Browse Arkansas Code titles and sections
16 U.S.C. § 839 — Congressional declaration of purpose
Federal law — U.S. Code and appendices · legal_authorities
Page 1519
TITLE 16—CONSERVATION
§ 839
1 So in original. The word ‘‘the’’ probably should not appear.
value to the Pacific Northwest of increasing
the coordination of the operation of hydro-
electric and water storage facilities on rivers
located in the United States and Canada.
(2) Criteria
The study conducted under paragraph (1)
shall analyze—
(A) projected changes to the Pacific North-
west electricity supply;
(B) potential reductions in greenhouse gas
emissions;
(C) any potential need to increase trans-
mission capacity; and
(D) any other factor the Administrator
considers to be relevant for increasing bilat-
eral coordination.
(3) Coordination
In conducting the study under paragraph (1),
the Administrator shall coordinate, to the ex-
tent practicable, with—
(A) the 1 British Columbia or a crown cor-
poration owned by British Columbia;
(B) the Assistant Secretary;
(C) the Commissioner of Reclamation; and
(D) any public utility districts that oper-
ate hydroelectric projects on the mainstem
of the Columbia River.
(4) Authorization of appropriations
There is authorized to be appropriated
$10,000,000, which shall be nonreimburseable,
to carry out this subsection.
(Pub. L. 117–58, div. D, title I, § 40113, Nov. 15,
2021, 135 Stat. 947.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Infrastructure In-
vestment and Jobs Act, and not as part of the Federal
Columbia River Transmission System Act which com-
prises this chapter.
Statutory Notes and Related Subsidiaries
WAGE RATE REQUIREMENTS
For provisions relating to rates of wages to be paid to
laborers and mechanics on projects for construction,
alteration, or repair work funded under div. D or an
amendment by div. D of Pub. L. 117–58, including au-
thority of Secretary of L
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 839
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: bd5400db08f9d75678ad8916b30057691e43a1667f15bebc38822205022985fc. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-f0534696a9308df502ad7167
Source file: Laws/federal/codes/united-states-code-2024/title-16/section-839-congressional-declaration-of-purpose--b4cb18b54f.md
Pages: Not recorded – Not recorded
Passage SHA-256: dd771cfc9f907dcb4e9d268288b0d1f7a81e3b6a3151073a1324ccb86f6828c7
Source location: USCODE-2024-title16-chap12H-sec839.pdf
Stored source content
Page 1519
TITLE 16—CONSERVATION
§ 839
1 So in original. The word ‘‘the’’ probably should not appear.
value to the Pacific Northwest of increasing
the coordination of the operation of hydro-
electric and water storage facilities on rivers
located in the United States and Canada.
(2) Criteria
The study conducted under paragraph (1)
shall analyze—
(A) projected changes to the Pacific North-
west electricity supply;
(B) potential reductions in greenhouse gas
emissions;
(C) any potential need to increase trans-
mission capacity; and
(D) any other factor the Administrator
considers to be relevant for increasing bilat-
eral coordination.
(3) Coordination
In conducting the study under paragraph (1),
the Administrator shall coordinate, to the ex-
tent practicable, with—
(A) the 1 British Columbia or a crown cor-
poration owned by British Columbia;
(B) the Assistant Secretary;
(C) the Commissioner of Reclamation; and
(D) any public utility districts that oper-
ate hydroelectric projects on the mainstem
of the Columbia River.
(4) Authorization of appropriations
There is authorized to be appropriated
$10,000,000, which shall be nonreimburseable,
to carry out this subsection.
(Pub. L. 117–58, div. D, title I, § 40113, Nov. 15,
2021, 135 Stat. 947.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Infrastructure In-
vestment and Jobs Act, and not as part of the Federal
Columbia River Transmission System Act which com-
prises this chapter.
Statutory Notes and Related Subsidiaries
WAGE RATE REQUIREMENTS
For provisions relating to rates of wages to be paid to
laborers and mechanics on projects for construction,
alteration, or repair work funded under div. D or an
amendment by div. D of Pub. L. 117–58, including au-
thority of Secretary of Labor, see section 18851 of Title
42, The Public Health and Welfare.
CHAPTER 12H—PACIFIC NORTHWEST ELEC-
TRIC POWER PLANNING AND CONSERVA-
TION
Sec.
839.
Congressional declaration of purpose.
839a.
Definitions.
839b.
Regional planning and participation.
839c.
Sale of power.
839d.
Conservation and resource acquisition.
839d–1.
Federal projects in Pacific Northwest.
839e.
Rates.
839f.
Administrative provisions.
839g.
Savings provisions.
839h.
Separability.
