Browse Arkansas Code titles and sections
10 U.S.C. § 18233a — Notice and wait requirements for cer-
Federal law — U.S. Code and appendices · legal_authorities
Page 3793
TITLE 10—ARMED FORCES
§ 18233a
of existing facilities to meet the purposes of this chap-
ter’’ for ‘‘contribute to any State or Territory, Puerto
Rico, or the District of Columbia, such amounts for the
acquisition, construction, expansion, rehabilitation, or
conversion by the failure of existing facilities to meet
the purposes of this chapter’’ and ‘‘A contribution
made for an armory may not be more than 75 percent
of the cost of construction of which it is applied’’.
Subsec. (a)(6). Pub. L. 97–214, § 3(d)(2), struck out ‘‘or
Territory, Puerto Rico, or the District of Columbia’’
after ‘‘contribute to any State’’.
Subsec. (e). Pub. L. 97–214, § 10(a)(2), substituted ‘‘ar-
chitectural and engineering services and construction
design’’ for ‘‘advance planning, construction design,
and architectural services’’.
Subsec. (f). Pub. L. 97–214, § 3(a), expanded subsec. (f)
into pars. (1) and (2), and substituted provision that
legal authority to construct, expand, rehabilitate, etc.,
any facility under this section, also includes the au-
thority to expend funds for surveys, administration,
overhead, planning, and supervision incident to any
such activity and provisions that authority to acquire
real property under this section includes authority to
make surveys and to acquire interests in land (includ-
ing temporary interests) by purchase, gift, exchange of
Government-owned land, or otherwise, for provisions
that facilities authorized by subsec. (a) could not be
considered ‘‘military public works’’ under the military
construction authorization acts that repeal prior au-
thorizations for military public works.
1981—Subsec. (a)(2). Pub. L. 97–99, § 803(1), inserted ‘‘or
by the United States’’ after ‘‘or convert facilities
owned by it’’.
Subsec
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 18233a
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 1eb05f8e5eafe29821ddbae464343738020c7f7ef8bc55095a334a8a8a260349. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-c009c0d3debe7b511f2d0f28
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-18233a-notice-and-wait-requirements-for-cer--177aebd09a.md
Pages: Not recorded – Not recorded
Passage SHA-256: 185772c782dec6a06783ce9cc6bab72b066a4727ad4f02335687177047377ced
Source location: USCODE-2024-title10-subtitleE-partV-chap1803-sec18233a.pdf
Stored source content
Page 3793
TITLE 10—ARMED FORCES
§ 18233a
of existing facilities to meet the purposes of this chap-
ter’’ for ‘‘contribute to any State or Territory, Puerto
Rico, or the District of Columbia, such amounts for the
acquisition, construction, expansion, rehabilitation, or
conversion by the failure of existing facilities to meet
the purposes of this chapter’’ and ‘‘A contribution
made for an armory may not be more than 75 percent
of the cost of construction of which it is applied’’.
Subsec. (a)(6). Pub. L. 97–214, § 3(d)(2), struck out ‘‘or
Territory, Puerto Rico, or the District of Columbia’’
after ‘‘contribute to any State’’.
Subsec. (e). Pub. L. 97–214, § 10(a)(2), substituted ‘‘ar-
chitectural and engineering services and construction
design’’ for ‘‘advance planning, construction design,
and architectural services’’.
Subsec. (f). Pub. L. 97–214, § 3(a), expanded subsec. (f)
into pars. (1) and (2), and substituted provision that
legal authority to construct, expand, rehabilitate, etc.,
any facility under this section, also includes the au-
thority to expend funds for surveys, administration,
overhead, planning, and supervision incident to any
such activity and provisions that authority to acquire
real property under this section includes authority to
make surveys and to acquire interests in land (includ-
ing temporary interests) by purchase, gift, exchange of
Government-owned land, or otherwise, for provisions
that facilities authorized by subsec. (a) could not be
considered ‘‘military public works’’ under the military
construction authorization acts that repeal prior au-
thorizations for military public works.
