Browse Arkansas Code titles and sections
33 U.S.C. § 1296 — Determination of priority of projects
Federal law — U.S. Code and appendices · legal_authorities
Page 441
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1298
February 1, 1978, shall be made under this sub-
chapter for any treatment works unless only
such unmanufactured articles, materials, and
supplies as have been mined or produced in the
United States, and only such manufactured arti-
cles, materials, and supplies as have been manu-
factured in the United States, substantially all
from articles, materials, or supplies mined, pro-
duced, or manufactured, as the case may be, in
the United States will be used in such treatment
works. This section shall not apply in any case
where the Administrator determines, based upon
those factors the Administrator deems relevant,
including the available resources of the agency,
it to be inconsistent with the public interest (in-
cluding multilateral government procurement
agreements) or the cost to be unreasonable, or if
articles, materials, or supplies of the class or
kind to be used or the articles, materials, or
supplies from which they are manufactured are
not mined, produced, or manufactured, as the
case may be, in the United States in sufficient
and reasonably available commercial quantities
and of a satisfactory quality.
(June 30, 1948, ch. 758, title II, § 215, as added
Pub. L. 95–217, § 39, Dec. 27, 1977, 91 Stat. 1581.)
§ 1296. Determination of priority of projects
Notwithstanding any other provision of this
chapter, the determination of the priority to be
given each category of projects for construction
of publicly owned treatment works within each
State shall be made solely by that State, except
that if the Administrator, after a public hear-
ing, determines that a specific project will not
result in compliance with the enforceable re-
quirements of this chapter, such project shall be
removed
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 1296
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: b99a11eeb0b4cc51e97f33478f31e197c2c031e4c5a409154de5d0cb98725d27. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-f72cff0b0cca13714c7e35c7
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-1296-determination-of-priority-of-projects--a682493f84.md
Pages: Not recorded – Not recorded
Passage SHA-256: b22272e113c04f694a68cca89a3fa8556bb54b49553c3f2adf062e5e3706ffbe
Source location: USCODE-2024-title33-chap26-subchapII-sec1296.pdf
Stored source content
Page 441
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1298
February 1, 1978, shall be made under this sub-
chapter for any treatment works unless only
such unmanufactured articles, materials, and
supplies as have been mined or produced in the
United States, and only such manufactured arti-
cles, materials, and supplies as have been manu-
factured in the United States, substantially all
from articles, materials, or supplies mined, pro-
duced, or manufactured, as the case may be, in
the United States will be used in such treatment
works. This section shall not apply in any case
where the Administrator determines, based upon
those factors the Administrator deems relevant,
including the available resources of the agency,
it to be inconsistent with the public interest (in-
cluding multilateral government procurement
agreements) or the cost to be unreasonable, or if
articles, materials, or supplies of the class or
kind to be used or the articles, materials, or
supplies from which they are manufactured are
not mined, produced, or manufactured, as the
case may be, in the United States in sufficient
and reasonably available commercial quantities
and of a satisfactory quality.
(June 30, 1948, ch. 758, title II, § 215, as added
Pub. L. 95–217, § 39, Dec. 27, 1977, 91 Stat. 1581.)
§ 1296. Determination of priority of projects
Notwithstanding any other provision of this
chapter, the determination of the priority to be
given each category of projects for construction
of publicly owned treatment works within each
State shall be made solely by that State, except
that if the Administrator, after a public hear-
ing, determines that a specific project will not
result in compliance with the enforceable re-
quirements of this chapter, such project shall be
removed from the State’s priority list and such
State shall submit a revised priority list. These
categories shall include, but not be limited to
(A) secondary treatment, (B) more stringent
treatment, (C) infiltration-in-flow correction,
(D) major sewer system rehabilitation, (E) new
collector sewers and appurtenances, (F) new
interceptors and appurtenances, and (G) correc-
tion of combined sewer overflows. Not less than
25 per centum of funds allocated to a State in
any fiscal year under this subchapter for con-
struction of publicly owned treatment works in
such State shall be obligated for those types of
projects referred to in clauses (D), (E), (F), and
(G) of this section, if such projects are on such
State’s priority list for that year and are other-
wise eligible for funding in that fiscal year. It is
the policy of Congress that projects for waste-
water treatment and management undertaken
with Federal financial assistance under this
chapter by any State, municipality, or inter-
municipal or interstate agency shall be projects
which, in the estimation of the State, are de-
signed to achieve optimum water quality man-
agement, consistent with the public health and
water quality goals and requirements of this
chapter.
