Arkansas Legal Resource Navigator

43 U.S.C. § 1554 — Federal reclamation laws

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1554 — Federal reclamation laws

Page 413 TITLE 43—PUBLIC LANDS § 1556 (c) Powerplant operations Section 7 of the Colorado River Storage Project Act [43 U.S.C. 620f] shall be administered in accordance with the foregoing criteria. (Pub. L. 90–537, title VI, § 602, Sept. 30, 1968, 82 Stat. 900.) Editorial Notes REFERENCES IN TEXT The Colorado River Storage Project Act, referred to in subsec. (a), is act Apr. 11, 1956, ch. 203, 70 Stat. 105, which is classified generally to chapter 12B (§ 620 et seq.) of this title. For complete classification of this Act to the Code, see Short Title note set out under sec- tion 620 of this title and Tables. The Boulder Canyon Project Act, referred to in sub- sec. (a), is act Dec. 21, 1928, ch. 42, 45 Stat. 1057, which is classified generally to subchapter I (§ 617 et seq.) of chapter 12A of this title. For complete classification of this Act to the Code, see section 617t of this title and Tables. The Boulder Canyon Project Adjustment Act, re- ferred to in subsec. (a), is act July 19, 1940, ch. 643, 54 Stat. 774, which is classified generally to subchapter II (§ 618 et seq.) of chapter 12A of this title. For complete classification of this Act to the Code, see section 618o of this title and Tables. Statutory Notes and Related Subsidiaries TERMINATION OF REPORTING REQUIREMENTS For termination, effective May 15, 2000, of provisions in subsec. (b) of this section relating to the require- ment that the Secretary transmit an annual report to Congress, see section 3003 of Pub. L. 104–66, as amended, set out as a note under section 1113 of Title 31, Money and Finance, and the 3rd item on page 113 of House Document No. 103–7. § 1553. Upper Colorado River Basin; rights to consumptive uses not to be reduced or preju- diced; duties and powers of Commis

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1554

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 156f132775115b7596b32871c7405d76f7620916dd36d8d48aaf462b1d81b998. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-f8e8ce0050e1e1702d10735a
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-1554-federal-reclamation-laws--504c4bbc79.md
Pages: Not recorded – Not recorded
Passage SHA-256: 90c274a793a96586ec29e01cb839c7f2483c2540e25b5cbe905bcdbb511c33cb