1981—Subsec. (a)(2). Pub. L. 97–99, § 803(1), inserted ‘‘or
by the United States’’ after ‘‘or convert facilities
owned by it’’.
Subsec. (a)(6). Pub. L. 97–99, § 804, added par. (6).
Subsec. (b). Pub. L. 97–99, § 803(2), inserted provisions
that such property may be transferred to any State or
Territory, Puerto Rico, or the District of Columbia in-
cident to the expansion, rehabilitation, or conversion
of such property under subsec. (a)(2) so long as the
transfer of such property does not result in the cre-
ation of an enclave owned by a State or Territory,
Puerto Rico, or the District of Columbia within a Fed-
eral installation.
1979—Subsec. (a)(5). Pub. L. 96–125 added par. (5).
1958—Subsec. (a). Pub. L. 85–861, § 1(37), substituted
‘‘two or more reserve components’’ for ‘‘two or more of
the reserve components’’ in cl. (2), added cl. (3), and re-
designated former cl. (3) as (4).
Pub. L. 85–685, § 601(1), inserted reference to section
2233a of this title in opening provisions, and struck out
provisions which required the Secretary of Defense to
consult with the Committees on Armed Services of the
Senate and House of Representatives.
Subsec. (b). Pub. L. 85–861, § 1(38), inserted ‘‘by the
United States’’ after ‘‘property acquired’’.
Subsec. (d). Pub. L. 85–861, § 1(39), added subsec. (d).
Subsecs. (e), (f). Pub. L. 85–685, § 601(2), added subsecs.
(e) and (f).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1994 AMENDMENT
Amendment by Pub. L. 103–337 effective Dec. 1, 1994,
except as otherwise provided, see section 1691 of Pub. L.
103–337, set out as an Effective Date note under section
10001 of this title.
EFFECTIVE DATE OF 1984 AMENDMENT
Pub. L. 98–407, title VII, § 703(b), Aug. 28, 1984, 98 Stat.
1517, provided that: ‘‘The amendments made by sub-
section (a) [amending this section] shall take effect on
October 1, 1984.’’
EFFECTIVE DATE OF 1982 AMENDMENT
Amendment by Pub. L. 97–214 effective Oct. 1, 1982,
and applicable to military construction projects, and to
construction and acquisition of military family hous-
ing authorized before, on, or after such date, see sec-
tion 12(a) of Pub. L. 97–214, set out as an Effective Date
note under section 2801 of this title.
OBLIGATION OF FUNDS BEFORE JULY 1, 1958
Section 16 of Pub. L. 85–861, Sept. 2, 1958, 72 Stat. 1558,
provided that not more than $580,000,000 could be obli-
gated for the purposes of this section before July 1,
1958, but with such limitation not applicable to the ex-
penses for the leasing of property under subsec. (a)(1) of
this section.
§ 18233a. Notice and wait requirements for cer-
tain projects
(a) CONGRESSIONAL NOTIFICATION.—Except as
provided in subsection (b), an expenditure or
contribution in excess of the amount specified in
section 2805(b)(1) of this title may not be made
under section 18233 of this title for any facility
until—
(1) the Secretary of Defense has notified the
congressional defense committees of the loca-
tion, nature, and estimated cost of the facil-
ity; and
(2) a period of 21 days has elapsed after the
notification has been received by those com-
mittees or, if over sooner, a period of 14 days
has elapsed after the date on which a copy of
the notification is provided in an electronic
medium pursuant to section 480 of this title.
(b) CERTAIN EXPENDITURES OR CONTRIBUTIONS
EXEMPTED.—Subsection (a) does not apply to ex-
penditures or contributions for the following:
(1) Facilities acquired by lease.
