Arkansas Legal Resource Navigator

33 U.S.C. § 2270 — Subsurface drain systems research and

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2270 — Subsurface drain systems research and

Page 757 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2280 ‘‘(F) regularly monitor and audit each eligible project being constructed by an Indian Tribe under this section to ensure that the construction activi- ties are carried out in compliance with the plans approved by the Secretary and that the construc- tion costs are reasonable. ‘‘(2) DETAILED PROJECT SCHEDULE.—Not later than 180 days after entering into an agreement under para- graph (1)(D), each Indian Tribe, to the maximum ex- tent practicable, shall submit to the Secretary a de- tailed project schedule, based on estimated funding levels, that lists all deadlines for each milestone in the construction of the eligible project. ‘‘(3) TECHNICAL ASSISTANCE.—On the request of an Indian Tribe, the Secretary may provide technical as- sistance to the Indian Tribe, if the Indian Tribe con- tracts with and compensates the Secretary for the technical assistance relating to— ‘‘(A) any study, engineering activity, and design activity for construction carried out by the Indian Tribe under this section; and ‘‘(B) expeditiously obtaining any permits nec- essary for the eligible project. ‘‘(e) COST SHARE.—Nothing in this section affects the cost-sharing requirement applicable on the day before the date of enactment of this Act to an eligible project carried out under this section. ‘‘(f) IMPLEMENTATION GUIDANCE.— ‘‘(1) IN GENERAL.—Not later than 120 days after the date of enactment of this Act, the Secretary shall issue guidance for the implementation of the pilot program under this section that, to the extent prac- ticable, identifies— ‘‘(A) the metrics for measuring the success of the pilot program; ‘‘(B) a process for identifying future eligible projects to participate in the pilot program; ‘‘(C) measur

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2270

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: e60efce2083fa18c4589db838d952677790a51985f13c778f281a6e44397dcfa. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-fe822615aafd08e72892152b
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2270-subsurface-drain-systems-research-and--f9b4a198e8.md
Pages: Not recorded – Not recorded
Passage SHA-256: d60b5b710e6baa06eb3d9511670ef74974cd0b041e7fd8c7d5241b5e10059bf7

