10 U.S.C. § 4371 — Cost growth definitions; applicability of
Federal law — U.S. Code and appendices · legal_authorities
Page 2748
TITLE 10—ARMED FORCES
§ 4371
Sec.
4376.
Breach of critical cost growth threshold: reas-
sessment of program; presumption of pro-
gram termination.
4377.
Breach of critical cost growth threshold: ac-
tions if program not terminated.
Editorial Notes
PRIOR PROVISIONS
A prior chapter 325 ‘‘DEPARTMENT OF DEFENSE
LABORATORIES’’, consisting of reserved section 4351,
was repealed by Pub. L. 116–283, div. A, title XVIII,
§ 1841(a)(1)(A), Jan. 1, 2021, 134 Stat. 4242.
§ 4371. Cost growth definitions; applicability of
reporting requirements; constant base year
dollars
(a) DEFINITIONS.—In this chapter:
(1) PROGRAM ACQUISITION UNIT COST; PROCURE-
MENT UNIT COST; MAJOR CONTRACT.—Except as
provided in section 4203(d) of this title, the
terms ‘‘program acquisition unit cost’’, ‘‘pro-
curement unit cost’’, and ‘‘major contract’’
have the same meanings as provided in section
4351(a) of this title.
(2) SIGNIFICANT
COST
GROWTH
THRESHOLD.—
The term ‘‘significant cost growth threshold’’
means the following:
(A) In the case of a major defense acquisi-
tion program or designated major defense
subprogram, a percentage increase in the
program acquisition unit cost for the pro-
gram or subprogram of—
(i) at least 15 percent over the program
acquisition unit cost for the program or
subprogram as shown in the current Base-
line Estimate for the program or subpro-
gram; or
(ii) at least 30 percent over the program
acquisition unit cost for the program or
subprogram as shown in the original Base-
line Estimate for the program or subpro-
gram.
(B) In the case of a major defense acquisi-
tion program or designated major defense
subprogram that is a procurement program,
a percentage increase in the procurement
unit cost for the program or subprogram of—
(i) at le
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 4371
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: b70a33afdb859bbed8742b8d103c9a5cc841b8caa69192721477ff49dcaaa134. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-e39991e55ba3ab40175ec380
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-4371-cost-growth-definitions-applicability-of--c6f674f472.md
Pages: Not recorded – Not recorded
Passage SHA-256: 14a4f4017ebb648a5f327f071c84a0892b8b0406fc3d489be6b4fa638202c48f
Source location: USCODE-2024-title10-subtitleA-partV-subpartF-chap325-sec4371.pdf
Stored source content
Page 2748
TITLE 10—ARMED FORCES
§ 4371
Sec.
4376.
Breach of critical cost growth threshold: reas-
sessment of program; presumption of pro-
gram termination.
4377.
Breach of critical cost growth threshold: ac-
tions if program not terminated.
Editorial Notes
PRIOR PROVISIONS
A prior chapter 325 ‘‘DEPARTMENT OF DEFENSE
LABORATORIES’’, consisting of reserved section 4351,
was repealed by Pub. L. 116–283, div. A, title XVIII,
§ 1841(a)(1)(A), Jan. 1, 2021, 134 Stat. 4242.
§ 4371. Cost growth definitions; applicability of
reporting requirements; constant base year
dollars
(a) DEFINITIONS.—In this chapter:
(1) PROGRAM ACQUISITION UNIT COST; PROCURE-
MENT UNIT COST; MAJOR CONTRACT.—Except as
provided in section 4203(d) of this title, the
terms ‘‘program acquisition unit cost’’, ‘‘pro-
curement unit cost’’, and ‘‘major contract’’
have the same meanings as provided in section
4351(a) of this title.
(2) SIGNIFICANT
COST
GROWTH
THRESHOLD.—
The term ‘‘significant cost growth threshold’’
means the following:
(A) In the case of a major defense acquisi-
tion program or designated major defense
subprogram, a percentage increase in the
program acquisition unit cost for the pro-
gram or subprogram of—
(i) at least 15 percent over the program
acquisition unit cost for the program or
subprogram as shown in the current Base-
line Estimate for the program or subpro-
gram; or
(ii) at least 30 percent over the program
acquisition unit cost for the program or
subprogram as shown in the original Base-
line Estimate for the program or subpro-
gram.
(B) In the case of a major defense acquisi-
tion program or designated major defense
subprogram that is a procurement program,
a percentage increase in the procurement
unit cost for the program or subprogram of—
(i) at least 15 percent over the procure-
ment unit cost for the program or subpro-
gram as shown in the current Baseline Es-
timate for the program or subprogram; or
(ii) at least 30 percent over the procure-
ment unit cost for the program or subpro-
gram as shown in the original Baseline Es-
timate for the program or subprogram.
