Browse Arkansas Code titles and sections
49 U.S.C. § 47504 — Noise compatibility programs
Federal law — U.S. Code and appendices · legal_authorities
Page 1692
TITLE 49—TRANSPORTATION
§ 47504
In subsection (b), the words ‘‘to the Secretary’’ are
added for clarity. The words ‘‘after the submission to
the Secretary of a noise exposure map under paragraph
(1)’’ are omitted as surplus.
Editorial Notes
AMENDMENTS
2018—Subsec. (b). Pub. L. 115–254 amended subsec. (b)
generally. Prior to amendment, text read as follows:
‘‘If, in an area surrounding an airport, a change in the
operation of the airport would establish a substantial
new noncompatible use, or would significantly reduce
noise over existing noncompatible uses, that is not re-
flected in either the existing conditions map or fore-
cast map currently on file with the Federal Aviation
Administration, the airport operator shall submit a re-
vised noise exposure map to the Secretary showing the
new noncompatible use or noise reduction.’’
2003—Subsec. (a). Pub. L. 108–176, § 324(1), substituted
‘‘a forecast period that is at least 5 years in the future’’
for ‘‘1985,’’ in introductory provisions.
Subsec. (b). Pub. L. 108–176, § 324(2), added subsec. (b)
and struck out heading and text of former subsec. (b).
Text read as follows: ‘‘If a change in the operation of
an airport will establish a substantial new noncompat-
ible use in an area surrounding the airport, the airport
operator shall submit a revised noise exposure map to
the Secretary showing the new noncompatible use.’’
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2003 AMENDMENT
Amendment by Pub. L. 108–176 applicable only to fis-
cal years beginning after Sept. 30, 2003, except as other-
wise specifically provided, see section 3 of Pub. L.
108–176, set out as a note under section 106 of this title.
NOISE DISCLOSURE
Pub. L. 108–176, title III, § 322, Dec. 12, 2003, 117 Stat.
Source: Supplied 2024 U.S. Code historical extraction · 49 U.S.C. § 47504
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: e2aa2c604b0f793856ee22687b480b0add16b684f33140f1d0957cf1820e1c56. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-f4a751f6750571866c8e82d2
Source file: Laws/federal/codes/united-states-code-2024/title-49/section-47504-noise-compatibility-programs--683c729787.md
Pages: Not recorded – Not recorded
Passage SHA-256: 03a87d7e63ba155318ab58b4b6ed7ae697c50adb78af7d76aaa631e1a6c9e62a
Source location: USCODE-2024-title49-subtitleVII-partB-chap475-subchapI-sec47504.pdf
Stored source content
Page 1692
TITLE 49—TRANSPORTATION
§ 47504
In subsection (b), the words ‘‘to the Secretary’’ are
added for clarity. The words ‘‘after the submission to
the Secretary of a noise exposure map under paragraph
(1)’’ are omitted as surplus.
Editorial Notes
AMENDMENTS
2018—Subsec. (b). Pub. L. 115–254 amended subsec. (b)
generally. Prior to amendment, text read as follows:
‘‘If, in an area surrounding an airport, a change in the
operation of the airport would establish a substantial
new noncompatible use, or would significantly reduce
noise over existing noncompatible uses, that is not re-
flected in either the existing conditions map or fore-
cast map currently on file with the Federal Aviation
Administration, the airport operator shall submit a re-
vised noise exposure map to the Secretary showing the
new noncompatible use or noise reduction.’’
2003—Subsec. (a). Pub. L. 108–176, § 324(1), substituted
‘‘a forecast period that is at least 5 years in the future’’
for ‘‘1985,’’ in introductory provisions.
Subsec. (b). Pub. L. 108–176, § 324(2), added subsec. (b)
and struck out heading and text of former subsec. (b).
Text read as follows: ‘‘If a change in the operation of
an airport will establish a substantial new noncompat-
ible use in an area surrounding the airport, the airport
operator shall submit a revised noise exposure map to
the Secretary showing the new noncompatible use.’’
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2003 AMENDMENT
Amendment by Pub. L. 108–176 applicable only to fis-
cal years beginning after Sept. 30, 2003, except as other-
wise specifically provided, see section 3 of Pub. L.