(2) A project for a facility that has been au-
thorized by Congress, if the location and pur-
pose of the facility are the same as when au-
thorized and if, based upon bids received—
(A) the scope of work of the project, as ap-
proved by Congress, is not proposed to be re-
duced by more than 25 percent; and
(B) the current working estimate of the
cost of the project does not exceed the
amount approved for the project by more
than the lesser of the following:
(i) 25 percent.
(ii) 200 percent of the amount specified
by section 2805(a) of this title as the max-
imum amount for a minor military con-
struction project.
(3) A repair project (as that term is defined
in subsection (e) of section 2811 of this title)
that costs less than the amount specified in
subsection (d) of such section.
(Added Pub. L. 85–685, title VI, § 601(3), Aug. 20,
1958, 72 Stat. 665, § 2233a; amended Pub. L. 87–554,
title VII, § 701, July 27, 1962, 76 Stat. 243; Pub. L.
93–552, title VII, § 703, Dec. 27, 1974, 88 Stat. 1770;
Pub. L. 94–107, title VII, § 703, Oct. 7, 1975, 89
Stat. 569; Pub. L. 96–125, title VII, § 704, Nov. 26,
1979, 93 Stat. 947; Pub. L. 97–214, § 3(c)(1), July 12,
1982, 96 Stat. 169; Pub. L. 98–115, title VII, § 702,
Oct. 11, 1983, 97 Stat. 782; Pub. L. 98–407, title
VII, § 702, Aug. 28, 1984, 98 Stat. 1517; Pub. L.
100–26, § 7(f)(1), Apr. 21, 1987, 101 Stat. 281; Pub. L.
100–180, div. B, subdiv. 3, title I, § 2304(a), Dec. 4,
1987, 101 Stat. 1215; Pub. L. 102–190, div. B, title
XXVIII, § 2804, Dec. 5, 1991, 105 Stat. 1537; renum-
bered § 18233a and amended Pub. L. 103–337, div.
A, title XVI, § 1664(b)(2), (5), Oct. 5, 1994, 108 Stat.
3010;
Pub.
L.
104–106,
div.
A,
title
XV,
§ 1502(a)(10), Feb. 10, 1996, 110 Stat. 503; Pub. L.
104–201, div. B, title XXVIII, § 2801(b), (c), Sept.
23, 1996, 110 Stat. 2787; Pub. L. 106–65, div. A, title
Page 3794
TITLE 10—ARMED FORCES
§ 18233b
X, § 1067(1), div. B, title XXVIII, § 2806, Oct. 5,
1999, 113 Stat. 774, 850; Pub. L. 106–398, § 1 [[div.
A], title X, § 1087(a)(22)], Oct. 30, 2000, 114 Stat.
1654, 1654A–291; Pub. L. 108–375, div. B, title
XXVIII, § 2808(a), Oct. 28, 2004, 118 Stat. 2124;
Pub. L. 112–81, div. B, title XXVIII, § 2802(c)(3),
Dec. 31, 2011, 125 Stat. 1685; Pub. L. 114–92, div. B,
title XXVIII, § 2801, Nov. 25, 2015, 129 Stat. 1168.)
Editorial Notes
AMENDMENTS
2015—Subsec. (a). Pub. L. 114–92, § 2801(1), substituted
‘‘in excess of the amount specified in section 2805(b)(1)
of this title’’ for ‘‘in an amount in excess of $750,000’’ in
introductory provisions.
Subsec. (b)(3). Pub. L. 114–92, § 2801(2), substituted
‘‘subsection (e) of section 2811 of this title) that costs
less than the amount specified in subsection (d) of such
section’’ for ‘‘section 2811(e) of this title) that costs less
than $7,500,000’’.
2011—Subsec. (b)(2)(B)(ii). Pub. L. 112–81 substituted
‘‘section 2805(a)’’ for ‘‘section 2805(a)(2)’’.
2004—Pub. L. 108–375 amended section generally, sub-
stituting provisions relating to notice and wait require-
ments for certain projects for provisions relating to
limitation on certain projects and authority to carry
out small projects with operation and maintenance
funds.
