Browse Arkansas Code titles and sections
49 U.S.C. § 47171 — Expedited, coordinated environmental
Federal law — U.S. Code and appendices · legal_authorities
Page 1676
TITLE 49—TRANSPORTATION
§ 47171
are omitted as surplus. The word ‘‘waive’’ is sub-
stituted for ‘‘grant releases from’’ and ‘‘and to convey,
quitclaim, or release any right or interest reserved to
the United States by’’ to eliminate unnecessary words.
The words ‘‘a term of a gift of an interest in property
under this subchapter’’ are substituted for ‘‘any of the
terms, conditions, reservations, and restrictions con-
tained in . . . any such instrument of disposal’’ for
clarity and consistency. In clause (1), the words ‘‘trans-
ferred by such instrument’’ are omitted as surplus. In
clause (2), the text of 50 App.:1622c (last proviso) is
omitted as executed. The words ‘‘protect or’’ are omit-
ted as surplus.
In subsection (b), the words ‘‘In making any disposi-
tion of surplus property under this subsection’’ are
omitted as surplus. The words ‘‘Secretary of a military
department’’ are substituted for ‘‘the Secretary of the
Army, or the Secretary of the Navy’’ for consistency
with other titles of the United States Code and to
eliminate unnecessary words. The words ‘‘Secretary of
the Army’’ are substituted for ‘‘Secretary of War’’ in
section 13(g)(3) of the Surplus Property Act of 1944 (ch.
479, 58 Stat. 765) because of section 205(a) of the Na-
tional Security Act of 1947 (ch. 343, 61 Stat. 501). The
Secretary of the Air Force is included in ‘‘Secretary of
a military department’’ because of section 207(a) and (f)
of the National Security Act of 1947 (ch. 343, 61 Stat.
502, 503). The word ‘‘waive’’ is substituted for ‘‘omit
from the instrument of disposal’’ to eliminate unneces-
sary words and for consistency in this subchapter. The
words ‘‘conditions, reservations, and restrictions’’ are
omitted as surplus.
Editorial Notes
AMENDMENTS
202
Source: Supplied 2024 U.S. Code historical extraction · 49 U.S.C. § 47171
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 015acd920a9381441f1d95b35c4f20ba96be323d96d7fb0ba0493517c19bb220. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-d53e1b52d77464c5bceaf61e
Source file: Laws/federal/codes/united-states-code-2024/title-49/section-47171-expedited-coordinated-environmental--4b08d36dfa.md
Pages: Not recorded – Not recorded
Passage SHA-256: d36b9a2c2fe0846fc646553cb1cf4cb9986d8948d658327136f048d05f0ad09d
Source location: USCODE-2024-title49-subtitleVII-partB-chap471-subchapIII-sec47171.pdf
Stored source content
Page 1676
TITLE 49—TRANSPORTATION
§ 47171
are omitted as surplus. The word ‘‘waive’’ is sub-
stituted for ‘‘grant releases from’’ and ‘‘and to convey,
quitclaim, or release any right or interest reserved to
the United States by’’ to eliminate unnecessary words.
The words ‘‘a term of a gift of an interest in property
under this subchapter’’ are substituted for ‘‘any of the
terms, conditions, reservations, and restrictions con-
tained in . . . any such instrument of disposal’’ for
clarity and consistency. In clause (1), the words ‘‘trans-
ferred by such instrument’’ are omitted as surplus. In
clause (2), the text of 50 App.:1622c (last proviso) is
omitted as executed. The words ‘‘protect or’’ are omit-
ted as surplus.
In subsection (b), the words ‘‘In making any disposi-
tion of surplus property under this subsection’’ are
omitted as surplus. The words ‘‘Secretary of a military
department’’ are substituted for ‘‘the Secretary of the
Army, or the Secretary of the Navy’’ for consistency
with other titles of the United States Code and to
eliminate unnecessary words. The words ‘‘Secretary of
the Army’’ are substituted for ‘‘Secretary of War’’ in
section 13(g)(3) of the Surplus Property Act of 1944 (ch.
479, 58 Stat. 765) because of section 205(a) of the Na-
tional Security Act of 1947 (ch. 343, 61 Stat. 501). The
Secretary of the Air Force is included in ‘‘Secretary of
a military department’’ because of section 207(a) and (f)
of the National Security Act of 1947 (ch. 343, 61 Stat.
502, 503). The word ‘‘waive’’ is substituted for ‘‘omit
from the instrument of disposal’’ to eliminate unneces-
sary words and for consistency in this subchapter. The
words ‘‘conditions, reservations, and restrictions’’ are
omitted as surplus.
Editorial Notes
AMENDMENTS
2024—Subsec. (c). Pub. L. 118–63 added subsec. (c) and
struck out former subsec. (c). Prior to amendment, text
read as follows: ‘‘Notwithstanding subsections (a) and
(b), before the Secretary may waive any term imposed
under this section that an interest in land be used for
an aeronautical purpose, the Secretary must provide
notice to the public not less than 30 days before
waiving such term.’’
2000—Subsec. (a)(1). Pub. L. 106–181, § 135(d)(3), sub-
stituted ‘‘conveyance’’ for ‘‘gift’’ in introductory provi-
sions and subpar. (B) and ‘‘conveyed’’ for ‘‘given’’ in
subpar. (A).
Subsec. (c). Pub. L. 106–181, § 125(d), added subsec. (c).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2000 AMENDMENT
Amendment by Pub. L. 106–181 applicable only to fis-
cal years beginning after Sept. 30, 1999, see section 3 of
Pub. L. 106–181, set out as a note under section 106 of
this title.
CONSTRUCTION OF 2000 AMENDMENT
Nothing in amendment by section 125(d) of Pub. L.
106–181 to be construed to authorize Secretary of Trans-
portation to issue waiver or make a modification re-
ferred to in such amendment, see section 125(e) of Pub.
L. 106–181, set out as a note under section 47107 of this
title.
SUBCHAPTER III—AVIATION
DEVELOPMENT STREAMLINING
§ 47171. Expedited, coordinated environmental
review process
(a) AVIATION PROJECT REVIEW PROCESS.—The
Secretary of Transportation shall implement an
expedited and coordinated environmental review
process
for
airport
capacity
enhancement
projects, terminal development projects, general
aviation airport construction or improvement
projects, and aviation safety projects that—
(1) provides for streamlined coordination
among the Federal, regional, State, and local
agencies concerned with the preparation of en-
vironmental impact statements or environ-
mental assessments under the National Envi-
ronmental Policy Act of 1969 (42 U.S.C. 4321 et
seq.);
(2) provides that all environmental reviews,
analyses, opinions, permits, licenses, and ap-
provals that must be issued or made by a Fed-
eral agency or airport sponsor for such a
project will be conducted concurrently, to the
maximum extent practicable; and
(3) provides that any environmental review,
analysis, opinion, permit, license, or approval
that must be issued or made by a Federal
agency or airport sponsor for such a project
will be completed within a time period estab-
lished by the Secretary, in cooperation with
the agencies identified under subsection (d)
with respect to the project.
