42 U.S.C. § 7651g — Permits and compliance plans
Federal law — U.S. Code and appendices · legal_authorities
Page 7431
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651g
4 So in original. Probably should be ‘‘subsections,’’.
5 So in original. The semicolon probably should be a comma.
1 So in original. Probably should be followed by a comma.
the alternative emission rate demonstrated in
paragraphs (2) and (3) above.
Units subject to subsection (b)(1) for which an
alternative emission limitation is established
shall not be required to install any additional
control technology beyond low NOx
burners.
Nothing in this section shall preclude an owner
or operator from installing and operating an al-
ternative NOx
control technology capable of
achieving the applicable emission limitation. If
the owner or operator of a unit subject to the
emissions limitation requirements of subsection
(b)(1) demonstrates to the satisfaction of the Ad-
ministrator that the technology necessary to
meet such requirements is not in adequate sup-
ply to enable its installation and operation at
the unit, consistent with system reliability, by
January 1, 1995, then the Administrator shall ex-
tend the deadline for compliance for the unit by
a period of 15 months. Any owner or operator
may petition the Administrator to make a de-
termination under the previous sentence. The
Administrator shall grant or deny such petition
within 3 months of submittal.
(e) Emissions averaging
In lieu of complying with the applicable emis-
sion limitations under subsection (b)(1), (2), or
(d), the owner or operator of two or more units
subject to one or more of the applicable emis-
sion limitations set pursuant to these sections,4
may petition the permitting authority for alter-
native contemporaneous annual emission limi-
tations for such units that ensure that (1) the
actual annual emission rate in pound
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7651g
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 54f341019c6d70858b5f3d41905521b44abb60805641fff858c2eeb7bb134fa3. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-deed0bd20dbdd7c03c784453
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-7651g-permits-and-compliance-plans--9b630b3d30.md
Pages: Not recorded – Not recorded
Passage SHA-256: f27a63f2168098974e4ff40e10a31e8f31a452b993dc4974e2741c0d434ebdbf
Source location: USCODE-2024-title42-chap85-subchapIV-A-sec7651g.pdf
Stored source content
Page 7431
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651g
4 So in original. Probably should be ‘‘subsections,’’.
5 So in original. The semicolon probably should be a comma.
1 So in original. Probably should be followed by a comma.
the alternative emission rate demonstrated in
paragraphs (2) and (3) above.
Units subject to subsection (b)(1) for which an
alternative emission limitation is established
shall not be required to install any additional
control technology beyond low NOx
burners.
Nothing in this section shall preclude an owner
or operator from installing and operating an al-
ternative NOx
control technology capable of
achieving the applicable emission limitation. If
the owner or operator of a unit subject to the
emissions limitation requirements of subsection
(b)(1) demonstrates to the satisfaction of the Ad-
ministrator that the technology necessary to
meet such requirements is not in adequate sup-
ply to enable its installation and operation at
the unit, consistent with system reliability, by
January 1, 1995, then the Administrator shall ex-
tend the deadline for compliance for the unit by
a period of 15 months. Any owner or operator
may petition the Administrator to make a de-
termination under the previous sentence. The
Administrator shall grant or deny such petition
within 3 months of submittal.
(e) Emissions averaging
In lieu of complying with the applicable emis-
sion limitations under subsection (b)(1), (2), or
(d), the owner or operator of two or more units
subject to one or more of the applicable emis-
sion limitations set pursuant to these sections,4
may petition the permitting authority for alter-
native contemporaneous annual emission limi-
tations for such units that ensure that (1) the
actual annual emission rate in pounds of nitro-
gen oxides per million Btu averaged over the
units in question is a rate that is less than or
equal to (2) the Btu-weighted average annual
emission rate for the same units if they had
been operated, during the same period of time,
in compliance with limitations set in accord-
ance with the applicable emission rates set pur-
suant to subsections (b)(1) and (2).
If the permitting authority determines, in ac-
cordance with regulations issued by the Admin-
istrator not later than eighteen months after
November 15, 1990; 5 that the conditions in the
paragraph above can be met, the permitting au-
thority shall issue operating permits for such
units, in accordance with section 7651g of this
title and part B 3 of title III, that allow alter-
native contemporaneous annual emission limi-
tations. Such emission limitations shall only re-
main in effect while both units continue oper-
ation under the conditions specified in their re-
spective operating permits.
(July 14, 1955, ch. 360, title IV, § 407, as added
Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104
Stat. 2613.)
Editorial Notes
REFERENCES IN TEXT
Part B of title III, referred to in subsecs. (d) and (e),
means title III of the Clean Air Act, act July 14, 1955,
ch. 360, as added, which is classified to subchapter III of
this chapter, but title III does not contain parts. For
provisions of the Clean Air Act relating to permits, see
subchapter V (§ 7661 et seq.) of this chapter.
