Browse Arkansas Code titles and sections
30 U.S.C. § 1264 — Decisions of regulatory authority and ap-
Federal law — U.S. Code and appendices · legal_authorities
Page 285
TITLE 30—MINERAL LANDS AND MINING
§ 1264
cant by the regulatory authority and shall be
made available to the public. If written objec-
tions are filed and an informal conference re-
quested, the regulatory authority shall then
hold an informal conference in the locality of
the proposed mining, if requested within a rea-
sonable time of the receipt of such objections or
request. The date, time and location of such in-
formal conference shall be advertised by the reg-
ulatory authority in a newspaper of general cir-
culation in the locality at least two weeks prior
to the scheduled conference date. The regu-
latory authority may arrange with the applicant
upon request by any party to the administrative
proceeding access to the proposed mining area
for the purpose of gathering information rel-
evant to the proceeding. An electronic or steno-
graphic record shall be made of the conference
proceeding, unless waived by all parties. Such
record shall be maintained and shall be acces-
sible to the parties until final release of the ap-
plicant’s performance bond. In the event all par-
ties requesting the informal conference stipu-
late agreement prior to the requested informal
conference and withdraw their request, such in-
formal conference need not be held.
(c) Prior Federal coal lease hearing as evidence
Where the lands included in an application for
a permit are the subject of a Federal coal lease
in connection with which hearings were held and
determinations
were
made
under
section
201(a)(3)(A), (B) and (C) of this title, such hear-
ings shall be deemed as to the matters covered
to satisfy the requirements of this section and
section 1264 of this title and such determina-
tions shall be deemed to be a part of the record
and conclusive for p
Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 1264
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 5b2ec04e6364693d543ef83820c630a4eacc0861fb8662391d12beec613f3074. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-ce2c8b7f95220eacbbb786d8
Source file: Laws/federal/codes/united-states-code-2024/title-30/section-1264-decisions-of-regulatory-authority-and-ap--c3065c9ddd.md
Pages: Not recorded – Not recorded
Passage SHA-256: ab2126aa7b6e8dad29d382fd56b07dc0d47dda8128d33d3dea8c8e0fa74486c8
Source location: USCODE-2024-title30-chap25-subchapV-sec1264.pdf
Stored source content
Page 285
TITLE 30—MINERAL LANDS AND MINING
§ 1264
cant by the regulatory authority and shall be
made available to the public. If written objec-
tions are filed and an informal conference re-
quested, the regulatory authority shall then
hold an informal conference in the locality of
the proposed mining, if requested within a rea-
sonable time of the receipt of such objections or
request. The date, time and location of such in-
formal conference shall be advertised by the reg-
ulatory authority in a newspaper of general cir-
culation in the locality at least two weeks prior
to the scheduled conference date. The regu-
latory authority may arrange with the applicant
upon request by any party to the administrative
proceeding access to the proposed mining area
for the purpose of gathering information rel-
evant to the proceeding. An electronic or steno-
graphic record shall be made of the conference
proceeding, unless waived by all parties. Such
record shall be maintained and shall be acces-
sible to the parties until final release of the ap-
plicant’s performance bond. In the event all par-
ties requesting the informal conference stipu-
late agreement prior to the requested informal
conference and withdraw their request, such in-
formal conference need not be held.
(c) Prior Federal coal lease hearing as evidence
Where the lands included in an application for
a permit are the subject of a Federal coal lease
in connection with which hearings were held and
determinations
were
made
under
section
201(a)(3)(A), (B) and (C) of this title, such hear-
ings shall be deemed as to the matters covered
to satisfy the requirements of this section and
section 1264 of this title and such determina-
tions shall be deemed to be a part of the record
and conclusive for purposes of sections 1260, 1264
of this title and this section.
(Pub. L. 95–87, title V, § 513, Aug. 3, 1977, 91 Stat.
484.)
§ 1264. Decisions of regulatory authority and ap-
peals
(a) Issuance of findings within 60 days after in-
formal conference
If an informal conference has been held pursu-
ant to section 1263(b) of this title, the regulatory
authority shall issue and furnish the applicant
for a permit and persons who are parties to the
administrative proceedings with the written
finding of the regulatory authority, granting or
denying the permit in whole or in part and stat-
ing the reasons therefor, within the sixty days
of said hearings.
