Arkansas Legal Resource Navigator

42 U.S.C. § 7426 — Interstate pollution abatement

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7426 — Interstate pollution abatement

Page 7250 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 7426 cally or regionally available coal or coal deriva- tives to comply with implementation plan re- quirements. In taking any action under this sub- section, the Governor, the President, or the President’s designee as the case may be, shall take into account, the final cost to the con- sumer of such an action. (c) Contracts; schedules The Governor, in the case of action under sub- section (b)(1), or the Administrator, in the case of an action under subsection (b)(2) or (3) shall, by rule or order, require each source to which such action applies to— (1) enter into long-term contracts of at least ten years in duration (except as the President or his designee may otherwise permit or re- quire by rule or order for good cause) for sup- plies of regionally available coal or coal de- rivatives, (2) enter into contracts to acquire any addi- tional means of emission limitation which the Administrator or the State determines may be necessary to comply with the requirements of this chapter while using such coal or coal de- rivatives as fuel, and (3) comply with such schedules (including in- crements of progress), timetables and other re- quirements as may be necessary to assure compliance with the requirements of this chapter. Requirements under this subsection shall be es- tablished simultaneously with, and as a condi- tion of, any action under subsection (b). (d) Existing or new major fuel burning sta- tionary sources This section applies only to existing or new major fuel burning stationary sources— (1) which have the design capacity to produce 250,000,000 Btu’s per hour (or its equiv- alent), as determined by the Administrator, and (2) which are not in compliance with the re- quirements of an applicable

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7426

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 1196a26cb4a90d5f74c96724f667131a679ad4a86f5fe6a469253d988bd41be0. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-e7645809e0d4c7d946f8bcf3
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-7426-interstate-pollution-abatement--b025a5f625.md
Pages: Not recorded – Not recorded
Passage SHA-256: dc76ee22c5198e89a4e35f59ebac36791567807010bd7c60128a430dd24f41a3