(3) CRITICAL COST GROWTH THRESHOLD.—The
term ‘‘critical cost growth threshold’’ means
the following:
(A) In the case of a major defense acquisi-
tion program or designated major defense
subprogram, a percentage increase in the
program acquisition unit cost for the pro-
gram or subprogram of—
(i) at least 25 percent over the program
acquisition unit cost for the program or
subprogram as shown in the current Base-
line Estimate for the program or subpro-
gram; or
(ii) at least 50 percent over the program
acquisition unit cost for the program or
subprogram as shown in the original Base-
line Estimate for the program or subpro-
gram.
(B) In the case of a major defense acquisi-
tion program or designated major defense
subprogram that is a procurement program,
a percentage increase in the procurement
unit cost for the program or subprogram of—
(i) at least 25 percent over the procure-
ment unit cost for the program or subpro-
gram as shown in the current Baseline Es-
timate for the program or subprogram; or
(ii) at least 50 percent over the procure-
ment unit cost for the program or subpro-
gram as shown in the original Baseline Es-
timate for the program or subprogram.
(4) BASELINE ESTIMATE.—The term ‘‘Baseline
Estimate’’, with respect to a unit cost report
that is submitted under this chapter to the
service acquisition executive designated by
the Secretary concerned on a major defense
acquisition program or designated major sub-
program, means the cost estimate included in
the baseline description for the program or
subprogram under section 4214 of this title.
(5) ORIGINAL BASELINE ESTIMATE.—The term
‘‘original Baseline Estimate’’ has the same
meaning as provided in section 4214(d) of this
title.
(6) PROCUREMENT PROGRAM.—The term ‘‘pro-
curement program’’ means a program for
which funds for procurement are authorized to
be appropriated in a fiscal year.
(b) Reporting under this chapter shall not
apply if a program has received a limited report-
ing waiver under section 4351(h) of this title.
(c) Any determination of a percentage increase
under this chapter shall be stated in terms of
constant base year dollars (as described in sec-
tion 4202 of this title).
(Added and amended Pub. L. 116–283, div. A, title
XVIII, § 1850(a)–(d), Jan. 1, 2021, 134 Stat. 4265,
4266;
Pub.
L.
117–81,
div.
A,
title
XVII,
§ 1701(o)(6)(E)(i), (ii), Dec. 27, 2021, 135 Stat. 2147,
2148.)
Editorial Notes
CODIFICATION
The text of subsec. (a) of section 2433 of this title,
which was transferred to this section and amended by
Pub. L. 116–283, § 1850(b)(1), was based on Pub. L. 97–252,
title XI, § 1107(a)(1), Sept. 8, 1982, 96 Stat. 741, § 139b;
Pub. L. 98–525, title XII, § 1242(b)(1), Oct. 19, 1984, 98
Stat. 2607; renumbered § 2433 and amended Pub. L.
99–433, title I, §§ 101(a)(5), 110(g)(8)(A), Oct. 1, 1986, 100
Stat. 995, 1004; Pub. L. 100–26, § 7(b)(4), (k)(7), Apr. 21,
1987, 101 Stat. 279, 284; Pub. L. 100–180, div. A, title XIII,
§ 1314(a)(1), Dec. 4, 1987, 101 Stat. 1175; Pub. L. 101–189,
div. A, title VIII, § 811(a)(1), Nov. 29, 1989, 103 Stat. 1490;
Pub. L. 102–484, div. A, title VIII, § 817(d)(1), Oct. 23,
1992, 106 Stat. 2456; Pub. L. 103–355, title III, § 3003(a)(1),
Oct. 13, 1994, 108 Stat. 3329; Pub. L. 109–163, div. A, title
VIII, § 802(a), (d)(2), Jan. 6, 2006, 119 Stat. 3367, 3370; Pub.
L. 110–417, [div. A], title VIII, § 811(c)(1), Oct. 14, 2008, 122
Stat. 4522; Pub. L. 111–383, div. A, title X, § 1075(b)(34),
Jan. 7, 2011, 124 Stat. 4371.
The text of subsec. (f) of section 2433 of this title,
which was transferred to this section, redesignated sub-
sec. (c) and amended by Pub. L. 116–283, § 1850(d), was
based on Pub. L. 97–252, title XI, § 1107(a)(1), Sept. 8,
1982, 96 Stat. 741, § 139b; renumbered § 2433, Pub. L.
