Browse Arkansas Code titles and sections
42 U.S.C. § 7426 — Interstate pollution abatement
Federal law — U.S. Code and appendices · legal_authorities
Page 7250
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7426
cally or regionally available coal or coal deriva-
tives to comply with implementation plan re-
quirements. In taking any action under this sub-
section, the Governor, the President, or the
President’s designee as the case may be, shall
take into account, the final cost to the con-
sumer of such an action.
(c) Contracts; schedules
The Governor, in the case of action under sub-
section (b)(1), or the Administrator, in the case
of an action under subsection (b)(2) or (3) shall,
by rule or order, require each source to which
such action applies to—
(1) enter into long-term contracts of at least
ten years in duration (except as the President
or his designee may otherwise permit or re-
quire by rule or order for good cause) for sup-
plies of regionally available coal or coal de-
rivatives,
(2) enter into contracts to acquire any addi-
tional means of emission limitation which the
Administrator or the State determines may be
necessary to comply with the requirements of
this chapter while using such coal or coal de-
rivatives as fuel, and
(3) comply with such schedules (including in-
crements of progress), timetables and other re-
quirements as may be necessary to assure
compliance with the requirements of this
chapter.
Requirements under this subsection shall be es-
tablished simultaneously with, and as a condi-
tion of, any action under subsection (b).
(d) Existing or new major fuel burning sta-
tionary sources
This section applies only to existing or new
major fuel burning stationary sources—
(1) which have the design capacity to
produce 250,000,000 Btu’s per hour (or its equiv-
alent), as determined by the Administrator,
and
(2) which are not in compliance with the re-
quirements of an applicable
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7426
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 1196a26cb4a90d5f74c96724f667131a679ad4a86f5fe6a469253d988bd41be0. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-e7645809e0d4c7d946f8bcf3
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-7426-interstate-pollution-abatement--b025a5f625.md
Pages: Not recorded – Not recorded
Passage SHA-256: dc76ee22c5198e89a4e35f59ebac36791567807010bd7c60128a430dd24f41a3
Source location: USCODE-2024-title42-chap85-subchapI-partA-sec7426.pdf
Stored source content
Page 7250
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7426
cally or regionally available coal or coal deriva-
tives to comply with implementation plan re-
quirements. In taking any action under this sub-
section, the Governor, the President, or the
President’s designee as the case may be, shall
take into account, the final cost to the con-
sumer of such an action.
(c) Contracts; schedules
The Governor, in the case of action under sub-
section (b)(1), or the Administrator, in the case
of an action under subsection (b)(2) or (3) shall,
by rule or order, require each source to which
such action applies to—
(1) enter into long-term contracts of at least
ten years in duration (except as the President
or his designee may otherwise permit or re-
quire by rule or order for good cause) for sup-
plies of regionally available coal or coal de-
rivatives,
(2) enter into contracts to acquire any addi-
tional means of emission limitation which the
Administrator or the State determines may be
necessary to comply with the requirements of
this chapter while using such coal or coal de-
rivatives as fuel, and
(3) comply with such schedules (including in-
crements of progress), timetables and other re-
quirements as may be necessary to assure
compliance with the requirements of this
chapter.
Requirements under this subsection shall be es-
tablished simultaneously with, and as a condi-
tion of, any action under subsection (b).
(d) Existing or new major fuel burning sta-
tionary sources
This section applies only to existing or new
major fuel burning stationary sources—
(1) which have the design capacity to
produce 250,000,000 Btu’s per hour (or its equiv-
alent), as determined by the Administrator,
and
(2) which are not in compliance with the re-
quirements of an applicable implementation
plan or which are prohibited from burning oil
or natural gas, or both, under any other au-
thority of law.
(e) Actions not to be deemed modifications of
major fuel burning stationary sources
Except as may otherwise be provided by rule
by the State or the Administrator for good
cause, any action required to be taken by a
major fuel burning stationary source under this
section shall not be deemed to constitute a
modification for purposes of section 7411(a)(2)
and (4) of this title.
(f) Treatment of prohibitions, rules, or orders as
requirements or parts of plans under other
provisions
For purposes of sections 7413 and 7420 of this
title a prohibition under subsection (b), and a
corresponding rule or order under subsection (c),
shall be treated as a requirement of section 7413
of this title. For purposes of any plan (or portion
thereof) promulgated under section 7410(c) of
this title, any rule or order under subsection (c)
corresponding to a prohibition under subsection
(b), shall be treated as a part of such plan. For
purposes of section 7413 of this title, a prohibi-
tion under subsection (b), applicable to any
source, and a corresponding rule or order under
subsection (c), shall be treated as part of the ap-
plicable implementation plan for the State in
which subject source is located.