(b) AVIATION PROJECTS SUBJECT TO A STREAM-
LINED ENVIRONMENTAL REVIEW PROCESS.—
(1) IN
GENERAL.—Any airport capacity en-
hancement
project,
terminal
development
project, or general aviation airport construc-
tion or improvement project shall be subject
to the coordinated and expedited environ-
mental review process requirements set forth
in this section.
(2) PROJECT DESIGNATION CRITERIA.—
(A) IN GENERAL.—The Secretary may des-
ignate an aviation safety project for priority
environmental review.
(B) REQUIREMENTS.—A designated project
shall be subject to the coordinated and expe-
dited environmental review process require-
ments set forth in this section.
(C) GUIDELINES.—
(i) IN GENERAL.—The Secretary shall es-
tablish guidelines for the designation of an
aviation safety project or aviation secu-
rity project for priority environmental re-
view.
(ii)
CONSIDERATION.—Guidelines
estab-
lished under clause (i) shall provide for
consideration of—
(I) the importance or urgency of the
project;
(II) the potential for undertaking the
environmental review under existing
emergency procedures under the Na-
tional Environmental Policy Act of 1969
(42 U.S.C. 4321 et seq.);
(III) the need for cooperation and con-
current reviews by other Federal or
State agencies; and
(IV) the prospect for undue delay if the
project is not designated for priority re-
view.
(c) HIGH PRIORITY OF AND AGENCY PARTICIPA-
TION IN COORDINATED REVIEWS.—
(1) HIGH
PRIORITY
FOR
ENVIRONMENTAL
RE-
VIEWS.—Each Federal agency with jurisdiction
over an environmental review, analysis, opin-
ion, permit, license, or approval shall accord
any such review, analysis, opinion, permit, li-
cense, or approval involving a project de-
scribed or designated under subsection (b) the
highest possible priority and conduct the re-
Page 1677
TITLE 49—TRANSPORTATION
§ 47171
view, analysis, opinion, permit, license, or ap-
proval expeditiously.
(2) AGENCY
PARTICIPATION.—Each Federal
agency described in subsection (d) shall formu-
late and implement administrative, policy,
and procedural mechanisms to enable the
agency to participate in the coordinated envi-
ronmental review process under this section
and to ensure completion of environmental re-
views, analyses, opinions, permits, licenses,
and approvals described in subsection (a) in a
timely and environmentally responsible man-
ner.
(d) IDENTIFICATION
OF JURISDICTIONAL AGEN-
CIES.—With respect to a project described or des-
ignated under subsection (b), the Secretary shall
identify, as soon as practicable, all Federal and
State agencies that may have jurisdiction over
environmental-related matters that may be af-
fected by the project or may be required by law
to conduct an environmental-related review or
analysis of the project or determine whether to
issue an environmental-related permit, license,
or approval for the project.
(e) STATE AUTHORITY.—Under a coordinated re-
view process being implemented under this sec-
tion by the Secretary with respect to a project
at an airport within the boundaries of a State,
the Governor of the State, consistent with State
law, may choose to participate in such process
and provide that all State agencies that have ju-
risdiction over environmental-related matters
that may be affected by the project or may be
required by law to conduct an environmental-re-
lated review or analysis of the project or deter-
mine whether to issue an environmental-related
permit, license, or approval for the project, be
subject to the process.
(f) MEMORANDUM OF UNDERSTANDING.—The co-
ordinated review process developed under this
section may be incorporated into a memo-
randum of understanding for a project between
the Secretary and the heads of other Federal
and State agencies identified under subsection
(d) with respect to the project and, if applicable,
the airport sponsor.
(g) USE OF INTERAGENCY ENVIRONMENTAL IM-
PACT STATEMENT TEAMS.—
(1) IN GENERAL.—The Secretary may utilize
an interagency environmental impact state-
ment team to expedite and coordinate the co-
ordinated environmental review process for a
project under this section. When utilizing an
interagency environmental impact statement
team, the Secretary shall invite Federal,
State and Tribal agencies with jurisdiction by
law, and may invite such agencies with special
expertise, to participate on an interagency en-
vironmental impact statement team.
(2) RESPONSIBILITY OF INTERAGENCY ENVIRON-
MENTAL IMPACT STATEMENT TEAM.—Under a co-
ordinated environmental review process being
implemented under this section, the inter-
agency environmental impact statement team
shall assist the Federal Aviation Administra-
tion in the preparation of the environmental
impact statement. To facilitate timely and ef-
ficient environmental review, the team shall
agree on agency or Tribal points of contact,
protocols for communication among agencies,
and deadlines for necessary actions by each in-
dividual agency (including the review of envi-
ronmental analyses, the conduct of required
consultation
and
coordination,
and
the
issuance of environmental opinions, licenses,
permits, and approvals). The members of the
team may formalize their agreement in a writ-
ten memorandum.
(h) LEAD AGENCY RESPONSIBILITY.—The Fed-
eral Aviation Administration shall be the lead
agency for projects described in subsection (b)(1)
and shall be responsible for defining the scope
and content of the environmental impact state-
ment, consistent with regulations issued by the
Council on Environmental Quality. Any other
Federal agency or State agency that is partici-
pating in a coordinated environmental review
process under this section shall give substantial
deference, to the extent consistent with applica-
ble law and policy, to the aviation expertise of
the Federal Aviation Administration.
(i) EFFECT OF FAILURE TO MEET DEADLINE.—
(1) NOTIFICATION OF CONGRESS AND CEQ.— If
the Secretary determines that a Federal agen-
cy, State agency, or airport sponsor that is
participating in a coordinated review process
under this section with respect to a project
has not met a deadline established under sub-
section (a)(3) for the project, the Secretary
shall notify, within 30 days of the date of such
determination, the Committee on Commerce,
Science, and Transportation of the Senate, the
Committee on Transportation and Infrastruc-
ture of the House of Representatives, the
Council on Environmental Quality, and the
agency or sponsor involved about the failure
to meet the deadline.
(2) AGENCY REPORT.—Not later than 30 days
after date of receipt of a notice under para-
graph (1), the agency or sponsor involved shall
submit a report to the Secretary, the Com-
mittee on Transportation and Infrastructure
of the House of Representatives, the Com-
mittee on Commerce, Science, and Transpor-
tation of the Senate, and the Council on Envi-
ronmental Quality explaining why the agency
or sponsor did not meet the deadline and what
actions it intends to take to complete or issue
the required review, analysis, opinion, permit,
license, or approval.
(j) PURPOSE AND NEED.—
(1) IN GENERAL.—For any environmental re-
view, analysis, opinion, permit, license, or ap-
proval that must be issued or made by a Fed-
eral or State agency that is participating in a
coordinated review process under this section
and that requires an analysis of purpose and
need for the project, the agency, notwith-
standing any other provision of law, shall be
bound by the project purpose and need as de-
fined by the Secretary.
(2) DEADLINE.—The Secretary shall define
the purpose and need of a project not later
than 45 days after—
(A) the submission of the appropriately
completed proposed purpose and need de-
scription of the airport sponsor; and
(B) any appropriately completed proposed
revision to a development project that af-
fects the purpose and need description pre-
viously prepared or accepted by the Federal
Aviation Administration.