(June 30, 1948, ch. 758, title II, § 216, as added
Pub. L. 95–217, § 40, Dec. 27, 1977, 91 Stat. 1582;
amended Pub. L. 97–117, § 18, Dec. 29, 1981, 95
Stat. 1630.)
Editorial Notes
AMENDMENTS
1981—Pub. L. 97–117 inserted provision that it is the
policy of Congress that projects for wastewater treat-
ment and management undertaken with Federal finan-
cial assistance under this chapter by any State, mu-
nicipality, or intermunicipal or interstate agency be
projects which, in the estimation of the State, are de-
signed to achieve optimum water quality management,
consistent with the public health and water quality
goals and requirements of this chapter.
§ 1297. Guidelines for cost-effectiveness analysis
Any guidelines for cost-effectiveness analysis
published by the Administrator under this sub-
chapter shall provide for the identification and
selection of cost effective alternatives to com-
ply with the objectives and goals of this chapter
and sections 1281(b), 1281(d), 1281(g)(2)(A), and
1311(b)(2)(B) of this title.
(June 30, 1948, ch. 758, title II, § 217, as added
Pub. L. 95–217, § 41, Dec. 27, 1977, 91 Stat. 1582.)
§ 1298. Cost effectiveness
(a) Congressional statement of policy
It is the policy of Congress that a project for
waste treatment and management undertaken
with Federal financial assistance under this
chapter by any State, municipality, or inter-
municipal or interstate agency shall be consid-
ered as an overall waste treatment system for
waste treatment and management, and shall be
that system which constitutes the most eco-
nomical and cost-effective combination of de-
vices and systems used in the storage, treat-
ment, recycling, and reclamation of municipal
sewage or industrial wastes of a liquid nature to
implement section 1281 of this title, or necessary
to recycle or reuse water at the most economi-
cal cost over the estimated life of the works, in-
cluding intercepting sewers, outfall sewers, sew-
age collection systems, pumping power, and
other equipment, and their appurtenances; ex-
tension, improvements, remodeling, additions,
and alterations thereof; elements essential to
provide a reliable recycled supply such as stand-
by treatment units and clear well facilities; and
any works, including site acquisition of the land
that will be an integral part of the treatment
process (including land use for the storage of
treated wastewater in land treatment systems
prior to land application) or which is used for ul-
timate disposal of residues resulting from such
treatment; water efficiency measures and de-
vices; and any other method or system for pre-
venting, abating, reducing, storing, treating,
separating, or disposing of municipal waste, in-
cluding storm water runoff, or industrial waste,
including waste in combined storm water and
sanitary sewer systems; to meet the require-
ments of this chapter.
(b) Determination by Administrator as pre-
requisite to approval of grant
In accordance with the policy set forth in sub-
section (a) of this section, before the Adminis-
trator approves any grant to any State, munici-
pality, or intermunicipal or interstate agency
for the erection, building, acquisition, alter-
ation, remodeling, improvement, or extension of
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
Notwithstanding any other provision of this chapter, the determination of the priority to be given each category of projects for construction of publicly owned treatment works within each State shall be made solely by that State, except that if the Administrator, after a public hearing, determines that a specific project will not result in compliance with the enforceable requirements of this chapter, such project shall be removed from the State’s priority list and such State shall submit a revised priority list. These categories shall include, but not be limited to (A) secondary treatment, (B) more stringent treatment, (C) infiltration-in-flow correction, (D) major sewer system rehabilitation, (E) new collector sewers and appurtenances, (F) new interceptors and appurtenances, and (G) correction of combined sewer overflows. Not less than 25 per centum of funds allocated to a State in any fiscal year under this subchapter for construction of publicly owned treatment works in such State shall be obligated for those types of projects referred to in clauses (D), (E), (F), and (G) of this section, if such projects are on such State’s priority list for that year and are otherwise eligible for funding in that fiscal year. It is the policy of Congress that projects for wastewater treatment and management undertaken with Federal financial assistance under this chapter by any State, municipality, or intermunicipal or interstate agency shall be projects which, in the estimation of the State, are designed to achieve optimum water quality management, consistent with the public health and water quality goals and requirements of this chapter.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1296
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.