108–176, set out as a note under section 106 of this title.
NOISE DISCLOSURE
Pub. L. 108–176, title III, § 322, Dec. 12, 2003, 117 Stat.
2540, provided that:
‘‘(a) NOISE
DISCLOSURE
SYSTEM
IMPLEMENTATION
STUDY.—The Administrator of the Federal Aviation Ad-
ministration shall conduct a study to determine the
feasibility of developing a program under which pro-
spective home buyers of property located in the vicin-
ity of an airport could be notified of information de-
rived from noise exposure maps that may affect the use
and enjoyment of the property. The study shall assess
the scope, administration, usefulness, and burdensome-
ness of any such program, the costs and benefits of such
a program, and whether participation in such a pro-
gram should be voluntary or mandatory.
‘‘(b) PUBLIC AVAILABILITY OF NOISE EXPOSURE MAPS.—
The Administrator shall make noise exposure and land
use information from noise exposure maps available to
the public via the Internet on its website in an appro-
priate format.
‘‘(c) NOISE EXPOSURE MAP.—In this section, the term
‘noise exposure map’ means a noise exposure map pre-
pared under section 47503 of title 49, United States
Code.’’
§ 47504. Noise compatibility programs
(a) SUBMISSIONS.—(1) An airport operator that
submitted a noise exposure map and related in-
formation under section 47503(a) of this title
may submit a noise compatibility program to
the Secretary of Transportation after—
(A) consulting with public agencies and
planning authorities in the area surrounding
the airport, United States Government offi-
cials having local responsibility for the air-
port, and air carriers using the airport; and
(B) notice and an opportunity for a public
hearing.
(2) A program submitted under paragraph (1)
of this subsection shall state the measures the
operator has taken or proposes to take to reduce
existing noncompatible uses and prevent intro-
ducing additional noncompatible uses in the
area covered by the map. The measures may in-
clude—
(A) establishing a preferential runway sys-
tem;
(B) restricting the use of the airport by a
type or class of aircraft because of the noise
characteristics of the aircraft;
(C) constructing barriers and acoustical
shielding and soundproofing public buildings;
(D) using flight procedures to control the op-
eration of aircraft to reduce exposure of indi-
viduals to noise in the area surrounding the
airport; and
(E) acquiring land, air rights, easements, de-
velopment rights, and other interests to en-
sure that the property will be used in ways
compatible with airport operations.
(b) APPROVALS.—(1) The Secretary shall ap-
prove or disapprove a program submitted under
subsection (a) of this section (except as the pro-
gram is related to flight procedures referred to
in subsection (a)(2)(D) of this section) not later
than 180 days after receiving it. The Secretary
shall approve the program (except as the pro-
gram is related to flight procedures referred to
in subsection (a)(2)(D)) if the program—
(A) does not place an unreasonable burden
on interstate or foreign commerce;
(B) is reasonably consistent with achieving
the goal of reducing noncompatible uses and
preventing the introduction of additional non-
compatible uses; and
(C) provides for necessary revisions because
of a revised map submitted under section
47503(b) of this title.
(2) A program (except as the program is re-
lated to flight procedures referred to in sub-
section (a)(2)(D) of this section) is deemed to be
approved if the Secretary does not act within
the 180-day period.
(3) The Secretary shall submit any part of a
program related to flight procedures referred to
in subsection (a)(2)(D) of this section to the Ad-
ministrator of the Federal Aviation Administra-
tion. The Administrator shall approve or dis-
approve that part of the program.
(4) The Secretary shall not approve in fiscal
years 2004 through 2007 a program submitted
under subsection (a) if the program requires the
expenditure of funds made available under sec-
tion 48103 for mitigation of aircraft noise less
than 65 DNL.
(c) GRANTS.—(1) The Secretary may incur obli-
gations to make grants from amounts available
under section 48103 of this title to carry out a
project under a part of a noise compatibility
program approved under subsection (b) of this
section. A grant may be made to—
(A) an airport operator submitting the pro-
gram; and
(B) a unit of local government in the area
surrounding the airport, if the Secretary de-
cides the unit is able to carry out the project.