Page 1678
TITLE 49—TRANSPORTATION
§ 47171
(3) ASSISTANCE.—The Secretary shall provide
all airport sponsors with technical assistance
in drafting purpose and need statements and
necessary
supporting
documentation
for
projects involving Federal approvals from
more than 1 Federal agency.
(k) ALTERNATIVES ANALYSIS.—The Secretary
shall determine the reasonable alternatives to a
project described or designated under subsection
(b). Any other Federal agency, or State agency
that is participating in a coordinated review
process under this section with respect to the
project shall—
(1) consider only those alternatives to the
project that the Secretary has determined are
reasonable; and
(2) limit the comments of the agency to—
(A) subject matter areas within the special
expertise of the agency; and
(B) changes necessary to ensure the agency
is carrying out the obligations of that agen-
cy under the National Environmental Policy
Act of 1969 (42 U.S.C. 4321 et seq.) and other
applicable law.
(l) SOLICITATION AND CONSIDERATION OF COM-
MENTS.—In applying subsections (j) and (k), the
Secretary shall solicit and consider comments
from interested persons and governmental enti-
ties in accordance with the National Environ-
mental Policy Act of 1969 (42 U.S.C. 4321 et seq.)
and section 1503 of title 40, Code of Federal Reg-
ulations.
(m) COORDINATION AND SCHEDULE.—
(1) COORDINATION PLAN.—
(A) IN
GENERAL.—Not later than 90 days
after the date of publication of a notice of
intent to prepare an environmental impact
statement or the initiation of an environ-
mental assessment, the Secretary of Trans-
portation shall establish a plan for coordi-
nating public and agency participation in
and comment on the environmental review
process for a project described or designated
under subsection (b). The coordination plan
may be incorporated into a memorandum of
understanding.
(B)
CLOUD-BASED,
INTERACTIVE
DIGITAL
PLATFORMS.—The Secretary is encouraged to
utilize cloud-based, interactive digital plat-
forms to meet community engagement and
agency coordination requirements under
subparagraph (A).
(C) SCHEDULE.—
(i) IN GENERAL.—The Secretary shall es-
tablish as part of such coordination plan,
after consultation with and the concur-
rence of each participating agency for the
project and with the State in which the
project is located (and, if the State is not
the project sponsor, with the project spon-
sor), a schedule for—
(I) interim milestones and deadlines
for agency activities necessary to com-
plete the environmental review; and
(II) completion of the environmental
review process for the project.
(ii) FACTORS FOR CONSIDERATION.—In es-
tablishing the schedule under clause (i),
the Secretary shall consider factors such
as—
(I) the responsibilities of participating
agencies under applicable laws;
(II) resources available to the cooper-
ating agencies;
(III) overall size and complexity of the
project;
(IV) the overall time required by an
agency to conduct an environmental re-
view and make decisions under applica-
ble Federal law relating to a project (in-
cluding the issuance or denial of a per-
mit or license) and the cost of the
project; and
(V) the sensitivity of the natural and
historic resources that could be affected
by the project.
(iii) MAXIMUM
PROJECT
SCHEDULE.—To
the maximum extent practicable and con-
sistent with applicable Federal law, the
Secretary shall develop, in concurrence
with the project sponsor, a maximum
schedule for the project described or des-
ignated under subsection (b) that is not
more than 2 years for the completion of
the environmental review process for such
projects, as measured from, as applicable,
the date of publication of a notice of in-
tent to prepare an environmental impact
statement to the record of decision.
(iv) DISPUTE RESOLUTION.—
(I) IN GENERAL.—Any issue or dispute
that arises between the Secretary and
participating agencies (or amongst par-
ticipating agencies) during the environ-
mental review process shall be addressed
expeditiously to avoid delay.
(II) RESPONSIBILITIES.—The Secretary
and participating agencies shall—
(aa) implement the requirements of
this section consistent with any dis-
pute resolution process established in
an applicable law, regulation, or le-
gally binding agreement to the max-
imum extent permitted by law; and
(bb) seek to resolve issues or disputes
at the earliest possible time at the
project level through agency employ-
ees who have day-to-day involvement
in the project.
(III) SECRETARY RESPONSIBILITIES.—
(aa)
IN
GENERAL.—The
Secretary
shall make information available to
each cooperating and participating
agency and project sponsor as early as
practicable in the environmental re-
view regarding the environmental, his-
toric, and socioeconomic resources lo-
cated within the project area and the
general locations of the alternatives
under consideration.
(bb) SOURCES
OF
INFORMATION.—The
information described in item (aa) may
be based on existing data sources, in-
cluding geographic information sys-
tems mapping.
(IV) COOPERATING
AND
PARTICIPATING
AGENCY RESPONSIBILITIES.—Each cooper-
ating and participating agency shall—
(aa) identify, as early as practicable,
any issues of concern regarding any po-
Page 1679
TITLE 49—TRANSPORTATION
§ 47171
1 So in original. Probably should be ‘‘subparagraph (E)(ii)(I)—
’’.
tential environmental impacts of the
project, including any issues that
could substantially delay or prevent an
agency from completing any environ-
mental review or authorization re-
quired for the project; and
(bb) communicate any issues de-
scribed in item (aa) to the project
sponsor.
(V)
ELEVATION
FOR
MISSED
MILE-
STONE.—If a dispute between the Sec-
retary and participating agencies (or
amongst participating agencies) causes a
milestone to be missed or extended, or
the Secretary anticipates that a permit-
ting timetable milestone will be missed
or will need to be extended, the dispute
shall be elevated to an official des-
ignated by the relevant agency for reso-
lution. The elevation of a dispute shall
take place as soon as practicable after
the Secretary becomes aware of the dis-
pute or potential missed milestone.
(VI) EXCEPTION.—Disputes that do not
impact the ability of an agency to meet
a milestone may be elevated as appro-
priate.
(VII) FURTHER EVALUATION.—If a reso-
lution has not been reached at the end of
the 30-day period after a relevant mile-
stone date or extension date after a dis-
pute has been elevated to the designated
official, the relevant agencies shall ele-
vate the dispute to senior agency leader-
ship for resolution.
(D) CONSISTENCY
WITH
OTHER
TIME
PERI-
ODS.—A schedule under subparagraph (C)
shall be consistent with any other relevant
time periods established under Federal law.
(E) MODIFICATION.—
(i) IN
GENERAL.—Except as provided in
clause (ii), the Secretary may lengthen or
shorten a schedule established under sub-
paragraph (C) for good cause. The Sec-
retary may consider a decision by the
project sponsor to change, modify, expand,
or reduce the scope of a project as good
cause for purposes of this clause.
(ii) LIMITATIONS.—
(I) LENGTHENED
SCHEDULE.—The Sec-
retary may lengthen a schedule under
clause (i) for a cooperating Federal agen-
cy by not more than 1 year after the lat-
est deadline established for the project
described or designated under subsection
(b) by the Secretary.
