Browse Arkansas Code titles and sections
33 U.S.C. § 426i — Shore damage prevention or mitigation
Federal law — U.S. Code and appendices · legal_authorities
Page 70
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 426g–1
‘‘(b) PROJECT SELECTION.—In carrying out the pilot
program under subsection (a), the Secretary shall con-
sult with relevant State agencies in selecting projects.
‘‘(c) CRITERIA.—In carrying out the pilot program
under subsection (a), the Secretary shall establish cri-
teria and other considerations that—
‘‘(1) foster Federal, State, and local collaboration;
‘‘(2) evaluate the performance of projects being car-
ried out under a single contract with respect to
whether such projects yield any regional or multi-dis-
trict benefits; and
‘‘(3) include other criteria and considerations that
the Secretary determines to be appropriate.
‘‘(d) REPORT.—Not later than 1 year after the date of
enactment of this Act [Oct. 23, 2018], and annually
thereafter, the Secretary shall submit to the Com-
mittee on Environment and Public Works of the Senate
and the Committee on Transportation and Infrastruc-
ture of the House of Representatives a report that in-
cludes findings and recommendations of the Secretary
with respect to the projects completed under the pilot
program carried out under subsection (a).
‘‘(e) AUTHORIZATION OF APPROPRIATIONS.—There is au-
thorized to be appropriated to carry out this section
$75,000,000.
‘‘(f) TERMINATION.—The authority of the Secretary to
enter into contracts pursuant to the pilot program car-
ried out under subsection (a) shall expire on the date
that is 10 years after the date of enactment of this
Act.’’
§ 426g–1. State and regional plans
The Secretary may—
(1) cooperate with any State in the prepara-
tion of a comprehensive State or regional plan
for the conservation of coastal resources lo-
cated within the boundaries of the State;
(2) encourage State participation in the
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 426i
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: c33da0ef34d4e8e8cd3dbb856519cda8a4a5e16de4c75debdfa746b979bf0845. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-cb0e8218ed1047dc2ef3fb69
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-426i-shore-damage-prevention-or-mitigation--783c1f5997.md
Pages: Not recorded – Not recorded
Passage SHA-256: 3618de67b6ea33802bebe1ff8c74b988cefb066b4db97dbd0e1abea31efda972
Source location: USCODE-2024-title33-chap9-subchapI-sec426i.pdf
Stored source content
Page 70
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 426g–1
‘‘(b) PROJECT SELECTION.—In carrying out the pilot
program under subsection (a), the Secretary shall con-
sult with relevant State agencies in selecting projects.
‘‘(c) CRITERIA.—In carrying out the pilot program
under subsection (a), the Secretary shall establish cri-
teria and other considerations that—
‘‘(1) foster Federal, State, and local collaboration;
‘‘(2) evaluate the performance of projects being car-
ried out under a single contract with respect to
whether such projects yield any regional or multi-dis-
trict benefits; and
‘‘(3) include other criteria and considerations that
the Secretary determines to be appropriate.
‘‘(d) REPORT.—Not later than 1 year after the date of
enactment of this Act [Oct. 23, 2018], and annually
thereafter, the Secretary shall submit to the Com-
mittee on Environment and Public Works of the Senate
and the Committee on Transportation and Infrastruc-
ture of the House of Representatives a report that in-
cludes findings and recommendations of the Secretary
with respect to the projects completed under the pilot
program carried out under subsection (a).
‘‘(e) AUTHORIZATION OF APPROPRIATIONS.—There is au-
thorized to be appropriated to carry out this section
$75,000,000.
‘‘(f) TERMINATION.—The authority of the Secretary to
enter into contracts pursuant to the pilot program car-
ried out under subsection (a) shall expire on the date
that is 10 years after the date of enactment of this
Act.’’
§ 426g–1. State and regional plans
The Secretary may—
(1) cooperate with any State in the prepara-
tion of a comprehensive State or regional plan
for the conservation of coastal resources lo-
cated within the boundaries of the State;
(2) encourage State participation in the im-
plementation of the plan; and
(3) submit to Congress reports and rec-
ommendations with respect to appropriate
Federal participation in carrying out the plan.