(2) SOUNDPROOFING AND ACQUISITION OF CERTAIN
RESIDENTIAL
BUILDINGS
AND
PROPERTIES.—The
Page 1693
TITLE 49—TRANSPORTATION
§ 47504
Secretary may incur obligations to make grants
from amounts made available under section
48103 of this title—
(A) for projects to soundproof residential
buildings—
(i) if the airport operator received ap-
proval for a grant for a project to soundproof
residential buildings pursuant to section
301(d)(4)(B) of the Airport and Airway Safety
and Capacity Expansion Act of 1987;
(ii) if the airport operator submits updated
noise exposure contours, as required by the
Secretary; and
(iii) if the Secretary determines that the
proposed projects are compatible with the
purposes of this chapter;
(B) to an airport operator and unit of local
government referred to in paragraph (1)(A) or
(1)(B) of this subsection to soundproof residen-
tial buildings located on residential prop-
erties, and to acquire residential properties, at
which noise levels are not compatible with
normal operations of an airport—
(i) if the airport operator amended an ex-
isting local aircraft noise regulation during
calendar year 1993 to increase the maximum
permitted noise levels for scheduled air car-
rier aircraft as a direct result of implemen-
tation of revised aircraft noise departure
procedures mandated for aircraft safety pur-
poses by the Administrator of the Federal
Aviation Administration for standardized
application at airports served by scheduled
air carriers;
(ii) if the airport operator submits updated
noise exposure contours, as required by the
Secretary; and
(iii) if the Secretary determines that the
proposed projects are compatible with the
purposes of this chapter;
(C) to an airport operator and unit of local
government referred to in paragraph (1)(A) or
(1)(B) of this subsection to carry out any part
of a program developed before February 18,
1980, or before implementing regulations were
prescribed, if the Secretary decides the pro-
gram is substantially consistent with reducing
existing noncompatible uses and preventing
the introduction of additional noncompatible
uses and the purposes of this chapter will be
furthered by promptly carrying out the pro-
gram;
(D) to an airport operator and unit of local
government referred to in paragraph (1)(A) or
(1)(B) of this subsection to soundproof a build-
ing in the noise impact area surrounding the
airport that is used primarily for educational
or medical purposes and that the Secretary de-
cides is adversely affected by airport noise;
(E) to an airport operator of a congested air-
port (as defined in section 47175) and a unit of
local government referred to in paragraph
(1)(B) of this subsection to carry out a project
to mitigate noise in the area surrounding the
airport if the project is included as a commit-
ment in a record of decision of the Federal
Aviation Administration for an airport capac-
ity enhancement project (as defined in section
47175) even if that airport has not met the re-
quirements of part 150 of title 14, Code of Fed-
eral Regulations; and
(F) to an airport operator of a congested air-
port (as defined in section 47175) and a unit of
local government referred to in paragraph
(1)(B) to carry out a project to mitigate noise,
if the project—
(i) consists of—
(I) replacement windows, doors, and the
installation of through-the-wall air condi-
tioning units; or
(II) a contribution of the equivalent
costs to be used for reconstruction if re-
construction is the preferred local solu-
tion;
(ii) is located at a school near the airport;
and
(iii) is included in a memorandum of agree-
ment entered into before September 30, 2002,
even if the airport has not met the require-
ments of part 150 of title 14, Code of Federal
Regulations, and only if the financial limita-
tions of the memorandum are applied.
(3) An airport operator may agree to make a
grant made under paragraph (1)(A) of this sub-
section available to a public agency in the area
surrounding the airport if the Secretary decides
the agency is able to carry out the project.
(4) The Government’s share of a project for
which a grant is made under this subsection is
the greater of—
(A) 80 percent of the cost of the project; or
(B) the Government’s share that would apply
if the amounts available for the project were
made available under subchapter I of chapter
471 of this title for a project at the airport.
(5) The provisions of subchapter I of chapter
471 of this title related to grants apply to a
grant made under this chapter, except—
(A) section 47109(a) and (b) of this title; and
(B) any provision that the Secretary decides
is inconsistent with, or unnecessary to carry
out, this chapter.