Source location: USCODE-2024-title42-chap85-subchapI-partA-sec7426.pdf

Stored source content

Page 7250 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 7426 cally or regionally available coal or coal deriva- tives to comply with implementation plan re- quirements. In taking any action under this sub- section, the Governor, the President, or the President’s designee as the case may be, shall take into account, the final cost to the con- sumer of such an action. (c) Contracts; schedules The Governor, in the case of action under sub- section (b)(1), or the Administrator, in the case of an action under subsection (b)(2) or (3) shall, by rule or order, require each source to which such action applies to— (1) enter into long-term contracts of at least ten years in duration (except as the President or his designee may otherwise permit or re- quire by rule or order for good cause) for sup- plies of regionally available coal or coal de- rivatives, (2) enter into contracts to acquire any addi- tional means of emission limitation which the Administrator or the State determines may be necessary to comply with the requirements of this chapter while using such coal or coal de- rivatives as fuel, and (3) comply with such schedules (including in- crements of progress), timetables and other re- quirements as may be necessary to assure compliance with the requirements of this chapter. Requirements under this subsection shall be es- tablished simultaneously with, and as a condi- tion of, any action under subsection (b). (d) Existing or new major fuel burning sta- tionary sources This section applies only to existing or new major fuel burning stationary sources— (1) which have the design capacity to produce 250,000,000 Btu’s per hour (or its equiv- alent), as determined by the Administrator, and (2) which are not in compliance with the re- quirements of an applicable implementation plan or which are prohibited from burning oil or natural gas, or both, under any other au- thority of law. (e) Actions not to be deemed modifications of major fuel burning stationary sources Except as may otherwise be provided by rule by the State or the Administrator for good cause, any action required to be taken by a major fuel burning stationary source under this section shall not be deemed to constitute a modification for purposes of section 7411(a)(2) and (4) of this title. (f) Treatment of prohibitions, rules, or orders as requirements or parts of plans under other provisions For purposes of sections 7413 and 7420 of this title a prohibition under subsection (b), and a corresponding rule or order under subsection (c), shall be treated as a requirement of section 7413 of this title. For purposes of any plan (or portion thereof) promulgated under section 7410(c) of this title, any rule or order under subsection (c) corresponding to a prohibition under subsection (b), shall be treated as a part of such plan. For purposes of section 7413 of this title, a prohibi- tion under subsection (b), applicable to any source, and a corresponding rule or order under subsection (c), shall be treated as part of the ap- plicable implementation plan for the State in which subject source is located. (g) Delegation of Presidential authority The President may delegate his authority under this section to an officer or employee of the United States designated by him on a case- by-case basis or in any other manner he deems suitable. (h) ‘‘Locally or regionally available coal or coal derivatives’’ defined For the purpose of this section the term ‘‘lo- cally or regionally available coal or coal deriva- tives’’ means coal or coal derivatives which is, or can in the judgment of the State or the Ad- ministrator feasibly be, mined or produced in the local or regional area (as determined by the Administrator) in which the major fuel burning stationary source is located. (July 14, 1955, ch. 360, title I, § 125, as added Pub. L. 95–95, title I, § 122, Aug. 7, 1977, 91 Stat. 722.) Statutory Notes and Related Subsidiaries EFFECTIVE DATE Section effective Aug. 7, 1977, except as otherwise ex- pressly provided, see section 406(d) of Pub. L. 95–95, set out as an Effective Date of 1977 Amendment note under section 7401 of this title. § 7426. Interstate pollution abatement (a) Written notice to all nearby States Each applicable implementation plan shall— (1) require each major proposed new (or modified) source— (A) subject to part C (relating to signifi- cant deterioration of air quality) or (B) which may significantly contribute to levels of air pollution in excess of the na- tional ambient air quality standards in any air quality control region outside the State in which such source intends to locate (or make such modification), to provide written notice to all nearby States the air pollution levels of which may be af- fected by such source at least sixty days prior to the date on which commencement of con- struction is to be permitted by the State pro- viding notice, and (2) identify all major existing stationary sources which may have the impact described in paragraph (1) with respect to new or modi- fied sources and provide notice to all nearby States of the identity of such sources not later than three months after August 7, 1977. (b) Petition for finding that major sources emit or would emit prohibited air pollutants Any State or political subdivision may peti- tion the Administrator for a finding that any major source or group of stationary sources emits or would emit any air pollutant in viola- tion of the prohibition of section 7410(a)(2)(D)(ii) of this title or this section. Within 60 days after receipt of any petition under this subsection and after public hearing, the Administrator shall make such a finding or deny the petition. Page 7251 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 7428 1 See References in Text note below. 1 So in original. Probably should be ‘‘calendar year’’. 1 So in original. Section enacted without a subsec. (b). (c) Violations; allowable continued operation Notwithstanding any permit which may have been granted by the State in which the source is located (or intends to locate), it shall be a viola- tion of this section and the applicable imple- mentation plan in such State— (1) for any major proposed new (or modified) source with respect to which a finding has been made under subsection (b) to be con- structed or to operate in violation of the pro- hibition of section 7410(a)(2)(D)(ii) of this title or this section, or (2) for any major existing source to operate more than three months after such finding has been made with respect to it. The Administrator may permit the continued operation of a source referred to in paragraph (2) beyond the expiration of such three-month pe- riod if such source complies with such emission limitations and compliance schedules (con- taining increments of progress) as may be pro- vided by the Administrator to bring about com- pliance with the requirements contained in sec- tion 7410(a)(2)(D)(ii) of this title or this section as expeditiously as practicable, but in no case later than three years after the date of such finding. Nothing in the preceding sentence shall be construed to preclude any such source from being eligible for an enforcement order under section 7413(d) 1 of this title after the expiration of such period during which the Administrator has permitted continuous operation. (July 14, 1955, ch. 360, title I, § 126, as added Pub. L. 95–95, title I, § 123, Aug. 7, 1977, 91 Stat. 724; amended Pub. L. 95–190, § 14(a)(39), Nov. 16, 1977, 91 Stat. 1401; Pub. L. 101–549, title I, § 109(a), Nov. 15, 1990, 104 Stat. 2469.) Editorial Notes REFERENCES IN TEXT Section 7413(d) of this title, referred to in subsec. (c), was amended generally by Pub. L. 101–549, title VII, § 701, Nov. 15, 1990, 104 Stat. 2672, and, as so amended, no longer relates to final compliance orders. AMENDMENTS 1990—Subsec. (b). Pub. L. 101–549, § 109(a)(1), inserted ‘‘or group of stationary sources’’ after ‘‘any major source’’ and substituted ‘‘section 7410(a)(2)(D)(ii) of this title or this section’’ for ‘‘section 7410(a)(2)(E)(i) of this title’’. Subsec. (c). Pub. L. 101–549, § 109(a)(2)(A), which di- rected the insertion of ‘‘this section and’’ after ‘‘viola- tion of’’, was executed by making the insertion after first reference to ‘‘violation of’’ to reflect the probable intent of Congress. Pub. L. 101–549, § 109(a)(2)(B), substituted ‘‘section 7410(a)(2)(D)(ii) of this title or this section’’ for ‘‘sec- tion 7410(a)(2)(E)(i) of this title’’ in par. (1) and penul- timate sentence. 1977—Subsec. (a)(1). Pub. L. 95–190 substituted ‘‘(relat- ing to significant deterioration of air quality)’’ for ‘‘, relating to significant deterioration of air quality’’. Statutory Notes and Related Subsidiaries EFFECTIVE DATE Section effective Aug. 7, 1977, except as otherwise ex- pressly provided, see section 406(d) of Pub. L. 95–95, set out as an Effective Date of 1977 Amendment note under section 7401 of this title. § 7427. Public notification (a) Warning signs; television, radio, or press no- tices or information Each State plan shall contain measures which will be effective to notify the public during any calendar 1 on a regular basis of instances or areas in which any national primary ambient air quality standard is exceeded or was exceeded during any portion of the preceding calendar year to advise the public of the health hazards associated with such pollution, and to enhance public awareness of the measures which can be taken to prevent such standards from being ex- ceeded and the ways in which the public can par- ticipate in regulatory and other efforts to im- prove air quality. Such measures may include the posting of warning signs on interstate high- way access points to metropolitan areas or tele- vision, radio, or press notices or information. (b) Grants The Administrator is authorized to make grants to States to assist in carrying out the re- quirements of subsection (a). (July 14, 1955, ch. 360, title I, § 127, as added Pub. L. 95–95, title I, § 124, Aug. 7, 1977, 91 Stat. 725.) Statutory Notes and Related Subsidiaries EFFECTIVE DATE Section effective Aug. 7, 1977, except as otherwise ex- pressly provided, see section 406(d) of Pub. L. 95–95, set out as an Effective Date of 1977 Amendment note under section 7401 of this title. § 7428. State boards (a) 1 Not later than the date one year after Au- gust 7, 1977, each applicable implementation plan shall contain requirements that— (1) any board or body which approves per- mits or enforcement orders under this chapter shall have at least a majority of members who represent the public interest and do not derive any significant portion of their income from persons subject to permits or enforcement or- ders under this chapter, and (2) any potential conflicts of interest by members of such board or body or the head of an executive agency with similar powers be adequately disclosed. A State may adopt any requirements respecting conflicts of interest for such boards or bodies or heads of executive agencies, or any other enti- ties which are more stringent than the require- ments of paragraph (1) and (2), and the Adminis- trator shall approve any such more stringent re- quirements submitted as part of an implementa- tion plan. (July 14, 1955, ch. 360, title I, § 128, as added Pub. L. 95–95, title I, § 125, Aug. 7, 1977, 91 Stat. 725.) Statutory Notes and Related Subsidiaries EFFECTIVE DATE Section effective Aug. 7, 1977, except as otherwise ex- pressly provided, see section 406(d) of Pub. L. 95–95, set