(Aug. 13, 1946, ch. 960, § 4, as added Pub. L.
104–303, title II, § 227(d)(2), Oct. 12, 1996, 110 Stat.
3700.)
Editorial Notes
PRIOR PROVISIONS
A prior section 4 of act Aug. 13, 1946, was renumbered
section 5 of that act, and was classified to section 426h
of this title prior to repeal by Pub. L. 104–303.
§ 426h. Repealed. Pub. L. 110–114, title II,
§ 2038(b), Nov. 8, 2007, 121 Stat. 1100
Section, act Aug. 13, 1946, ch. 960, § 5, as added Pub. L.
104–303, title II, § 227(e)(1), Oct. 12, 1996, 110 Stat. 3700;
amended Pub. L. 106–53, title V, § 581, Aug. 17, 1999, 113
Stat. 375; Pub. L. 109–234, title II, § 2305, June 15, 2006,
120 Stat. 456; Pub. L. 110–161, div. C, title I, § 113, Dec.
26, 2007, 121 Stat. 1944, related to national shoreline ero-
sion control development and demonstration program.
A prior section 426h, acts Aug. 13, 1946, ch. 960, § 5, for-
merly § 4, 60 Stat. 1057; July 28, 1956, ch. 768, 70 Stat. 703;
renumbered § 5, Oct. 12, 1996, Pub. L. 104–303, title II,
§ 227(d)(1), 110 Stat. 3700, defined the word ‘‘shores’’ as
used in sections 426e to 426h of this title, prior to repeal
by Pub. L. 104–303, title II, § 227(e)(1), Oct. 12, 1996, 110
Stat. 3700.
§ 426h–1. Definitions
In sections 426e and 426f to 426h–1 of this title,
the following definitions apply:
(1) Erosion control program
The term ‘‘erosion control program’’ means
the national shoreline erosion control develop-
ment and demonstration program established
under this section.
(2) Secretary
The term ‘‘Secretary’’ means the Secretary
of the Army.
(3) Separable element
The term ‘‘separable element’’ has the
meaning provided by section 2213(f) of this
title.
(4) Shore
The term ‘‘shore’’ includes each shoreline of
the Atlantic and Pacific Oceans, the Gulf of
Mexico, the Great Lakes, and lakes, estuaries,
and bays directly connected therewith.
(5) Shore protection project
The term ‘‘shore protection project’’ in-
cludes a project for beach nourishment, in-
cluding the replacement of sand.
(Aug. 13, 1946, ch. 960, § 6, as added Pub. L.
104–303, title II, § 227(e)(1), Oct. 12, 1996, 110 Stat.
3702.)
§ 426i. Shore damage prevention or mitigation
(a) In general
The Secretary of the Army is authorized to in-
vestigate, study, plan, and implement structural
and nonstructural measures for the prevention
or mitigation of shore damages attributable to
Federal navigation works and shore damage at-
tributable to the Atlantic Intracoastal Water-
way and the Gulf Intracoastal Waterway, if a
non-Federal public body agrees to operate and
maintain such measures, and, in the case of in-
terests in real property acquired in conjunction
with nonstructural measures, to operate and
maintain the property for public purposes in ac-
cordance with regulations prescribed by the Sec-
retary.
(b) Cost sharing
The costs of implementing measures, includ-
ing a study, shall be cost-shared in the same
proportion as the cost-sharing provisions appli-
cable to construction of the project causing the
shore damage.
(c) Requirement for specific authorization
No such project shall be initiated without spe-
cific authorization by Congress if the Federal
first cost exceeds $15,000,000.
(d) Coordination
The Secretary shall—
(1) coordinate the implementation of the
measures under this section with other Fed-
eral and non-Federal shore protection projects
in the same geographic area; and
(2) to the extent practicable, combine miti-
gation projects with other shore protection
projects in the same area into a comprehen-
sive regional project.
(e) Reimbursement for feasibility studies
Beginning on December 16, 2016, in any case in
which the Secretary implements a project under
this section, the Secretary shall reimburse or
credit the non-Federal interest for any amounts
contributed for the study evaluating the damage
in excess of the non-Federal share of the costs,
as determined under subsection (b).