2000—Subsec. (b)(1). Pub. L. 106–398, § 1 [[div. A], title
X, § 1087(a)(22)(A)], substituted ‘‘section 2805(c)(1)(A)’’
for ‘‘section 2805(c)(1)’’.
Subsec. (b)(2). Pub. L. 106–398, § 1 [[div. A], title X,
§ 1087(a)(22)(B)], substituted ‘‘section 2805(c)(1)(B)’’ for
‘‘section 2805(c)(2)’’.
1999—Subsec. (a)(1). Pub. L. 106–65, § 1067(1), sub-
stituted ‘‘and the Committee on Armed Services’’ for
‘‘and the Committee on National Security’’.
Subsec. (a)(2)(C). Pub. L. 106–65, § 2806(a), added sub-
par. (C).
Subsec. (b). Pub. L. 106–65, § 2806(b), amended subsec.
(b) generally. Prior to amendment, subsec. (b) read as
follows: ‘‘Under such regulations as the Secretary of
Defense may prescribe, a project authorized under sec-
tion 18233(a) of this title that costs $500,000 or less may
be carried out with funds available for operations and
maintenance.’’
1996—Subsec. (a)(1). Pub. L. 104–201, § 2801(c), sub-
stituted ‘‘$1,500,000’’ for ‘‘$400,000’’.
Pub. L. 104–106 substituted ‘‘the Committee on Armed
Services and the Committee on Appropriations of the
Senate and the Committee on National Security and
the Committee on Appropriations of the’’ for ‘‘the Com-
mittees on Armed Services and on Appropriations of
the Senate and’’.
Subsec. (b). Pub. L. 104–201, § 2801(b), substituted
‘‘$500,000’’ for ‘‘$300,000’’.
1994—Pub. L. 103–337, § 1664(b)(2), renumbered section
2233a of this title as this section.
Subsec. (a)(1). Pub. L. 103–337, § 1664(b)(5)(A), sub-
stituted ‘‘18233’’ for ‘‘2233’’.
Subsec. (b). Pub. L. 103–337, § 1664(b)(5)(B), substituted
‘‘18233(a)’’ for ‘‘2233(a)’’.
1991—Subsec.
(b).
Pub.
L.
102–190
substituted
‘‘$300,000’’ for ‘‘$200,000’’.
1987—Subsec. (a)(2)(B)(ii)(II). Pub. L. 100–26 sub-
stituted ‘‘specified by section 2805(a)(2) of this title’’ for
‘‘specified by law’’.
Subsec. (b). Pub. L. 100–180 substituted ‘‘$200,000’’ for
‘‘$100,000’’.
1984—Subsec. (b). Pub. L. 98–407 substituted ‘‘$100,000’’
for ‘‘$50,000’’.
1983—Subsec.
(a)(1).
Pub.
L.
98–115
substituted
‘‘$400,000’’ for ‘‘$200,000’’.
1982—Pub. L. 97–214 substituted ‘‘Limitation on cer-
tain projects; authority to carry out small projects
with operation and maintenance funds’’ for ‘‘Limita-
tion’’ as section catchline and completely revised text.
Before such revision section had provided that no ex-
penditure or contribution of more than $175,000 could be
made under section 2233 of this title for any facility
until after the expiration of thirty days from the date
upon which the Secretary of Defense or his designee no-
tified the Senate and the House of Representatives of
the location, nature, and estimated cost of such facil-
ity, but that such requirement did not apply to facili-
ties acquired by lease, facilities acquired, constructed,
expanded, rehabilitated, converted, or equipped to re-
store or replace facilities damaged or destroyed, where
the Senate and the House of Representatives had been
notified of that action, and that, under such regula-
tions as the Secretary of Defense might prescribe, any
project authorized pursuant to section 2233(a) which did
not cost more than $50,000 could be accomplished from
appropriations available for maintenance and oper-
ations.