(b) Decision without informal conference; notifi-
cation within a reasonable time
If there has been no informal conference held
pursuant to section 1263(b) of this title, the reg-
ulatory authority shall notify the applicant for
a permit within a reasonable time as determined
by the regulatory authority and set forth in reg-
ulations, taking into account the time needed
for proper investigation of the site, the com-
plexity of the permit application, and whether
or not written objection to the application has
been filed, whether the application has been ap-
proved or disapproved in whole or part.
(c) Request for rehearing on reasons for final de-
termination; time; issuance of decision
If the application is approved, the permit shall
be issued. If the application is disapproved, spe-
cific reasons therefor must be set forth in the
notification. Within thirty days after the appli-
cant is notified of the final decision of the regu-
latory authority on the permit application, the
applicant or any person with an interest which
is or may be adversely affected may request a
hearing on the reasons for the final determina-
tion. The regulatory authority shall hold a hear-
ing within thirty days of such request and pro-
vide notification to all interested parties at the
time that the applicant is so notified. If the Sec-
retary is the regulatory authority the hearing
shall be of record and governed by section 554 of
title 5. Where the regulatory authority is the
State, such hearing shall be of record, adjudica-
tory in nature and no person who presided at a
conference under section 1263(b) of this title
shall either preside at the hearing or participate
in this decision thereon or in any administrative
appeal therefrom. Within thirty days after the
hearing the regulatory authority shall issue and
furnish the applicant, and all persons who par-
ticipated in the hearing, with the written deci-
sion of the regulatory authority granting or de-
nying the permit in whole or in part and stating
the reasons therefor.
(d) Temporary relief
Where a hearing is requested pursuant to sub-
section (c), the Secretary, where the Secretary
is the regulatory authority, or the State hearing
authority may, under such conditions as it may
prescribe, grant such temporary relief as it
deems appropriate pending final determination
of the proceedings if—
(1) all parties to the proceedings have been
notified and given an opportunity to be heard
on a request for temporary relief;
(2) the person requesting such relief shows
that there is a substantial likelihood that he
will prevail on the merits of the final deter-
mination of the proceeding; and
(3) such relief will not adversely affect the
public health or safety or cause significant im-
minent environmental harm to land, air, or
water resources.
(e) Power of regulatory authority with respect to
rehearing
For the purpose of such hearing, the regu-
latory authority may administer oaths, sub-
poena witnesses, or written or printed mate-
rials, compel attendance of the witness, or pro-
duction of the materials, and take evidence in-
cluding but not limited to site inspections of the
land to be affected and other surface coal min-
ing operations carried on by the applicant in the
general vicinity of the proposed operation. A
verbatim record of each public hearing required
by this chapter shall be made, and a transcript
made available on the motion of any party or by
order of the regulatory authority.
(f) Right to appeal in accordance with section
1276 of this title
Any applicant or any person with an interest
which is or may be adversely affected who has
participated in the administrative proceedings
Page 286
TITLE 30—MINERAL LANDS AND MINING
§ 1265
as an objector, and who is aggrieved by the deci-
sion of the regulatory authority, or if the regu-
latory authority fails to act within the time
limits specified in this chapter shall have the
right to appeal in accordance with section 1276
of this title.
(Pub. L. 95–87, title V, § 514, Aug. 3, 1977, 91 Stat.
485.)
§ 1265. Environmental protection performance
standards
(a) Permit requirement
Any permit issued under any approved State
or Federal program pursuant to this chapter to
conduct surface coal mining operations shall re-
quire that such surface coal mining operations
will meet all applicable performance standards
of this chapter, and such other requirements as
the regulatory authority shall promulgate.