(II) SHORTENED
SCHEDULE.—The Sec-
retary may not shorten a schedule under
clause (i) if doing so would impair the
ability of a cooperating Federal agency
to conduct necessary analyses or other-
wise carry out relevant obligations of
the Federal agency for the project.
(F) FAILURE TO MEET DEADLINE.—If a co-
operating Federal agency fails to meet a
deadline established under subparagraph
(D)(ii)(I)— 1
(i) the cooperating Federal agency shall,
not later than 10 days after failing to meet
the deadline, submit to the Secretary a re-
port that describes the reasons why the
deadline was not met; and
(ii) the Secretary shall—
(I) submit to the Committee on Trans-
portation
and
Infrastructure
of
the
House of Representatives and the Com-
mittee
on
Commerce,
Science,
and
Transportation of the Senate a copy of
the report under clause (i); and
(II) make the report under clause (i)
publicly available on a website of the De-
partment of Transportation.
(G) DISSEMINATION.—A copy of a schedule
under subparagraph (C), and of any modifica-
tions to the schedule under subparagraph
(E), shall be—
(i) provided to all participating agencies
and to the State department of transpor-
tation of the State in which the project is
located (and, if the State is not the project
sponsor, to the project sponsor); and
(ii) made available to the public.
(2)
COMMENT
DEADLINES.—The
Secretary
shall establish the following deadlines for
comment during the environmental review
process for a project:
(A) For comments by agencies and the
public on a draft environmental impact
statement, a period of not more than 60 days
after publication in the Federal Register of
notice of the date of public availability of
such statement, unless—
(i) a different deadline is established by
agreement of the lead agency, the project
sponsor, and all participating agencies; or
(ii) the deadline is extended by the lead
agency for good cause.
(B) For all other comment periods estab-
lished by the lead agency for agency or pub-
lic comments in the environmental review
process, a period of not more than 45 days
from availability of the materials on which
comment is requested, unless—
(i) a different deadline is established by
agreement of the Secretary, the project
sponsor, and all participating agencies; or
(ii) the deadline is extended by the lead
agency for good cause.
(3) DEADLINES
FOR
DECISIONS
UNDER
OTHER
LAWS.—In any case in which a decision under
any Federal law relating to a project described
or designated under subsection (b) (including
the issuance or denial of a permit or license)
is required to be made by the later of the date
that is 180 days after the date on which the
Secretary made all final decisions of the lead
agency with respect to the project or 180 days
after the date on which an application was
submitted for the permit or license, the Sec-
retary shall submit to the Committee on
Transportation
and
Infrastructure
of
the
House of Representatives and the Committee
on Commerce, Science, and Transportation of
the Senate and publish on a website of the De-
partment of Transportation—
(A) as soon as practicable after the 180-day
period, an initial notice of the failure of the
Federal agency to make the decision; and
Page 1680
TITLE 49—TRANSPORTATION
§ 47171
(B) every 60 days thereafter until such date
as all decisions of the Federal agency relat-
ing to the project have been made by the
Federal agency, an additional notice that
describes the number of decisions of the Fed-
eral agency that remain outstanding as of
the date of the additional notice.
(4) INVOLVEMENT OF THE PUBLIC.—Nothing in
this subsection shall reduce any time period
provided for public comment in the environ-
mental review process under existing Federal
law, including a regulation.
(n) CONCURRENT REVIEWS
AND SINGLE NEPA
DOCUMENT.—
(1)
CONCURRENT
REVIEWS.—Each
partici-
pating agency and cooperating agency under
the expedited and coordinated environmental
review process established under this section
shall—
(A) carry out the obligations of such agen-
cy under other applicable law concurrently,
and in conjunction, with the review required
under the National Environmental Policy
Act of 1969 (42 U.S.C. 4321 et seq.), unless
doing so would impair the ability of such
agency to conduct needed analysis or other-
wise carry out such obligations; and
(B) formulate and implement administra-
tive, policy, and procedural mechanisms to
enable the agency to ensure completion of
the environmental review process in a time-
ly, coordinated, and environmentally re-
sponsible manner.
(2) SINGLE NEPA DOCUMENT.—
(A) IN GENERAL.—To the maximum extent
practicable and consistent with Federal law,
all Federal permits and reviews for a project
shall rely on a single environmental docu-
ment prepared under the National Environ-
mental Policy Act of 1969 (42 U.S.C. 4321 et
seq.) under the leadership of the Secretary.
(B) USE OF DOCUMENT.—
(i) IN GENERAL.—To the maximum extent
practicable, the Secretary shall develop an
environmental document sufficient to sat-
isfy the requirements for any Federal ap-
proval or other Federal action required for
the project, including permits issued by
other Federal agencies.
(ii) COOPERATION OF PARTICIPATING AGEN-
CIES.—In carrying out this subparagraph,
other participating agencies shall cooper-
ate with the lead agency and provide time-
ly information.
(C) TREATMENT AS PARTICIPATING AND CO-
OPERATING AGENCIES.—A Federal agency re-
quired to make an approval or take an ac-
tion for a project, as described in this para-
graph, shall work with the Secretary to en-
sure that the agency making the approval or
taking the action is treated as being both a
participating and cooperating agency for the
project.
(D)
EXCEPTIONS.—The
Secretary
may
waive the application of subparagraph (A)
with respect to a project if—
(i) the project sponsor requests that
agencies issue separate environmental doc-
uments;
(ii) the obligations of a cooperating
agency or participating agency under the
National Environmental Policy Act of 1969
(42 U.S.C. 4321 et seq.) have already been
satisfied with respect to the project; or
(iii) the Secretary determines that reli-
ance on a single environmental document
(as described in subparagraph (A)) would
not facilitate timely completion of the en-
vironmental review process for the project.
(3)
PARTICIPATING
AGENCY
RESPONSIBIL-
ITIES.—An agency participating in the expe-
dited and coordinated environmental review
process under this section shall—
(A) provide comments, responses, studies,
or methodologies on areas within the special
expertise or jurisdiction of the agency; and
(B) use the process to address any environ-
mental issues of concern to the agency.
(o) ENVIRONMENTAL IMPACT STATEMENT.—
(1) IN GENERAL.—In preparing a final envi-
ronmental impact statement under the Na-
tional Environmental Policy Act of 1969 (42
U.S.C. 4321 et seq.) for a project described or
designated under subsection (b), if the Sec-
retary modifies the statement in response to
comments that are minor and are confined to
factual corrections or explanations of why the
comments do not warrant additional agency
response, the Secretary may write on errata
sheets attached to the statement instead of re-
writing the draft statement, subject to the
condition that the errata sheets—
(A) cite the sources, authorities, and rea-
sons that support the position of the agency;
and
(B)
if
appropriate,
indicate
the
cir-
cumstances that would trigger agency re-
appraisal or further response.
