Browse Arkansas Code titles and sections
42 U.S.C. § 7256c — Milestone-based demonstration projects
Federal law — U.S. Code and appendices · legal_authorities
Page 7090
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7256c
§ 7256c. Milestone-based demonstration projects
(a) In general
Acting under section 7256(g) of this title, not-
withstanding paragraph (10) of such section, the
Secretary of Energy (in this section referred to
as the ‘‘Secretary’’) may carry out demonstra-
tion projects as a milestone-based demonstra-
tion project that requires particular technical
and financial milestones to be met before a par-
ticipant is awarded grants by the Department
through a competitive award process.
(b) Requirements
In carrying out milestone-based demonstra-
tion projects under the authority in paragraph
(1), the Secretary shall, for each relevant
project—
(1) request proposals from eligible entities,
as determined by the Secretary, including—
(A) a business plan, that may include a
plan for scalable manufacturing and a plan
for addressing supply chain gaps;
(B) a plan for raising private sector invest-
ment; and
(C) proposed technical and financial mile-
stones,
including
estimated
project
timelines and total costs; and
(2) award funding of a predetermined amount
to projects that successfully meet proposed
milestones under paragraph (1)(C) or for ex-
penses deemed reimbursable by the Secretary,
in accordance with terms negotiated for an in-
dividual award;
(3) require cost sharing in accordance with
section 16352 of this title; and
(4) communicate regularly with selected eli-
gible entities and, if the Secretary deems ap-
propriate, exercise small amounts of flexi-
bility for technical and financial milestones as
projects mature.
(c) Awards
For the program established under subsection
(a)—
(1) an award recipient shall be responsible
for all costs until milestones are achieved, or
reimbursable
expenses
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7256c
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: c23c9e548df086fe4d567f851b8e0820166c4eb8d03342fc214b15c79153d1c3. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-cf7fc859bda398ccb67988a4
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-7256c-milestone-based-demonstration-projects--0c28a9598f.md
Pages: Not recorded – Not recorded
Passage SHA-256: 94cc6ac8adfc6147e4f25e2fe0a02f37f0ca514a1e8ed99b3238f4f1c8a21ec9
Source location: USCODE-2024-title42-chap84-subchapVI-partC-sec7256c.pdf
Stored source content
Page 7090
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7256c
§ 7256c. Milestone-based demonstration projects
(a) In general
Acting under section 7256(g) of this title, not-
withstanding paragraph (10) of such section, the
Secretary of Energy (in this section referred to
as the ‘‘Secretary’’) may carry out demonstra-
tion projects as a milestone-based demonstra-
tion project that requires particular technical
and financial milestones to be met before a par-
ticipant is awarded grants by the Department
through a competitive award process.
(b) Requirements
In carrying out milestone-based demonstra-
tion projects under the authority in paragraph
(1), the Secretary shall, for each relevant
project—
(1) request proposals from eligible entities,
as determined by the Secretary, including—
(A) a business plan, that may include a
plan for scalable manufacturing and a plan
for addressing supply chain gaps;
(B) a plan for raising private sector invest-
ment; and
(C) proposed technical and financial mile-
stones,
including
estimated
project
timelines and total costs; and
(2) award funding of a predetermined amount
to projects that successfully meet proposed
milestones under paragraph (1)(C) or for ex-
penses deemed reimbursable by the Secretary,
in accordance with terms negotiated for an in-
dividual award;
(3) require cost sharing in accordance with
section 16352 of this title; and
(4) communicate regularly with selected eli-
gible entities and, if the Secretary deems ap-
propriate, exercise small amounts of flexi-
bility for technical and financial milestones as
projects mature.
(c) Awards
For the program established under subsection
(a)—
(1) an award recipient shall be responsible
for all costs until milestones are achieved, or
reimbursable
expenses
are
reviewed
and
verified by the Department; and
(2) should an awardee not meet the mile-
stones described in subsection (a), the Sec-
retary or their designee may end the partner-
ship with an award recipient and use the re-
maining funds in the ended agreement for new
or existing projects carried out under this sec-
tion.
(d) Project management
In carrying out projects under this program
and assessing the completion of their milestones
in accordance with subsection (b), the Secretary
shall consult with experts that represent diverse
perspectives and professional experiences, in-
cluding those from the private sector, to ensure
a complete and thorough review.
(e) Report
In accordance with section 16391a(a) of this
title, the Secretary shall report annually on any
demonstration projects carried out using the au-
thorities under this section.