(6) AIRCRAFT NOISE PRIMARILY CAUSED BY MILI-
TARY
AIRCRAFT.—The Secretary may make a
grant under this subsection for a project even if
the purpose of the project is to mitigate the ef-
fect of noise primarily caused by military air-
craft at an airport.
(d) GOVERNMENT RELIEF FROM LIABILITY.—The
Government is not liable for damages from avia-
tion noise because of action taken under this
section.
(e) GRANTS FOR ASSESSMENT OF FLIGHT PROCE-
DURES.—
(1) IN
GENERAL.—In accordance with sub-
section (c)(1), the Secretary may make a grant
to an airport operator to assist in completing
environmental review and assessment activi-
ties for proposals to implement flight proce-
dures at such airport that have been approved
as part of an airport noise compatibility pro-
gram under subsection (b).
(2) ADDITIONAL
STAFF.—The Administrator
may accept funds from an airport operator, in-
cluding funds provided to the operator under
paragraph (1), to hire additional staff or ob-
tain the services of consultants in order to fa-
cilitate the timely processing, review, and
completion of environmental activities associ-
ated with proposals to implement flight proce-
Page 1694
TITLE 49—TRANSPORTATION
§ 47504
dures at such airport that have been approved
as part of an airport noise compatibility pro-
gram under subsection (b).
(3) RECEIPTS
CREDITED
AS
OFFSETTING
COL-
LECTIONS.—Notwithstanding section 3302 of
title 31, any funds accepted under this sec-
tion—
(A) shall be credited as offsetting collec-
tions to the account that finances the ac-
tivities and services for which the funds are
accepted;
(B) shall be available for expenditure only
to pay the costs of activities and services for
which the funds are accepted; and
(C) shall remain available until expended.
(f) DETERMINATION OF FAIR MARKET VALUE OF
RESIDENTIAL
PROPERTIES.—In
approving
a
project to acquire residential real property
using financial assistance made available under
this section or chapter 471, the Secretary shall
ensure that the appraisal of the property to be
acquired disregards any decrease or increase in
the fair market value of the real property
caused by the project for which the property is
to be acquired, or by the likelihood that the
property would be acquired for the project,
other than that due to physical deterioration
within the reasonable control of the owner.
(Pub. L. 103–272, § 1(e), July 5, 1994, 108 Stat. 1285;
Pub. L. 103–305, title I, § 119, Aug. 23, 1994, 108
Stat. 1580; Pub. L. 103–429, § 6(71), Oct. 31, 1994,
108 Stat. 4387; Pub. L. 106–181, title I, § 154, Apr.
5, 2000, 114 Stat. 88; Pub. L. 108–176, title I, § 189,
title III, § 306, Dec. 12, 2003, 117 Stat. 2519, 2539;
Pub. L. 112–95, title V, §§ 504, 505, Feb. 14, 2012, 126
Stat. 104; Pub. L. 115–232, div. A, title X, § 1044,
Aug. 13, 2018, 132 Stat. 1958.)
HISTORICAL AND REVISION NOTES
PUB. L. 103–272
Revised
Section
Source (U.S. Code)
Source (Statutes at Large)
47504(a) ......
49 App.:2104(a).
Feb. 18, 1980, Pub. L. 96–193,
§ 104(a), 94 Stat. 51; Dec.
30, 1987, Pub. L. 100–223,
§ 301(a), 101 Stat. 1523.
47504(b) ......
49 App.:2104(b).
Feb. 18, 1980, Pub. L. 96–193,
§ 104(b), (d), 94 Stat. 52, 53.
47504(c) ......
49 App.:2104(c).
Feb. 18, 1980, Pub. L. 96–193,
§ 104(c), 94 Stat. 52; Sept. 3,
1982,
Pub.
L.
97–248,
§ 524(b)(4),
96
Stat.
696;
Dec.
30,
1987,
Pub.
L.
100–223, § 301(b), (c), 101
Stat. 1523; Oct. 28, 1991,
Pub. L. 102–143, § 336, 105
Stat. 947.
47504(d) ......