(g) Delegation of Presidential authority
The President may delegate his authority
under this section to an officer or employee of
the United States designated by him on a case-
by-case basis or in any other manner he deems
suitable.
(h) ‘‘Locally or regionally available coal or coal
derivatives’’ defined
For the purpose of this section the term ‘‘lo-
cally or regionally available coal or coal deriva-
tives’’ means coal or coal derivatives which is,
or can in the judgment of the State or the Ad-
ministrator feasibly be, mined or produced in
the local or regional area (as determined by the
Administrator) in which the major fuel burning
stationary source is located.
(July 14, 1955, ch. 360, title I, § 125, as added Pub.
L. 95–95, title I, § 122, Aug. 7, 1977, 91 Stat. 722.)
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section effective Aug. 7, 1977, except as otherwise ex-
pressly provided, see section 406(d) of Pub. L. 95–95, set
out as an Effective Date of 1977 Amendment note under
section 7401 of this title.
§ 7426. Interstate pollution abatement
(a) Written notice to all nearby States
Each applicable implementation plan shall—
(1) require each major proposed new (or
modified) source—
(A) subject to part C (relating to signifi-
cant deterioration of air quality) or
(B) which may significantly contribute to
levels of air pollution in excess of the na-
tional ambient air quality standards in any
air quality control region outside the State
in which such source intends to locate (or
make such modification),
to provide written notice to all nearby States
the air pollution levels of which may be af-
fected by such source at least sixty days prior
to the date on which commencement of con-
struction is to be permitted by the State pro-
viding notice, and
(2) identify all major existing stationary
sources which may have the impact described
in paragraph (1) with respect to new or modi-
fied sources and provide notice to all nearby
States of the identity of such sources not later
than three months after August 7, 1977.
(b) Petition for finding that major sources emit
or would emit prohibited air pollutants
Any State or political subdivision may peti-
tion the Administrator for a finding that any
major source or group of stationary sources
emits or would emit any air pollutant in viola-
tion of the prohibition of section 7410(a)(2)(D)(ii)
of this title or this section. Within 60 days after
receipt of any petition under this subsection and
after public hearing, the Administrator shall
make such a finding or deny the petition.
Page 7251
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7428
1 See References in Text note below.
1 So in original. Probably should be ‘‘calendar year’’.
1 So in original. Section enacted without a subsec. (b).
(c) Violations; allowable continued operation
Notwithstanding any permit which may have
been granted by the State in which the source is
located (or intends to locate), it shall be a viola-
tion of this section and the applicable imple-
mentation plan in such State—
(1) for any major proposed new (or modified)
source with respect to which a finding has
been made under subsection (b) to be con-
structed or to operate in violation of the pro-
hibition of section 7410(a)(2)(D)(ii) of this title
or this section, or
(2) for any major existing source to operate
more than three months after such finding has
been made with respect to it.
The Administrator may permit the continued
operation of a source referred to in paragraph (2)
beyond the expiration of such three-month pe-
riod if such source complies with such emission
limitations and compliance schedules (con-
taining increments of progress) as may be pro-
vided by the Administrator to bring about com-
pliance with the requirements contained in sec-
tion 7410(a)(2)(D)(ii) of this title or this section
as expeditiously as practicable, but in no case
later than three years after the date of such
finding. Nothing in the preceding sentence shall
be construed to preclude any such source from
being eligible for an enforcement order under
section 7413(d) 1 of this title after the expiration
of such period during which the Administrator
has permitted continuous operation.
(July 14, 1955, ch. 360, title I, § 126, as added Pub.
L. 95–95, title I, § 123, Aug. 7, 1977, 91 Stat. 724;
amended Pub. L. 95–190, § 14(a)(39), Nov. 16, 1977,
91 Stat. 1401; Pub. L. 101–549, title I, § 109(a), Nov.
15, 1990, 104 Stat. 2469.)
Editorial Notes
REFERENCES IN TEXT
Section 7413(d) of this title, referred to in subsec. (c),
was amended generally by Pub. L. 101–549, title VII,
§ 701, Nov. 15, 1990, 104 Stat. 2672, and, as so amended, no
longer relates to final compliance orders.
AMENDMENTS
1990—Subsec. (b). Pub. L. 101–549, § 109(a)(1), inserted
‘‘or group of stationary sources’’ after ‘‘any major
source’’ and substituted ‘‘section 7410(a)(2)(D)(ii) of this
title or this section’’ for ‘‘section 7410(a)(2)(E)(i) of this
title’’.