Page 2749
TITLE 10—ARMED FORCES
§ 4372
99–433, title I, § 101(a)(5), Oct. 1, 1986, 100 Stat. 995; Pub.
L. 103–355, title III, § 3003(d), Oct. 13, 1994, 108 Stat. 3329.
The text of subsec. (h) of section 2433 of this title,
which was transferred to this section, redesignated sub-
sec. (b) and amended by Pub. L. 116–283, § 1850(c), was
based on Pub. L. 99–500, § 101(c) [title X, § 961(b)(2)], Oct.
18, 1986, 100 Stat. 1783–82, 1783–176, and Pub. L. 99–591,
§ 101(c) [title X, § 961(b)(2)], Oct. 30, 1986, 100 Stat.
3341–82, 3341–176; Pub. L. 99–661, div. A, title IX, for-
merly title IV, § 961(b)(2), Nov. 14, 1986, 100 Stat. 3956, re-
numbered title IX, Pub. L. 100–26, § 3(5), Apr. 21, 1987, 101
Stat. 273.
AMENDMENTS
2021—Subsec. (a). Pub. L. 116–283, § 1850(b)(2), inserted
subsec. heading and headings in pars. (1) to (6).
Pub. L. 116–283, § 1850(b)(1), transferred subsec. (a) of
section 2433 of this title to this section and substituted
‘‘this chapter’’ for ‘‘this section’’ in introductory provi-
sions and par. (2).
Subsec. (a)(1). Pub. L. 116–283, § 1850(b)(3)(A), as
amended by Pub. L. 117–81, § 1701(o)(6)(E)(i), substituted
‘‘section 4203(d)’’ for ‘‘section 2430a(d)’’ and ‘‘section
4351(a)’’ for ‘‘section 2432(a)’’.
Subsec. (a)(2). Pub. L. 116–283, § 1850(b)(4), redesig-
nated par. (4) as (2) and transferred it to appear in nu-
merical order. Former par. (2) redesignated (4).
Pub. L. 116–283, § 1850(b)(3)(B), substituted ‘‘section
4214’’ for ‘‘section 2435’’.
Subsec. (a)(3) to (5). Pub. L. 116–283, § 1850(b)(4), redes-
ignated pars. (5), (2), and (6) as (3) to (5), respectively,
and transferred them to appear in numerical order.
Former pars. (3) and (4) redesignated pars. (6) and (2),
respectively.
Subsec. (a)(6). Pub. L. 116–283, § 1850(b)(4), redesig-
nated par. (3) as (6) and transferred it to appear in nu-
merical order. Former par. (6) redesignated (5).
Pub. L. 116–283, § 1850(b)(3)(C), substituted ‘‘section
4214(d)’’ for ‘‘section 2435(d)’’.
Subsec. (b). Pub. L. 116–283, § 1850(c), as amended by
Pub. L. 117–81, § 1701(o)(6)(E)(ii), transferred subsec. (h)
of section 2433 of this title to this section, redesignated
it as subsec. (b), and substituted ‘‘under this chapter’’
for ‘‘under this section’’ and ‘‘section 4351(h)’’ for ‘‘sec-
tion 2432(h)’’.
Subsec. (c). Pub. L. 116–283, § 1850(d), transferred sub-
sec. (f) of section 2433 of this title to this section, redes-
ignated it as subsec. (c), and substituted ‘‘under this
chapter’’ for ‘‘under this section’’ and ‘‘section 4202’’ for
‘‘section 2430’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2021 AMENDMENT
Amendment by Pub. L. 117–81 applicable as if in-
cluded in the enactment of title XVIII of Pub. L. 116–283
as enacted, see section 1701(a)(2) of Pub. L. 117–81, set
out in a note preceding section 3001 of this title and Ef-
fective Date note below.
EFFECTIVE DATE
Section and amendment by Pub. L. 116–283 effective
Jan. 1, 2022, with additional provisions for delayed im-
plementation and applicability of existing law, see sec-
tion 1801(d) of Pub. L. 116–283, set out as an Effective
Date of 2021 Amendment note preceding section 3001 of
this title.
