Browse Arkansas Code titles and sections
33 U.S.C. § 2270 — Subsurface drain systems research and
Federal law — U.S. Code and appendices · legal_authorities
Page 757
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2280
‘‘(F) regularly monitor and audit each eligible
project being constructed by an Indian Tribe under
this section to ensure that the construction activi-
ties are carried out in compliance with the plans
approved by the Secretary and that the construc-
tion costs are reasonable.
‘‘(2) DETAILED PROJECT SCHEDULE.—Not later than
180 days after entering into an agreement under para-
graph (1)(D), each Indian Tribe, to the maximum ex-
tent practicable, shall submit to the Secretary a de-
tailed project schedule, based on estimated funding
levels, that lists all deadlines for each milestone in
the construction of the eligible project.
‘‘(3) TECHNICAL ASSISTANCE.—On the request of an
Indian Tribe, the Secretary may provide technical as-
sistance to the Indian Tribe, if the Indian Tribe con-
tracts with and compensates the Secretary for the
technical assistance relating to—
‘‘(A) any study, engineering activity, and design
activity for construction carried out by the Indian
Tribe under this section; and
‘‘(B) expeditiously obtaining any permits nec-
essary for the eligible project.
‘‘(e) COST SHARE.—Nothing in this section affects the
cost-sharing requirement applicable on the day before
the date of enactment of this Act to an eligible project
carried out under this section.
‘‘(f) IMPLEMENTATION GUIDANCE.—
‘‘(1) IN GENERAL.—Not later than 120 days after the
date of enactment of this Act, the Secretary shall
issue guidance for the implementation of the pilot
program under this section that, to the extent prac-
ticable, identifies—
‘‘(A) the metrics for measuring the success of the
pilot program;
‘‘(B) a process for identifying future eligible
projects to participate in the pilot program;
‘‘(C) measur
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2270
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: e60efce2083fa18c4589db838d952677790a51985f13c778f281a6e44397dcfa. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-fe822615aafd08e72892152b
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2270-subsurface-drain-systems-research-and--f9b4a198e8.md
Pages: Not recorded – Not recorded
Passage SHA-256: d60b5b710e6baa06eb3d9511670ef74974cd0b041e7fd8c7d5241b5e10059bf7
Source location: USCODE-2024-title33-chap36-subchapIV-sec2270.pdf
Stored source content
Page 757
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2280
‘‘(F) regularly monitor and audit each eligible
project being constructed by an Indian Tribe under
this section to ensure that the construction activi-
ties are carried out in compliance with the plans
approved by the Secretary and that the construc-
tion costs are reasonable.
‘‘(2) DETAILED PROJECT SCHEDULE.—Not later than
180 days after entering into an agreement under para-
graph (1)(D), each Indian Tribe, to the maximum ex-
tent practicable, shall submit to the Secretary a de-
tailed project schedule, based on estimated funding
levels, that lists all deadlines for each milestone in
the construction of the eligible project.
‘‘(3) TECHNICAL ASSISTANCE.—On the request of an
Indian Tribe, the Secretary may provide technical as-
sistance to the Indian Tribe, if the Indian Tribe con-
tracts with and compensates the Secretary for the
technical assistance relating to—
‘‘(A) any study, engineering activity, and design
activity for construction carried out by the Indian
Tribe under this section; and
‘‘(B) expeditiously obtaining any permits nec-
essary for the eligible project.
‘‘(e) COST SHARE.—Nothing in this section affects the
cost-sharing requirement applicable on the day before
the date of enactment of this Act to an eligible project
carried out under this section.
‘‘(f) IMPLEMENTATION GUIDANCE.—
‘‘(1) IN GENERAL.—Not later than 120 days after the
date of enactment of this Act, the Secretary shall
issue guidance for the implementation of the pilot
program under this section that, to the extent prac-
ticable, identifies—
‘‘(A) the metrics for measuring the success of the
pilot program;
‘‘(B) a process for identifying future eligible
projects to participate in the pilot program;
‘‘(C) measures to address the risks of an Indian
Tribe constructing eligible projects under the pilot
program, including which entity bears the risk for
eligible projects that fail to meet Corps of Engi-
neers standards for design or quality;
‘‘(D) the laws and regulations that an Indian
Tribe must follow in carrying out an eligible
project under the pilot program; and
‘‘(E) which entity bears the risk in the event that
an eligible project carried out under the pilot pro-
gram fails to be carried out in accordance with the
project authorization or this section.
‘‘(2) NEW PROJECT PARTNERSHIP AGREEMENTS.—The
Secretary may not enter into a project partnership
agreement under this section until the date on which
the Secretary issues the guidance under paragraph
(1).