49 App.:2104(d).
In subsection (a)(1)(A), the words ‘‘the officials of’’
are omitted as surplus. The words ‘‘planning authori-
ties’’ are substituted for ‘‘planning agencies’’ for con-
sistency.
In subsection (a)(2)(A), the word ‘‘establishing’’ is
substituted for ‘‘the implementation of’’ for consist-
ency.
In subsection (a)(2)(B), the words ‘‘the implementa-
tion of’’ are omitted as surplus.
In subsection (b)(1), before clause (A), the words ‘‘to
him’’ and ‘‘the measures to be undertaken in carrying
out’’ are omitted as surplus. In clause (B), the word
‘‘achieving’’ is substituted for ‘‘obtaining’’ for clarity.
The word ‘‘existing’’ is omitted as surplus.
Subsection (b)(2) is substituted for 49 App.:2104(b) (3d
sentence) to eliminate unnecessary words.
In subsection (c)(1)(B) and (2), the words ‘‘for which
grant applications are made in accordance with such
noise compatibility programs’’ are omitted as surplus.
In subsection (c)(1), before clause (A), the words
‘‘incur obligations to’’ and ‘‘further . . . under this sec-
tion’’ are omitted as surplus. In clause (C), the words
‘‘to carry out any part of a program’’ are substituted
for ‘‘any project to carry out a noise compatibility pro-
gram’’, and the words ‘‘or before implementing regula-
tions were prescribed’’ are substituted for ‘‘or the pro-
mulgation of its implementing regulations’’, for clarity
and consistency. The words ‘‘the purposes of’’ before
‘‘reducing’’ are omitted as surplus. The word ‘‘non-
compatible’’ is added after ‘‘existing’’ for clarity and
consistency. In clause (D), the words ‘‘for any project’’
and ‘‘determined to be’’ are omitted as surplus.
In subsection (c)(2), the words ‘‘in turn’’ are omitted
as surplus.
In subsection (c)(4), before clause (A), the words ‘‘All
of’’ and ‘‘made under section 505 of that Act’’ are omit-
ted as surplus. The word ‘‘except’’ is substituted for
‘‘unless’’ for clarity. In clause (1), the words ‘‘relating
to United States share of project costs’’ are omitted as
surplus. In clause (2), the words ‘‘the purposes of’’ are
omitted as surplus.
In subsection (d), the words ‘‘by the Secretary or the
Administrator of the Federal Aviation Administration’’
are omitted as surplus.
PUB. L. 103–429
This
redesignates
49:47504(c)(1)(C)
and
(D)
as
49:47504(c)(2)(C) and (D) because the subject matter is
similar to that of 49:47504(c)(2)(A) and (B) that was
added by section 119(2) of the Federal Aviation Admin-
istration Authorization Act of 1994 (Public Law 103–305,
108 Stat. 1580).
Editorial Notes
REFERENCES IN TEXT
Section 301(d)(4)(B) of the Airport and Airway Safety
and Capacity Expansion Act of 1987, referred to in sub-
sec. (c)(2)(A)(i), is section 301(d)(4)(B) of Pub. L. 100–223,
which was set out as a note under section 2104 of former
Title 49, Transportation, prior to repeal by Pub. L.
103–272, § 7(b), July 5, 1994, 108 Stat. 1379.
AMENDMENTS
2018—Subsec. (c)(2)(F). Pub. L. 115–232 added subpar.
(F).
2012—Subsec. (e). Pub. L. 112–95, § 504, added subsec.
(e).
Subsec. (f). Pub. L. 112–95, § 505, added subsec. (f).
2003—Subsec. (b)(4). Pub. L. 108–176, § 189, added par.
(4).
Subsec. (c)(2)(C)–(E). Pub. L. 108–176, § 306, realigned
margins of subpars. (C) and (D) and added subpar. (E).
2000—Subsec. (c)(6). Pub. L. 106–181 added par. (6).
1994—Subsec. (c)(1)(A). Pub. L. 103–429, § 6(71)(A), in-
serted ‘‘and’’ after semicolon at end.
Subsec. (c)(1)(B). Pub. L. 103–429, § 6(71)(B), sub-
stituted a period for semicolon at end.