(2) SINGLE DOCUMENT.—To the maximum ex-
tent practicable, for a project subject to a co-
ordinated review process under this section,
the Secretary shall expeditiously develop a
single document that consists of a final envi-
ronmental impact statement and a record of
decision, unless—
(A) the final environmental impact state-
ment or record of decision makes substan-
tial changes to the project that are relevant
to environmental or safety concerns; or
(B) there is a significant new circumstance
or information relevant to environmental
concerns that bears on the proposed action
or the environmental impacts of the pro-
posed action.
(3) LENGTH OF ENVIRONMENTAL DOCUMENT.—
(A) IN
GENERAL.—Except as provided in
subparagraph (B), an environmental impact
statement shall not exceed 150 pages, not in-
cluding any citations or appendices.
(B) EXTRAORDINARY COMPLEXITY.—An envi-
ronmental impact statement for a proposed
agency action of extraordinary complexity
shall not exceed 300 pages, not including any
citations or appendices.
(p) INTEGRATION
OF PLANNING
AND ENVIRON-
MENTAL REVIEW.—
(1) IN
GENERAL.—Subject to paragraph (5)
and to the maximum extent practicable and
Page 1681
TITLE 49—TRANSPORTATION
§ 47171
appropriate, the following agencies may adopt
or incorporate by reference, and use a plan-
ning product in proceedings relating to, any
class of action in the environmental review
process of a project described or designated
under subsection (b):
(A) The lead agency for a project, with re-
spect to an environmental impact state-
ment, environmental assessment, categor-
ical exclusion, or other document prepared
under the National Environmental Policy
Act of 1969 (42 U.S.C. 4321 et seq.).
(B) A cooperating agency with responsi-
bility under Federal law with respect to the
process for and completion of any environ-
mental permit, approval, review, or study
required for a project under any Federal law
other than the National Environmental Pol-
icy Act of 1969 (42 U.S.C. 4321 et seq.), if con-
sistent with such Act.
(2) IDENTIFICATION.—If a lead or cooperating
agency makes a determination to adopt or in-
corporate by reference and use a planning
product under paragraph (1), such agency shall
identify the agencies that participated in the
development of the planning products.
(3) ADOPTION
OR
INCORPORATION
BY
REF-
ERENCE OF PLANNING PRODUCTS.—Such agency
may—
(A) adopt or incorporate by reference an
entire planning product under paragraph (1);
or
(B) select portions of a planning project
under paragraph (1) for adoption or incorpo-
ration by reference.
(4) TIMING.—The adoption or incorporation
by reference of a planning product under para-
graph (1) may—
(A) be made at the time the lead and co-
operating agencies decide the appropriate
scope of environmental review for the
project; or
(B) occur later in the environmental re-
view process, as appropriate.
(5) CONDITIONS.—Such agency in the environ-
mental review process may adopt or incor-
porate by reference a planning product under
this section if such agency determines, with
the concurrence of the lead agency, if appro-
priate, and, if the planning product is nec-
essary for a cooperating agency to issue a per-
mit, review, or approval for the project, with
the concurrence of the cooperating agency, if
appropriate, that the following conditions
have been met:
(A) The planning product was developed
through a planning process conducted pursu-
ant to applicable Federal law.
(B) The planning product was developed in
consultation with appropriate Federal and
State resource agencies and Indian Tribes.
(C) The planning process included broad
multidisciplinary consideration of systems-
level or corridor-wide transportation needs
and potential effects, including effects on
the human and natural environment.
(D) The planning process included public
notice that the planning products produced
in the planning process may be adopted dur-
ing any subsequent environmental review
process in accordance with this section.
(E) During the environmental review proc-
ess, the such agency has—
(i) made the planning documents avail-
able for public review and comment by
members of the general public and Fed-
eral, State, local, and Tribal governments
that may have an interest in the proposed
project;
(ii) provided notice of the intention of
the such agency to adopt or incorporate by
reference the planning product; and
(iii) considered any resulting comments.
(F) There is no significant new informa-
tion or new circumstance that has a reason-
able likelihood of affecting the continued
validity or appropriateness of the planning
product or portions thereof.
(G) The planning product has a rational
basis and is based on reliable and reasonably
current data and reasonable and scientif-
ically acceptable methodologies.
(H) The planning product is documented in
sufficient detail to support the decision or
the results of the analysis and to meet re-
quirements for use of the information in the
environmental review process.
(I) The planning product is appropriate for
adoption or incorporation by reference and
use in the environmental review process for
the project and is incorporated in accord-
ance with, and is sufficient to meet the re-
quirements of, the National Environmental
Policy Act of 1969 (42 U.S.C. 4321 et seq.) and
section 1502.21 of title 40, Code of Federal
Regulations.
(6) EFFECT OF ADOPTION OR INCORPORATION BY
REFERENCE.—Any planning product or portions
thereof adopted or incorporated by reference
by such agency in accordance with this sub-
section may be—
(A) incorporated directly into an environ-
mental review process document or other en-
vironmental document; and
(B) relied on and used by other Federal
agencies in carrying out reviews of the
project.
(q) REPORT ON NEPA DATA.—
(1) IN GENERAL.—The Secretary shall carry
out a process to track, and annually submit to
the Committee on Transportation and Infra-
structure of the House of Representatives, the
Committee on Commerce, Science, and Trans-
portation of the Senate, the Committee on
Natural Resources of the House of Representa-
tives, and the Committee on Environment and
Public Works of the Senate a report on
projects described in subsection (b)(1) that
contains the information described in para-
graph (3).
(2) TIME TO COMPLETE.—For purposes of para-
graph (3), the NEPA process—
(A) for an environmental impact state-
ment—
(i) begins on the date on which a notice
of intent is published in the Federal Reg-
ister; and
(ii) ends on the date on which the Sec-
retary issues a record of decision, includ-
ing, if necessary, a revised record of deci-
sion; and
Page 1682
TITLE 49—TRANSPORTATION
§ 47171
(B) for an environmental assessment—
(i) begins on the date on which the Sec-
retary makes a determination to prepare
an environmental assessment; and
(ii) ends on the date on which the Sec-
retary issues a finding of no significant
impact or determines that preparation of
an environmental impact statement is
necessary.
(3) INFORMATION
DESCRIBED.—The informa-
tion referred to in paragraph (1) is, with re-
spect to the Federal Aviation Administra-
tion—
(A) the number of proposed actions for
which a categorical exclusion was applied by
the Secretary during the reporting period;
(B) the number of proposed actions for
which a documented categorical exclusion
was applied by the Secretary during the re-
porting period;
(C) the number of proposed actions pend-
ing on the date on which the report is sub-
mitted for which the issuance of a docu-
mented categorical exclusion by the Sec-
retary is pending;
(D) the number of proposed actions for
which an environmental assessment was
issued by the Secretary during the reporting
period;
(E) the length of time the Administration
took to complete each environmental assess-
ment described in subparagraph (D);
(F) the number of proposed actions pend-
ing on the date on which the report is sub-
mitted for which an environmental assess-
ment is being drafted by the Secretary;
(G) the number of proposed actions for
which a final environmental impact state-
ment was completed by the Secretary during
the reporting period;
(H) the length of time that the Secretary
took to complete each environmental im-
pact statement described in subparagraph
(G);
(I) the number of proposed actions pending
on the date on which the report is submitted
for which an environmental impact state-
ment is being drafted; and
(J) for the proposed actions reported under
subparagraphs (F) and (I), the percentage of
such proposed actions for which—
(i) project funding has been identified;
and
(ii) all other Federal, State, and local ac-
tivities that are required to allow the pro-
posed action to proceed are completed.