Page 71
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 426k
(Pub. L. 90–483, title I, § 111, Aug. 13, 1968, 82
Stat. 735; Pub. L. 99–662, title IX, §§ 915(f), 940,
Nov. 17, 1986, 100 Stat. 4191, 4199; Pub. L. 106–53,
title II, § 214, Aug. 17, 1999, 113 Stat. 291; Pub. L.
113–121, title I, § 1030(c), June 10, 2014, 128 Stat.
1232; Pub. L. 114–322, title I, § 1169, Dec. 16, 2016,
130 Stat. 1671; Pub. L. 115–270, title I, § 1157(c),
Oct. 23, 2018, 132 Stat. 3794; Pub. L. 118–272, div.
A, title I, § 1107(h), Jan. 4, 2025, 138 Stat. 3005.)
Editorial Notes
AMENDMENTS
2025—Subsec.
(c).
Pub.
L.
118–272
substituted
‘‘$15,000,000’’ for ‘‘$12,500,000’’.
2018—Subsec.
(c).
Pub.
L.
115–270
substituted
‘‘$12,500,000’’ for ‘‘$10,000,000’’.
2016—Subsec. (b). Pub. L. 114–322, § 1169(1), substituted
‘‘measures, including a study, shall be cost-shared in
the same proportion as the cost-sharing provisions ap-
plicable to construction of the project’’ for ‘‘measures
under this section shall be cost-shared in the same pro-
portion as the cost-sharing provisions applicable to the
project’’.
Subsec. (e). Pub. L. 114–322, § 1169(2), added subsec. (e).
2014—Subsec.
(c).
Pub.
L.
113–121
substituted
‘‘$10,000,000’’ for ‘‘$5,000,000’’.
1999—Pub. L. 106–53 designated first sentence as sub-
sec. (a), inserted heading, and inserted ‘‘and shore dam-
age attributable to the Atlantic Intracoastal Waterway
and the Gulf Intracoastal Waterway’’ after ‘‘navigation
works’’, designated second sentence as subsec. (b) and
inserted heading, and designated third sentence as sub-
sec. (c), inserted heading, and substituted ‘‘$5,000,000’’
for ‘‘$2,000,000’’, and added subsec. (d).
1986—Pub. L. 99–662, § 940, amended section generally.
Prior to amendment, section read as follows: ‘‘The Sec-
retary of the Army, acting through the Chief of Engi-
neers, is authorized to investigate, study, and con-
struct projects for the prevention or mitigation of
shore damages attributable to Federal navigation
works. The cost of installing, operating, and maintain-
ing such projects shall be borne entirely by the United
States. No such project shall be constructed without
specific authorization by Congress if the estimated
first cost exceeds $2,000,000.’’
Pub. L. 99–662, § 915(f), substituted ‘‘$2,000,000’’ for
‘‘$1,000,000’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1986 AMENDMENT
Amendment by section 915(f) of Pub. L. 99–662 not ap-
plicable to any project under contract for construction
on Nov. 17, 1986, see section 915(i) of Pub. L. 99–662, set
out as a note under section 426g of this title.
COASTAL EROSION
Pub. L. 115–270, title I, § 1172, Oct. 23, 2018, 132 Stat.
3799, provided that:
‘‘(a) IN GENERAL.—Pursuant to section 111 of the
River and Harbor Act of 1968 (33 U.S.C. 426i), the Sec-
retary [of the Army] shall, to the maximum extent
practicable, complete operation and maintenance re-
nourishment to mitigate coastal erosion attributed to
Federal project structures in the upper northeast
United States.
‘‘(b) PROJECT SELECTION.—In carrying out the work
under subsection (a), the Secretary shall—
‘‘(1) identify and carry out not more than five
projects—
‘‘(A) located in any of the States of Maine, New
Hampshire, Massachusetts, Connecticut, Rhode Is-
land, or New York; and
‘‘(B) for which a feasibility study has been com-
pleted by December 31, 2019, that includes findings
that a Federal project structure is interrupting the
natural flow of sediment and causing coastal ero-
sion; and
‘‘(2) consult with relevant State agencies in select-
ing projects.’’