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7426 — Interstate pollution abatement

**(a) Written notice to all nearby States** Each applicable implementation plan shall— (1) require each major proposed new (or modified) source— (A) subject to part C (relating to significant deterioration of air quality) or (B) which may significantly contribute to levels of air pollution in excess of the national ambient air quality standards in any air quality control region outside the State in which such source intends to locate (or make such modification), to provide written notice to all nearby States the air pollution levels of which may be affected by such source at least sixty days prior to the date on which commencement of construction is to be permitted by the State providing notice, and (2) identify all major existing stationary sources which may have the impact described in paragraph (1) with respect to new or modified sources and provide notice to all nearby States of the identity of such sources not later than three months after August 7, 1977. **(b) Petition for finding that major sources emit or would emit prohibited air pollutants** Any State or political subdivision may petition the Administrator for a finding that any major source or group of stationary sources emits or would emit any air pollutant in violation of the prohibition of [section 7410(a)(2)(D)(ii) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410/a/2/D/ii&num=0&edition=prelim) or this section. Within 60 days after receipt of any petition under this subsection and after public hearing, the Administrator shall make such a finding or deny the petition. **(c) Violations; allowable continued operation** Notwithstanding any permit which may have been granted by the State in which the source is located (or intends to locate), it shall be

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7426

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.