COST GROWTH REPORTS
FOR MAJOR ACQUISITION PRO-
GRAMS THAT ARE HIGHLY SENSITIVE CLASSIFIED PRO-
GRAMS
Pub. L. 118–159, div. A, title VIII, § 809, Dec. 23, 2024,
138 Stat. 1978, provided that:
‘‘(a) GUIDANCE REQUIRED.—Not later than 180 days
after the date of the enactment of this Act [Dec. 23,
2024], the Under Secretary of Defense for Acquisition
and Sustainment, in consultation [sic] each Secretary
of a military department, shall establish guidance re-
quiring that each service acquisition executive (as de-
fined in section 101 of title 10, United States Code) sub-
mit to the congressional defense committees [Commit-
tees on Armed Services and Appropriations of the Sen-
ate and the House of Representatives] a cost growth re-
port for a covered program each time the estimated
unit cost for such covered program has increased by a
percentage equal to or greater than any of the signifi-
cant cost growth thresholds or critical cost growth
thresholds under section 4371 of title 10, United States
Code.
‘‘(b) ELEMENTS OF REPORT.—A cost growth report re-
quired under this section shall include, with respect to
a covered program, the following:
‘‘(1) The name of the covered program.
‘‘(2) The date of the preparation of the report.
‘‘(3) The program phase of the covered program.
‘‘(4) The unit cost estimates for the covered pro-
gram in constant base-year dollars and in current
dollars.
‘‘(5) A statement of the reasons for cost increases
that resulted in the submission of a report under this
section.
‘‘(6) A list of major program milestones, including
the dates for each program milestone according to
the original baseline, current baseline, and current
estimate.
‘‘(7) Annualized funding for the program by appro-
priation account from the date on which the program
commenced to the current estimated year of comple-
tion.
‘‘(8) Any actions taken or proposed to be taken to
control future cost growth of the covered program.
‘‘(9) Any changes made in the performance or mile-
stones of the covered program and the extent to
which such changes have contributed to the cost in-
crease.
‘‘(c) CRITICAL BREACH.—With respect to a covered pro-
gram for which the cost growth meets the threshold for
a critical cost growth threshold (as defined in section
4371 of title 10, United States Code), the applicable serv-
ice acquisition executive shall—
‘‘(1) treat such covered program as if the unit cost
of such a covered program has increased by a percent-
age equal to or greater than any of the critical cost
growth thresholds for the covered program; and
‘‘(2) follow applicable procedures in sections 4376
and 4377 of title 10, United States Code.
‘‘(d) DEFINITIONS.—In this section:
‘‘(1) The term ‘covered program’ means a Depart-
ment of Defense program—
‘‘(A) that is a highly sensitive classified program
(as determined by the Secretary of Defense);
‘‘(B) that would be a major defense acquisition
program under section 4201 of title 10, United
States Code, except for the exclusion from the ap-
plicability of that section of such a highly sensitive
classified program; and
‘‘(C) that has entered the engineering and manu-
facturing design phase, or equivalent phase.
‘‘(2) The term ‘unit cost’ means, with respect to a
covered program, as applicable—
‘‘(A) the program acquisition unit cost (as defined
in section 4351 of title 10, United States Code); or
‘‘(B) the procurement unit cost (as defined in such
section).’’
§ 4372. Unit cost reports: quarterly report from
program manager to service acquisition ex-
ecutive
(a) REQUIRED REPORTS.—
(1) REQUIREMENT.—The program manager for
a major defense acquisition program (other
than a program not required to be included in
the Selected Acquisition Report for that quar-
ter under section 4351(b)(3) of this title) shall,
on a quarterly basis, submit to the service ac-
quisition executive designated by the Sec-
retary concerned a written report on the unit
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definitions.—** In this chapter:
(1) **Program acquisition unit cost; procurement unit cost; major contract.—** — Except as provided in [section 4203(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4203/d&num=0&edition=prelim), the terms “program acquisition unit cost”, “procurement unit cost”, and “major contract” have the same meanings as provided in [section 4351(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4351/a&num=0&edition=prelim).
(2) **Significant cost growth threshold.—** — The term “significant cost growth threshold” means the following:
(A) In the case of a major defense acquisition program or designated major defense subprogram, a percentage increase in the program acquisition unit cost for the program or subprogram of—
(i) at least 15 percent over the program acquisition unit cost for the program or subprogram as shown in the current Baseline Estimate for the program or subprogram; or
(ii) at least 30 percent over the program acquisition unit cost for the program or subprogram as shown in the original Baseline Estimate for the program or subprogram.
(B) In the case of a major defense acquisition program or designated major defense subprogram that is a procurement program, a percentage increase in the procurement unit cost for the program or subprogram of—
(i) at least 15 percent over the procurement unit cost for the program or subprogram as shown in the current Baseline Estimate for the program or subprogram; or
(ii) at least 30 percent over the procurement unit cost for the program or subprogram as shown in the original Baseline Estimate for the program or subprogram.
(3) **Critical cost growth threshold.—** — The term “criti