1979—Par. (1). Pub. L. 96–125 substituted ‘‘$175,000’’ for
‘‘$100,000’’.
1975—Par. (2). Pub. L. 94–107 substituted ‘‘$50,000’’ for
‘‘$25,000’’.
1974—Par. (1). Pub. L. 93–552 substituted ‘‘$100,000’’ for
‘‘$850,000’’.
1962—Pub. L. 87–554 designated existing provisions as
par. (1), substituted ‘‘until after the expiration of thir-
ty days from the date upon which the Secretary of De-
fense or his designee notifies the Senate and the House
of Representatives of the location, nature, and esti-
mated cost of such facility’’ for ‘‘that has not been au-
thorized by a law authorizing appropriations for spe-
cific facilities for reserve forces’’, and added par. (2).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1994 AMENDMENT
Amendment by Pub. L. 103–337 effective Dec. 1, 1994,
except as otherwise provided, see section 1691 of Pub. L.
103–337, set out as an Effective Date note under section
10001 of this title.
EFFECTIVE DATE OF 1987 AMENDMENT
Pub. L. 100–180, div. B, subdiv. 3, title I, § 2304(b), Dec.
4, 1987, 101 Stat. 1215, provided that: ‘‘The amendment
made by subsection (a) [amending this section] shall
apply to projects authorized under section 2233(a) [now
18233(a)] of title 10, United States Code, for which con-
tracts are entered into on or after the date of the en-
actment of this Act [Dec. 4, 1987].’’
EFFECTIVE DATE OF 1984 AMENDMENT
Pub. L. 98–407, title VII, § 702, Aug. 28, 1984, 98 Stat.
1517, provided that the amendment made by that sec-
tion is effective Oct. 1, 1984.
EFFECTIVE DATE OF 1983 AMENDMENT
Pub. L. 98–115, title VII, § 702, Oct. 11, 1983, 97 Stat.
782, provided that the amendment made by that section
is effective Oct. 1, 1983.
EFFECTIVE DATE OF 1982 AMENDMENT
Amendment by Pub. L. 97–214 effective Oct. 1, 1982,
and applicable to military construction projects, and to
construction and acquisition of military family hous-
ing authorized before, on, or after such date, see sec-
tion 12(a) of Pub. L. 97–214, set out as an Effective Date
note under section 2801 of this title.
§ 18233b. Authority to carry out small projects
with operation and maintenance funds
Under such regulations as the Secretary of De-
fense may prescribe, the Secretary may expend,
from appropriations available for operation and
maintenance, amounts necessary to carry out
any project authorized under section 18233(a) of
this title that costs not more than the amount
specified in section 2805(c) of this title.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Congressional Notification.—** Except as provided in subsection (b), an expenditure or contribution in excess of the amount specified in [section 2805(b)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2805/b/1&num=0&edition=prelim) may not be made under [section 18233 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section18233&num=0&edition=prelim) for any facility until—
(1) the Secretary of Defense has notified the congressional defense committees of the location, nature, and estimated cost of the facility; and
(2) a period of 21 days has elapsed after the notification has been received by those committees or, if over sooner, a period of 14 days has elapsed after the date on which a copy of the notification is provided in an electronic medium pursuant to [section 480 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section480&num=0&edition=prelim).
**(b) Certain Expenditures or Contributions Exempted.—** Subsection (a) does not apply to expenditures or contributions for the following:
(1) Facilities acquired by lease.
(2) A project for a facility that has been authorized by Congress, if the location and purpose of the facility are the same as when authorized and if, based upon bids received—
(A) the scope of work of the project, as approved by Congress, is not proposed to be reduced by more than 25 percent; and
(B) the current working estimate of the cost of the project does not exceed the amount approved for the project by more than the lesser of the following:
(i) 25 percent.
(ii) 200 percent of the amount specified by [section 2805(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-sect
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 18233a
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.