(b) General standards
General performance standards shall be appli-
cable to all surface coal mining and reclamation
operations and shall require the operation as a
minimum to—
(1) conduct surface coal mining operations
so as to maximize the utilization and con-
servation of the solid fuel resource being re-
covered so that reaffecting the land in the fu-
ture through surface coal mining can be mini-
mized;
(2) restore the land affected to a condition
capable of supporting the uses which it was ca-
pable of supporting prior to any mining, or
higher or better uses of which there is reason-
able likelihood, so long as such use or uses do
not present any actual or probable hazard to
public health or safety or pose any actual or
probable threat of water diminution or pollu-
tion, and the permit applicants’ declared pro-
posed land use following reclamation is not
deemed to be impractical or unreasonable, in-
consistent with applicable land use policies
and plans, involves unreasonable delay in im-
plementation, or is violative of Federal, State,
or local law;
(3) except as provided in subsection (c) with
respect to all surface coal mining operations
backfill, compact (where advisable to insure
stability or to prevent leaching of toxic mate-
rials), and grade in order to restore the ap-
proximate original contour of the land with
all highwalls, spoil piles, and depressions
eliminated (unless small depressions are need-
ed in order to retain moisture to assist revege-
tation or as otherwise authorized pursuant to
this chapter): Provided, however, That in sur-
face coal mining which is carried out at the
same location over a substantial period of
time where the operation transects the coal
deposit, and the thickness of the coal deposits
relative to the volume of the overburden is
large and where the operator demonstrates
that the overburden and other spoil and waste
materials at a particular point in the permit
area or otherwise available from the entire
permit area is insufficient, giving due consid-
eration to volumetric expansion, to restore
the approximate original contour, the oper-
ator, at a minimum, shall backfill, grade, and
compact (where advisable) using all available
overburden and other spoil and waste mate-
rials to attain the lowest practicable grade
but not more than the angle of repose, to pro-
vide adequate drainage and to cover all acid-
forming and other toxic materials, in order to
achieve an ecologically sound land use com-
patible with the surrounding region: And pro-
vided further, That in surface coal mining
where the volume of overburden is large rel-
ative to the thickness of the coal deposit and
where the operator demonstrates that due to
volumetric expansion the amount of overbur-
den and other spoil and waste materials re-
moved in the course of the mining operation is
more than sufficient to restore the approxi-
mate original contour, the operator shall after
restoring the approximate contour, backfill,
grade, and compact (where advisable) the ex-
cess overburden and other spoil and waste ma-
terials to attain the lowest grade but not more
than the angle of repose, and to cover all acid-
forming and other toxic materials, in order to
achieve an ecologically sound land use com-
patible with the surrounding region and that
such overburden or spoil shall be shaped and
graded in such a way as to prevent slides, ero-
sion, and water pollution and is revegetated in
accordance with the requirements of this
chapter;
(4) stabilize and protect all surface areas in-
cluding spoil piles affected by the surface coal
mining and reclamation operation to effec-
tively control erosion and attendant air and
water pollution;
(5) remove the topsoil from the land in a sep-
arate layer, replace it on the backfill area, or
if not utilized immediately, segregate it in a
separate pile from other spoil and when the
topsoil is not replaced on a backfill area with-
in a time short enough to avoid deterioration
of the topsoil, maintain a successful cover by
quick growing plant or other means thereafter
so that the topsoil is preserved from wind and
water erosion, remains free of any contamina-
tion by other acid or toxic material, and is in
a usable condition for sustaining vegetation
when restored during reclamation, except if
topsoil is of insufficient quantity or of poor
quality for sustaining vegetation, or if other
strata can be shown to be more suitable for
vegetation requirements, then the operator
shall remove, segregate, and preserve in a like
manner such other strata which is best able to
support vegetation;
(6) restore the topsoil or the best available
subsoil which is best able to support vegeta-
tion;
(7) for all prime farm lands as identified in
section 1257(b)(16) of this title to be mined and
reclaimed, specifications for soil removal,
storage, replacement, and reconstruction shall
be established by the Secretary of Agriculture,
and the operator shall, as a minimum, be re-
quired to—
(A) segregate the A horizon of the natural
soil, except where it can be shown that other
available soil materials will create a final
soil having a greater productive capacity;
and if not utilized immediately, stockpile
this material separately from other spoil,
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Issuance of findings within 60 days after informal conference** If an informal conference has been held pursuant to [section 1263(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1263/b&num=0&edition=prelim), the regulatory authority shall issue and furnish the applicant for a permit and persons who are parties to the administrative proceedings with the written finding of the regulatory authority, granting or denying the permit in whole or in part and stating the reasons therefor, within the sixty days of said hearings.
**(b) Decision without informal conference; notification within a reasonable time** If there has been no informal conference held pursuant to [section 1263(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1263/b&num=0&edition=prelim), the regulatory authority shall notify the applicant for a permit within a reasonable time as determined by the regulatory authority and set forth in regulations, taking into account the time needed for proper investigation of the site, the complexity of the permit application, and whether or not written objection to the application has been filed, whether the application has been approved or disapproved in whole or part.
**(c) Request for rehearing on reasons for final determination; time; issuance of decision** If the application is approved, the permit shall be issued. If the application is disapproved, specific reasons therefor must be set forth in the notification. Within thirty days after the applicant is notified of the final decision of the regulatory authority on the permit application, the applicant or any person with an interest which is or may be adversely affected may request a hearing on the reasons for the final d
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1264
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.