Source location: USCODE-2024-title43-chap32-subchapV-sec1554.pdf

Stored source content

Page 413 TITLE 43—PUBLIC LANDS § 1556 (c) Powerplant operations Section 7 of the Colorado River Storage Project Act [43 U.S.C. 620f] shall be administered in accordance with the foregoing criteria. (Pub. L. 90–537, title VI, § 602, Sept. 30, 1968, 82 Stat. 900.) Editorial Notes REFERENCES IN TEXT The Colorado River Storage Project Act, referred to in subsec. (a), is act Apr. 11, 1956, ch. 203, 70 Stat. 105, which is classified generally to chapter 12B (§ 620 et seq.) of this title. For complete classification of this Act to the Code, see Short Title note set out under sec- tion 620 of this title and Tables. The Boulder Canyon Project Act, referred to in sub- sec. (a), is act Dec. 21, 1928, ch. 42, 45 Stat. 1057, which is classified generally to subchapter I (§ 617 et seq.) of chapter 12A of this title. For complete classification of this Act to the Code, see section 617t of this title and Tables. The Boulder Canyon Project Adjustment Act, re- ferred to in subsec. (a), is act July 19, 1940, ch. 643, 54 Stat. 774, which is classified generally to subchapter II (§ 618 et seq.) of chapter 12A of this title. For complete classification of this Act to the Code, see section 618o of this title and Tables. Statutory Notes and Related Subsidiaries TERMINATION OF REPORTING REQUIREMENTS For termination, effective May 15, 2000, of provisions in subsec. (b) of this section relating to the require- ment that the Secretary transmit an annual report to Congress, see section 3003 of Pub. L. 104–66, as amended, set out as a note under section 1113 of Title 31, Money and Finance, and the 3rd item on page 113 of House Document No. 103–7. § 1553. Upper Colorado River Basin; rights to consumptive uses not to be reduced or preju- diced; duties and powers of Commission not impaired (a) Rights of the upper basin to the consump- tive use of water available to that basin from the Colorado River system under the Colorado River Compact shall not be reduced or preju- diced by any use of such water in the lower basin. (b) Nothing in this chapter shall be construed so as to impair, conflict with, or otherwise change the duties and powers of the Upper Colo- rado River Commission. (Pub. L. 90–537, title VI, § 603, Sept. 30, 1968, 82 Stat. 901.) § 1554. Federal reclamation laws Except as otherwise provided in this chapter, in constructing, operating, and maintaining the units of the projects herein and hereafter au- thorized, the Secretary shall be governed by the Federal reclamation laws (Act of June 17, 1902; 32 Stat. 388, and Acts amendatory thereof or supplementary thereto) to which laws this chap- ter shall be deemed a supplement. (Pub. L. 90–537, title VI, § 604, Sept. 30, 1968, 82 Stat. 901.) Editorial Notes REFERENCES IN TEXT Act of June 17, 1902, referred to in text, is popularly known as the Reclamation Act, which is classified gen- erally to chapter 12 (§ 371 et seq.) of this title. For com- plete classification of this Act to the Code, see Short Title note set out under section 371 of this title and Ta- bles. § 1555. Federal Power Act inapplicable to Colo- rado River between Hoover Dam and Glen Canyon Dam Part I of the Federal Power Act [16 U.S.C. 791a et seq.] shall not be applicable to the reaches of the main stream of the Colorado River between Hoover Dam and Glen Canyon Dam until and un- less otherwise provided by Congress. (Pub. L. 90–537, title VI, § 605, Sept. 30, 1968, 82 Stat. 901.) Editorial Notes REFERENCES IN TEXT The Federal Power Act, referred to in text, is act June 10, 1920, ch. 285, 41 Stat. 1063. Part I of the Federal Power Act is classified generally to subchapter I (§ 791a et seq.) of chapter 12 of Title 16, Conservation. For com- plete classification of this Act to the Code, see section 791a of Title 16 and Tables. § 1556. Definitions As used in this chapter, (a) all terms which are defined in the Colorado River Compact shall have the meanings therein defined; (b) ‘‘Main stream’’ means the main stream of the Colorado River downstream from Lee Ferry within the United States, including the res- ervoirs thereon; (c) ‘‘User’’ or ‘‘water user’’ in relation to main stream water in the lower basin means the United States or any person or legal entity enti- tled under the decree of the Supreme Court of the United States in Arizona against California, and others (376 U.S. 340), to use main stream water when available thereunder; (d) ‘‘Active storage’’ means that amount of water in reservoir storage, exclusive of bank storage, which can be released through the ex- isting reservoir outlet works; (e) ‘‘Colorado River Basin States’’ means the States of Arizona, California, Colorado, Nevada, New Mexico, Utah, and Wyoming; (f) ‘‘Western United States’’ means those States lying wholly or in part west of the Conti- nental Divide; and (g) ‘‘Augment’’ or ‘‘augmentation’’, when used herein with reference to water, means to in- crease the supply of the Colorado River or its tributaries by the introduction of water into the Colorado River system, which is in addition to the natural supply of the system. (Pub. L. 90–537, title VI, § 606, Sept. 30, 1968, 82 Stat. 901.) CHAPTER 32A—COLORADO RIVER BASIN SALINITY CONTROL SUBCHAPTER I—PROGRAMS DOWNSTREAM FROM IMPERIAL DAM Sec. 1571. Water quality improvement. 1572. Canal or canal lining. 1573. Construction and maintenance of well fields; land acquisition; land replacement; non- reimbursable costs. 1574. Modification of projects.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 791a — Short title

This chapter may be cited as the “Federal Power Act”.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 791a

Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 791a — Short title

Page 1364 TITLE 16—CONSERVATION § 791 Sec. Statutory Notes and Related Subsidiaries FINDINGS Pub. L. 113–23, § 2, Aug. 9, 2013, 127 Stat. 493, provided that: ‘‘Congress finds that— ‘‘(1) the hydropower industry currently employs ap- proximately 300,000 workers across the United States; ‘‘(2) hydropower is the largest source of clean, re- newable electricity in the United States; ‘‘(3) as of the date of enactment of this Act [Aug. 9, 2013], hydropower resources, including pumped stor- age facilities, provide— ‘‘(A) nearly 7 percent of the electricity generated in the United States; and ‘‘(B) approximately 100,000 megawatts of electric capacity in the United States; ‘‘(4) only 3 percent of the 80,000 dams in the United States generate electricity, so there is substantial potential for adding hydropower generation to non- powered dams; and ‘‘(5) according to one study, by utilizing currently untapped resources, the United States could add ap- proximately 60,000 megawatts of new hydropower ca- pacity by 2025, which could create 700,000 new jobs over the next 13 years.’’ SUBCHAPTER I—REGULATION OF THE DE- VELOPMENT OF WATER POWER AND RE- SOURCES Statutory Notes and Related Subsidiaries CODIFICATION; CONSTRUCTION Act Aug. 26, 1935, ch. 687, title II, § 212, 49 Stat. 847, provided that sections 1 to 29 of the Federal Water Power Act, as amended (sections 792, 793, 794 to 797, 798 to 818, 819, and 820 to 823 of this title) shall constitute part I of the act. Said section 212 also repealed sections 25 and 30 of the act (sections 819, 791 of this title). It also contained a proviso as follows: ‘‘That nothing in that Act, as amended, shall be construed to repeal or amend the provisions of the amendment to the Federal Water Power Act approved March 3, 192

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 791a

Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1554 — Federal reclamation laws

Except as otherwise provided in this chapter, in constructing, operating, and maintaining the units of the projects herein and hereafter authorized, the Secretary shall be governed by the Federal reclamation laws (Act of June 17, 1902; 32 Stat. 388, and Acts amendatory thereof or supplementary thereto) to which laws this chapter shall be deemed a supplement.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1554

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 620f — Powerplant operations

The hydroelectric powerplants and transmission lines authorized by this chapter to be constructed, operated, and maintained by the Secretary shall be operated in conjunction with other Federal powerplants, present and potential, so as to produce the greatest practicable amount of power and energy that can be sold at firm power and energy rates, but in the exercise of the authority hereby granted he shall not affect or interfere with the operation of the provisions of the Colorado River Compact, the Upper Colorado River Basin Compact, the Boulder Canyon Project Act [[43 U.S.C. 617](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617&num=0&edition=prelim) et seq.], the Boulder Canyon Project Adjustment Act [[43 U.S.C. 618](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618&num=0&edition=prelim) et seq.], and any contract lawfully entered into under said Compacts and Acts. Subject to the provisions of the Colorado River Compact, neither the impounding nor the use of water for the generation of power and energy at the plants of the Colorado River storage project shall preclude or impair the appropriation of water for domestic or agricultural purposes pursuant to applicable State law.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620f

Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 620f. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 620f — Powerplant operations

Page 236 TITLE 43—PUBLIC LANDS § 620e (Pub. L. 90–537, title V, § 502, Sept. 30, 1968, 82 Stat. 898.) Editorial Notes CODIFICATION Section was enacted as part of the Colorado River Basin Project Act, and not as part of act Apr. 11, 1956, popularly known as the Colorado River Storage Project Act, which comprises this chapter. § 620e. Cost allocations; Indian lands; report to Congress Upon completion of each unit, participating project or separable feature thereof, the Sec- retary shall allocate the total costs (excluding any expenditures authorized by section 620g of this title) of constructing said unit, project or feature to power, irrigation, municipal water supply, flood control, navigation, or any other purposes authorized under reclamation law. Al- locations of construction, operation and mainte- nance costs to authorized nonreimbursable pur- poses shall be nonreturnable under the provi- sions of this chapter. In the event that the Nav- ajo participating project is authorized, the costs allocated to irrigation of Indian-owned tribal or restricted lands within, under, or served by such project, and beyond the capability of such lands to repay, shall be determined, and, in recogni- tion of the fact that assistance to the Navajo In- dians is the responsibility of the entire nation, such costs shall be nonreimbursable. On January 1 of each year the Secretary shall report to the Congress for the previous fiscal year, beginning with the fiscal year 1957, upon the status of the revenues from, and the cost of, constructing, op- erating, and maintaining the Colorado River storage project and the participating projects. The Secretary’s report shall be prepared to re- flect accurately the Federal investment allo- cated at that time to power, to irri

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 620f

Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 620f. This identifies an authority to review, not proof of applicability.