Source location: USCODE-2024-title33-chap36-subchapIV-sec2270.pdf

Stored source content

Page 757 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2280 ‘‘(F) regularly monitor and audit each eligible project being constructed by an Indian Tribe under this section to ensure that the construction activi- ties are carried out in compliance with the plans approved by the Secretary and that the construc- tion costs are reasonable. ‘‘(2) DETAILED PROJECT SCHEDULE.—Not later than 180 days after entering into an agreement under para- graph (1)(D), each Indian Tribe, to the maximum ex- tent practicable, shall submit to the Secretary a de- tailed project schedule, based on estimated funding levels, that lists all deadlines for each milestone in the construction of the eligible project. ‘‘(3) TECHNICAL ASSISTANCE.—On the request of an Indian Tribe, the Secretary may provide technical as- sistance to the Indian Tribe, if the Indian Tribe con- tracts with and compensates the Secretary for the technical assistance relating to— ‘‘(A) any study, engineering activity, and design activity for construction carried out by the Indian Tribe under this section; and ‘‘(B) expeditiously obtaining any permits nec- essary for the eligible project. ‘‘(e) COST SHARE.—Nothing in this section affects the cost-sharing requirement applicable on the day before the date of enactment of this Act to an eligible project carried out under this section. ‘‘(f) IMPLEMENTATION GUIDANCE.— ‘‘(1) IN GENERAL.—Not later than 120 days after the date of enactment of this Act, the Secretary shall issue guidance for the implementation of the pilot program under this section that, to the extent prac- ticable, identifies— ‘‘(A) the metrics for measuring the success of the pilot program; ‘‘(B) a process for identifying future eligible projects to participate in the pilot program; ‘‘(C) measures to address the risks of an Indian Tribe constructing eligible projects under the pilot program, including which entity bears the risk for eligible projects that fail to meet Corps of Engi- neers standards for design or quality; ‘‘(D) the laws and regulations that an Indian Tribe must follow in carrying out an eligible project under the pilot program; and ‘‘(E) which entity bears the risk in the event that an eligible project carried out under the pilot pro- gram fails to be carried out in accordance with the project authorization or this section. ‘‘(2) NEW PROJECT PARTNERSHIP AGREEMENTS.—The Secretary may not enter into a project partnership agreement under this section until the date on which the Secretary issues the guidance under paragraph (1). ‘‘(g) REPORT.— ‘‘(1) IN GENERAL.—Not later than 3 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transpor- tation and Infrastructure of the House of Representa- tives and make publicly available a report detailing the results of the pilot program under this section, including— ‘‘(A) a description of the progress of Indian Tribes in meeting milestones in detailed project schedules developed pursuant to subsection (d)(2); and ‘‘(B) any recommendations of the Secretary con- cerning whether the pilot program or any compo- nent of the pilot program should be implemented on a national basis. ‘‘(2) UPDATE.—Not later than 5 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives an update to the report under paragraph (1). ‘‘(3) FAILURE TO MEET DEADLINE.—If the Secretary fails to submit a report by the required deadline under this subsection, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a de- tailed explanation of why the deadline was missed and a projected date for submission of the report. ‘‘(h) ADMINISTRATION.—All laws and regulations that would apply to the Secretary if the Secretary were car- rying out the eligible project shall apply to an Indian Tribe carrying out an eligible project under this sec- tion. ‘‘(i) TERMINATION OF AUTHORITY.—The authority to commence an eligible project under this section termi- nates on December 31, 2029. ‘‘(j) AUTHORIZATION OF APPROPRIATIONS.—In addition to any amounts appropriated for a specific eligible project, there is authorized to be appropriated to the Secretary to carry out this section, including the costs of administration of the Secretary, $15,000,000 for each of fiscal years 2024 through 2029.’’ ‘‘SECRETARY’’ DEFINED Secretary means the Secretary of the Army, see sec- tion 2 of Pub. L. 106–541, set out as a note under section 2201 of this title. § 2270. Subsurface drain systems research and development Subject to the availability of appropriations, the Secretary, acting through the Director of the Engineer Research and Development Center and, where appropriate, in consultation with other Federal agencies, shall carry out research and development activities relating to the use of subsurface drain systems as— (1) a flood risk-reduction measure; or (2) a coastal storm risk-reduction measure. (Pub. L. 116–260, div. AA, title II, § 227, Dec. 27, 2020, 134 Stat. 2698.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resources Development Act of 2020, and not as part of the Water Resources Development Act of 1986 which comprises this chapter. Statutory Notes and Related Subsidiaries ‘‘SECRETARY’’ DEFINED Secretary means the Secretary of the Army, see sec- tion 2 of div. AA of Pub. L. 116–260, set out as a note under section 2201 of this title. SUBCHAPTER V—GENERAL PROVISIONS § 2280. Maximum cost of projects (a) In general In order to insure against cost overruns, each total cost set forth with respect to a project for water resources development and conservation and related purposes authorized to be carried out by the Secretary in this Act or in a law en- acted after the date of the enactment of this Act, including the Water Resources Develop- ment Act of 1988, or in an amendment made by this Act or any later law with respect to such a project shall be the maximum cost of that project, except that such maximum amount— (1) may be increased by the Secretary for modifications which do not materially alter the scope or functions of the project as author- ized, but not by more than 20 percent of the total cost stated for the project in this Act, in

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2270 — Post-disaster watershed assessments

**(a) Watershed assessments** (1) **In general** — In an area that the President has declared a major disaster in accordance with [section 5170 of title 42](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section5170&num=0&edition=prelim), the Secretary may carry out a watershed assessment to identify, to the maximum extent practicable, specific flood risk reduction, hurricane and storm damage reduction, ecosystem restoration, or navigation project recommendations that will help to rehabilitate and improve the resiliency of damaged infrastructure and natural resources to reduce risks to human life and property from future natural disasters. (2) **Existing projects** — A watershed assessment carried out paragraph 11 So in original. Probably should be preceded by “under”. (1) may identify existing projects being carried out under 1 or more of the authorities referred to in subsection (b)(1). (3) **Duplicate watershed assessments** — In carrying out a watershed assessment under paragraph (1), the Secretary shall use all existing watershed assessments and related information developed by the Secretary or other Federal, State, or local entities. **(b) Projects** (1) **In general** — The Secretary may carry out projects identified under a watershed assessment under subsection (a) in accordance with the criteria for projects carried out under one of the following authorities: (A) Section 205 of the Flood Control Act of 1948 ([33 U.S.C. 701s](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701s&num=0&edition=prelim)). (B) Section 111 of the River and Harbor Act of 1968 ([33 U.S.C. 426i](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section426i&num=0&edition=prelim)). (C) Section 206 of the Wat

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2270

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.