Subsec. (c)(1)(C), (D). Pub. L. 103–429, § 6(71)(C), redes-
ignated par. (1)(C) as (2)(C) and (1)(D) as (2)(D).
Subsec. (c)(2). Pub. L. 103–305, § 119(2), added par. (2).
Former par. (2) redesignated (3).
Subsec. (c)(2)(A)(iii). Pub. L. 103–429, § 6(71)(D), struck
out ‘‘and’’ after semicolon at end.
Subsec. (c)(2)(B)(iii). Pub. L. 103–429, § 6(71)(E), sub-
stituted a semicolon for period at end.
Subsec. (c)(2)(C), (D). Pub. L. 103–429, § 6(71)(F), sub-
stituted ‘‘to an airport operator and unit of local gov-
ernment referred to in paragraph (1)(A) or (1)(B) of this
subsection’’ for ‘‘an airport operator or unit of local
government referred to in clause (A) or (B) of this para-
graph’’.
Pub. L. 103–429, § 6(71)(C), redesignated par. (1)(C) as
(2)(C) and (1)(D) as (2)(D).
Subsec. (c)(3). Pub. L. 103–305, § 119(1), redesignated
par. (2) as (3). Former par. (3) redesignated (4).
Subsec. (c)(4). Pub. L. 103–305, § 119(3), struck out
‘‘paragraph (1) of’’ before ‘‘this subsection’’ in introduc-
tory provisions.
Page 1695
TITLE 49—TRANSPORTATION
§ 47508
Pub. L. 103–305, § 119(1), redesignated par. (3) as (4).
Former par. (4) redesignated (5).
Subsec. (c)(5). Pub. L. 103–305, § 119(1), redesignated
par. (4) as (5).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2003 AMENDMENT
Amendment by Pub. L. 108–176 applicable only to fis-
cal years beginning after Sept. 30, 2003, except as other-
wise specifically provided, see section 3 of Pub. L.
108–176, set out as a note under section 106 of this title.
EFFECTIVE DATE OF 2000 AMENDMENT
Amendment by Pub. L. 106–181 applicable only to fis-
cal years beginning after Sept. 30, 1999, see section 3 of
Pub. L. 106–181, set out as a note under section 106 of
this title.
§ 47505. Airport noise compatibility planning
grants
(a) GENERAL
AUTHORITY.—The Secretary of
Transportation may make a grant to a sponsor
of an airport to develop, for planning purposes,
information necessary to prepare and submit—
(1) a noise exposure map and related infor-
mation under section 47503 of this title, in-
cluding the cost of obtaining the information;
or
(2) a noise compatibility program under sec-
tion 47504 of this title.
(b) AVAILABILITY
OF AMOUNTS
AND GOVERN-
MENT’S SHARE
OF COSTS.—A grant under sub-
section (a) of this section may be made from
amounts available under section 48103 of this
title. The United States Government’s share of
the grant is the percent for which a project for
airport development at an airport would be eli-
gible under section 47109(a) and (b) of this title.
(Pub. L. 103–272, § 1(e), July 5, 1994, 108 Stat.
1286.)
HISTORICAL AND REVISION NOTES
Revised
Section
Source (U.S. Code)
Source (Statutes at Large)
47505 ..........
49 App.:2103(b).
Feb. 18, 1980, Pub. L. 96–193,
§ 103(b), 94 Stat. 51; re-
stated Sept. 3, 1982, Pub.
L.
97–248,
§ 524(b)(3),
96
Stat. 696.
In subsection (a), before clause (1), the words ‘‘incur
obligations to’’ are omitted as surplus.
§ 47506. Limitations on recovering damages for
noise
(a) GENERAL LIMITATIONS.—A person acquiring
an interest in property after February 18, 1980,
in an area surrounding an airport for which a
noise exposure map has been submitted under
section 47503 of this title and having actual or
constructive knowledge of the existence of the
map may recover damages for noise attributable
to the airport only if, in addition to any other
elements for recovery of damages, the person
shows that—
(1) after acquiring the interest, there was a
significant—
(A) change in the type or frequency of air-
craft operations at the airport;
(B) change in the airport layout;
(C) change in flight patterns; or
(D) increase in nighttime operations; and
(2) the damages resulted from the change or
increase.
