a description of a nonstructural alternative to the recommended plan when such plan does not have significant nonstructural features, and a description of the Federal and non-Federal participation in such plan, and shall demonstrate that States, other non-Federal interests, and Federal agencies have been consulted in the development of the recommended plan. A feasibility report shall include a preliminary analysis of the Federal interest and the costs, benefits, and environmental impacts of the project.
(3) **Applicability** — This subsection shall not apply to—
(A) any study with respect to which a report has been submitted to Congress before November 17, 1986;
(B) any study for a project, which project is authorized for construc
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2282c
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 06471ca3370c7cf070683c402483669da2b3fc958134c637519aa833a2276e31. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_02b61a429b6bb7c2c602ed91
Source file: Laws/federal/codes/united-states-code/title-33/section-2282c-feasibility-reports--efbc1413b1.md
Pages: Not recorded – Not recorded
Passage SHA-256: c5f19ad75087fc79d59cf1240c65c1b67e6ac47ae68748cc468d2594a68a922b
Source location: Title 33, Chapter 36, § 2282c; chapter-036-water-resources-development.md
Stored source content
**(a) Preparation of reports**
(1) **In general** — In the case of any water resources project-related study authorized to be undertaken by the Secretary that results in recommendations concerning a project or the operation of a project and that requires specific authorization by Congress in law or otherwise, the Secretary shall prepare a feasibility report, subject to [section 2215 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2215&num=0&edition=prelim).
(2) **Contents of feasibility reports** — A feasibility report shall describe, with reasonable certainty, the economic, environmental, and social benefits and detriments of the recommended plan and alternative plans considered by the Secretary and the engineering features (including hydrologic and geologic information), the public acceptability, and the purposes, scope, and scale of the recommended plan. A feasibility report shall also include the views of other Federal agencies and non-Federal agencies with regard to the recommended plan, a description of a nonstructural alternative to the recommended plan when such plan does not have significant nonstructural features, and a description of the Federal and non-Federal participation in such plan, and shall demonstrate that States, other non-Federal interests, and Federal agencies have been consulted in the development of the recommended plan. A feasibility report shall include a preliminary analysis of the Federal interest and the costs, benefits, and environmental impacts of the project.
(3) **Applicability** — This subsection shall not apply to—
(A) any study with respect to which a report has been submitted to Congress before November 17, 1986;
(B) any study for a project, which project is authorized for construction by this Act and is not subject to section 903(b); 11 See References in Text note below.
(C) any study for a project which does not require specific authorization by Congress in law or otherwise; and
(D) general studies not intended to lead to recommendation of a specific water resources project.
(4) **Feasibility report defined** — In this subsection, the term “feasibility report” means each feasibility report, and any associated environmental impact statement and mitigation plan, prepared by the Corps of Engineers for a water resources project. The term includes a project implementation report prepared under title VI of the Water Resources Development Act of 2000 (114 Stat. 2680–2694), a general reevaluation report, and a limited reevaluation report.
**(b) Federal interest determination**
(1) **In general**
(A) *Identification* — As part of the submission of a work plan to Congress pursuant to the joint explanatory statement for an annual appropriations Act or as part of the submission of a spend plan to Congress for a supplemental appropriations Act under which the Corps of Engineers receives funding, the Secretary shall identify the studies in the plan—
(i) for which the Secretary plans to prepare a feasibility report under subsection (a) that will benefit—
(I) an economically disadvantaged community (as defined by the Secretary under section 160 of the Water Resources Development Act of 2020 ([33 U.S.C. 2201](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2201&num=0&edition=prelim) note)); or
(II) a community other than a community described in subclause (I); and
(ii) that are designated as a new start under the work plan.
(B) *Determination*
(i) *In general* — After identifying the studies under subparagraph (A) and subject to subparagraph (C), the Secretary shall, with the consent of the applicable non-Federal interest for the study, first determine the Federal interest in carrying out the study and the projects that may be proposed in the study.
(ii) *Feasibility cost share agreement* — The Secretary may make a determination under clause (i) prior to the execution of a feasibility cost share agreement between the Secretary and the non-Federal interest.
(C) *Limitation* — For each fiscal year, the Secretary may not make a determination under subparagraph (B) for more than 20 studies identified under subparagraph (A)(i)(II).
(D) *Application*
(i) *In general* — Subject to clause (ii) and with the consent of the non-Federal interest, the Secretary may use the authority provided under this subsection for a study in a work plan submitted to Congress prior to January 4, 2025, if the study otherwise meets the requirements described in subparagraph (A).
(ii) *Limitation* — Subparagraph (C) shall apply to the use of authority under clause (i).