‘‘(g) REPORT.—
‘‘(1) IN GENERAL.—Not later than 3 years after the
date of enactment of this Act, the Secretary shall
submit to the Committee on Environment and Public
Works of the Senate and the Committee on Transpor-
tation and Infrastructure of the House of Representa-
tives and make publicly available a report detailing
the results of the pilot program under this section,
including—
‘‘(A) a description of the progress of Indian Tribes
in meeting milestones in detailed project schedules
developed pursuant to subsection (d)(2); and
‘‘(B) any recommendations of the Secretary con-
cerning whether the pilot program or any compo-
nent of the pilot program should be implemented on
a national basis.
‘‘(2) UPDATE.—Not later than 5 years after the date
of enactment of this Act, the Secretary shall submit
to the Committee on Environment and Public Works
of the Senate and the Committee on Transportation
and Infrastructure of the House of Representatives an
update to the report under paragraph (1).
‘‘(3) FAILURE TO MEET DEADLINE.—If the Secretary
fails to submit a report by the required deadline
under this subsection, the Secretary shall submit to
the Committee on Environment and Public Works of
the Senate and the Committee on Transportation and
Infrastructure of the House of Representatives a de-
tailed explanation of why the deadline was missed
and a projected date for submission of the report.
‘‘(h) ADMINISTRATION.—All laws and regulations that
would apply to the Secretary if the Secretary were car-
rying out the eligible project shall apply to an Indian
Tribe carrying out an eligible project under this sec-
tion.
‘‘(i) TERMINATION
OF AUTHORITY.—The authority to
commence an eligible project under this section termi-
nates on December 31, 2029.
‘‘(j) AUTHORIZATION OF APPROPRIATIONS.—In addition
to any amounts appropriated for a specific eligible
project, there is authorized to be appropriated to the
Secretary to carry out this section, including the costs
of administration of the Secretary, $15,000,000 for each
of fiscal years 2024 through 2029.’’
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 106–541, set out as a note under section
2201 of this title.
§ 2270. Subsurface drain systems research and
development
Subject to the availability of appropriations,
the Secretary, acting through the Director of
the Engineer Research and Development Center
and, where appropriate, in consultation with
other Federal agencies, shall carry out research
and development activities relating to the use of
subsurface drain systems as—
(1) a flood risk-reduction measure; or
(2) a coastal storm risk-reduction measure.
(Pub. L. 116–260, div. AA, title II, § 227, Dec. 27,
2020, 134 Stat. 2698.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of div. AA of Pub. L. 116–260, set out as a note
under section 2201 of this title.
SUBCHAPTER V—GENERAL PROVISIONS
§ 2280. Maximum cost of projects
(a) In general
In order to insure against cost overruns, each
total cost set forth with respect to a project for
water resources development and conservation
and related purposes authorized to be carried
out by the Secretary in this Act or in a law en-
acted after the date of the enactment of this
Act, including the Water Resources Develop-
ment Act of 1988, or in an amendment made by
this Act or any later law with respect to such a
project shall be the maximum cost of that
project, except that such maximum amount—
(1) may be increased by the Secretary for
modifications which do not materially alter
the scope or functions of the project as author-
ized, but not by more than 20 percent of the
total cost stated for the project in this Act, in
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Watershed assessments**
(1) **In general** — In an area that the President has declared a major disaster in accordance with [section 5170 of title 42](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section5170&num=0&edition=prelim), the Secretary may carry out a watershed assessment to identify, to the maximum extent practicable, specific flood risk reduction, hurricane and storm damage reduction, ecosystem restoration, or navigation project recommendations that will help to rehabilitate and improve the resiliency of damaged infrastructure and natural resources to reduce risks to human life and property from future natural disasters.
(2) **Existing projects** — A watershed assessment carried out paragraph 11 So in original. Probably should be preceded by “under”. (1) may identify existing projects being carried out under 1 or more of the authorities referred to in subsection (b)(1).
(3) **Duplicate watershed assessments** — In carrying out a watershed assessment under paragraph (1), the Secretary shall use all existing watershed assessments and related information developed by the Secretary or other Federal, State, or local entities.
**(b) Projects**
(1) **In general** — The Secretary may carry out projects identified under a watershed assessment under subsection (a) in accordance with the criteria for projects carried out under one of the following authorities:
(A) Section 205 of the Flood Control Act of 1948 ([33 U.S.C. 701s](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701s&num=0&edition=prelim)).
(B) Section 111 of the River and Harbor Act of 1968 ([33 U.S.C. 426i](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section426i&num=0&edition=prelim)).
(C) Section 206 of the Wat
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2270
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.