§ 839. Congressional declaration of purpose
The purposes of this chapter, together with
the provisions of other laws applicable to the
Federal Columbia River Power System, are all
intended to be construed in a consistent man-
ner. Such purposes are also intended to be con-
strued in a manner consistent with applicable
environmental laws. Such purposes are:
(1) to encourage, through the unique oppor-
tunity provided by the Federal Columbia
River Power System—
(A) conservation and efficiency in the use
of electric power, and
(B) the development of renewable re-
sources within the Pacific Northwest;
(2) to assure the Pacific Northwest of an ade-
quate, efficient, economical, and reliable
power supply;
(3) to provide for the participation and con-
sultation of the Pacific Northwest States,
local
governments,
consumers,
customers,
users of the Columbia River System (including
Federal and State fish and wildlife agencies
and appropriate Indian tribes), and the public
at large within the region in—
(A) the development of regional plans and
programs related to energy conservation, re-
newable resources, other resources, and pro-
tecting, mitigating and enhancing fish and
wildlife resources,
(B) facilitating the orderly planning of the
region’s power system, and
(C) providing environmental quality;
(4) to provide that the customers of the Bon-
neville Power Administration and their con-
sumers continue to pay all costs necessary to
produce, transmit, and conserve resources to
meet the region’s electric power requirements,
including the amortization on a current basis
of the Federal investment in the Federal Co-
lumbia River Power System;
(5) to insure, subject to the provisions of this
chapter—
(A) that the authorities and responsibil-
ities of State and local governments, elec-
tric utility systems, water management
agencies, and other non-Federal entities for
the regulation, planning, conservation, sup-
ply, distribution, and use of electric power
shall be construed to be maintained, and
(B) that Congress intends that this chapter
not be construed to limit or restrict the
ability of customers to take actions in ac-
cordance with other applicable provisions of
Federal or State law, including, but not lim-
ited to, actions to plan, develop, and operate
resources and to achieve conservation, with-
out regard to this chapter; and
(6) to protect, mitigate and enhance the fish
and
wildlife,
including
related
spawning
grounds and habitat, of the Columbia River
and its tributaries, particularly anadromous
fish which are of significant importance to the
social and economic well-being of the Pacific
Northwest and the Nation and which are de-
pendent on suitable environmental conditions
substantially obtainable from the manage-
ment and operation of the Federal Columbia
River Power System and other power gener-
ating facilities on the Columbia River and its
tributaries.
(Pub. L. 96–501, § 2, Dec. 5, 1980, 94 Stat. 2697.)
Page 1520
TITLE 16—CONSERVATION
§ 839a
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in provision preceding par.
(1) and in par. (5), was in the original ‘‘this Act’’, mean-
ing Pub. L. 96–501, Dec. 5, 1980, 94 Stat. 2697, known as
the Pacific Northwest Electric Power Planning and
Conservation Act, which enacted this chapter, amended
sections 837, 838i, and 838k of this title, and enacted
provisions set out as notes under this section. For com-
plete classification of this Act to the Code, see Short
Title note set out below and Tables.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Pub. L. 96–501, § 11, Dec. 5, 1980, 94 Stat. 2735, provided
that: ‘‘This Act [enacting this chapter, amending sec-
tions 837, 838i, and 838k of this title, and enacting provi-
sions set out as notes under this section] shall be effec-
tive on the date of enactment [Dec. 5, 1980], or October
1, 1980, whichever is later. For purposes of this Act, the
term ‘date of the enactment of this Act’ means such
date of enactment [Dec. 5, 1980] or October 1, 1980,
whichever is later.’’
SHORT TITLE
Pub. L. 96–501, § 1, Dec. 5, 1980, 94 Stat. 2697, provided
in part that: ‘‘This Act [enacting this chapter, amend-
ing sections 837, 838i, and 838k of this title, and enact-
ing provisions set out as notes under this section] may
be cited as the ‘Pacific Northwest Electric Power Plan-
ning and Conservation Act’.’’
§ 839a. Definitions
As used in this chapter, the term—
(1) ‘‘Acquire’’ and ‘‘acquisition’’ shall not be
construed as authorizing the Administrator to
construct, or have ownership of, under this
chapter or any other law, any electric gener-
ating facility.
(2) ‘‘Administrator’’ means the Adminis-
trator of the Bonneville Power Administra-
tion.
(3) ‘‘Conservation’’ means any reduction in
electric power consumption as a result of in-
creases in the efficiency of energy use, produc-
tion, or distribution.