§ 7651g. Permits and compliance plans
(a) Permit program
The provisions of this subchapter shall be im-
plemented, subject to section 7651b of this title,
by permits issued to units subject to this sub-
chapter (and enforced) in accordance with the
provisions of subchapter V, as modified by this
subchapter. Any such permit issued by the Ad-
ministrator, or by a State with an approved per-
mit program, shall prohibit—
(1) annual emissions of sulfur dioxide in ex-
cess of the number of allowances to emit sul-
fur dioxide the owner or operator, or the des-
ignated representative of the owners or opera-
tors, of the unit hold for the unit,
(2)
exceedances
of
applicable
emissions
rates,
(3) the use of any allowance prior to the year
for which it was allocated, and
(4) contravention of any other provision of
the permit.
Permits issued to implement this subchapter
shall be issued for a period of 5 years, notwith-
standing subchapter V. No permit shall be issued
that is inconsistent with the requirements of
this subchapter, and subchapter V as applicable.
(b) Compliance plan
Each initial permit application shall be ac-
companied by a compliance plan for the source
to comply with its requirements under this sub-
chapter. Where an affected source consists of
more than one affected unit, such plan shall
cover all such units, and for purposes of section
7661a(c) of this title, such source shall be consid-
ered a ‘‘facility’’. Nothing in this section regard-
ing compliance plans or in subchapter V shall be
construed as affecting allowances. Except as
provided under subsection (c)(1)(B), submission
of a statement by the owner or operator, or the
designated representative of the owners and op-
erators, of a unit subject to the emissions limi-
tation requirements of sections 7651c, 7651d, and
7651f of this title, that the unit will meet the ap-
plicable emissions limitation requirements of
such sections in a timely manner or that, in the
case of the emissions limitation requirements of
sections 7651c and 7651d of this title, the owners
and operators will hold allowances to emit not
less than the total annual emissions of the unit,
shall be deemed to meet the proposed and ap-
proved compliance planning requirements of
this section and subchapter V, except that, for
any unit that will meet the requirements of this
subchapter by means of an alternative method
of compliance authorized under section 7651c(b),
(c), (d), or (f) of this title 1 section 7651f(d) or (e)
of this title, section 7651h of this title and sec-
tion 7651i of this title, the proposed and ap-
proved compliance plan, permit application and
permit shall include, pursuant to regulations
promulgated by the Administrator, for each al-
ternative method of compliance a comprehen-
sive description of the schedule and means by
which the unit will rely on one or more alter-
native methods of compliance in the manner and
time authorized under this subchapter. Recorda-
tion by the Administrator of transfers of allow-
Page 7432
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651g
2 So in original. Section 7651a of this title does not contain sub-
sections.
ances shall amend automatically all applicable
proposed or approved permit applications, com-
pliance plans and permits. The Administrator
may also require—
(1) for a source, a demonstration of attain-
ment of national ambient air quality stand-
ards, and
(2) from the owner or operator of two or
more affected sources, an integrated compli-
ance plan providing an overall plan for achiev-
ing compliance at the affected sources.
(c) First phase permits
The Administrator shall issue permits to af-
fected sources under sections 7651c and 7651f of
this title.
(1) Permit application and compliance plan
(A) Not later than 27 months after November
15, 1990, the designated representative of the
owners or operators, or the owner and oper-
ator, of each affected source under sections
7651c and 7651f of this title shall submit a per-
mit application and compliance plan for that
source in accordance with regulations issued
by the Administrator under paragraph (3). The
permit application and the compliance plan
shall be binding on the owner or operator or
the designated representative of owners and
operators for purposes of this subchapter and
section 7651a(a) 2 of this title, and shall be en-
forceable in lieu of a permit until a permit is
issued by the Administrator for the source.
(B) In the case of a compliance plan for an
affected source under sections 7651c and 7651f
of this title for which the owner or operator
proposes to meet the requirements of that sec-
tion by reducing utilization of the unit as
compared with its baseline or by shutting
down the unit, the owner or operator shall in-
clude in the proposed compliance plan a speci-
fication of the unit or units that will provide
electrical generation to compensate for the re-
duced output at the affected source, or a dem-
onstration that such reduced utilization will
be accomplished through energy conservation
or improved unit efficiency. The unit to be
used for such compensating generation, which
is not otherwise an affected unit under sec-
tions 7651c and 7651f of this title, shall be
deemed an affected unit under section 7651c of
this title, subject to all of the requirements
for such units under this subchapter, except
that allowances shall be allocated to such
compensating unit in the amount of an annual
limitation equal to the product of the unit’s
baseline multiplied by the lesser of the unit’s
actual 1985 emissions rate or its allowable 1985
emissions rate, divided by 2,000.
