16 U.S.C. § 837a — Limitation of sale, delivery, and exchange
Federal law — U.S. Code and appendices · legal_authorities
Page 1507
TITLE 16—CONSERVATION
§ 837a
Sec.
837c.
Contract limitations and conditions for use of
electric energy and peaking capacity of
plants in other marketing areas for use
within Pacific Northwest.
837d.
Exchange contracts.
837e.
Transmission lines for other electric energy;
rates.
837f.
Purchaser priority on Pacific Northwest
power; amendment of existing contracts
and new contracts to include priority provi-
sions.
837g.
Transmission lines between Pacific North-
west and Pacific Southwest; prohibition
against construction of lines or related fa-
cilities; exceptions of lines and facilities
recommended by Secretary or authorized
by Congress; authority of Secretary to con-
struct other transmission lines unaffected.
837g–1.
Construction of additional facilities by Sec-
retary of Energy for mutually beneficial
power sales between Pacific Northwest and
California; contribution of funds by non-
Federal entities.
837h.
Provisions not applicable to Canyon Ferry
project or benefits and exchanges under
Treaty between Canada and United States;
preference of power users in Montana not
modified.
§ 837. Definitions
As used in this chapter—
(a) ‘‘Secretary’’ means the Secretary of En-
ergy.
(b) ‘‘Pacific Northwest’’ means (1) the region
consisting of the States of Oregon and Wash-
ington, the State of Montana west of the Conti-
nental Divide, and such portions of the States of
Nevada, Utah, and Wyoming within the Colum-
bia drainage basin and of the State of Idaho as
the Secretary may determine to be within the
marketing area of the Federal Columbia River
power system, and (2) any contiguous areas, not
in excess of seventy-five airline miles from said
region, which are a part of the service area of a
rural electric cooperative served by
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 837a
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 6bddcd5e3d48bf3fbffb44ba2579abd696b7be76635736bed7628409b659aead. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-e1a2331ba8a622176ef56a73
Source file: Laws/federal/codes/united-states-code-2024/title-16/section-837a-limitation-of-sale-delivery-and-exchange--32990c95f5.md
Pages: Not recorded – Not recorded
Passage SHA-256: 424179c2911ef8256c2b4023286b106858e7d1e43f3575cb35fe0ff5b70f1c8e
Source location: USCODE-2024-title16-chap12F-sec837a.pdf
Stored source content
Page 1507
TITLE 16—CONSERVATION
§ 837a
Sec.
837c.
Contract limitations and conditions for use of
electric energy and peaking capacity of
plants in other marketing areas for use
within Pacific Northwest.
837d.
Exchange contracts.
837e.
Transmission lines for other electric energy;
rates.
837f.
Purchaser priority on Pacific Northwest
power; amendment of existing contracts
and new contracts to include priority provi-
sions.
837g.
Transmission lines between Pacific North-
west and Pacific Southwest; prohibition
against construction of lines or related fa-
cilities; exceptions of lines and facilities
recommended by Secretary or authorized
by Congress; authority of Secretary to con-
struct other transmission lines unaffected.
837g–1.
Construction of additional facilities by Sec-
retary of Energy for mutually beneficial
power sales between Pacific Northwest and
California; contribution of funds by non-
Federal entities.
837h.
Provisions not applicable to Canyon Ferry
project or benefits and exchanges under
Treaty between Canada and United States;
preference of power users in Montana not
modified.
§ 837. Definitions
As used in this chapter—
(a) ‘‘Secretary’’ means the Secretary of En-
ergy.
(b) ‘‘Pacific Northwest’’ means (1) the region
consisting of the States of Oregon and Wash-
ington, the State of Montana west of the Conti-
nental Divide, and such portions of the States of
Nevada, Utah, and Wyoming within the Colum-
bia drainage basin and of the State of Idaho as
the Secretary may determine to be within the
marketing area of the Federal Columbia River
power system, and (2) any contiguous areas, not
in excess of seventy-five airline miles from said
region, which are a part of the service area of a
rural electric cooperative served by the Admin-
istrator on December 5, 1980, which has a dis-
tribution system from which it serves both with-
in and without said region.
(c) ‘‘Surplus energy’’ means electric energy
generated at Federal hydroelectric plants in the
Pacific Northwest which would otherwise be
wasted because of the lack of a market therefor
in the Pacific Northwest at any established rate.
(d) ‘‘Surplus peaking capacity’’ means electric
peaking
capacity
at
Federal
hydroelectric
plants in the Pacific Northwest for which there
is no demand in the Pacific Northwest at any es-
tablished rate.
(e) ‘‘Non-Federal utility’’ means any utility
not owned or controlled by the United States,
including any entity (1) which such a utility
owns or controls, in whole or in part, or is con-
trolled by, (2) which is controlled by those con-
trolling such utility, or (3) of which such utility
is a member.