(4)(A) ‘‘Cost-effective’’, when applied to any
measure or resource referred to in this chap-
ter, means that such measure or resource
must be forecast—
(i) to be reliable and available within the
time it is needed, and
(ii) to meet or reduce the electric power
demand, as determined by the Council or the
Administrator, as appropriate, of the con-
sumers of the customers at an estimated in-
cremental system cost no greater than that
of the least-cost similarly reliable and avail-
able alternative measure or resource, or any
combination thereof.
(B) For purposes of this paragraph, the term
‘‘system cost’’ means an estimate of all direct
costs of a measure or resource over its effec-
tive life, including, if applicable, the cost of
distribution and transmission to the consumer
and, among other factors, waste disposal costs,
end-of-cycle costs, and fuel costs (including
projected increases), and such quantifiable en-
vironmental costs and benefits as the Admin-
istrator determines, on the basis of a method-
ology developed by the Council as part of the
plan, or in the absence of the plan by the Ad-
ministrator, are directly attributable to such
measure or resource.
(C) In determining the amount of power that
a conservation measure or other resource may
be expected to save or to produce, the Council
or the Administrator, as the case may be,
shall take into account projected realization
factors and plant factors, including appro-
priate
historical
experience
with
similar
measures or resources.
(D) For purposes of this paragraph, the ‘‘es-
timated incremental system cost’’ of any con-
servation measure or resource shall not be
treated as greater than that of any noncon-
servation measure or resource unless the in-
cremental system cost of such conservation
measure or resource is in excess of 110 per cen-
tum of the incremental system cost of the
nonconservation measure or resource.
(5) ‘‘Consumer’’ means any end user of elec-
tric power.
(6) ‘‘Council’’ means, unless otherwise spe-
cifically provided, the members appointed to
the Pacific Northwest Electric Power and Con-
servation Planning Council established pursu-
ant to section 839b of this title.
(7) ‘‘Customer’’ means anyone who contracts
for the purchase of power from the Adminis-
trator pursuant to this chapter.
(8) ‘‘Direct service industrial customer’’
means an industrial customer that contracts
for the purchase of power from the Adminis-
trator for direct consumption.
(9) ‘‘Electric power’’ means electric peaking
capacity, or electric energy, or both.
(10)
‘‘Federal
base
system
resources’’
means—
(A) the Federal Columbia River Power
System hydroelectric projects;
(B) resources acquired by the Adminis-
trator under long-term contracts in force on
December 5, 1980; and
(C) resources acquired by the Adminis-
trator in an amount necessary to replace re-
ductions in capability of the resources re-
ferred to in subparagraphs (A) and (B) of this
paragraph.
(11) ‘‘Indian tribe’’ means any Indian tribe or
band which is located in whole or in part in
the region and which has a governing body
which is recognized by the Secretary of the In-
terior.
(12) ‘‘Major resource’’ means any resource
that—
(A) has a planned capability greater than
fifty average megawatts, and
(B) if acquired by the Administrator, is ac-
quired for a period of more than five years.
Such term does not include any resource ac-
quired pursuant to section 838i(b)(6) of this
title.
(13) ‘‘New large single load’’ means any load
associated with a new facility, an existing fa-
cility, or an expansion of an existing facility—
(A) which is not contracted for, or com-
mitted to, as determined by the Adminis-
trator, by a public body, cooperative, inves-
tor-owned utility, or Federal agency cus-
tomer prior to September 1, 1979, and
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
The purposes of this chapter, together with the provisions of other laws applicable to the Federal Columbia River Power System, are all intended to be construed in a consistent manner. Such purposes are also intended to be construed in a manner consistent with applicable environmental laws. Such purposes are:
(1) to encourage, through the unique opportunity provided by the Federal Columbia River Power System—
(A) conservation and efficiency in the use of electric power, and
(B) the development of renewable resources within the Pacific Northwest;
(2) to assure the Pacific Northwest of an adequate, efficient, economical, and reliable power supply;
(3) to provide for the participation and consultation of the Pacific Northwest States, local governments, consumers, customers, users of the Columbia River System (including Federal and State fish and wildlife agencies and appropriate Indian tribes), and the public at large within the region in—
(A) the development of regional plans and programs related to energy conservation, renewable resources, other resources, and protecting, mitigating and enhancing fish and wildlife resources,
(B) facilitating the orderly planning of the region’s power system, and
(C) providing environmental quality;
(4) to provide that the customers of the Bonneville Power Administration and their consumers continue to pay all costs necessary to produce, transmit, and conserve resources to meet the region’s electric power requirements, including the amortization on a current basis of the Federal investment in the Federal Columbia River Power System;
(5) to insure, subject to the provisions of this chapter—
(A) that the authorities and responsibilities of State and local governments, electric utility systems, water management agencie
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 839
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.