(2) **Cost share** — The costs of a determination under paragraph (1)—
(A) shall be at Federal expense;
(B) shall not exceed $300,000; and
(C) shall be paid from the funding provided for the study in the applicable work plan described in that paragraph.
(3) **Deadline** — A determination under paragraph (1) shall be completed by not later than 120 days after the date on which funds are made available to the Secretary to carry out the determination.
(4) **Treatment** — The cost of a determination under paragraph (1) shall not be included for purposes of the maximum total cost under [section 2282c(a)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2282c/a/2&num=0&edition=prelim).
(5) **Report to non-Federal interest** — If, based on a determination under paragraph (1), the Secretary determines that a study or project is not in the Federal interest because the project will not result, or is unlikely to result, in a recommended plan that will produce national economic development benefits greater than cost, but may result in a technically sound and environmentally acceptable plan that is otherwise consistent with [section 2281 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2281&num=0&edition=prelim), the Secretary shall issue a report to the non-Federal interest with recommendations on how the non-Federal interest might modify the proposal such that the project could be in the Federal interest and feasible.
(6) **Post-determination work** — A study under this section shall continue after a determination under paragraph (1)(B)(i) without a new investment decision.
**(c) Projects not specifically authorized by Congress** In the case of any water resources project-related study authorized to be undertaken by the Secretary without specific authorization by Congress in law or otherwise, the Secretary shall prepare a detailed project report.
**(d) Indian tribes** For purposes of studies undertaken pursuant to this section, the Secretary is authorized to consider benefits which may accrue to Indian tribes as a result of a project resulting from such a study.
**(e) Standard and uniform procedures and practices** The Secretary shall undertake such measures as are necessary to ensure that standard and uniform procedures and practices are followed by each district office (and each division office for any area in which there is no district office) of the United States Army Corps of Engineers in the preparation of feasibility reports on water resources projects.
**(f) Enhanced public participation**
(1) **In general** — The Secretary shall establish procedures to enhance public participation in the development of each feasibility study under subsection (a), including, if appropriate, establishment of a stakeholder advisory group to assist the Secretary with the development of the study.
(2) **Membership** — If the Secretary provides for the establishment of a stakeholder advisory group under this subsection, the membership of the advisory group shall include balanced representation of social, economic, and environmental interest groups, and such members shall serve on a voluntary, uncompensated basis.
(3) **Limitation** — Procedures established under this subsection shall not delay development of any feasibility study under subsection (a).
**(g) Detailed project schedule**
(1) **In general** — Not later than 180 days after June 10, 2014, the Secretary shall determine a set of milestones needed for the completion of a feasibility study under this subsection, including all major actions, report submissions and responses, reviews, and comment periods.
(2) **Detailed project schedule milestones** — Each District Engineer shall, to the maximum extent practicable, establish a detailed project schedule, based on full funding capability, that lists all deadlines for milestones relating to feasibility studies in the District developed by the Secretary under paragraph (1).
(3) **Non-Federal interest notification** — Each District Engineer shall submit by certified mail the detailed project schedule under paragraph (2) to each relevant non-Federal interest—
(A) for projects that have received funding from the General Investigations Account of the Corps of Engineers in the period beginning on October 1, 2009, and ending on June 10, 2014, not later than 180 days after the establishment of milestones under paragraph (1); and
(B) for projects for which a feasibility cost-sharing agreement is executed after the establishment of milestones under paragraph (1), not later than 90 days after the date on which the agreement is executed.
(4) **Congressional and public notification** — Beginning in the first full fiscal year after June 10, 2014, the Secretary shall—
(A) submit an annual report that lists all detailed project schedules under paragraph (2) and an explanation of any missed deadlines to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives; and
(B) make publicly available, including on the Internet, a copy of the annual report described in subparagraph (A) not later than 14 days after date 22 So in original. Probably should be preceded by “the”. on which a report is submitted to Congress.
(5) **Failure to act** — If a District Engineer fails to meet any of the deadlines in the project schedule under paragraph (2), the District Engineer shall—
(A) not later than 30 days after each missed deadline, submit to the non-Federal interest a report detailing—
(i) why the District Engineer failed to meet the deadline; and
(ii) a revised project schedule reflecting amended deadlines for the feasibility study; and
(B) not later than 30 days after each missed deadline, make publicly available, including on the Internet, a copy of the amended project schedule described in subparagraph (A)(ii).