(4) DEFINITIONS.—In this section:
(A)
ENVIRONMENTAL
ASSESSMENT.—The
term ‘‘environmental assessment’’ has the
meaning given such term in section 1508.1 of
title 40, Code of Federal Regulations (or a
successor regulation).
(B) ENVIRONMENTAL
IMPACT
STATEMENT.—
The term ‘‘environmental impact state-
ment’’ means a detailed statement required
under section 102(2)(C) of the National Envi-
ronmental Policy Act of 1969 (42 U.S.C.
4332(2)(C)).
(C) NEPA
PROCESS.—The term ‘‘NEPA
process’’ means the entirety of the develop-
ment and documentation of the analysis re-
quired under the National Environmental
Policy Act of 1969 (42 U.S.C. 4321 et seq.), in-
cluding the assessment and analysis of any
impacts, alternatives, and mitigation of a
proposed action, and any interagency par-
ticipation and public involvement required
to be carried out before the Secretary under-
takes a proposed action.
(D) PROPOSED
ACTION.—The term ‘‘pro-
posed action’’ means an action (within the
meaning of the National Environmental Pol-
icy Act of 1969 (42 U.S.C. 4321 et seq.)) under
this title that the Secretary proposes to
carry out.
(E) REPORTING PERIOD.—The term ‘‘report-
ing period’’ means the fiscal year prior to
the fiscal year in which a report is issued
under subsection (a).
(Added Pub. L. 108–176, title III, § 304(a), Dec. 12,
2003, 117 Stat. 2534; amended Pub. L. 115–254, div.
B, title I, § 191(a), title V, § 539(q), Oct. 5, 2018, 132
Stat. 3238, 3371; Pub. L. 118–63, title VII, § 783,
May 16, 2024, 138 Stat. 1302.)
Editorial Notes
REFERENCES IN TEXT
The National Environmental Policy Act of 1969, re-
ferred to in subsecs. (a)(1), (b)(2)(C)(ii)(II), (k)(2)(B), (l),
(n)(1)(A), (2)(A), (D)(ii), (o)(1), (p)(1), (5)(I), and (q)(4)(C),
(D), is Pub. L. 91–190, Jan. 1, 1970, 83 Stat. 852, which is
classified generally to chapter 55 (§ 4321 et seq.) of Title
42, The Public Health and Welfare. For complete classi-
fication of this Act to the Code, see Short Title note
set out under section 4321 of Title 42 and Tables.
AMENDMENTS
2024—Subsec. (a). Pub. L. 118–63, § 783(1)(A), struck out
‘‘develop and’’ after ‘‘shall’’ and substituted ‘‘projects,
terminal development projects, general aviation air-
port construction or improvement projects, and avia-
tion safety projects’’ for ‘‘projects at congested air-
ports, general aviation airport construction or im-
provement projects, aviation safety projects, and avia-
tion security projects’’ in introductory provisions.
Subsec. (a)(1). Pub. L. 118–63, § 783(1)(B), substituted
‘‘streamlined’’ for ‘‘better’’.
Subsec. (b). Pub. L. 118–63, § 783(2), added subsec. (b)
and struck out former subsec. (b) which related to avia-
tion projects subject to a streamlined environmental
review process, including airport capacity enhance-
ment projects at congested airports, general aviation
airport construction or improvement projects, and
aviation safety and aviation security projects.
Subsec. (c)(1). Pub. L. 118–63, § 783(3), substituted ‘‘a
project described or designated under subsection (b)’’
for ‘‘an airport capacity enhancement project at a con-
gested airport or a project designated under subsection
(b)(3)’’.
Subsec. (d). Pub. L. 118–63, § 783(4), substituted ‘‘a
project described or designated under subsection (b)’’
for ‘‘each airport capacity enhancement project at a
congested airport or a project designated under sub-
section (b)(3)’’.
Subsec. (h). Pub. L. 118–63, § 783(5), substituted ‘‘de-
scribed in subsection (b)(1)’’ for ‘‘designated under sub-
section
(b)(3)
and
airport
capacity
enhancement
projects at congested airports’’.
Subsec. (j). Pub. L. 118–63, § 783(6), designated existing
provisions as par. (1), inserted heading, and added pars.
(2) and (3).
Subsec. (k). Pub. L. 118–63, § 783(7), substituted ‘‘a
project described or designated under subsection (b)’’
for ‘‘an airport capacity enhancement project at a con-
gested airport or a project designated under subsection
Page 1683
TITLE 49—TRANSPORTATION
§ 47171
(b)(3)’’; inserted dash after ‘‘project shall’’ and par. (1)
designation before ‘‘consider’’; substituted ‘‘; and’’ for
period at end; and added par. (2).
Subsec. (l). Pub. L. 118–63, § 783(8), substituted ‘‘and
section 1503 of title 40, Code of Federal Regulations.’’
for period at end.
Subsecs. (m) to (q). Pub. L. 118–63, § 783(9), added sub-
secs. (m) to (q) and struck out former subsec. (m). Prior
to amendment, text of subsec. (m) read as follows: ‘‘The
Transportation
Infrastructure
Streamlining
Task
Force, established by Executive Order 13274 (67 Fed.
Reg. 59449; relating to environmental stewardship and
transportation infrastructure project reviews), may
monitor airport projects that are subject to the coordi-
nated review process under this section.’’
2018—Subsec. (a). Pub. L. 115–254, § 191(a)(1), inserted
‘‘general aviation airport construction or improvement
projects,’’ after ‘‘congested airports,’’ in introductory
provisions.
Subsec. (b)(2), (3). Pub. L. 115–254, § 191(a)(2), added
par. (2) and redesignated former par. (2) as (3).
Subsecs.
(c)(1),
(d),
(h),
(k).
Pub.
L.
115–254,
§ 191(a)(3)–(6), substituted ‘‘subsection (b)(3)’’ for ‘‘sub-
section (b)(2)’’.
Subsec. (l). Pub. L. 115–254, § 539(q), substituted ‘‘4321’’
for ‘‘4371’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section applicable only to fiscal years beginning
after Sept. 30, 2003, except as otherwise specifically pro-
vided, see section 3 of Pub. L. 108–176, set out an Effec-
tive Date of 2003 Amendment note under section 106 of
this title.
CATEGORICAL EXCLUSIONS
Pub. L. 118–63, title VII, § 788, May 16, 2024, 138 Stat.