Subsec. (c). Pub. L. 101–549, § 109(a)(2)(A), which di-
rected the insertion of ‘‘this section and’’ after ‘‘viola-
tion of’’, was executed by making the insertion after
first reference to ‘‘violation of’’ to reflect the probable
intent of Congress.
Pub. L. 101–549, § 109(a)(2)(B), substituted ‘‘section
7410(a)(2)(D)(ii) of this title or this section’’ for ‘‘sec-
tion 7410(a)(2)(E)(i) of this title’’ in par. (1) and penul-
timate sentence.
1977—Subsec. (a)(1). Pub. L. 95–190 substituted ‘‘(relat-
ing to significant deterioration of air quality)’’ for
‘‘, relating to significant deterioration of air quality’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section effective Aug. 7, 1977, except as otherwise ex-
pressly provided, see section 406(d) of Pub. L. 95–95, set
out as an Effective Date of 1977 Amendment note under
section 7401 of this title.
§ 7427. Public notification
(a) Warning signs; television, radio, or press no-
tices or information
Each State plan shall contain measures which
will be effective to notify the public during any
calendar 1 on a regular basis of instances or
areas in which any national primary ambient
air quality standard is exceeded or was exceeded
during any portion of the preceding calendar
year to advise the public of the health hazards
associated with such pollution, and to enhance
public awareness of the measures which can be
taken to prevent such standards from being ex-
ceeded and the ways in which the public can par-
ticipate in regulatory and other efforts to im-
prove air quality. Such measures may include
the posting of warning signs on interstate high-
way access points to metropolitan areas or tele-
vision, radio, or press notices or information.
(b) Grants
The Administrator is authorized to make
grants to States to assist in carrying out the re-
quirements of subsection (a).
(July 14, 1955, ch. 360, title I, § 127, as added Pub.
L. 95–95, title I, § 124, Aug. 7, 1977, 91 Stat. 725.)
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section effective Aug. 7, 1977, except as otherwise ex-
pressly provided, see section 406(d) of Pub. L. 95–95, set
out as an Effective Date of 1977 Amendment note under
section 7401 of this title.
§ 7428. State boards
(a) 1 Not later than the date one year after Au-
gust 7, 1977, each applicable implementation
plan shall contain requirements that—
(1) any board or body which approves per-
mits or enforcement orders under this chapter
shall have at least a majority of members who
represent the public interest and do not derive
any significant portion of their income from
persons subject to permits or enforcement or-
ders under this chapter, and
(2) any potential conflicts of interest by
members of such board or body or the head of
an executive agency with similar powers be
adequately disclosed.
A State may adopt any requirements respecting
conflicts of interest for such boards or bodies or
heads of executive agencies, or any other enti-
ties which are more stringent than the require-
ments of paragraph (1) and (2), and the Adminis-
trator shall approve any such more stringent re-
quirements submitted as part of an implementa-
tion plan.
(July 14, 1955, ch. 360, title I, § 128, as added Pub.
L. 95–95, title I, § 125, Aug. 7, 1977, 91 Stat. 725.)
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section effective Aug. 7, 1977, except as otherwise ex-
pressly provided, see section 406(d) of Pub. L. 95–95, set
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Written notice to all nearby States** Each applicable implementation plan shall—
(1) require each major proposed new (or modified) source—
(A) subject to part C (relating to significant deterioration of air quality) or
(B) which may significantly contribute to levels of air pollution in excess of the national ambient air quality standards in any air quality control region outside the State in which such source intends to locate (or make such modification),
to provide written notice to all nearby States the air pollution levels of which may be affected by such source at least sixty days prior to the date on which commencement of construction is to be permitted by the State providing notice, and
(2) identify all major existing stationary sources which may have the impact described in paragraph (1) with respect to new or modified sources and provide notice to all nearby States of the identity of such sources not later than three months after August 7, 1977.
**(b) Petition for finding that major sources emit or would emit prohibited air pollutants** Any State or political subdivision may petition the Administrator for a finding that any major source or group of stationary sources emits or would emit any air pollutant in violation of the prohibition of [section 7410(a)(2)(D)(ii) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410/a/2/D/ii&num=0&edition=prelim) or this section. Within 60 days after receipt of any petition under this subsection and after public hearing, the Administrator shall make such a finding or deny the petition.
**(c) Violations; allowable continued operation** Notwithstanding any permit which may have been granted by the State in which the source is located (or intends to locate), it shall be
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7426
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.