(f) ‘‘Energy requirements of any Pacific North-
west customer’’ means the full requirements for
electric energy of (1) any purchaser from the
United States for direct consumption in the Pa-
cific Northwest, and (2) any non-Federal utility
in that region in excess of (i) the hydroelectric
energy available for its own use from its gener-
ating plants in the Pacific Northwest, and (ii)
any additional energy available for use in the
Pacific Northwest which, under a then existing
contract, the utility (A) can obtain at no higher
incremental cost than the rate charged by the
United States, or (B) is required to accept.
(g) Terms not defined herein shall, unless the
context requires otherwise, have the meaning
given them in the March 1949 Glossary of Impor-
tant Power and Rate Terms prepared under the
supervision of the Federal Power Commission.
(Pub. L. 88–552, § 1, Aug. 31, 1964, 78 Stat. 756;
Pub. L. 95–91, title III, § 302(a), Aug. 4, 1977, 91
Stat. 578; Pub. L. 96–501, § 8(e), Dec. 5, 1980, 94
Stat. 2729.)
Editorial Notes
AMENDMENTS
1980—Subsec. (b)(2). Pub. L. 96–501 substituted ‘‘(2)
any contiguous areas, not in excess of seventy-five air-
line miles from said region, which are a part of the
service area of a rural electric cooperative served by
the Administrator on December 5, 1980, which has a dis-
tribution system from which it serves both within and
without said region’’ for ‘‘(2) any contiguous areas, not
in excess of seventy-five airline miles from said region,
which are a part of the service area of a distribution co-
operative which has (i) no generating facilities, and (ii)
a distribution system from which it serves both within
and without said region’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1980 AMENDMENT
Amendment by Pub. L. 96–501 effective Dec. 5, 1980,
see section 11 of Pub. L. 96–501, set out as an Effective
Date note under section 839 of this title.
TRANSFER OF FUNCTIONS
‘‘Secretary of Energy’’ substituted for ‘‘Secretary of
the Interior’’ in subsec. (a) pursuant to Pub. L. 95–91,
§ 302(a), which is classified to section 7152(a) of Title 42,
The Public Health and Welfare.
The Federal Power Commission was terminated, and
its functions, personnel, property, funds, etc., were
transferred to the Secretary of Energy (except for cer-
tain functions which were transferred to the Federal
Energy Regulatory Commission) by sections 7151(b),
7171(a), 7172(a), 7291, and 7293 of Title 42.
§ 837a. Limitation of sale, delivery, and exchange
of electric energy and electric peaking ca-
pacity for use outside Pacific Northwest to
surplus energy and surplus peaking capacity;
notice to customers; inspection of contract
drafts
Subject to the provisions of this chapter, the
sale, delivery, and exchange of electric energy
generated at, and peaking capacity of, Federal
hydroelectric plants in the Pacific Northwest
for use outside the Pacific Northwest shall be
limited to surplus energy and surplus peaking
capacity. At least 30 days prior to the execution
of any contract for the sale, delivery, or ex-
change of surplus energy or surplus peaking ca-
pacity for use outside the Pacific Northwest, the
Secretary shall give the then customers of the
Bonneville Power Administration written notice
that negotiations for such a contract are pend-
ing, and thereafter, at any customer’s request,
make available for its inspection current drafts
of the proposed contract.
(Pub. L. 88–552, § 2, Aug. 31, 1964, 78 Stat. 756.)
Page 1508
TITLE 16—CONSERVATION
§ 837b
Statutory Notes and Related Subsidiaries
TRANSFER OF FUNCTIONS
Functions of Secretary of the Interior with respect to
Bonneville Power Administration transferred to Sec-
retary of Energy by section 7152(a)(1)(D), (2) of Title 42,
The Public Health and Welfare, with Bonneville Power
Administration to be preserved as a distinct organiza-
tional entity within Department of Energy and headed
by an Administrator.
§ 837b. Contract terms and conditions for use of
electric energy outside Pacific Northwest
(a) Surplus energy; discontinuance of deliveries
to maintain ability to meet requirements of
Pacific Northwest customers; purchaser’s re-
sponsibility for hardships; deliveries by non-
Federal utility for use on contiguous dis-
tribution system not deemed deliveries for
use outside Pacific Northwest
Any contract for the sale or exchange of sur-
plus energy for use outside the Pacific North-
west, or as replacement, directly or indirectly,
within the Pacific Northwest for hydroelectric
energy delivered for use outside that region by
a non-Federal utility, shall provide that the
Secretary, after giving the purchaser notice not
in excess of sixty days, will not deliver electric
energy under such contract whenever it can rea-
sonably be foreseen that such delivery would im-
pair his ability to meet, either at or after the
time of such delivery, the energy requirements
of any Pacific Northwest customer. The pur-
chaser shall obligate himself not to take deliv-
ery of or use any such energy to supply any load
under such conditions that discontinuance of de-
liveries from the Pacific Northwest in sixty days
would cause undue hardship to the purchaser or
in his territory, and, further, the purchaser shall
acknowledge full responsibility if any such hard-
ship occurs. Deliveries by a non-Federal utility
from its generating plants in the Pacific North-
west for use on its own distribution system in an
area outside but contiguous to the Pacific
Northwest (not including any extension of its
outside service area by merger or acquisition
after August 31, 1964) shall not be deemed deliv-
eries by such utility for use outside the Pacific
Northwest.