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
The Secretary of the Army is authorized to allot from any appropriations heretofore or hereafter made for flood control, not to exceed $50,000,000 per year, for the construction, repair, restoration, and modification of emergency streambank and shoreline protection works to prevent damage to highways, bridge approaches, lighthouses (including those lighthouses with historical value), and public works, churches, hospitals, schools, and other nonprofit public services, when in the opinion of the Chief of Engineers such work is advisable: Provided, That not more than $15,000,000 shall be allotted for this purpose at any single locality from the appropriations for any one fiscal year, and if such amount is not sufficient to cover the costs included in the Federal cost share for a project, as determined by the Secretary, the non-Federal interest shall be responsible for any such costs that exceed such amount.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 701r
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Construction of small shore and beach restoration and protection projects**
(1) **In general** — The Secretary may carry out a program for the construction of small shore and beach restoration and protection projects not specifically authorized by Congress that otherwise comply with [section 426e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section426e&num=0&edition=prelim) if the Secretary determines that such construction is advisable.
(2) **Local cooperation** — The local cooperation requirement of [section 426e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section426e&num=0&edition=prelim) shall apply to a project under this section.
(3) **Completeness** — A project under this subsection—
(A) shall be complete; and
(B) shall not commit the United States to any additional improvement to ensure the successful operation of the project; except for participation in periodic beach nourishment in accordance with—
(i) [section 426e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section426e&num=0&edition=prelim); and
(ii) the procedure for projects authorized after submission of a survey report.
**(b) National shoreline erosion control development and demonstration program**
(1) **In general** — The Secretary shall conduct under the program authorized by subsection (a) a national shoreline erosion control development and demonstration program (referred to in this section as the “demonstration program”).
(2) **Requirements**
(A) *In general* — The demonstration program shall include provisions for—
(i) projects consisting of planning, design, construction, and monitoring of prototype engineered and native and naturalized vegetat
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 426g
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definitions** In this section:
(1) **Indian tribe** — The terms “Indian tribe” and “Indian Tribe” have the meanings given the terms “Indian tribe” has the meaning given the term 11 So in original. in [section 5304 of title 25](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title25-section5304&num=0&edition=prelim).
(2) **Inter-tribal consortium** — The term “inter-tribal consortium” has the meaning given the term in [section 3202 of title 25](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title25-section3202&num=0&edition=prelim).
(3) **Tribal organization** — The term “Tribal organization” has the meaning given the term in [section 5304 of title 25](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title25-section5304&num=0&edition=prelim).
**(b) Program**
(1) **In general** — In cooperation with Indian tribes, inter-tribal consortiums, Tribal organizations, and the heads of other Federal agencies, the Secretary may carry out water-related planning activities, or activities relating to the study, design, and construction of water resources development projects, that—
(A) will substantially benefit Indian tribes, inter-tribal consortiums, or Tribal organizations; and
(B) are located primarily within Indian country (as defined in [section 1151 of title 18](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title18-section1151&num=0&edition=prelim), and including lands that are within the jurisdictional area of an Oklahoma Indian tribe, as determined by the Secretary of the Interior, and are recognized by the Secretary of the Interior as eligible for trust land status under part 151 of title 25, Code of Federal Regulations) or in proximity to Alaska Native villages.
(2) **Authorized activities** — An activ
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2281
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** It is the policy of the United States for the Corps of Engineers to strive to understand and accommodate and, in coordination with non-Federal interests, seek to address the water resources development needs of all communities in the United States.
**(b) Outreach and access**
(1) **In general** — The Secretary shall, at Federal expense, develop, support, and implement public awareness, education, and regular outreach and engagement efforts for potential non-Federal interests with respect to the water resources development authorities of the Secretary, with particular emphasis on—
(A) technical service programs, including the authorities under—
(i) [section 709a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section709a&num=0&edition=prelim);
(ii) [section 1962d–16 of title 42](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1962d–16&num=0&edition=prelim); and
(iii) [section 2269 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2269&num=0&edition=prelim);
(B) continuing authority programs, as such term is defined in [section 2282d(c)(1)(D) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2282d/c/1/D&num=0&edition=prelim); and
(C) ensuring that a potential non-Federal interest is aware of the roles, responsibilities, and financial commitments associated with a completed water resources development project prior to initiating a feasibility study (as defined in [section 2215(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2215/d&num=0&edition=prelim)), including operations, maintenance, repair, replacement, and rehabilitation responsibili
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2282
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
In any case in which a project under the jurisdiction of the Secretary is budgeted under a different business line than the business line under which the project was originally authorized, the Secretary shall ensure that the project is carried out in accordance with any requirements that apply to the business line under which the project was originally authorized.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2201
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Flood control**
(1) **General rule** — The non-Federal interests for a project with costs assigned to flood control (other than a nonstructural project) shall—
(A) pay 5 percent of the cost of the project assigned to flood control during construction of the project;
(B) provide all lands, easements, rights-of-way, and dredged material disposal areas required only for flood control and perform all related necessary relocations; and
(C) provide that portion of the joint costs of lands, easements, rights-of-way, dredged material disposal areas, and relocations which is assigned to flood control.