1314, provided that:
‘‘(a) CATEGORICAL EXCLUSION FOR PROJECTS OF LIM-
ITED FEDERAL ASSISTANCE.—An action by the Adminis-
trator [of the Federal Aviation Administration] to ap-
prove, permit, finance, or otherwise authorize any air-
port project that is undertaken by the sponsor, owner,
or operator of a public-use airport shall be presumed to
be covered by a categorical exclusion under FAA [Fed-
eral Aviation Administration] Order 1050.1F (or any
successor document), if such project—
‘‘(1) receives less than $6,000,000 (as adjusted annu-
ally by the Administrator to reflect any increases in
the Consumer Price Index prepared by the Depart-
ment of Labor) of Federal funds or funds from
charges collected under section 40117 of title 49,
United States Code; or
‘‘(2) has a total estimated cost of not more than
$35,000,000 (as adjusted annually by the Administrator
to reflect any increases in the Consumer Price Index
prepared by the Department of Labor) and Federal
funds comprising less than 15 percent of the total es-
timated project cost.
‘‘(b) CATEGORICAL EXCLUSION IN EMERGENCIES.—An ac-
tion by the Administrator to approve, permit, finance,
or otherwise authorize an airport project that is under-
taken by the sponsor, owner, or operator of a public-use
airport shall be presumed to be covered by a categor-
ical exclusion under FAA Order 1050.1F (or any suc-
cessor document), if such project is—
‘‘(1) for the repair or reconstruction of any airport
facility, runway, taxiway, or similar structure that is
in operation or under construction when damaged by
an emergency declared by the Governor of the State
with concurrence of the Administrator or for a dis-
aster or emergency declared by the President pursu-
ant to the Robert T. Stafford Disaster Relief and
Emergency Assistance Act (42 U.S.C. 5121 et seq.);
‘‘(2) in the same location with the same capacity,
dimensions, and design as the original airport facil-
ity, runway, taxiway, or similar structure as before
the declaration described in this section; and
‘‘(3) commenced within a 2-year period beginning on
the date of a declaration described in this section.
‘‘(c) EXTRAORDINARY CIRCUMSTANCES.—The presump-
tion that an action is covered by a categorical exclu-
sion under subsections (a) and (b) shall not apply if the
Administrator
determines
that
extraordinary
cir-
cumstances exist with respect to such action.
‘‘(d) RULE OF CONSTRUCTION.—Nothing in this section
shall be construed to impact any aviation safety au-
thority of the Administrator.
‘‘(e) DEFINITIONS.—In this section:
‘‘(1) CATEGORICAL
EXCLUSION.—The term ‘categor-
ical exclusion’ has the meaning given such term in
section 1508.1(d) of title 40, Code of Federal Regula-
tions.
‘‘(2) PUBLIC-USE AIRPORT; SPONSOR.—The terms ‘pub-
lic-use airport’ and ‘sponsor’ have the meanings given
such terms in section 47102 of title 49, United States
Code.’’
UPDATING PRESUMED TO CONFORM LIMITS
Pub. L. 118–63, title VII, § 789, May 16, 2024, 138 Stat.
1315, provided that: ‘‘Not later than 24 months after the
date of enactment of this Act [May 16, 2024], the Ad-
ministrator [of the Federal Aviation Administration]
shall take such actions as are necessary to update the
FAA’s [Federal Aviation Administration’s] list of ac-
tions that are presumed to conform to a State imple-
mentation plan pursuant to section 93.153(f) of title 40,
Code of Federal Regulations, to include projects relat-
ing to the construction of aircraft hangars.’’
FINDINGS
Pub. L. 108–176, title III, § 302, Dec. 12, 2003, 117 Stat.
2533, provided that: ‘‘Congress finds that—
‘‘(1) airports play a major role in interstate and for-
eign commerce;
‘‘(2) congestion and delays at our Nation’s major
airports have a significant negative impact on our
Nation’s economy;
‘‘(3) airport capacity enhancement projects at con-
gested airports are a national priority and should be
constructed on an expedited basis;
‘‘(4) airport capacity enhancement projects must
include an environmental review process that pro-
vides local citizenry an opportunity for consideration
of and appropriate action to address environmental
concerns; and
‘‘(5) the Federal Aviation Administration, airport
authorities, communities, and other Federal, State,
and local government agencies must work together to
develop a plan, set and honor milestones and dead-
lines, and work to protect the environment while sus-
taining the economic vitality that will result from
the continued growth of aviation.’’
LIMITATIONS
Pub. L. 108–176, title III, § 308, Dec. 12, 2003, 117 Stat.
2539, provided that: ‘‘Nothing in this subtitle [subtitle
A (§§ 301–309) of title III of Pub. L. 108–176, enacting this
subchapter, amending sections 40104, 47106, and 47504 of
this title, and enacting provisions set out as notes
under this section], including any amendment made by
this title [enacting this subchapter and amending sec-
tions 40104, 40128, 47106, 47503, and 47504 of this title],
shall preempt or interfere with—
‘‘(1) any practice of seeking public comment;
‘‘(2) any power, jurisdiction, or authority that a
State agency or an airport sponsor has with respect
to carrying out an airport capacity enhancement
project; and
‘‘(3) any obligation to comply with the provisions of
the National Environmental Policy Act of 1969 (42
U.S.C. 4371 [4321] et seq.) and the regulations issued
by the Council on Environmental Quality to carry
out such Act.’’
RELATIONSHIP TO OTHER REQUIREMENTS
Pub. L. 108–176, title III, § 309, Dec. 12, 2003, 117 Stat.
2540, provided that: ‘‘The coordinated review process re-
Page 1684
TITLE 49—TRANSPORTATION
§ 47172
quired under the amendments made by this subtitle
[enacting this subchapter and amending sections 40104,
47106, and 47504 of this title] shall apply to an airport
capacity enhancement project at a congested airport
whether or not the project is designated by the Sec-
retary of Transportation as a high-priority transpor-
tation infrastructure project under Executive Order
13274 [49 U.S.C. 301 note] (67 Fed. Reg. 59449; relating to
environmental stewardship and transportation infra-
structure project reviews).’’
§ 47172. Air traffic procedures for airport capac-
ity enhancement projects at congested air-
ports
(a) IN GENERAL.—The Administrator of the
Federal Aviation Administration may consider
prescribing flight procedures to avoid or mini-
mize potentially significant adverse noise im-
pacts of an airport capacity enhancement
project at a congested airport that involves the
construction of new runways or the reconfigura-
tion of existing runways during the environ-
mental planning process for the project. If the
Administrator determines that noise mitigation
flight procedures are consistent with safe and ef-
ficient use of the navigable airspace, the Admin-
istrator may commit, at the request of the air-
port sponsor and in a manner consistent with
applicable Federal law, to prescribing such pro-
cedures in any record of decision approving the
project.
(b) MODIFICATION.—Notwithstanding any com-
mitment by the Administrator under subsection
(a), the Administrator may initiate changes to
such procedures if necessary to maintain safety
and efficiency in light of new information or
changed circumstances.
(Added Pub. L. 108–176, title III, § 304(a), Dec. 12,
2003, 117 Stat. 2537.)
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section applicable only to fiscal years beginning
after Sept. 30, 2003, except as otherwise specifically pro-
vided, see section 3 of Pub. L. 108–176, set out an Effec-
tive Date of 2003 Amendment note under section 106 of
this title.