(b) Conservable electric energy; provisional basis
for delivery; return of energy to meet re-
quirements of Pacific Northwest customers;
time and extent of return of energy
Electric energy generated at Federal hydro-
electric plants in the Pacific Northwest which
can be conserved, for which there is no imme-
diate demand in the Pacific Northwest at any
established rate, but for which the Secretary de-
termines there may be a demand in meeting the
future requirements of the Pacific Northwest,
may be delivered for use outside that region
only on a provisional basis under contracts pro-
viding that if the Secretary determines at a sub-
sequent time that, by virtue of prior deliveries
under such contract, the Secretary is or will be
unable to meet the energy requirements of any
Pacific Northwest customer, the purchaser will
return the full amount of energy delivered to
him, or such portion or portions thereof as may
be required, at such time or times as may be
specified by the Secretary, except that the Sec-
retary shall not require return during the pur-
chaser’s daily peak periods. The Secretary shall
require the return of the energy provisionally
delivered hereunder, to such extent and at such
times, as may be necessary to meet demands at
any established rate for use within the Pacific
Northwest.
(c) Surplus peaking capacity; termination clause;
advance or return of energy; time of return
of energy; sale under subsection (a) condi-
tions
Any contract for the disposition of surplus
peaking capacity shall provide that (1) the Sec-
retary may terminate the contract upon notice
not in excess of sixty months, and (2) the pur-
chaser shall advance or return the energy nec-
essary to supply the peaking capacity, except
that the Secretary shall not require such ad-
vance or return during the purchaser’s daily
peak periods. The Secretary may contract for
the sale of such energy to the purchaser, in lieu
of its return, under the conditions prescribed in
subsection (a) of this section.
(d) Determination of energy requirements of Pa-
cific Northwest non-Federal utility customer;
exclusion of conservable energy; sale of sur-
plus energy to the utility
The Secretary, in making any determination
of the energy requirements of any Pacific North-
west customer which is a non-Federal utility
having hydroelectric generating facilities, shall
exclude any amounts of hydroelectric energy
generated in the Pacific Northwest and disposed
of outside the Pacific Northwest by the utility
which, through reasonable measures, could have
been conserved or otherwise kept available for
the utility’s own needs in the Pacific Northwest.
The Secretary may sell the utility as a replace-
ment therefor only what would otherwise be sur-
plus energy.
(Pub. L. 88–552, § 3, Aug. 31, 1964, 78 Stat. 756.)
§ 837c. Contract limitations and conditions for
use of electric energy and peaking capacity
of plants in other marketing areas for use
within Pacific Northwest
Any contract of the Secretary for the sale or
exchange of electric energy generated at, or
peaking
capacity
of,
Federal
hydroelectric
plants in marketing areas outside the Pacific
Northwest for use within the Pacific Northwest
shall be subject to limitations and conditions
corresponding to those provided in sections 837a
and 837b of this title for any contract for the
sale or exchange of hydroelectric energy or
peaking capacity generated within the Pacific
Northwest for use outside the Pacific Northwest.
(Pub. L. 88–552, § 4, Aug. 31, 1964, 78 Stat. 757.)
§ 837d. Exchange contracts
Without regard to the limitations specified in
sections 837a and 837b of this title, the Secretary
may enter into contracts for the exchange with
areas other than the Pacific Northwest of (1)
surplus energy during the Pacific Northwest
storage refill period, (2) any hydroelectric en-
ergy during the Pacific Northwest storage refill
period which will be returned to the Pacific
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
Subject to the provisions of this chapter, the sale, delivery, and exchange of electric energy generated at, and peaking capacity of, Federal hydroelectric plants in the Pacific Northwest for use outside the Pacific Northwest shall be limited to surplus energy and surplus peaking capacity. At least 30 days prior to the execution of any contract for the sale, delivery, or exchange of surplus energy or surplus peaking capacity for use outside the Pacific Northwest, the Secretary shall give the then customers of the Bonneville Power Administration written notice that negotiations for such a contract are pending, and thereafter, at any customer’s request, make available for its inspection current drafts of the proposed contract.