(Pub. L. 116–260, div. Z, title IX, § 9005, Dec. 27,
2020, 134 Stat. 2599.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Energy Act of 2020,
and not as part of the Department of Energy Organiza-
tion Act which comprises this chapter.
§ 7257. Acquisition, construction, etc., of labora-
tories, research and testing sites, etc.
The Secretary is authorized to acquire (by
purchase, lease, condemnation, or otherwise),
construct, improve, repair, operate, and main-
tain laboratories, research and testing sites and
facilities, quarters and related accommodations
for employees and dependents of employees of
the Department, personal property (including
patents), or any interest therein, as the Sec-
retary deems necessary; and to provide by con-
tract or otherwise for eating facilities and other
necessary facilities for the health and welfare of
employees of the Department at its installations
and purchase and maintain equipment therefor.
(Pub. L. 95–91, title VI, § 647, Aug. 4, 1977, 91 Stat.
599.)
Statutory Notes and Related Subsidiaries
PILOT PROGRAM FOR PROJECT MANAGEMENT OVERSIGHT
REGARDING
DEPARTMENT
OF
ENERGY
CONSTRUCTION
PROJECTS
Pub. L. 106–65, div. C, title XXXI, § 3175, Oct. 5, 1999,
113 Stat. 950, provided that:
‘‘(a) REQUIREMENT.—(1) The Secretary of Energy shall
carry out a pilot program on use of project manage-
ment oversight services (in this section referred to as
‘PMO services’) for construction projects of the Depart-
ment of Energy.
‘‘(2) The purpose of the pilot program shall be to pro-
vide a basis for determining whether or not the use of
competitively procured, external PMO services for
those construction projects would permit the Depart-
ment to control excessive costs and schedule delays as-
sociated with those construction projects that have
large capital costs.
‘‘(b) PROJECTS COVERED BY PROGRAM.—(1) Subject to
paragraph (2), the Secretary shall carry out the pilot
program at construction projects selected by the Sec-
retary. The projects shall include one or more con-
struction projects authorized pursuant to section 3101
[113 Stat. 915] and one construction project authorized
pursuant to section 3102 [113 Stat. 917].
‘‘(2) Each project selected by the Secretary shall be a
project having capital construction costs anticipated
to be not less than $25,000,000.
‘‘(c) SERVICES UNDER PROGRAM.—The PMO services
used under the pilot program shall include the fol-
lowing services:
‘‘(1) Monitoring the overall progress of a project.
‘‘(2) Determining whether or not a project is on
schedule.
‘‘(3) Determining whether or not a project is within
budget.
‘‘(4) Determining whether or not a project conforms
with plans and specifications approved by the Depart-
ment.
‘‘(5) Determining whether or not a project is being
carried out efficiently and effectively.
‘‘(6) Any other management oversight services that
the Secretary considers appropriate for purposes of
the pilot program.
‘‘(d) PROCUREMENT
OF SERVICES UNDER PROGRAM.—
Any PMO services procured under the pilot program
shall be acquired—
‘‘(1) on a competitive basis; and
‘‘(2) from among commercial entities that—
‘‘(A) do not currently manage or operate facilities
at a location where the pilot program is being con-
ducted; and
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
#### Codification
Section 7256a, Pub. L. 99–145, title XV, § 1534, Nov. 8, 1985, 99 Stat. 774; Pub. L. 100–180, div. C, title I, § 3131(a), Dec. 4, 1987, 101 Stat. 1238, which related to costs not allowed under covered contracts, was renumbered section 4801 of Pub. L. 107–314 by Pub. L. 108–136, div. C, title XXXI, § 3141(k)(2)(A)–(C), Nov. 24, 2003, 117 Stat. 1783, and was formerly classified to [section 2781 of Title 50](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title50-section2781&num=0&edition=prelim), War and National Defense. See [section 6321 of Title 10](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section6321&num=0&edition=prelim), Armed Forces.
Section 7256b, Pub. L. 101–189, div. C, title XXXI, § 3151, Nov. 29, 1989, 103 Stat. 1682, which related to the prohibition of bonuses to contractors operating defense nuclear facilities, was renumbered section 4802 of Pub. L. 107–314 by Pub. L. 108–136, div. C, title XXXI, § 3141(k)(3)(A)–(C), Nov. 24, 2003, 117 Stat. 1783, and was formerly classified to [section 2782 of Title 50](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title50-section2782&num=0&edition=prelim), War and National Defense. See [section 6322 of Title 10](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section6322&num=0&edition=prelim), Armed Forces.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7256c
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.