§ 426i–1. Repealed. Pub. L. 113–121, title I,
§ 1014(c)(2), June 10, 2014, 128 Stat. 1222
Section, Pub. L. 102–580, title II, § 206, Oct. 31, 1992, 106
Stat. 4828; Pub. L. 104–303, title II, § 227(c)(2), Oct. 12,
1996, 110 Stat. 3700, related to construction of shoreline
protection projects by non-Federal interests.
§ 426i–2. National coastal data bank
(1) Establishment of data bank
Not later than 2 years after August 17, 1999,
the Secretary shall establish a national coastal
data bank containing data on the geophysical
and climatological characteristics of the shores
of the United States.
(2) Content
To the extent practicable, the national coastal
data bank shall include data regarding current
and predicted shore positions, information on
federally authorized shore protection projects,
and data on the movement of sand along the
shores of the United States, including impedi-
ments to such movement caused by natural and
manmade features.
(3) Access
The national coastal data bank shall be made
readily accessible to the public.
(Pub. L. 106–53, title II, § 215(d), Aug. 17, 1999, 113
Stat. 293.)
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 106–53, set out as a note under section
2201 of this title.
§ 426j.
Repealed.
Pub.
L.
110–114,
title
II,
§ 2037(b)(1), Nov. 8, 2007, 121 Stat. 1096
Section, Pub. L. 94–587, § 145, Oct. 22, 1976, 90 Stat.
2931; Pub. L. 99–662, title IX, § 933, Nov. 17, 1986, 100 Stat.
4197; Pub. L. 100–676, § 35, Nov. 17, 1988, 102 Stat. 4031;
Pub. L. 102–580, title II, § 207, Oct. 31, 1992, 106 Stat. 4829;
Pub. L. 106–53, title II, § 217(a), Aug. 17, 1999, 113 Stat.
294, related to placement on State beaches of sand
dredged in constructing and maintaining navigation in-
lets and channels adjacent to such beaches.
Statutory Notes and Related Subsidiaries
EXISTING PROJECTS
Pub. L. 110–114, title II, § 2037(b)(2), Nov. 8, 2007, 121
Stat. 1096, provided that: ‘‘The Secretary [of the Army]
may complete any project being carried out under sec-
tion 145 of the Water Resources Development Act of
1976 [this section] on the day before the date of enact-
ment of this Act [Nov. 8, 2007].’’
§ 426k. Five year demonstration program to tem-
porarily increase diversion of water from
Lake Michigan at Chicago, Illinois
(a) Authorization of Secretary of the Army; pur-
pose; amounts of increase; incremental ac-
complishment; effects on Illinois Waterway;
responsibilities for development, implemen-
tation, and supervision
In order to alleviate water damage on the
shoreline of Lake Michigan and others of the
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** The Secretary of the Army is authorized to investigate, study, plan, and implement structural and nonstructural measures for the prevention or mitigation of shore damages attributable to Federal navigation works and shore damage attributable to the Atlantic Intracoastal Waterway and the Gulf Intracoastal Waterway, if a non-Federal public body agrees to operate and maintain such measures, and, in the case of interests in real property acquired in conjunction with nonstructural measures, to operate and maintain the property for public purposes in accordance with regulations prescribed by the Secretary.
**(b) Cost sharing** The costs of implementing measures, including a study, shall be cost-shared in the same proportion as the cost-sharing provisions applicable to construction of the project causing the shore damage.
**(c) Requirement for specific authorization** No such project shall be initiated without specific authorization by Congress if the Federal first cost exceeds $15,000,000.
**(d) Coordination** The Secretary shall—
(1) coordinate the implementation of the measures under this section with other Federal and non-Federal shore protection projects in the same geographic area; and
(2) to the extent practicable, combine mitigation projects with other shore protection projects in the same area into a comprehensive regional project.
**(e) Reimbursement for feasibility studies** Beginning on December 16, 2016, in any case in which the Secretary implements a project under this section, the Secretary shall reimburse or credit the non-Federal interest for any amounts contributed for the study evaluating the damage in excess of the non-Federal share of the costs, as determined under subsection (b).
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 426i
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.