(2) EPA action on compliance plans
The Administrator shall review each pro-
posed compliance plan to determine whether it
satisfies the requirements of this subchapter,
and shall approve or disapprove such plan
within 6 months after receipt of a complete
submission. If a plan is disapproved, it may be
resubmitted for approval with such changes as
the Administrator shall require consistent
with the requirements of this subchapter and
within such period as the Administrator pre-
scribes as part of such disapproval.
(3) Regulations; issuance of permits
Not later than 18 months after November 15,
1990, the Administrator shall promulgate regu-
lations, in accordance with subchapter V, to
implement a Federal permit program to issue
permits for affected sources under this sub-
chapter. Following promulgation, the Admin-
istrator shall issue a permit to implement the
requirements of section 7651c of this title and
the allowances provided under section 7651b of
this title to the owner or operator of each af-
fected source under section 7651c of this title.
Such a permit shall supersede any permit ap-
plication
and
compliance
plan
submitted
under paragraph (1).
(4) Fees
During the years 1995 through 1999 inclusive,
no fee shall be required to be paid under sec-
tion 7661a(b)(3) of this title or under section
7410(a)(2)(L) of this title with respect to emis-
sions from any unit which is an affected unit
under section 7651c of this title.
(d) Second phase permits
(1) To provide for permits for (A) new electric
utility steam generating units required under
section 7651b(e) of this title to have allowances,
(B) affected units or sources under section 7651d
of this title, and (C) existing units subject to ni-
trogen oxide emission reductions under section
7651f of this title, each State in which one or
more such units or sources are located shall sub-
mit in accordance with subchapter V, a permit
program for approval as provided by that sub-
chapter. Upon approval of such program, for the
units or sources subject to such approved pro-
gram the Administrator shall suspend the
issuance of permits as provided in subchapter V.
(2) The owner or operator or the designated
representative of each affected source under sec-
tion 7651d of this title shall submit a permit ap-
plication and compliance plan for that source to
the permitting authority, not later than Janu-
ary 1, 1996.
(3) Not later than December 31, 1997, each
State with an approved permit program shall
issue permits to the owner or operator, or the
designated representative of the owners and op-
erators, of affected sources under section 7651d
of this title that satisfy the requirements of
subchapter V and this subchapter and that sub-
mitted to such State a permit application and
compliance plan pursuant to paragraph (2). In
the case of a State without an approved permit
program by July 1, 1996, the Administrator
shall, not later than January 1, 1998, issue a per-
mit to the owner or operator or the designated
representative of each such affected source. In
the case of affected sources for which applica-
tions and plans are timely received under para-
graph (2), the permit application and the compli-
ance plan, including amendments thereto, shall
be binding on the owner or operator or the des-
ignated representative of the owners or opera-
tors and shall be enforceable as a permit for pur-
poses of this subchapter and subchapter V until
a permit is issued by the permitting authority
Page 7433
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651h
for the affected source. The provisions of section
558(c) of title 5 (relating to renewals) shall apply
to permits issued by a permitting authority
under this subchapter and subchapter V.
(4) The permit issued in accordance with this
subsection for an affected source shall provide
that the affected units at the affected source
may not emit an annual tonnage of sulfur diox-
ide in excess of the number of allowances to
emit sulfur dioxide the owner or operator or des-
ignated representative hold for the unit.
(e) New units
The owner or operator of each source that in-
cludes a new electric utility steam generating
unit shall submit a permit application and com-
pliance plan to the permitting authority not
later than 24 months before the later of (1) Janu-
ary 1, 2000, or (2) the date on which the unit
commences operation. The permitting authority
shall issue a permit to the owner or operator, or
the designated representative thereof, of the
unit that satisfies the requirements of sub-
chapter V and this subchapter.
(f) Units subject to certain other limits
The owner or operator, or designated rep-
resentative thereof, of any unit subject to an
emission rate requirement under section 7651f of
this title shall submit a permit application and
compliance plan for such unit to the permitting
authority, not later than January 1, 1998. The
permitting authority shall issue a permit to the
owner or operator that satisfies the require-
ments of subchapter V and this subchapter, in-
cluding any appropriate monitoring and report-
ing requirements.
(g) Amendment of application and compliance
plan
At any time after the submission of an appli-
cation and compliance plan under this section,
the applicant may submit a revised application
and compliance plan, in accordance with the re-
quirements of this section. In considering any
permit application and compliance plan under
this subchapter, the permitting authority shall
ensure coordination with the applicable electric
ratemaking authority, in the case of regulated
utilities, and with unregulated public utilities.