§ 47173. Airport funding of FAA staff
(a)
ACCEPTANCE
OF
SPONSOR-PROVIDED
FUNDS.—Notwithstanding any other provision of
law, the Administrator of the Federal Aviation
Administration may accept funds from an air-
port sponsor, including funds provided to the
sponsor under section 47114(c), to hire additional
staff or obtain the services of consultants—
(1) to facilitate the timely processing, re-
view, and completion of environmental activi-
ties associated with an airport development
project;
(2) to conduct special environmental studies
related to an airport project funded with Fed-
eral funds;
(3) to conduct special studies or reviews to
support approved noise compatibility meas-
ures described in part 150 of title 14, Code of
Federal Regulations;
(4) to conduct special studies or reviews to
support environmental mitigation in a record
of decision or finding of no significant impact
by the Federal Aviation Administration; and
(5) to facilitate the timely processing, re-
view, and completion of environmental activi-
ties associated with new or amended flight
procedures, including performance-based navi-
gation procedures, such as required navigation
performance procedures and area navigation
procedures.
(b) ADMINISTRATIVE
PROVISION.—Instead of
payment from an airport sponsor from funds ap-
portioned to the sponsor under section 47114, the
Administrator, with agreement of the sponsor,
may transfer funds that would otherwise be ap-
portioned to the sponsor under section 47114 to
the account used by the Administrator for ac-
tivities described in subsection (a).
(c) RECEIPTS CREDITED AS OFFSETTING COLLEC-
TIONS.—Notwithstanding section 3302 of title 31,
any funds accepted under this section, except
funds transferred pursuant to subsection (b)—
(1) shall be credited as offsetting collections
to the account that finances the activities and
services for which the funds are accepted;
(2) shall be available for expenditure only to
pay the costs of activities and services for
which the funds are accepted; and
(3) shall remain available until expended.
(d) MAINTENANCE OF EFFORT.—No funds may be
accepted pursuant to subsection (a), or trans-
ferred pursuant to subsection (b), in any fiscal
year in which the Federal Aviation Administra-
tion does not allocate at least the amount it ex-
pended in fiscal year 2002 (excluding amounts ac-
cepted pursuant to section 337 of the Depart-
ment of Transportation and Related Agencies
Appropriations Act, 2002 (115 Stat. 862)) for the
activities described in subsection (a).
(Added Pub. L. 108–176, title III, § 304(a), Dec. 12,
2003, 117 Stat. 2537; amended Pub. L. 112–95, title
V, § 503, Feb. 14, 2012, 126 Stat. 103.)
Editorial Notes
REFERENCES IN TEXT
Section 337 of the Department of Transportation and
Related Agencies Appropriations Act, 2002, referred to
in subsec. (d), is section 337 of Pub. L. 107–87, Dec. 18,
2001, 115 Stat. 862, which is not classified to the Code.
AMENDMENTS
2012—Subsec. (a). Pub. L. 112–95 substituted ‘‘services
of consultants—’’ for ‘‘services of consultants in order
to facilitate the timely processing, review, and comple-
tion of environmental activities associated with an air-
port development project.’’ and added pars. (1) to (5).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section applicable only to fiscal years beginning
after Sept. 30, 2003, except as otherwise specifically pro-
vided, see section 3 of Pub. L. 108–176, set out an Effec-
tive Date of 2003 Amendment note under section 106 of
this title.
§ 47174. Authorization of appropriations
In addition to the amounts authorized to be
appropriated under section 106(k), there is au-
thorized to be appropriated to the Secretary of
Transportation, out of the Airport and Airway
Trust Fund established under section 9502 of the
Internal Revenue Code of 1986 (26 U.S.C. 9502),
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
Section, Pub. L. 114–94, div. D, title XLI, § 41013, Dec. 4, 2015, 129 Stat. 1761, provided that this subchapter shall terminate 7 years after Dec. 4, 2015.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 4321
Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 4321. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 6095
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 4321
Sec.
4368a.
Utilization of talents of older Americans in
projects of pollution prevention, abate-
ment, and control.
4368b.
General assistance program.
4369.
Miscellaneous reports.
4369a.
Reports on environmental research and devel-
opment activities of Agency.
4370.
Reimbursement for use of facilities.
4370a.
Assistant Administrators of Environmental
Protection Agency; appointment; duties.
4370b.
Availability of fees and charges to carry out
Agency programs.
4370c.
Environmental Protection Agency fees.
4370d.
Percentage of Federal funding for organiza-
tions owned by socially and economically
disadvantaged individuals.
4370e.
Working capital fund in Treasury.
4370f.
Availability of funds after expiration of pe-
riod for liquidating obligations.
4370g.
Availability of funds for uniforms and certain
services.
4370h.
Availability of funds for facilities.
4370i.
Regional liaisons for minority, tribal, and
low-income communities.
4370j.
Municipal Ombudsman.
SUBCHAPTER IV—FEDERAL PERMITTING
IMPROVEMENT
4370m.
Definitions.
4370m–1. Federal Permitting Improvement Steering
Council.
4370m–2. Permitting process improvement.
4370m–3. Interstate compacts.
4370m–4. Coordination of required reviews.
4370m–5. Delegated State permitting programs.
4370m–6. Litigation, judicial review, and savings provi-
sion.
4370m–7. Reports.
4370m–8. Funding for governance, oversight, and proc-
essing of environmental reviews and per-
mits.
4370m–9. Application.
4370m–10. GAO report.
4370m–11. Savings provision.
4370m–12. Repealed.
§ 4321. Congressional declaration of purpose
The purposes of this chapter are: To declare a
national policy which will encourage productive
and enjoyable harmony
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 4321
Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 4321. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Aviation Project Review Process.—** The Secretary of Transportation shall implement an expedited and coordinated environmental review process for airport capacity enhancement projects, terminal development projects, general aviation airport construction or improvement projects, and aviation safety projects that—
(1) provides for streamlined coordination among the Federal, regional, State, and local agencies concerned with the preparation of environmental impact statements or environmental assessments under the National Environmental Policy Act of 1969 ([42 U.S.C. 4321](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section4321&num=0&edition=prelim) et seq.);
(2) provides that all environmental reviews, analyses, opinions, permits, licenses, and approvals that must be issued or made by a Federal agency or airport sponsor for such a project will be conducted concurrently, to the maximum extent practicable; and
(3) provides that any environmental review, analysis, opinion, permit, license, or approval that must be issued or made by a Federal agency or airport sponsor for such a project will be completed within a time period established by the Secretary, in cooperation with the agencies identified under subsection (d) with respect to the project.
**(b) Aviation Projects Subject to a Streamlined Environmental Review Process.—**
(1) **In general.—** — Any airport capacity enhancement project, terminal development project, or general aviation airport construction or improvement project shall be subject to the coordinated and expedited environmental review process requirements set forth in this section.
(2) **Project designation criteria.—**
(A) *In general.—* — The Secretary may designate an aviation safety project for priority environmenta
Source: Supplied U.S. Code snapshot — release unconfirmed · 49 U.S.C. § 47171
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.