(b) CONSTRUCTIVE
KNOWLEDGE.—Constructive
knowledge of the existence of a map under sub-
section (a) of this section shall be imputed, at a
minimum, to a person if—
(1) before the person acquired the interest,
notice of the existence of the map was pub-
lished at least 3 times in a newspaper of gen-
eral circulation in the county in which the
property is located; or
(2) the person is given a copy of the map
when acquiring the interest.
(Pub. L. 103–272, § 1(e), July 5, 1994, 108 Stat.
1286.)
HISTORICAL AND REVISION NOTES
Revised
Section
Source (U.S. Code)
Source (Statutes at Large)
47506 ..........
49 App.:2107.
Feb. 18, 1980, Pub. L. 96–193,
§ 107, 94 Stat. 53.
In subsection (a)(2), the words ‘‘for which recovery is
sought have’’ are omitted as surplus.
§ 47507. Nonadmissibility of noise exposure map
and related information as evidence
No part of a noise exposure map or related in-
formation described in section 47503 of this title
that is submitted to, or prepared by, the Sec-
retary of Transportation and no part of a list of
land uses the Secretary identifies as normally
compatible with various exposures of individuals
to noise may be admitted into evidence or used
for any other purpose in a civil action asking for
relief for noise resulting from the operation of
an airport.
(Pub. L. 103–272, § 1(e), July 5, 1994, 108 Stat.
1287.)
HISTORICAL AND REVISION NOTES
Revised
Section
Source (U.S. Code)
Source (Statutes at Large)
47507 ..........
49 App.:2106.
Feb. 18, 1980, Pub. L. 96–193,
§ 106, 94 Stat. 53.
The words ‘‘land uses which are’’ are omitted as sur-
plus. The words ‘‘civil action’’ are substituted for ‘‘suit
or action’’ for consistency in the revised title and with
other titles of the United States Code. The words
‘‘damages or other’’ are omitted as surplus.
§ 47508. Noise standards for air carriers and for-
eign air carriers providing foreign air trans-
portation
(a) GENERAL REQUIREMENTS.—The Secretary of
Transportation shall require each air carrier
and foreign air carrier providing foreign air
transportation to comply with noise standards—
(1) the Secretary prescribed for new subsonic
aircraft in regulations of the Secretary in ef-
fect on January 1, 1977; or
(2) of the International Civil Aviation Orga-
nization that are substantially compatible
with standards of the Secretary for new sub-
sonic aircraft in regulations of the Secretary
at parts 36 and 91 of title 14, Code of Federal
Regulations, prescribed between January 2,
1977, and January 1, 1982.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Submissions.—**
(1) An airport operator that submitted a noise exposure map and related information under [section 47503(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title49-section47503/a&num=0&edition=prelim) may submit a noise compatibility program to the Secretary of Transportation after—
(A) consulting with public agencies and planning authorities in the area surrounding the airport, United States Government officials having local responsibility for the airport, and air carriers using the airport; and
(B) notice and an opportunity for a public hearing.
(2) A program submitted under paragraph (1) of this subsection shall state the measures the operator has taken or proposes to take to reduce existing noncompatible uses and prevent introducing additional noncompatible uses in the area covered by the map. The measures may include—
(A) establishing a preferential runway system;
(B) restricting the use of the airport by a type or class of aircraft because of the noise characteristics of the aircraft;
(C) constructing barriers and acoustical shielding and soundproofing public buildings;
(D) using flight procedures to control the operation of aircraft to reduce exposure of individuals to noise in the area surrounding the airport; and
(E) acquiring land, air rights, easements, development rights, and other interests to ensure that the property will be used in ways compatible with airport operations.
**(b) Approvals.—**
(1) The Secretary shall approve or disapprove a program submitted under subsection (a) of this section (except as the program is related to flight procedures referred to in subsection (a)(2)(D) of this section) not later than 180 days after receiving it. The Secretary shall approve the program
Source: Supplied U.S. Code snapshot — release unconfirmed · 49 U.S.C. § 47504
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.