(h) Prohibition
(1) It shall be unlawful for an owner or oper-
ator, or designated representative, required to
submit a permit application or compliance plan
under this subchapter to fail to submit such ap-
plication or plan in accordance with the dead-
lines specified in this section or to otherwise fail
to comply with regulations implementing this
section.
(2) It shall be unlawful for any person to oper-
ate any source subject to this subchapter except
in compliance with the terms and requirements
of a permit application and compliance plan (in-
cluding amendments thereto) or permit issued
by the Administrator or a State with an ap-
proved permit program. For purposes of this
subsection, compliance, as provided in section
7661c(f) of this title, with a permit issued under
subchapter V which complies with this sub-
chapter for sources subject to this subchapter
shall be deemed compliance with this subsection
as well as section 7661a(a) of this title.
(3) In order to ensure reliability of electric
power, nothing in this subchapter or subchapter
V shall be construed as requiring termination of
operations of an electric utility steam gener-
ating unit for failure to have an approved per-
mit or compliance plan, except that any such
unit may be subject to the applicable enforce-
ment provisions of section 7413 of this title.
(i) Multiple owners
No permit shall be issued under this section to
an affected unit until the designated representa-
tive of the owners or operators has filed a cer-
tificate of representation with regard to matters
under this subchapter, including the holding and
distribution of allowances and the proceeds of
transactions involving allowances. Where there
are multiple holders of a legal or equitable title
to, or a leasehold interest in, such a unit, or
where a utility or industrial customer purchases
power from an affected unit (or units) under life-
of-the-unit, firm power contractual arrange-
ments, the certificate shall state (1) that allow-
ances and the proceeds of transactions involving
allowances will be deemed to be held or distrib-
uted in proportion to each holder’s legal, equi-
table, leasehold, or contractual reservation or
entitlement, or (2) if such multiple holders have
expressly provided for a different distribution of
allowances by contract, that allowances and the
proceeds of transactions involving allowances
will be deemed to be held or distributed in ac-
cordance with the contract. A passive lessor, or
a person who has an equitable interest through
such lessor, whose rental payments are not
based, either directly or indirectly, upon the
revenues or income from the affected unit shall
not be deemed to be a holder of a legal, equi-
table, leasehold, or contractual interest for the
purpose of holding or distributing allowances as
provided in this subsection, during either the
term of such leasehold or thereafter, unless ex-
pressly provided for in the leasehold agreement.
Except as otherwise provided in this subsection,
where all legal or equitable title to or interest
in an affected unit is held by a single person, the
certification shall state that all allowances re-
ceived by the unit are deemed to be held for that
person.
(July 14, 1955, ch. 360, title IV, § 408, as added
Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104
Stat. 2616.)
§ 7651h. Repowered sources
(a) Availability
Not later than December 31, 1997, the owner or
operator of an existing unit subject to the emis-
sions limitation requirements of section 7651d(b)
and (c) of this title may demonstrate to the per-
mitting authority that one or more units will be
repowered with a qualifying clean coal tech-
nology to comply with the requirements under
section 7651d of this title. The owner or operator
shall, as part of any such demonstration, pro-
vide, not later than January 1, 2000, satisfactory
documentation of a preliminary design and engi-
neering effort for such repowering and an exe-
cuted and binding contract for the majority of
the equipment to repower such unit and such
other information as the Administrator may re-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Permit program** The provisions of this subchapter shall be implemented, subject to [section 7651b of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651b&num=0&edition=prelim), by permits issued to units subject to this subchapter (and enforced) in accordance with the provisions of subchapter V, as modified by this subchapter. Any such permit issued by the Administrator, or by a State with an approved permit program, shall prohibit—
(1) annual emissions of sulfur dioxide in excess of the number of allowances to emit sulfur dioxide the owner or operator, or the designated representative of the owners or operators, of the unit hold for the unit,
(2) exceedances of applicable emissions rates,
(3) the use of any allowance prior to the year for which it was allocated, and
(4) contravention of any other provision of the permit.
Permits issued to implement this subchapter shall be issued for a period of 5 years, notwithstanding subchapter V. No permit shall be issued that is inconsistent with the requirements of this subchapter, and subchapter V as applicable.
**(b) Compliance plan** Each initial permit application shall be accompanied by a compliance plan for the source to comply with its requirements under this subchapter. Where an affected source consists of more than one affected unit, such plan shall cover all such units, and for purposes of [section 7661a(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7661a/c&num=0&edition=prelim), such source shall be considered a “facility”. Nothing in this section regarding compliance plans or in subchapter V shall be construed as affecting allowances. Except as provided under subsection (c)(1)(B), submission of a statement by the owner