(2) **35 percent minimum contribution** — If the value of the contributions required under paragraph (1) of this subsection is less than 35 percent of the cost of the project assigned to flood control, the non-Federal interest shall pay during construction of the project such additional amounts as are necessary so that the total contribution of the non-Federal interests under this subsection is equal to 35 percent of the cost of the project assigned to flood control.
(3) **50 percent maximum** — The non-Federal share under paragraph (1) shall not exceed 50 percent of the cost of the project assigned to flood control. The preceding sentence does not modify the requirement of paragraph (1)(A) of this subsection.
(4) **Deferred payment of amount exceeding 30 percent** — If the total amount of the contribution required under paragraph (1) of this subsection exceeds 30 percent of the cost of the project assigned to flood control, the non-Federal interests may pay the amount of the excess to the Secretary over a 15-year period (or such shorter period as may be agreed to by the Secretary and the non-Federal interests) beginning on the date construction of the project or
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2215
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** The Secretary of the Army is authorized to investigate, study, plan, and implement structural and nonstructural measures for the prevention or mitigation of shore damages attributable to Federal navigation works and shore damage attributable to the Atlantic Intracoastal Waterway and the Gulf Intracoastal Waterway, if a non-Federal public body agrees to operate and maintain such measures, and, in the case of interests in real property acquired in conjunction with nonstructural measures, to operate and maintain the property for public purposes in accordance with regulations prescribed by the Secretary.
**(b) Cost sharing** The costs of implementing measures, including a study, shall be cost-shared in the same proportion as the cost-sharing provisions applicable to construction of the project causing the shore damage.
**(c) Requirement for specific authorization** No such project shall be initiated without specific authorization by Congress if the Federal first cost exceeds $15,000,000.
**(d) Coordination** The Secretary shall—
(1) coordinate the implementation of the measures under this section with other Federal and non-Federal shore protection projects in the same geographic area; and
(2) to the extent practicable, combine mitigation projects with other shore protection projects in the same area into a comprehensive regional project.
**(e) Reimbursement for feasibility studies** Beginning on December 16, 2016, in any case in which the Secretary implements a project under this section, the Secretary shall reimburse or credit the non-Federal interest for any amounts contributed for the study evaluating the damage in excess of the non-Federal share of the costs, as determined under subsection (b).
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 426i
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
The Secretary of the Army is authorized to allot from any appropriations heretofore or hereafter made for flood control, not to exceed $90,000,000 for any one fiscal year, for the implementation of small structural and nonstructural projects, and projects that use natural features or nature-based features (as those terms are defined in [section 2289a(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2289a/a&num=0&edition=prelim)), for flood control and related purposes not specifically authorized by Congress, which come within the provisions of [section 701a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701a&num=0&edition=prelim), when in the opinion of the Chief of Engineers such work is advisable. The amount allotted for a project shall be sufficient to complete Federal participation in the project. Not more than $15,000,000 shall be allotted under this section for a project at any single locality. The provisions of local cooperation specified in [section 701c of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701c&num=0&edition=prelim) shall apply. The work shall be complete in itself and not commit the United States to any additional improvement to insure its successful operation, except as may result from the normal procedure applying to projects authorized after submission of preliminary examination and survey reports.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 701s
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Allotment from appropriations for construction** The Secretary of the Army is authorized to allot from any appropriations hereafter made for rivers and harbors not to exceed $62,500,000 for any one fiscal year for the construction of small river and harbor improvement projects not specifically authorized by Congress which will result in substantial benefits to navigation and which can be operated consistently with appropriate and economic use of the waters of the Nation for other purposes, when in the opinion of the Chief of Engineers such work is advisable, if benefits are in excess of the cost.
**(b) Limitation on allotment** Not more than $15,000,000 shall be allotted for the construction of a project under this section at any single locality and the amount allotted shall be sufficient to complete the Federal participation in the project under this section.
**(c) Lands, easements, and rights-of-way; indemnification; assurances of local cooperation** Local interests shall provide without cost to the United States all necessary lands, easements and rights-of-way for all projects to be constructed under the authority of this section. In addition, local interests may be required to hold and save the United States free from damages that may result from the construction and maintenance of the project and may be required to provide such additional local cooperation as the Chief of Engineers deems appropriate. A State, county, municipality or other responsible local entity shall give assurance satisfactory to the Chief of Engineers that such conditions of cooperation as are required will be accomplished.
**(d) Sharing of costs by non-Federal interests** Non-Federal interests may be required to share in the cost of the project to the extent that the Chief of Engineer
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 577
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
In conducting studies of potential water resources projects, the Secretary shall consider measures to preserve and enhance scenic and aesthetic qualities in the vicinity of such projects.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2287
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.